CN212156036U - Reinforcing device for heavy pipeline arrangement - Google Patents

Reinforcing device for heavy pipeline arrangement Download PDF

Info

Publication number
CN212156036U
CN212156036U CN202020525265.4U CN202020525265U CN212156036U CN 212156036 U CN212156036 U CN 212156036U CN 202020525265 U CN202020525265 U CN 202020525265U CN 212156036 U CN212156036 U CN 212156036U
Authority
CN
China
Prior art keywords
main body
top end
fixing
groove
stress plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020525265.4U
Other languages
Chinese (zh)
Inventor
武鹏超
赵伟
孟凯
谢成阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Bureau Installation Engineering Co Ltd
Original Assignee
China Construction Second Bureau Installation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Bureau Installation Engineering Co Ltd filed Critical China Construction Second Bureau Installation Engineering Co Ltd
Priority to CN202020525265.4U priority Critical patent/CN212156036U/en
Application granted granted Critical
Publication of CN212156036U publication Critical patent/CN212156036U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The utility model provides a reinforcing device for heavy pipeline arrangement, which comprises a main body, a bottom groove, a stress plate and a fixing head; the main body is of a T-shaped structure, and the top end of the main body is of an arc-shaped structure; the bottom groove is arranged in the middle of the bottom of the main body, and the bottom end of the limiting rod is inserted into the bottom groove; two ends of the stress plate are inserted into the outer side of the bottom groove, and the bottom ends of the limiting rods are inserted into the jacks at the two ends of the stress plate; the main part is when being used for installing in the inside use in soft ground, and the installation can be pushed down with the junction of atress board to the main part for the junction of atress board can be forced to push down and be in the coplanar, thereby makes this device can effectually be in soft earth top, and the bottom both sides of main part are slope column structure, be in order to make the main part install when soft subaerial, can increase area of contact, thereby make this device when consolidating the pipeline, the phenomenon of sinking can not appear.

Description

Reinforcing device for heavy pipeline arrangement
Technical Field
The utility model belongs to the technical field of reinforcing apparatus, more specifically say, in particular to heavy pipeline arranges and uses reinforcing apparatus.
Background
When the heavy pipeline is arranged and installed, a special reinforcing device is required to be used generally, so that the heavy pipeline can be installed and used stably, and problems can be avoided in the later stage.
For example, application No.: CN201920369506.8 relates to a building pipeline reinforced structure, comprising a first pipeline, a second pipeline and a connector, wherein the first pipeline and the second pipeline are coaxially arranged, the connector is coaxially arranged at one end of the second pipeline close to the first pipeline, a connecting groove matched with the connector is arranged on the first pipeline, a connecting component is arranged between the connector and the first pipeline, the connecting component comprises a pressing piece and a first air bag made of rubber, a second air bag and a connecting pipe, the first air bag and the second air bag are embedded on the peripheral surface of the connector, the connecting pipe is arranged between the first air bag and the second air bag and is communicated with the first air bag and the second air bag, the pressing piece is arranged on the first pipeline and corresponds to the position of the first air bag, the pressing piece moves towards the direction close to or far away from the first air bag along the radial direction of the first pipeline, thereby improving the pressure resistance of the pipeline joint, the construction cost is reduced.
Based on discovery among the prior art, current pipeline reinforcing apparatus that arranges is when using, if when installing on softer soil, the phenomenon that can't effectually avoid it to appear sinking, and when with the pipeline contact, can't assist it spacing, can't avoid the pipeline to be in the displacement that appears after the long-time use of inclined plane, and current pipeline reinforcing apparatus that arranges is when using, can't be according to the piping erection position, convenient installing uses on soft subaerial or the concrete pile, receive the restriction during the use, not enough variety.
In view of the above, the present invention provides a reinforcing device for heavy pipeline layout, which is developed and improved in view of the existing structure and defects, so as to achieve the purpose of higher practical value.
SUMMERY OF THE UTILITY MODEL
In order to solve the technical problem, the utility model provides a heavy pipeline arranges and uses reinforcing apparatus, with the current pipeline of solution reinforcing apparatus of arranging when using, if install on softer soil, the unable effectual phenomenon of sinking that appears of avoiding it, and in the time with the pipeline contact, can't assist it spacing, can't avoid the pipeline to be in the displacement after the long-time use of inclined plane, and current pipeline arranges reinforcing apparatus when using, can't be according to the piping erection position, convenient installation is used on soft subaerial or the concrete pile, receive the restriction during the use, the problem of not enough variety.
The utility model discloses heavy pipeline arranges with reinforcing apparatus's purpose and efficiency, is reached by following concrete technical means:
a reinforcing device for heavy pipeline arrangement comprises a main body, a bottom groove, a stress plate and a fixing head; the main body is of a T-shaped structure, and the top end of the main body is of an arc-shaped structure; the bottom groove is arranged in the middle of the bottom of the main body, and the bottom end of the limiting rod is inserted into the bottom groove; two ends of the stress plate are inserted into the outer side of the bottom groove, and the bottom ends of the limiting rods are inserted into the jacks at the two ends of the stress plate; the top connector embedding of fixed head is installed in the inside of kerve, and the inside bottom of installing the gag lever post of inserting of the fixed orifices on connector top.
Furthermore, the main body comprises a contact piece and a fixing piece; the bottom parts of the two sides of the main body are of inclined structures, and a plurality of contact pieces are arranged inside the top end of the main body in an embedded mode; the contact element is made of rubber, and the top end of the contact element is of an arc-shaped structure; the two sides of the top end of the main body are provided with fixing pieces, and the bottoms of the inner sides of the fixing pieces are of arc structures; the fixing piece is made of spring steel, and the top end of the fixing piece is of a wedge-shaped structure.
Furthermore, the bottom groove comprises a moving groove and a limiting rod; the bottom groove is of a T-shaped structure, and a moving groove is arranged above the bottom groove; the moving groove is of a cylindrical structure with a convex middle part, and a pull groove is arranged on the outer side of the moving groove; the inside of shifting chute has the gag lever post of protruding cylindrical structure in the middle of through spring mounting, and the outside of gag lever post is equipped with the arm-tie.
Further, the stress plate comprises a jack; the stress plate is of a rectangular plate-shaped structure, and two ends of the stress plate are of T-shaped structures; jacks with cylindrical structures are arranged above the two ends of the stress plate, and the top ends of the jacks are of inclined structures.
Furthermore, the fixing head comprises a connecting head; the fixing head is of a rectangular structure, and fixing blocks of a triangular structure are arranged on two sides of the fixing head; the top end of the fixing head is provided with a connector with a T-shaped structure, and the top end of the connector is provided with a fixing hole with a cylindrical structure; the fixed head is installed in the bottom of main part, and the bottom mounting of fixed head is in the inside of concrete pile.
Compared with the prior art, the utility model discloses following beneficial effect has:
in the device, a main body and a bottom groove are arranged, when the main body is used for being installed inside a soft ground for use, the main body can press and install the joint of the stress plate, so that the joint of the stress plate can be pressed down on the same plane under stress, the device can be effectively positioned above soft soil, the two sides of the bottom of the main body are of an inclined structure, the contact area can be enlarged when the main body is installed on the soft ground, the device can not sink when reinforcing a pipeline, the top end of the main body is of an arc structure, the pipeline can be embedded into the main body, a contact element inside the main body is used for assisting in being fixed with the main body, the contact element made of rubber can be effectively contacted with the outer side of the pipeline, and the pipeline is fixed on the inclined plane for a long time, the contact piece can also play a role in auxiliary fixation, the fixing piece at the top end of the main body is used for fixing the pipeline after the pipeline is installed, so that the pipeline cannot be separated, and the top end of the fixing piece is of an inclined structure, so that the pipeline can be guided when being embedded, and the pipeline can be quickly installed above the main body;
still furthermore, the kerve is used for being arranged at the bottom of the device, so that when the device is arranged on soft soil for use, the inner part of the kerve can be embedded into two ends of the stress plate, so that the device can not sink downwards when reinforcing a pipeline, when the device is arranged on a concrete pile for use, the fixing head can be fixedly connected with the concrete pile in advance, then the connector can be embedded into the inner part of the kerve, so that the main body can be matched with the connector through the kerve, so that the main body can be stably arranged above the concrete pile, the device can be suitable for being arranged at different positions, the moving groove is provided with a limiting rod, the limiting rod can receive the power of the spring to move up and down, after the outer end of the stress plate or the connector is embedded into the inner part of the kerve, the limiting rod can receive the power of the spring to move downwards, make inside the gag lever post bottom can insert the fixed orifices of jack or connector, make the installation that atress board or connector can stabilize, can not break away from, thereby solved when using, if install on softer soil, the phenomenon that can't effectually avoid it to appear sinking, and when with the pipeline contact, can't assist it spacing, can't avoid the pipeline to be in the displacement after the long-time use of inclined plane, and current pipeline reinforcing apparatus that arranges when using, can't be according to the pipeline erection position, convenient installation uses on soft subaerial or the concrete pile, receive the restriction during the use, not enough diversified problem.
Drawings
Fig. 1 is a schematic perspective view of the present invention.
Fig. 2 is a schematic view of the three-dimensional structure of the fixing head of the present invention.
Fig. 3 is a schematic view of the main body of the present invention.
Fig. 4 is a schematic view of the three-dimensional structure of the stress plate of the present invention.
Fig. 5 is a schematic view of the three-dimensional structure of the fixing head of the present invention.
In the drawings, the corresponding relationship between the component names and the reference numbers is as follows:
1. a main body; 101. a contact member; 102. a fixing member; 2. a bottom groove; 201. a moving groove; 202. a limiting rod; 3. a stress plate; 301. a jack; 4. a fixed head; 401. a connecting head.
Detailed Description
The following describes embodiments of the present invention in further detail with reference to the accompanying drawings and examples. The following examples are intended to illustrate the invention, but are not intended to limit the scope of the invention.
In the description of the present invention, "a plurality" means two or more unless otherwise specified; the terms "upper", "lower", "left", "right", "inner", "outer", "front", "rear", "head", "tail", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are merely for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," "third," and the like are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "connected" and "connected" are to be interpreted broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; may be directly connected or indirectly connected through an intermediate. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Example (b):
as shown in figures 1 to 5:
the utility model provides a reinforcing device for heavy pipeline arrangement, which comprises a main body 1, a bottom groove 2, a stress plate 3 and a fixing head 4; the main body 1 is of a T-shaped structure, the top end of the main body 1 is of an arc-shaped structure, the contact element 101 in the main body 1 is used for assisting in being fixed with the main body 1, so that the contact element 101 made of rubber can be effectively contacted with the outer side of a pipeline, when the pipeline is fixed on an inclined surface for a long time, the contact element 101 can also play a role in assisting in fixing the pipeline, the fixing element 102 at the top end of the main body 1 is used for fixing the pipeline after the pipeline is installed, so that the pipeline cannot be separated, the top end of the fixing element 102 is of an inclined structure, so that the pipeline can be guided when being embedded, and the pipeline can be quickly installed above the main body 1; the bottom groove 2 is arranged in the middle of the bottom of the main body 1, the bottom end of the limiting rod 202 is inserted into the bottom of the bottom groove 2, the limiting rod 202 is installed in the moving groove 201, the limiting rod 202 can receive power of a spring to move up and down, after the outer end of the stress plate 3 or the connector 401 is embedded into the bottom groove 2, the limiting rod 202 can receive the power of the spring to move down, the bottom end of the limiting rod 202 can be inserted into the jack 301 or the fixing hole of the connector 401, and the stress plate 3 or the connector 401 can be stably installed and cannot be separated; the two ends of the stress plate 3 are inserted into the outer side of the bottom groove 2, the bottom ends of the limiting rods 202 are inserted into the insertion holes 301 at the two ends of the stress plate 3, the insertion holes 301 are used for inserting the bottom ends of the limiting rods 202, so that the stress plate 3 can be effectively fixed after being spliced, the two ends of the stress plate 3 are of T-shaped structures, and can be positioned on the same plane with the bottom of the main body 1 when being embedded into the bottom groove 2, and the phenomenon that a single part sinks cannot occur; the top end connector 401 of the fixed head 4 is embedded in the bottom groove 2, the bottom end of the limiting rod 202 is inserted into the fixing hole at the top end of the connector 401, and the connector 401 is arranged in the bottom groove 2, so that the main body 1 can be stably connected with the fixed head 4 through the bottom groove 2, and the main body 1 can be stably arranged above the concrete pile to reinforce the pipeline; the main body 1 comprises a contact member 101 and a fixing member 102; the bottoms of the two sides of the main body 1 are of an inclined structure, and a plurality of contact pieces 101 are arranged inside the top end of the main body 1 in an embedded mode; the contact element 101 is made of rubber, and the top end of the contact element 101 is of an arc-shaped structure; fixing pieces 102 are installed on two sides of the top end of the main body 1, and the bottom of the inner side of each fixing piece 102 is of an arc-shaped structure; the fixing piece 102 is made of spring steel, the top end of the fixing piece 102 is of a wedge-shaped structure, when the main body 1 is used for being installed inside a soft ground for use, the main body 1 can press and install the joint of the stress plate 3, so that the joint of the stress plate 3 can be pressed down on the same plane under stress, the device can be effectively located above the soft soil, the two sides of the bottom of the main body 1 are of inclined structures, the contact area can be enlarged when the main body 1 is installed on the soft ground, the device cannot sink when a pipeline is reinforced, and the top end of the main body 1 is of an arc-shaped structure, so that the pipeline can be embedded into the main body 1; wherein, the bottom groove 2 comprises a moving groove 201 and a limiting rod 202; the bottom groove 2 is of a T-shaped structure, and a moving groove 201 is arranged above the bottom groove 2; the moving groove 201 is of a cylindrical structure with a convex middle part, and a pull groove is arranged on the outer side of the moving groove 201; the limiting rod 202 with a middle protruding cylindrical structure is installed inside the moving groove 201 through a spring, the outer side of the limiting rod 202 is provided with a pull plate, the bottom groove 2 is used for being arranged at the bottom of the device, so that when the device is installed on soft soil for use, the two ends of the stress plate 3 can be embedded into the bottom groove 2, the device cannot collapse downwards when a pipeline is reinforced, if the device is installed on a concrete pile for use, the fixing head 4 can be fixedly connected with the concrete pile in advance, then the connector 401 can be embedded into the bottom groove 2, the main body 1 can be matched with the connector 401 through the bottom groove 2, the main body 1 can be stably installed above the concrete pile, and the device can be suitable for installation at different positions; the stress plate 3 comprises an insertion hole 301; the stress plate 3 is of a rectangular plate-shaped structure, and two ends of the stress plate 3 are of T-shaped structures; the jacks 301 with cylindrical structures are arranged above the two ends of the stress plate 3, the top ends of the jacks 301 are of inclined structures, the stress plate 3 is used for being spliced on soft soil for use, so that the main body 1 and a pipeline are effectively supported and mounted, the pipeline is prevented from sinking, the pipeline is more stably mounted, the two ends of the stress plate 3 are of T-shaped structures and can be effectively inserted into the bottom groove 2, and the stress plate 3 can be effectively mounted and used; wherein, the fixed head 4 comprises a connecting head 401; the fixed head 4 is of a rectangular structure, and the two sides of the fixed head 4 are provided with fixed blocks of a triangular structure; the top end of the fixed head 4 is provided with a connector 401 with a T-shaped structure, and the top end of the connector 401 is provided with a fixing hole with a cylindrical structure; the fixed head 4 is installed in the bottom of main part 1, and the bottom mounting of fixed head 4 is in the inside of concrete pile, and the fixed head 4 of here is used for the snap-on in the inside of concrete pile for fixed head 4 can be firm be connected with the concrete pile, and the fixed block of fixed head 4 both sides is then used for the firm inside that is in the concrete.
The specific use mode and function of the embodiment are as follows:
in the utility model, when the device is needed to be used, when the device is arranged above the soil, the pulling plate at the outer end of the limiting rod 202 can be pulled by manpower to move upwards, then the outer end of the stress plate 3 is controlled by manpower to be inserted into the bottom groove 2, then the pulling plate is sent to ensure that the bottom end of the limiting rod 202 can be inserted into the jack 301, thereby the stress plate 3 is fixed, then the tool is used to control the central pipeline to be inserted into the top end of the main body 1, so that the bottom of the pipeline can be contacted with the contact element 101, thereby the auxiliary fixation is carried out, the top end of the pipeline can be contacted with the fixing element 102, thereby the pipeline is effectively reinforced and arranged, if the device is arranged on the concrete pile to use reinforcement, the fixing head 4 can be fixed on the concrete pile in advance, then the main body 1 is controlled by manpower to be arranged above the fixing head 4, make the inside of kerve 2 can imbed installation connector 401 for the bottom of gag lever post 202 can insert inside the fixed orifices on connector 401 top, thereby with main part 1 fixed mounting, thereby use the pipeline reinforcing installation.
The embodiments of the present invention have been presented for purposes of illustration and description, and are not intended to be exhaustive or limited to the invention in the form disclosed. Many modifications and variations will be apparent to those of ordinary skill in the art. The embodiment was chosen and described in order to best explain the principles of the invention and the practical application, and to enable others of ordinary skill in the art to understand the invention for various embodiments with various modifications as are suited to the particular use contemplated.

Claims (5)

1. The utility model provides a heavy pipeline arranges and uses reinforcing apparatus which characterized in that: the method comprises the following steps: the device comprises a main body (1), a bottom groove (2), a stress plate (3) and a fixing head (4); the main body (1) is of a T-shaped structure, and the top end of the main body (1) is of an arc-shaped structure; the bottom groove (2) is arranged in the middle of the bottom of the main body (1), and the bottom end of the limiting rod (202) is inserted into the bottom groove (2); two ends of the stress plate (3) are inserted into the outer side of the bottom groove (2), and the bottom ends of the limiting rods (202) are inserted into the insertion holes (301) at the two ends of the stress plate (3); the top end connector (401) of the fixed head (4) is embedded in the bottom groove (2), and the bottom end of the limiting rod (202) is inserted into the fixed hole in the top end of the connector (401).
2. The reinforcing apparatus for heavy duty piping according to claim 1, wherein: the main body (1) comprises a contact element (101) and a fixing element (102); the bottoms of two sides of the main body (1) are of an inclined structure, and a plurality of contact pieces (101) are arranged inside the top end of the main body (1) in an embedded mode; the contact element (101) is made of rubber, and the top end of the contact element (101) is of an arc-shaped structure; fixing pieces (102) are mounted on two sides of the top end of the main body (1), and the bottom of the inner side of each fixing piece (102) is of an arc-shaped structure; the fixing piece (102) is made of spring steel, and the top end of the fixing piece (102) is of a wedge-shaped structure.
3. The reinforcing apparatus for heavy duty piping according to claim 1, wherein: the bottom groove (2) comprises a moving groove (201) and a limiting rod (202); the bottom groove (2) is of a T-shaped structure, and a moving groove (201) is arranged above the bottom groove (2); the moving groove (201) is of a cylindrical structure with a convex middle part, and a pull groove is arranged on the outer side of the moving groove (201); a limiting rod (202) with a middle protruding cylindrical structure is mounted inside the moving groove (201) through a spring, and a pulling plate is arranged on the outer side of the limiting rod (202).
4. The reinforcing apparatus for heavy duty piping according to claim 1, wherein: the stress plate (3) comprises an insertion hole (301); the stress plate (3) is of a rectangular plate-shaped structure, and two ends of the stress plate (3) are of T-shaped structures; the jack (301) of cylindrical structure is equipped with above the both ends of atress board (3), and the top of jack (301) is the slope column structure.
5. The reinforcing apparatus for heavy duty piping according to claim 1, wherein: the fixed head (4) comprises a connecting head (401); the fixing head (4) is of a rectangular structure, and fixing blocks of a triangular structure are arranged on two sides of the fixing head (4); the top end of the fixing head (4) is provided with a connector (401) with a T-shaped structure, and the top end of the connector (401) is provided with a fixing hole with a cylindrical structure; the fixing head (4) is installed at the bottom of the main body (1), and the bottom end of the fixing head (4) is fixed inside the concrete pile.
CN202020525265.4U 2020-04-12 2020-04-12 Reinforcing device for heavy pipeline arrangement Active CN212156036U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020525265.4U CN212156036U (en) 2020-04-12 2020-04-12 Reinforcing device for heavy pipeline arrangement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020525265.4U CN212156036U (en) 2020-04-12 2020-04-12 Reinforcing device for heavy pipeline arrangement

Publications (1)

Publication Number Publication Date
CN212156036U true CN212156036U (en) 2020-12-15

Family

ID=73719506

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020525265.4U Active CN212156036U (en) 2020-04-12 2020-04-12 Reinforcing device for heavy pipeline arrangement

Country Status (1)

Country Link
CN (1) CN212156036U (en)

Similar Documents

Publication Publication Date Title
KR20100132164A (en) Method for installing waterproofing steel plate in construction of undergound tunnel
CN212156036U (en) Reinforcing device for heavy pipeline arrangement
KR101654606B1 (en) Structure reinforcing method by side support structure
CN113612040A (en) Distance-adjustable wiring mechanism based on power equipment and connection method thereof
CN109235445B (en) Steel sheet pile and foundation pit supporting construction method
CN111501672A (en) Ecological building block of double-linkage mode based on civil and architectural engineering
CN110952681A (en) Assembled concrete anti-seismic shear wall structure
KR20160053432A (en) Follower and pile assembly used in the same
CN203782694U (en) Easy-positioning blind plate for connecting building static drill pile foundation rooting piles
KR200472767Y1 (en) Easy Interchangeable Prefabricated Precast Culvert Block
CN210341883U (en) Drainage plate pile shoe device
CN110670871B (en) Portable jacking supporting device used in engineering construction process
CN112983272A (en) Mine exploration engineering tunneling device provided with supporting device
CN218540801U (en) Foundation pile pulling-resistant static load test system and connecting device thereof
CN217132163U (en) Real-time automatic monitoring sensor suitable for tunnel arch wall deformation
CN211312631U (en) Pile foundation bearing structure based on pile foundation underpins in hole
CN212926027U (en) Assembled foundation treatment device
CN211414213U (en) Pressure pipeline welding position supporting device
KR101440987B1 (en) System constructing underground structure by the pulling force of tension member and method constructing underground structure thereby
CN216428277U (en) Cement of building construction irritates a device
KR200290004Y1 (en) Structure for connecting reinforcing member of anchor
CN217129057U (en) Wall body reinforced structure
CN113026962B (en) Assembly type building structure and construction method
CN214993749U (en) Quick connecting structure of prestressed concrete precast pile
CN212176093U (en) Vertical seam connection structure of assembled shear force wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant