CN212164367U - Rape hybridization planting greenhouse - Google Patents

Rape hybridization planting greenhouse Download PDF

Info

Publication number
CN212164367U
CN212164367U CN202020459791.5U CN202020459791U CN212164367U CN 212164367 U CN212164367 U CN 212164367U CN 202020459791 U CN202020459791 U CN 202020459791U CN 212164367 U CN212164367 U CN 212164367U
Authority
CN
China
Prior art keywords
big
arch shelter
snow
planting
main part
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020459791.5U
Other languages
Chinese (zh)
Inventor
杨进成
李祥
刘坚坚
李艳兰
安正云
胡新洲
罗斌
朱自芬
王春贵
柳斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yuxi Academy of Agricultural Sciences
Original Assignee
Yuxi Academy of Agricultural Sciences
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yuxi Academy of Agricultural Sciences filed Critical Yuxi Academy of Agricultural Sciences
Priority to CN202020459791.5U priority Critical patent/CN212164367U/en
Application granted granted Critical
Publication of CN212164367U publication Critical patent/CN212164367U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A40/00Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
    • Y02A40/10Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in agriculture
    • Y02A40/25Greenhouse technology, e.g. cooling systems therefor

Landscapes

  • Cultivation Receptacles Or Flower-Pots, Or Pots For Seedlings (AREA)

Abstract

The utility model discloses a rape hybridization planting big-arch shelter, including planting the big-arch shelter main part, the front end surface of planting the big-arch shelter main part is provided with illumination mounting structure and big-arch shelter business turn over door, illumination mounting structure is located the upper end of big-arch shelter business turn over door, the both sides surface of planting the big-arch shelter main part all is provided with scrapes the snow ware structure. Rape hybridization plant big-arch shelter, be equipped with and scrape snow ware structure and illumination mounting structure, can make things convenient for the light top to planting the big-arch shelter main part of people to remove the snow, the effectual top that prevents to plant the big-arch shelter main part is destroyed, guarantee to plant the integrality of big-arch shelter main part, be favorable to people's use, and can be in weather at strong wind and rain night, people can be with the inside of illumination lamps and lanterns direct mount at translucent mounting box, can avoid being blown by wind and rain and scrape the damage, guarantee lighting conditions, work and activity that are favorable to people, be favorable to people's use, bring better use prospect.

Description

Rape hybridization planting greenhouse
Technical Field
The utility model relates to a plant the big-arch shelter field, in particular to rape hybridization planting big-arch shelter.
Background
The rape hybrid planting greenhouse is a greenhouse for cultivating and planting hybrid rape, and with the change of times of technology, the requirements of people on the rape hybrid planting greenhouse are higher and higher.
The existing rape hybrid planting greenhouse has certain defects when in use, firstly, people are inconvenient to clean accumulated snow on the greenhouse in heavy snow weather, certain disadvantages are caused, secondly, people are inconvenient to install the lighting device, the greenhouse is easy to damage, certain adverse effects are caused, certain influences are brought to the use process of people, and therefore the rape hybrid planting greenhouse is provided.
SUMMERY OF THE UTILITY MODEL
The utility model discloses a main aim at provides rape hybridization planting big-arch shelter, can effectively solve the problem in the background art.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
rape hybridization planting big-arch shelter, including planting the big-arch shelter main part, the front end surface of planting the big-arch shelter main part is provided with illumination mounting structure and big-arch shelter business turn over door, illumination mounting structure is located the upper end of big-arch shelter business turn over door, the both sides surface of planting the big-arch shelter main part all is provided with scrapes the snow ware structure.
Preferably, the snow scraper structure comprises a snow scraping cross rod, a limiting sliding frame and a connecting tension rod, the limiting sliding frame is arranged on the outer surfaces of the two sides of the limiting sliding frame, the snow scraping cross rod is arranged on the outer surface of one side of the limiting sliding frame, and the connecting tension rod is arranged on the outer surface of the middle of the snow scraping cross rod.
Preferably, the illumination mounting structure comprises a semitransparent mounting box, an opening isolation plate and a semitransparent box door, the semitransparent mounting box is arranged on the outer surface of the illumination mounting structure, the semitransparent box door is arranged on the outer surface of the front end of the semitransparent mounting box, and the opening isolation plate is arranged on the inner surface of the semitransparent mounting box.
Preferably, scrape and be provided with spacing movable ring between snow horizontal pole and the spacing balladeur train, the both ends surface of scraping the snow horizontal pole all through spacing movable ring and the middle part surface swing joint of scraping the snow horizontal pole, connect the tension bar and scrape and be provided with the swing joint piece between the snow horizontal pole, the middle part surface of scraping the snow horizontal pole passes through swing joint piece and the one end surface swing joint of being connected the tension bar.
Preferably, the number of the semitransparent box doors is two, and the middle part of the opening isolation plate is provided with a limiting notch.
Preferably, a connecting support rod is arranged between the limiting sliding frame and the planting greenhouse main body, and the outer surface of the lower end of the limiting sliding frame is fixedly connected with the outer surface of the upper end of the planting greenhouse main body through the connecting support rod.
Preferably, a fixing mounting frame is arranged between the semitransparent mounting box and the planting greenhouse main body, and the outer surface of the rear end of the semitransparent mounting box is detachably connected with the outer surface of the front end of the planting greenhouse main body through the fixing mounting frame.
Compared with the prior art, the utility model discloses following beneficial effect has: the rape hybrid planting greenhouse has the advantages that through the arranged snow scraper structure, in heavy snow weather in winter, people can grasp the connecting tension rod to lift the connecting tension rod, then pull the connecting tension rod to drive the snow scraping cross rod to move, so that the snow scraping cross rod can slide on the limiting sliding frame and drag snow pressed on the planting greenhouse main body, people can conveniently treat the snow on the planting greenhouse main body, the top of the planting greenhouse main body can be prevented from being broken when people dig, the use of people is facilitated, through the arranged lighting installation structure, at night in heavy wind and rain, people can directly install the lighting lamp inside the lighting installation structure, the lighting lamp can be prevented from being damaged due to wind-blown shaking, people can conveniently pack a storage battery into the translucent installation box for standby, and the normal work and movement of people can be guaranteed, the rape hybrid planting greenhouse is beneficial to use by people, simple in structure, convenient to operate and better in using effect compared with the traditional mode.
Drawings
Fig. 1 is a schematic view of the overall structure of the rape hybrid planting greenhouse of the utility model.
FIG. 2 is a top view of the rape hybrid planting greenhouse of the present invention.
Fig. 3 is a schematic structural diagram of the snow scraper structure in fig. 1 of the rape hybrid planting greenhouse of the present invention.
Fig. 4 is a schematic structural view of the illumination installation structure in fig. 1 of the rape hybrid planting greenhouse of the present invention.
In the figure: 1. planting a greenhouse main body; 2. a snow scraper structure; 21. a snow scraping cross bar; 22. a limiting sliding frame; 23. connecting a tension rod; 3. a lighting mounting structure; 31. a translucent mounting box; 32. an opening isolation plate; 33. a translucent box door; 4. the greenhouse is accessed to the door.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
As shown in fig. 1-4, the rape hybrid planting greenhouse comprises a planting greenhouse main body 1, wherein an illumination installation structure 3 and a greenhouse access door 4 are arranged on the outer surface of the front end of the planting greenhouse main body 1, the illumination installation structure 3 is positioned at the upper end of the greenhouse access door 4, and snow scraper structures 2 are arranged on the outer surfaces of two sides of the planting greenhouse main body 1.
Further, scrape snow ware structure 2 including scraping snow horizontal pole 21, spacing balladeur train 22 and connection pull rod 23, spacing balladeur train 22's both sides surface all is provided with spacing balladeur train 22, one side surface of spacing balladeur train 22 is provided with scrapes snow horizontal pole 21, the middle part surface of scraping snow horizontal pole 21 is provided with connection pull rod 23, in the heavy snow weather of winter, people can grasp connection pull rod 23, will connect pull rod 23 and lift, the activity of reuse power pulling connection pull rod 23 drive snow horizontal pole 21 of scraping, can make and scrape snow horizontal pole 21 and slide on spacing balladeur train 22, will press the snow on planting big-arch shelter main part 1 and scratch and drag, can make things convenient for people to handle the snow on planting big-arch shelter main part 1, can avoid people to dig the top of planting big-arch shelter main part 1 when digging and break.
Further, illumination mounting structure 3 includes translucent mounting box 31, opening division board 32 and translucent box door 33, illumination mounting structure 3's surface is provided with translucent mounting box 31, translucent mounting box 31's front end surface is provided with translucent box door 33, translucent mounting box 31's internal surface is provided with opening division board 32, at the night of heavy wind and rain, people can be with illumination lamps and lanterns direct mount in illumination mounting structure 3's inside, can avoid illumination lamps and lanterns to be blown rock and cause the damage, can also make things convenient for people to pack the battery into translucent mounting box 31's inside and carry out reserve, can guarantee people's normal work and activity.
Further, scrape and be provided with spacing movable ring between snow horizontal pole 21 and the spacing balladeur train 22, the both ends surface of scraping snow horizontal pole 21 all through spacing movable ring with the middle part surface swing joint of scraping snow horizontal pole 21, connect the pull rod 23 and be provided with the swing joint piece between the snow horizontal pole 21, the middle part surface of scraping snow horizontal pole 21 passes through swing joint piece and the one end surface swing joint of being connected pull rod 23, can guarantee that the active position of scraping snow horizontal pole 21 can not scrape the top of planting big-arch shelter main part 1.
Further, the quantity of translucent box door 33 is two sets of, and spacing notch has been seted up at the middle part of opening division board 32 to the power cord is placed to people.
Further, be provided with joint support pole between spacing balladeur train 22 and the planting big-arch shelter main part 1, spacing balladeur train 22's lower extreme surface passes through joint support pole and is connected with the upper end surface fixed connection who plants big-arch shelter main part 1, can guarantee spacing balladeur train 22's fastness.
Further, be provided with fixed mounting frame between translucent installation box 31 and the planting big-arch shelter main part 1, the rear end surface of translucent installation box 31 can be dismantled through fixed mounting frame and the front end surface of planting big-arch shelter main part 1 and be connected to guarantee translucent installation box 31's stability and fastness.
The utility model discloses theory of operation and use flow: in winter snowy weather, the top of the planting greenhouse main body 1 of the traditional rape hybrid planting greenhouse has a large amount of accumulated snow, when the accumulated snow is too much, the pressure on the planting greenhouse main body 1 is large, people can easily dig the top of the planting greenhouse main body 1 when removing snow on the top of the planting greenhouse main body 1, the snow scraper structure 2 is arranged, so that people can easily treat the accumulated snow on the top of the planting greenhouse main body 1, people can conveniently clean the snow, the damage to the top of the planting greenhouse main body 1 is avoided, the use of people is facilitated, under the condition of dim light or at night, people can directly install the lighting lamp inside the lighting installation structure 3, the damage caused by the wind-blown shaking of the lighting lamp can be avoided, the lighting installation structure 3 can also be convenient for people to hide the storage battery inside the installation box 31 for lighting, is beneficial to the work and the activity of people at night and the use of people.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (6)

1. Rape hybridization planting big-arch shelter, including planting big-arch shelter main part (1), its characterized in that: the front end surface of planting big-arch shelter main part (1) is provided with illumination mounting structure (3) and big-arch shelter business turn over door (4), illumination mounting structure (3) are located the upper end of big-arch shelter business turn over door (4), the both sides surface of planting big-arch shelter main part (1) all is provided with scrapes snow ware structure (2).
2. The rape hybrid planting greenhouse of claim 1, wherein: the snow scraper structure (2) comprises a snow scraping cross rod (21), a limiting sliding frame (22) and a connecting tension rod (23), the outer surfaces of the two sides of the limiting sliding frame (22) are respectively provided with the limiting sliding frame (22), the outer surface of one side of the limiting sliding frame (22) is provided with the snow scraping cross rod (21), and the outer surface of the middle of the snow scraping cross rod (21) is provided with the connecting tension rod (23).
3. The rape hybrid planting greenhouse of claim 1, wherein: the illumination mounting structure (3) comprises a semitransparent mounting box (31), an opening isolation plate (32) and a semitransparent box door (33), the semitransparent mounting box (31) is arranged on the outer surface of the illumination mounting structure (3), the semitransparent box door (33) is arranged on the outer surface of the front end of the semitransparent mounting box (31), and the opening isolation plate (32) is arranged on the inner surface of the semitransparent mounting box (31).
4. The rape hybrid planting greenhouse of claim 2, wherein: scrape and be provided with spacing movable ring between snow horizontal pole (21) and spacing balladeur train (22), the both ends surface of scraping snow horizontal pole (21) all through spacing movable ring with the middle part surface swing joint of scraping snow horizontal pole (21), connect tension bar (23) and scrape and be provided with swing joint piece between snow horizontal pole (21), the middle part surface of scraping snow horizontal pole (21) passes through swing joint piece and the one end surface swing joint of being connected tension bar (23).
5. The rape hybrid planting greenhouse of claim 3, wherein: the quantity of translucent box door (33) is two sets of, spacing notch has been seted up at the middle part of opening division board (32), translucent mounting box (31) and plant and be provided with fixed mounting frame between big-arch shelter main part (1), the rear end surface of translucent mounting box (31) can be dismantled through fixed mounting frame and the front end surface of planting big-arch shelter main part (1) and be connected.
6. The rape hybrid planting greenhouse of claim 4, wherein: be provided with joint support pole between spacing balladeur train (22) and the planting big-arch shelter main part (1), the lower extreme surface of spacing balladeur train (22) passes through joint support pole and the upper end surface fixed connection of planting big-arch shelter main part (1).
CN202020459791.5U 2020-04-01 2020-04-01 Rape hybridization planting greenhouse Expired - Fee Related CN212164367U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020459791.5U CN212164367U (en) 2020-04-01 2020-04-01 Rape hybridization planting greenhouse

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020459791.5U CN212164367U (en) 2020-04-01 2020-04-01 Rape hybridization planting greenhouse

Publications (1)

Publication Number Publication Date
CN212164367U true CN212164367U (en) 2020-12-18

Family

ID=73768492

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020459791.5U Expired - Fee Related CN212164367U (en) 2020-04-01 2020-04-01 Rape hybridization planting greenhouse

Country Status (1)

Country Link
CN (1) CN212164367U (en)

Similar Documents

Publication Publication Date Title
CN111699873A (en) Flower cultivation device integrating functions of lighting, watering, cleaning, soil loosening and the like
CN212164367U (en) Rape hybridization planting greenhouse
CN206593007U (en) A kind of solar LED street lamp with spraying function
CN209038317U (en) A kind of litterbin for being convenient for changing refuse bag of environmental protection
CN204316002U (en) Power circuit operation maintenance is removed obstacles safely instrument
CN207132231U (en) A kind of urban construction street lamp
CN213237319U (en) Self-cleaning solar street lamp
CN209527315U (en) A kind of ecological, environmental protective device for raising seedlings
CN208676169U (en) A kind of automation lift solar energy smart grid formula deinsectization device
CN209325616U (en) A kind of energy-saving and environment-friendly intelligent road-lamp
CN111156464A (en) New forms of energy-concerving and environment-protective type street lamp
CN215570215U (en) Wireless remote control intelligent street lamp based on solar energy
CN117738397B (en) Energy-saving and environment-friendly green building system and energy-saving method thereof
CN217797516U (en) Self-cleaning photovoltaic low-level lamp for airport road
CN209213702U (en) A kind of Mobyneb solar LED street lamp
CN218544212U (en) Solar energy flash lamp
CN217031017U (en) LED street lamp convenient to maintain
CN209691153U (en) Ideological and political education propaganda board
CN213991947U (en) High-utilization green belt for rainwater
CN217299038U (en) Airport night light warning aluminum alloy prevents subsiding well lid
CN218073123U (en) Farmland commodity shrimp trapping apparatus is supported to rice shrimp seed
CN216601256U (en) Meat duck is duck house for breeding
CN220099842U (en) Garbage interception mechanism of floating wharf
CN216571987U (en) Water conservancy project construction's rainwater recycle device
CN218323139U (en) Garden corridor frame device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201218

CF01 Termination of patent right due to non-payment of annual fee