CN212162645U - Positioning and mounting equipment for electrical engineering - Google Patents
Positioning and mounting equipment for electrical engineering Download PDFInfo
- Publication number
- CN212162645U CN212162645U CN202020687549.3U CN202020687549U CN212162645U CN 212162645 U CN212162645 U CN 212162645U CN 202020687549 U CN202020687549 U CN 202020687549U CN 212162645 U CN212162645 U CN 212162645U
- Authority
- CN
- China
- Prior art keywords
- baffle
- base member
- crane span
- span structure
- screw rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Installation Of Indoor Wiring (AREA)
Abstract
The utility model discloses a location erection equipment for electrical engineering belongs to the electrical engineering field, including the crane span structure base member, the welding has the support on the inner wall of crane span structure base member, the overlap joint board is installed through the screw cooperation at the top of support, the both sides of crane span structure base member all evenly peg graft in proper order has the screw rod, the one end of screw rod is passed through third bolt cooperation fourth bolt fastening on the surface of gusset plate and crane span structure base member, the screw rod is in through first bolt cooperation second bolt and baffle fixed connection, setting pressure spring has all been cup jointed on screw rod surface between baffle and the gusset plate, pressure spring's both ends are respectively in baffle, gusset plate contact, two the gusset plate is evenly installed in proper order on the surface of gusset plate. The utility model discloses a to the junction surface mounting protection machanism of crane span structure base member, avoid receiving external factors influence and make the whole location installation effect receive adverse effect, improve practicality and security.
Description
Technical Field
The utility model relates to an electrical engineering field specifically is a location erection equipment for electrical engineering.
Background
The cable bridge is divided into structures such as a groove type cable bridge, a tray type cable bridge, a ladder type cable bridge, a grid bridge and the like, and is composed of a support, a supporting arm, an installation accessory and the like. The multifunctional combined type pipe rack can be erected independently and also can be laid on various buildings and pipe rack supports, the characteristics of simple structure, attractive appearance, flexible configuration, convenience in maintenance and the like are reflected, and the multifunctional combined type pipe rack plays an extremely important role in electrical engineering.
The bridge is usually installed in a splicing mode in multiple stages, the splicing position of the bridge base body is generally combined only by using basic bolts to match with connecting pieces, only the basic positioning effect can be ensured, the overall protection effect is poor, and effective protection is difficult to provide in electrical engineering.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an electrical engineering is with location erection equipment, through the junction surface mounting protection machanism to the crane span structure base member, avoid receiving external factor influence and make the whole location installation effect receive adverse effect, improve practicality and security.
The utility model provides a following technical scheme: the utility model provides a location erection equipment for electrical engineering, includes the crane span structure base member, the welding has the support on the inner wall of crane span structure base member, the lap joint board is installed through the screw cooperation at the top of support, the gusset plate has all been laid on the both sides surface of crane span structure base member, the both sides of crane span structure base member all evenly pegs graft in proper order has the screw rod, the one end of screw rod is passed through third bolt cooperation fourth bolt fastening on the surface of gusset plate and crane span structure base member, the other end of screw rod is pegged graft to the baffle, just the screw rod is in through first bolt cooperation second bolt and baffle fixed connection, sets up pressure spring has all been cup jointed on the screw rod surface between baffle and the gusset plate, pressure spring's both ends are respectively in baffle, gusset plate contact, two the gusset plate is evenly installed in proper order.
Preferably, the inner wall of the bridge base body is sequentially and uniformly welded with reinforcing ribs, and the reinforcing ribs are of an integrated structure made of steel structure materials.
Preferably, the interior of the baffle is sequentially and uniformly filled with filler, and the filler is formed by filling foam board materials.
Preferably, the surfaces of the two sides of the baffle are provided with inclined planes which are deviated outwards at an angle of 45 degrees.
Preferably, silica gel pads are uniformly laid and bonded on the surfaces of the lapping plates, and the thickness of each silica gel pad is 1 cm-1.5 cm.
Preferably, one end of the reinforcing plate is fixed to a surface of the reinforcing plate by a screw, and the other end of the reinforcing plate is in contact with one side surface of the baffle plate.
The utility model discloses a technological effect and advantage:
the utility model discloses a to the junction surface mounting protection machanism of crane span structure base member, make its location installation effect obtain promoting, can effectively ensure the steadiness of integral erection, provide abundant protecting effect simultaneously to avoid receiving external factor influence and make the integral location installation effect receive adverse effect, improve practicality and security.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the baffle installation structure of the present invention;
fig. 3 is a schematic structural view of the screw and the pressure spring of the present invention.
Description of reference numerals: 1. a bridge base; 2. a support; 3. a lap plate; 4. reinforcing ribs; 5. a reinforcing plate; 6. a screw; 7. a pressure spring; 8. a baffle plate; 9. a bevel; 10. a filler; 11. a first bolt; 12. a second bolt; 13. a third bolt; 14. a fourth bolt; 15. a reinforcing plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The utility model provides a location installation equipment for electrical engineering as shown in figures 1-3, which comprises a bridge frame base body 1, wherein a support 2 is welded on the inner wall of the bridge frame base body 1, a lapping plate 3 is installed at the top of the support 2 through screw cooperation, a silica gel pad is uniformly laid and bonded on the surface of the lapping plate 3, the thickness of the silica gel pad is 1 cm-1.5 cm, certain protection is provided for internal cables, and lapping location effect is completed by matching with the lapping plate 3; evenly weld in proper order on the inner wall of crane span structure base member 1 has strengthening rib 4, and strengthening rib 4 has good intensity and rigidity for the integral structure that steel construction material made, comes the bulk strength of supplementary enhancement crane span structure base member 1 through strengthening rib 4, improves the safeguard effect with the cooperation of baffle 8.
Reinforcing plate 5 has all been laid on the both sides surface of crane span structure base member 1, the both sides of crane span structure base member 1 all evenly pegs graft in proper order has screw rod 6, the one end of screw rod 6 is passed through third bolt 13 and is cooperated fourth bolt 14 to fix on the surface of reinforcing plate 5 and crane span structure base member 1, the other end of screw rod 6 is pegged graft to baffle 8, and screw rod 6 cooperates second bolt 12 and baffle 8 fixed connection through first bolt 11, pressure spring 7 has all been cup jointed on the screw rod 6 surface of setting between baffle 8 and reinforcing plate 5, pressure spring 7's both ends are respectively in baffle 8, reinforcing plate 5 contact, reinforcing plate 15 is evenly installed in proper order on the surface of two reinforcing plates 5, the fix with screw is passed through on reinforcing plate 5's surface to reinforcing plate 15's one end, reinforcing plate 15's the other end and baffle 8 one side. Forming the auxiliary reinforcing mechanism.
Baffle 8's inside evenly filled in proper order has filler 10, and filler 10 forms for the foam board material is filled, acts as filler 10 through the foam board, provides certain thermal-insulated protective effect, and baffle 8's both sides surface all is equipped with inclined plane 9, and inclined plane 9 is 45 outside squints. The protection area of the baffle 8 is increased, and sufficient isolation protection can be provided for the surface of the bridge base body 1.
The working principle is that the protection mechanism consisting of the baffles 8 is additionally arranged on the bridge base body 1, so that the connection part of the bridge base body 1 is fully protected and isolated, and the integral positioning and mounting equipment is formed by matching with the bridge base body 1, so that the positioning and connecting effect of each bridge base body 1 can be enhanced.
The interior of the baffle 8 is sequentially and uniformly filled with the filler 10, the filler 10 is served by the foam board, a certain heat insulation protection effect is provided, and the protection performance of the baffle 8 is improved. Simultaneously all be equipped with inclined plane 9 at the both sides surface of baffle 8, inclined plane 9 is 45 outwards squints to this increase baffle 8's protective area can provide abundant isolation protection to crane span structure base member 1 surface. The stability and the compression resistance effect of the integral positioning and mounting equipment are determined by matching the reinforcing plates 5 and the reinforcing plates 15 on the two sides of the upper bridge frame base body 1. Therefore, the positioning installation equipment is prevented from being influenced by external factors, so that the overall positioning installation effect is prevented from being adversely influenced, and the practicability and the safety are improved.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications and variations can be made in the embodiments or in part of the technical features of the embodiments without departing from the spirit and the scope of the invention.
Claims (6)
1. The utility model provides an electrical engineering is with location erection equipment, includes crane span structure base member (1), its characterized in that: the welding has support (2) on the inner wall of crane span structure base member (1), lap joint board (3) are installed through the screw cooperation in the top of support (2), reinforcing plate (5) have all been laid on the both sides surface of crane span structure base member (1), the both sides of crane span structure base member (1) all evenly are pegged graft in proper order and have screw rod (6), the one end of screw rod (6) is passed through third bolt (13) cooperation fourth bolt (14) and is fixed on the surface of reinforcing plate (5) and crane span structure base member (1), the other end of screw rod (6) is pegged graft to on baffle (8), just screw rod (6) cooperate second bolt (12) and baffle (8) fixed connection through first bolt (11), set up screw rod (6) surface between baffle (8) and reinforcing plate (5) all has cup jointed pressure spring (7), pressure spring (7) are respectively in baffle (8) at the both ends of pressure spring (7), The reinforcing plates (5) are contacted, and the reinforcing plates (15) are sequentially and uniformly arranged on the surfaces of the two reinforcing plates (5).
2. The positioning and mounting device for electrical engineering according to claim 1, wherein: the inner wall of the bridge base body (1) is sequentially and uniformly welded with reinforcing ribs (4), and the reinforcing ribs (4) are of an integrated structure made of steel structure materials.
3. The positioning and mounting device for electrical engineering according to claim 1, wherein: the interior of the baffle (8) is sequentially and uniformly filled with fillers (10), and the fillers (10) are formed by filling foam board materials.
4. The positioning and mounting device for electrical engineering according to claim 1, wherein: inclined planes (9) are arranged on the surfaces of the two sides of the baffle (8), and the inclined planes (9) are outwards deviated by 45 degrees.
5. The positioning and mounting device for electrical engineering according to claim 1, wherein: and silica gel pads are uniformly laid on the surfaces of the lap joint plates (3) and are bonded, and the thickness of each silica gel pad is 1 cm-1.5 cm.
6. The positioning and mounting device for electrical engineering according to claim 1, wherein: one end of the reinforcing plate (15) is fixed on the surface of the reinforcing plate (5) through a screw, and the other end of the reinforcing plate (15) is in contact with one side surface of the baffle plate (8).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020687549.3U CN212162645U (en) | 2020-04-29 | 2020-04-29 | Positioning and mounting equipment for electrical engineering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020687549.3U CN212162645U (en) | 2020-04-29 | 2020-04-29 | Positioning and mounting equipment for electrical engineering |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212162645U true CN212162645U (en) | 2020-12-15 |
Family
ID=73720939
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020687549.3U Expired - Fee Related CN212162645U (en) | 2020-04-29 | 2020-04-29 | Positioning and mounting equipment for electrical engineering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212162645U (en) |
-
2020
- 2020-04-29 CN CN202020687549.3U patent/CN212162645U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN212162645U (en) | Positioning and mounting equipment for electrical engineering | |
KR200490492Y1 (en) | Supporting module | |
KR101375896B1 (en) | Roof connector to prevent from leaking water of sectional structure | |
CN209146691U (en) | A kind of antidetonation connecting elements and antidetonation suspension and support | |
CN218275900U (en) | Electric bridge with anti-seismic effect | |
CN213185357U (en) | Cable testing bridge with buffering shock-absorbing function | |
CN217679972U (en) | Connecting structure for assembled type external-hanging filling wallboard | |
CN216865570U (en) | Assembled thermal insulation wall | |
CN211817073U (en) | Light noise reduction device for building construction | |
CN211773825U (en) | Civil engineering construction is with high cushion cap foundation pile stabilising arrangement | |
CN213683036U (en) | Modular floor corner plate structure for interior decoration | |
CN211058143U (en) | Steel construction post that takes precautions against earthquakes | |
CN214941082U (en) | Connecting mechanism for prefabricated steel framework light floor slab and concrete beam node | |
KR200453981Y1 (en) | Connector for cable tray connection | |
CN211670608U (en) | Temporary pipeline protection device for building | |
CN220107482U (en) | Energy-saving bridge frame with good anti-seismic effect | |
CN212129608U (en) | Curtain clad steel plate enclosed construction | |
CN212336603U (en) | Mounting and connecting structure for heat-insulating layer decorative plate | |
CN215164605U (en) | Multidirectional broach type expansion joint device that shifts of shock attenuation | |
KR102600895B1 (en) | Clamp for roof-integrated solar power generation | |
CN219980299U (en) | Shock-resistant bracket for electric bridge | |
CN214379807U (en) | Seamless overlap joint crane span structure of easy dismouting of high strength | |
CN220414577U (en) | Prefabricated external heat preservation type external wall panel convenient to install | |
CN221126674U (en) | Strong and weak electric box installation device | |
CN217051401U (en) | High-strength suspension arm assembly for tower crane |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20201215 |
|
CF01 | Termination of patent right due to non-payment of annual fee |