CN212176521U - Steel-pipe rack chute of easy dismouting is marked time - Google Patents

Steel-pipe rack chute of easy dismouting is marked time Download PDF

Info

Publication number
CN212176521U
CN212176521U CN201922282163.4U CN201922282163U CN212176521U CN 212176521 U CN212176521 U CN 212176521U CN 201922282163 U CN201922282163 U CN 201922282163U CN 212176521 U CN212176521 U CN 212176521U
Authority
CN
China
Prior art keywords
connecting piece
steel pipe
footboard
bowl
detained
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922282163.4U
Other languages
Chinese (zh)
Inventor
王俊元
余金霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Corp Ltd
Original Assignee
MCC Tiangong Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Corp Ltd filed Critical MCC Tiangong Group Corp Ltd
Priority to CN201922282163.4U priority Critical patent/CN212176521U/en
Application granted granted Critical
Publication of CN212176521U publication Critical patent/CN212176521U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Ladders (AREA)

Abstract

The utility model provides a steel pipe frame ramp of easy dismouting is marked time, including footboard, first connecting piece and second connecting piece, the footboard rotates with first connecting piece to be connected, first connecting piece can dismantle the link with the steel pipe, the footboard has two at least, two adjacent footboards all can dismantle the link with the second connecting piece, the footboard both sides are equipped with the mounting hole with first connecting piece, second connecting piece looks adaptation, first connecting piece fixed mounting is on the footboard, first connecting piece can dismantle the link on the steel pipe simultaneously, accomplish the fixed of footboard and the steel pipe of ramp, simultaneously, the second connecting piece accomplishes the fixed and connection between the adjacent footboard, simultaneously as the atress component in the later stage use, first connecting piece connects fixed steel pipe and mark time respectively, connect through the second connecting piece between the adjacent mark time, can accomplish the installation of whole mark time, dismantle also very easily, saves a large amount of labor and machinery, and simultaneously, each part is very convenient to store and transport and is convenient to recycle.

Description

Steel-pipe rack chute of easy dismouting is marked time
Technical Field
The utility model belongs to the technical field of construction steel pipe scaffold frame, especially, relate to a steel-pipe frame ramp of easy dismouting is marked time.
Background
The scaffold is a working platform which is erected for ensuring that each construction process is smoothly carried out. Steel pipe scaffolding is often used, which is typically provided with construction chutes. The construction chute is a special way for constructors to go up and down, and the constructors can safely walk horizontally no matter the constructors go to an operation floor, a floor and an outer scaffold, so that the safe and convenient effect of improving the walking of the constructors is achieved. If necessary, the construction chute is also a fire protection channel for fire accidents. Through the practice of a plurality of projects, the construction inclined channel can improve the safety protection level, simultaneously greatly improve the ascending and descending speed of constructors, and prevent the occurrence of safety accidents and fire-fighting accident hidden dangers.
At present the construction chute commonly used mostly is on-the-spot stepping of making with the reinforcement welding, perhaps directly with climbing a net piece, perhaps with the footboard ladder, and the first kind is very nonstandard, and has great potential safety hazard, and the phenomenon of skidding appears easily in the in-process about the second kind constructor, has the potential safety hazard, and the third kind, the practicality is poor, and the installation takes time and takes a lot of work with dismantling. Therefore, the technical problem to be solved at present is to provide a steel pipe scaffold chute step which is easy to disassemble and assemble, high in safety and capable of being recycled.
Disclosure of Invention
The utility model discloses make the improvement to the problem that above-mentioned prior art exists, promptly the utility model provides an easy dismouting, the security is high, steel pipe scaffold ramp of circulated use is marked time.
The technical problem is solved, the utility model provides a steel-pipe frame chute of easy dismouting is marked time, including footboard, first connecting piece and second connecting piece, the footboard with first connecting piece rotates to be connected, first connecting piece can be dismantled with the steel pipe and link, footboard 1 has two at least, and two adjacent footboards all can be dismantled with the second connecting piece and link, 1 both sides of footboard are equipped with the mounting hole with first connecting piece, second connecting piece looks adaptation.
Preferably, first connecting piece includes that left bowl is detained, right bowl is detained and the pivot, left side bowl detain with right bowl is detained one end and is rotated the connection, and the other end passes through bolted connection, and the pivot setting is detained at left bowl, is equipped with the screw thread in the pivot, passes through the nut with the footboard and is connected, left side bowl is detained, right bowl is detained the cooperation bolt and can be fixed on the steel pipe.
Preferably, the second connecting member comprises a connecting rod and a fixing bolt, and the connecting rod connects the adjacent pedals together through the fixing bolt.
Preferably, a plurality of adjusting holes matched with the fixing bolts are formed in the two ends of the connecting rod.
Preferably, the pedal is provided with through holes or a mesh.
Preferably, the bottom surface of the pedal is provided with a back rib.
Preferably, the back rib is provided in plurality in both the transverse direction and the longitudinal direction.
Through the technical scheme, can directly do an bracing with steel pipe and fastener between steel pipe scaffold's two-layer, fixed steel pipe is connected respectively to first connecting piece and marks time, connects through the second connecting piece between the adjacent marking time, can accomplish the whole installation of marking time, dismantles also very easily, practices thrift a large amount of manual works, machinery, and simultaneously, each spare part is stored and is transported very conveniently, the recycling of being convenient for.
Drawings
Fig. 1 is a schematic structural view of an easily disassembled and assembled steel pipe frame ramp step according to an embodiment of the present invention;
fig. 2 is a side view of an easily disassembled ramp of a steel pipe frame according to an embodiment of the present invention;
fig. 3 is a top view of the easily detachable steel pipe frame ramp step according to the embodiment of the present invention;
fig. 4 is a bottom view of the easy-to-mount steel pipe frame ramp step of the embodiment of the present invention;
in the figure:
1. pedal 2, first connecting piece 3, second connecting piece
31. Connecting rod 32, fixing bolt 33 and adjusting hole
4. Net piece 5, back rib 6, steel pipe.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. It is to be understood that the embodiments described are only some embodiments of the invention, and not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the embodiments of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, which are only for convenience of describing the embodiments of the present invention and simplifying the description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the embodiments of the present invention.
As shown in fig. 1 to 4, the utility model provides a steel-pipe frame ramp of easy dismouting is marked time, including footboard 1, first connecting piece 2 and second connecting piece 3, footboard 1 rotates with first connecting piece 2 to be connected, and first connecting piece 2 can dismantle with steel pipe 6 and link, and footboard 1 has two at least, and two adjacent footboard 1 all can dismantle with second connecting piece 3 and link, and footboard 1 both sides are equipped with the mounting hole with first connecting piece 2, 3 looks adaptations of second connecting piece. Specifically, first connecting piece 2 fixed mounting can be on footboard 1, and first connecting piece can be dismantled simultaneously and connect on steel pipe 6, accomplishes footboard 1 and the fixed of the steel pipe 6 of chute, and simultaneously, second connecting piece 3 accomplishes the fixed of adjacent footboard 1 between and is connected, as the atress component in the later stage use simultaneously.
The preferred scheme, first connecting piece 2 includes that left bowl is detained, right bowl is detained and the pivot, left side bowl is detained and the one end rotation connection that right bowl was detained, and is concrete, through axle rotation connection, the other end passes through bolted connection, left side bowl is detained, right bowl is detained and is cooperated the bolt and can fix on steel pipe 6, and the bolt is screwed up, and left side bowl is detained, right bowl is detained and is not removing 6 straining steel pipe, and the bolt loosens, accomplishes the dismantlement operation of 2 remaining steel pipes of first connecting piece 6, the pivot sets up left side bowl is detained, be equipped with the external screw thread in the pivot, pass through the nut with footboard 1 and be connected, and is concrete two nuts are disposed to the pivot, two the nut is tightened up the footboard through the bolt hole.
Preferably, the second connecting member 3 comprises a connecting rod 31 and a fixing bolt 32, and the connecting rod 31 connects the adjacent pedals 1 together through the fixing bolt 32. Preferably, the connecting rod is made of steel or alloy materials, is in a long strip shape, and is fixedly connected between every two adjacent pedals 1 through the second connecting piece 3.
In a further preferred scheme, a plurality of adjusting holes 33 matched with the fixing bolts 32 are formed in two ends of the connecting rod 31, and the angle of the pedal 1 is adjusted by selecting different adjusting holes 33 to fix, so that each pedal 1 is guaranteed to be in a horizontal state.
Preferably, the pedal 1 is provided with through holes or meshes 4, so that the weight of the pedal 1 is reduced, the labor intensity of installation and construction is reduced, and the friction force between the pedal and the sole is increased.
Preferably, the bottom surface of the pedal 1 is provided with a back rib 5, which can strengthen the strength and rigidity of the pedal 1. In a further preferred embodiment, the back rib 5 is provided in plurality in both the transverse direction and the longitudinal direction.
Through the technical scheme, can directly do an bracing with steel pipe and fastener between steel pipe scaffold's two-layer, fixed steel pipe is connected respectively to first connecting piece and marks time, connects through the second connecting piece between the adjacent marking time, can accomplish the whole installation of marking time, dismantles also very easily, practices thrift a large amount of manual works, machinery, and simultaneously, each spare part is stored and is transported very conveniently, the recycling of being convenient for.
The embodiments of the present invention have been described in detail, but the description is only for the preferred embodiments of the present invention and should not be construed as limiting the scope of the present invention. All the equivalent changes and improvements made according to the application scope of the present invention should still fall within the patent coverage of the present invention.

Claims (7)

1. The utility model provides a steel-pipe frame chute of easy dismouting is marked time which characterized in that: including footboard (1), first connecting piece (2) and second connecting piece (3), footboard (1) with first connecting piece (2) rotate to be connected, first connecting piece can be dismantled with the steel pipe and be linked, footboard (1) has at least two, and two adjacent footboards all can be dismantled with second connecting piece (3) and be linked, footboard (1) both sides are equipped with the mounting hole with first connecting piece, second connecting piece looks adaptation.
2. The easily disassembled and assembled steel pipe frame chute step as claimed in claim 1, wherein: first connecting piece (2) are detained including left bowl, right bowl and pivot, left side bowl detain with right bowl is detained one end and is rotated the connection, and the other end passes through bolted connection, and the pivot setting is detained at left bowl, is equipped with the screw thread in the pivot, passes through the nut with footboard (1) and is connected, left side bowl is detained, right bowl is detained the cooperation bolt and can be fixed on the steel pipe.
3. The easily disassembled and assembled steel pipe frame chute step as claimed in claim 1, wherein: the second connecting piece (3) comprises a connecting rod (31) and a fixing bolt (32), and the connecting rod (31) connects the adjacent pedals (1) together through the fixing bolt (32).
4. The easily disassembled and assembled steel pipe frame chute step as claimed in claim 3, wherein: and a plurality of adjusting holes (33) matched with the fixing bolts (32) are formed in the two ends of the connecting rod.
5. The easily disassembled and assembled steel pipe frame chute step as claimed in claim 1, wherein: the pedal (1) is provided with a through hole or a net piece (4).
6. The easily disassembled and assembled steel pipe frame chute step as claimed in claim 5, wherein: the bottom surface of the pedal (1) is provided with a back rib (5).
7. The easily disassembled and assembled steel pipe frame chute step as claimed in claim 6, wherein: the back ribs (5) are arranged in a plurality of transverse and longitudinal directions.
CN201922282163.4U 2019-12-18 2019-12-18 Steel-pipe rack chute of easy dismouting is marked time Active CN212176521U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922282163.4U CN212176521U (en) 2019-12-18 2019-12-18 Steel-pipe rack chute of easy dismouting is marked time

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922282163.4U CN212176521U (en) 2019-12-18 2019-12-18 Steel-pipe rack chute of easy dismouting is marked time

Publications (1)

Publication Number Publication Date
CN212176521U true CN212176521U (en) 2020-12-18

Family

ID=73764319

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922282163.4U Active CN212176521U (en) 2019-12-18 2019-12-18 Steel-pipe rack chute of easy dismouting is marked time

Country Status (1)

Country Link
CN (1) CN212176521U (en)

Similar Documents

Publication Publication Date Title
US20150240505A1 (en) Safety Barrier Netting System
CN109339458B (en) Multifunctional trolley for binding and installing cast-in-situ beam reinforcement cage
CN110409782B (en) Building platform of adjustable interior decoration building
US7624843B2 (en) Multiple task working platform
CN201730338U (en) Strut for supporting polyphenyl foam formwork walls
CN212176521U (en) Steel-pipe rack chute of easy dismouting is marked time
CN208072912U (en) A kind of Easy opened scaffold that construction site auxiliary is built
CN210239090U (en) Movable operating platform
CN108385990A (en) Assembled type platform
CN210947854U (en) Support frame for steel structure construction with good stability
CN209817295U (en) Structure is found to assembled building top layer eaves gutter
JP2010059614A (en) Scaffold for construction work
CN111519891A (en) Anchor ring buckling type rigid outer frame wall connecting piece and construction method thereof
CN205777416U (en) Ladder scaffolding
CN213539818U (en) Modular square tube safety ladder cage
CN205936370U (en) Module cat ladder that can disassemble
CN213143807U (en) Climbing equipment for exterior wall decoration
CN206971679U (en) A kind of safe anti-falling scaffold
CN111075175A (en) Scaffold for architectural decoration
CN211597638U (en) Building scaffold convenient to remove
CN201245964Y (en) Moving platform
JP4533723B2 (en) Auxiliary handrail for temporary staircase for slope
CN219710931U (en) Flower frame beam construction operation platform
CN109356039A (en) A kind of safe construction assembled bent cap job platform
CN217151184U (en) Fastener type adjustable scaffold ladder stand

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant