CN212176633U - Lime pay-off for construction engineering - Google Patents

Lime pay-off for construction engineering Download PDF

Info

Publication number
CN212176633U
CN212176633U CN202020467213.6U CN202020467213U CN212176633U CN 212176633 U CN212176633 U CN 212176633U CN 202020467213 U CN202020467213 U CN 202020467213U CN 212176633 U CN212176633 U CN 212176633U
Authority
CN
China
Prior art keywords
diaphragm
ash storage
lime
storage bucket
limiting plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020467213.6U
Other languages
Chinese (zh)
Inventor
王海东
翟乃斐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Zhenyu Construction Project Management Co ltd
Original Assignee
Shandong Zhenyu Construction Project Management Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Zhenyu Construction Project Management Co ltd filed Critical Shandong Zhenyu Construction Project Management Co ltd
Priority to CN202020467213.6U priority Critical patent/CN212176633U/en
Application granted granted Critical
Publication of CN212176633U publication Critical patent/CN212176633U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Processing Of Solid Wastes (AREA)

Abstract

The utility model provides a lime pay-off for construction engineering mainly relates to construction engineering construction field. The utility model provides a lime pay-off for construction engineering, includes the diaphragm, the diaphragm bottom surface sets up the ash storage bucket, the ash storage bucket top surface runs through the diaphragm and communicates with each other with the external world, diaphragm bottom surface four corners all is equipped with vertical bracing piece, diaphragm one side is equipped with horizontal mounting panel, the mounting panel top surface is equipped with the arc limiting plate. The beneficial effects of the utility model reside in that: the utility model discloses a set up arc limiting plate, place the limit line in arc limiting plate, when carrying out the lime unwrapping wire, through observing the distance between limit line and the arc limiting plate, and then guarantee the precision of lime unwrapping wire, deviate from the unwrapping wire route when having avoided the unwrapping wire, practiced thrift the resource, improved the efficiency of construction, set up spiral stirring board in the ash storage bucket simultaneously, can avoid the lime to block up the ash storage bucket, guaranteed the continuation of construction.

Description

Lime pay-off for construction engineering
Technical Field
The utility model relates to a construction engineering construction field specifically is a lime pay-off for construction engineering.
Background
The construction paying-off aims to ensure that the construction engineering is safely and smoothly carried out according to the requirement of planning examination and approval by the prior inspection of the positioning and lofting of the construction engineering, simultaneously, the municipal facilities are perfected, the environmental quality is improved, and the damage to the benefits of adjacent property right main bodies is avoided
At present, when lime is used for construction engineering for paying off, a multi-worker trolley is used for paying off, due to the fact that different constructors have different experiences, deviation easily occurs during paying off, paying off is caused to be irregular, the using amount of lime is increased easily, resource waste is caused, and meanwhile during paying off, the lime easily causes blockage, the paying off cannot be continuously performed, construction time is prolonged, and construction efficiency is reduced.
SUMMERY OF THE UTILITY MODEL
For solving prior art's is not enough, the utility model provides a lime pay-off for construction engineering, the utility model discloses a set up arc limiting plate, place the limit line in arc limiting plate, when carrying out the lime unwrapping wire, through observing the distance between limit line and the arc limiting plate, and then guarantee the precision of lime unwrapping wire, deviate from the unwrapping wire route when having avoided the unwrapping wire, practiced thrift the resource, improved the efficiency of construction, set up spiral stirring board simultaneously in the ash storage fill, can avoid the lime to block up the ash storage fill, guaranteed the continuation of construction.
The utility model discloses a realize above-mentioned purpose, realize through following technical scheme:
the utility model provides a lime pay-off for construction engineering, includes the diaphragm, the diaphragm bottom surface sets up the ash storage bucket, the ash storage bucket top surface runs through the diaphragm and communicates with each other with the external world, ash storage bucket and diaphragm fixed connection, diaphragm bottom surface four corners all is equipped with vertical bracing piece, bracing piece and diaphragm fixed connection, diaphragm one side is equipped with horizontal mounting panel, mounting panel and diaphragm fixed connection, the mounting panel top surface is equipped with the arc limiting plate, arc limiting plate and mounting panel fixed connection, arc limiting plate one side is equipped with the opening.
Further, the inside upper end of ash storage bucket is equipped with the bearing, the bearing is through several evenly distributed's connecting rod and ash storage bucket fixed connection, states to be equipped with the montant in the bearing, the montant bottom is equipped with the spiral and stirs the board, spiral stirs board and montant fixed connection.
Furthermore, two inclined first push rods are arranged in front of the transverse plate and fixedly connected with the transverse plate, and the top ends of the two first push rods are fixedly connected through a horizontal second push rod.
Furthermore, the periphery of the second push rod is provided with an elastic protecting sleeve, and the elastic protecting sleeve is fixedly connected with the second push rod.
Furthermore, every bracing piece bottom surface all be equipped with the universal wheel, universal wheel and bracing piece fixed connection, the universal wheel has the brake function.
Furthermore, a baffle plate is arranged at the bottom end of the ash storage hopper and can be pulled out of the ash storage hopper.
Contrast prior art, the beneficial effects of the utility model are that:
the utility model discloses a set up arc limiting plate, place the limit line in arc limiting plate, when carrying out the lime unwrapping wire, through observing the distance between limit line and the arc limiting plate, and then guarantee the precision of lime unwrapping wire, deviate from the unwrapping wire route when having avoided the unwrapping wire, practiced thrift the resource, improved the efficiency of construction, set up spiral stirring board in the ash storage bucket simultaneously, can avoid the lime to block up the ash storage bucket, guaranteed the continuation of construction.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a left side view of FIG. 1;
reference numerals shown in the drawings: 1. a transverse plate; 2. a dust storage hopper; 3. a support bar; 4. mounting a plate; 5. an arc-shaped limiting plate; 6. an opening; 7. a connecting rod; 8. a vertical rod; 9. a spiral stirring plate; 10. a first push rod; 11. a second push rod; 12. an elastic protective sleeve; 13. a universal wheel; 14. and a baffle plate.
Detailed Description
The present invention will be further described with reference to the accompanying drawings and specific embodiments. It should be understood that these examples are for illustrative purposes only and are not intended to limit the scope of the present invention. Furthermore, it should be understood that various changes or modifications of the present invention may be made by those skilled in the art after reading the teachings of the present invention, and these equivalents also fall within the scope defined in the present application.
As shown in fig. 1, a lime pay-off for construction engineering, including diaphragm 1, 1 bottom surface of diaphragm sets up ash storage bucket 2, 2 top surfaces of ash storage bucket run through diaphragm 1 and communicate with each other with the external world, ash storage bucket 2 and 1 fixed connection of diaphragm, 1 bottom surface four corners of diaphragm all is equipped with vertical bracing piece 3, bracing piece 3 and 1 fixed connection of diaphragm, diaphragm 1 one side is equipped with horizontal mounting panel 4, mounting panel 4 and 1 fixed connection of diaphragm, 4 top surfaces of mounting panel are equipped with arc limiting plate 5, arc limiting plate 5 and 4 fixed connection of mounting panel, arc limiting plate 5 one side is equipped with opening 6.
Specifically, the inside upper end of ash storage bucket 2 is equipped with the bearing, the bearing through several evenly distributed's connecting rod 7 and ash storage bucket 2 fixed connection, state and be equipped with montant 8 in the bearing, 8 bottoms of montant are equipped with spiral stirring board 9, spiral stirring board 9 and montant 8 fixed connection. Lime moves down under self action of gravity, drives spiral stirring board 9 and rotates, and spiral stirring board 9 rotates and stirs near lime, makes the lime produce and flows, and what can be smooth flows out from ash storage bucket 2, has avoided lime jam ash storage bucket 2.
Specifically, two inclined first push rods 10 are arranged in front of the transverse plate 1, the first push rods 10 are fixedly connected with the transverse plate 1, and the top ends of the two first push rods 10 are fixedly connected through a horizontal second push rod 11. By arranging the first push rod 10 and the second push rod 12, an operator can apply force conveniently to push the device.
Specifically, the periphery of the second push rod 11 is provided with an elastic protection sleeve 12, and the elastic protection sleeve 12 is fixedly connected with the second push rod 11. Elastic protection sleeve 12 has the guard action to second push rod 11, can avoid operating personnel hand to rub second push rod 11 for a long time, has increased second push rod 11's life, has avoided second push rod 11 to cause wearing and tearing to operating personnel hand simultaneously, has improved operating personnel hand comfort level.
Specifically, every 3 bottom surfaces of bracing piece all be equipped with universal wheel 13, universal wheel 13 and 3 fixed connection of bracing piece, universal wheel 13 has the brake function. Through the rolling of universal wheel 13, be convenient for remove this device, saved operating personnel physical power.
Specifically, a baffle plate 14 is arranged at the bottom end of the ash storage hopper 2, and the baffle plate 14 can be pulled out of the ash storage hopper 2. The baffle plate 14 can block lime, and when the line is not required to be paid off, the baffle plate 14 is inserted into the bottom of the ash storage hopper 2, so that the lime stops flowing out.
Example (b):
when the device is used, firstly, limiting lines are pulled up at two end points needing lime paying off, the two points determine a straight line, the limiting lines are clamped into the arc-shaped limiting plates 5 through the openings 6, lime is added into the ash storage hopper 2, the transverse plate 1 is pushed to enable the transverse plate 1 to move forwards, the lime flows out from the bottom ends of the ash storage hopper 2, paying off is carried out, in the moving process, an operator judges whether paying off deviates or not by observing the distance between the limiting lines and the arc-shaped limiting plates 5, and the limiting lines are always located in the middle positions of the arc-shaped limiting plates 5 by adjusting the transverse plate 1, namely the limiting lines are not in contact with the arc-shaped limiting plates 5, so that the standardization of paying off is ensured; the utility model discloses a set up arc limiting plate, place the limit line in arc limiting plate, when carrying out the lime unwrapping wire, through observing the distance between limit line and the arc limiting plate, and then guarantee the precision of lime unwrapping wire, deviate from the unwrapping wire route when having avoided the unwrapping wire, practiced thrift the resource, improved the efficiency of construction, set up spiral stirring board in the ash storage bucket simultaneously, can avoid the lime to block up the ash storage bucket, guaranteed the continuation of construction.
Finally, it should be noted that: the above examples are only intended to illustrate the technical solution of the present invention, but not to limit it; although the present invention has been described in detail with reference to the foregoing embodiments, it will be understood by those of ordinary skill in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; and such modifications or substitutions do not depart from the spirit and scope of the corresponding technical solutions of the embodiments of the present invention.

Claims (6)

1. The utility model provides a lime pay-off for construction engineering, includes diaphragm (1), its characterized in that: diaphragm (1) bottom surface sets up ash storage bucket (2), ash storage bucket (2) top surface runs through diaphragm (1) and communicates with each other with the external world, ash storage bucket (2) and diaphragm (1) fixed connection, diaphragm (1) bottom surface four corners all is equipped with vertical bracing piece (3), bracing piece (3) and diaphragm (1) fixed connection, diaphragm (1) one side is equipped with horizontal mounting panel (4), mounting panel (4) and diaphragm (1) fixed connection, mounting panel (4) top surface is equipped with arc limiting plate (5), arc limiting plate (5) and mounting panel (4) fixed connection, arc limiting plate (5) one side is equipped with opening (6).
2. The lime line releasing device for construction works as set forth in claim 1, wherein: the ash storage bucket is characterized in that a bearing is arranged at the upper end inside the ash storage bucket (2), the bearing is fixedly connected with the ash storage bucket (2) through a plurality of uniformly distributed connecting rods (7), a vertical rod (8) is arranged in the bearing, a spiral stirring plate (9) is arranged at the bottom end of the vertical rod (8), and the spiral stirring plate (9) is fixedly connected with the vertical rod (8).
3. The lime line releasing device for construction works as set forth in claim 1, wherein: two inclined first push rods (10) are arranged in front of the transverse plate (1), the first push rods (10) are fixedly connected with the transverse plate (1), and the top ends of the two first push rods (10) are fixedly connected through a horizontal second push rod (11).
4. The lime line releasing device for construction works as set forth in claim 3, wherein: and an elastic protecting sleeve (12) is arranged on the periphery of the second push rod (11), and the elastic protecting sleeve (12) is fixedly connected with the second push rod (11).
5. The lime line releasing device for construction works as set forth in claim 1, wherein: every bracing piece (3) bottom surface all be equipped with universal wheel (13), universal wheel (13) and bracing piece (3) fixed connection, universal wheel (13) have the brake function.
6. The lime line releasing device for construction works as set forth in claim 1, wherein: the bottom end of the ash storage hopper (2) is provided with a baffle plate (14), and the baffle plate (14) can be pulled out from the ash storage hopper (2).
CN202020467213.6U 2020-04-02 2020-04-02 Lime pay-off for construction engineering Expired - Fee Related CN212176633U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020467213.6U CN212176633U (en) 2020-04-02 2020-04-02 Lime pay-off for construction engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020467213.6U CN212176633U (en) 2020-04-02 2020-04-02 Lime pay-off for construction engineering

Publications (1)

Publication Number Publication Date
CN212176633U true CN212176633U (en) 2020-12-18

Family

ID=73769281

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020467213.6U Expired - Fee Related CN212176633U (en) 2020-04-02 2020-04-02 Lime pay-off for construction engineering

Country Status (1)

Country Link
CN (1) CN212176633U (en)

Similar Documents

Publication Publication Date Title
CN102377115B (en) Overhauling platform of breaker
CN212176633U (en) Lime pay-off for construction engineering
CN101920920A (en) Movable small mould lifting machine
CN207311525U (en) A kind of hydraulic engineering material handling device
CN205971398U (en) Liftable formula assembling table car
CN204212065U (en) Bridge crossing anticollision barrier punching block erection equipment
CN207030805U (en) Purlin car is moved in portable maintenance for sack cleaner
CN202163829U (en) Silicon sheet carrying device
CN202729628U (en) Hoisting device
CN208396233U (en) A kind of form floor of the antistatic raised floor for toilet
CN209191996U (en) A kind of engineering construction plate brick breakage-proof haulage equipment
CN112067101A (en) Truck scale weighing platform with dust removal function
CN207732403U (en) A kind of novel cover plate for cable trench bridge
CN211465344U (en) Trash remover trades a appurtenance
CN203666708U (en) Balance weight cart and bearing tank matched with balance weight cart
CN220034214U (en) Anti-fouling anaerobic reaction tower water distribution device
CN212654355U (en) Fixing device for connecting pin of battery locomotive
CN221460952U (en) Sliding device suitable for narrow space
CN209209934U (en) A kind of waste plastics charging hoister
CN218037109U (en) Health management test bed for three-electric system of new energy automobile
CN210561732U (en) Movable type bent cap support
CN207332240U (en) A kind of novel wall apparatus of plastering for interior decoration
CN213531348U (en) Waste heat boiler overhauls platform
CN218841598U (en) Turnover plate material pouring elevator
CN212334405U (en) Automatic dust cleaning and collecting device for bridge crane rail

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201218

CF01 Termination of patent right due to non-payment of annual fee