CN212153114U - Installation device for pier body template outer support - Google Patents

Installation device for pier body template outer support Download PDF

Info

Publication number
CN212153114U
CN212153114U CN202020050702.1U CN202020050702U CN212153114U CN 212153114 U CN212153114 U CN 212153114U CN 202020050702 U CN202020050702 U CN 202020050702U CN 212153114 U CN212153114 U CN 212153114U
Authority
CN
China
Prior art keywords
outer support
pier shaft
shaft template
pier
template
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020050702.1U
Other languages
Chinese (zh)
Inventor
刘世奇
李阳春
郎小明
关喜彬
刘祥敏
焦鹏飞
王海东
杨金明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 19th Bureau Group Co Ltd
Sixth Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Original Assignee
Sixth Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sixth Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd filed Critical Sixth Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Priority to CN202020050702.1U priority Critical patent/CN212153114U/en
Application granted granted Critical
Publication of CN212153114U publication Critical patent/CN212153114U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a bridge construction field especially relates to an installation device of pier shaft template outer support, including pier shaft template and outer support, pier shaft template connection has two cassettes, be equipped with the draw-in groove of dovetail groove shape on the cassette, the fluting direction of the draw-in groove of establishing on two cassettes is unanimous, be connected with two connector links on the outer support, connector link one end is equipped with the tenon, the tenon with the installation is matchd to the draw-in groove one-to-one, the utility model discloses can solve among the prior art pier shaft template outer support installation inconvenient, damage easily and can not obtain the problem of effective turnover.

Description

Installation device for pier body template outer support
Technical Field
The utility model relates to a bridge building field, concrete field is an installation device of pier shaft template outer support.
Background
Along with the leap development of economy, bridge works are more and more, in the bridge construction process, after pier shaft formwork installation, the staff can carry out multiple operations to the pier shaft, in order to make things convenient for the staff to stand in the outside construction of pier shaft template, need erect the emergency support in the outside of pier shaft template so that set up operation platform, generally, the emergency support all passes through the bolt fastening on pier shaft template, this just need just accomplish the emergency support installation before pier shaft formwork installation, the emergency support of installing in advance collides with the damage easily in the installation of follow-up pier shaft template, there is very big potential safety hazard, and it is inconvenient just to lead to the emergency support to dismantle to waste time and energy and can lead to the emergency support through the mode installation of bolt fastening, make the emergency support can not get effectual turnover utilization, occupy the resource, increase construction cost.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an installation device of pier shaft template outer support to solve among the prior art pier shaft template outer support installation inconvenient, damage easily and can not obtain the problem of effective turnover.
In order to achieve the above object, the utility model provides a following technical scheme: the pier body template outer support mounting device comprises a pier body template and an outer support, wherein the pier body template is connected with two clamping seats, clamping grooves in a dovetail groove shape are formed in the clamping seats, the grooving directions of the clamping grooves formed in the two clamping seats are consistent, the outer support is connected with two connecting buckles, one ends of the connecting buckles are provided with tenons, and the tenons and the clamping grooves are installed in a matched mode in a one-to-one correspondence mode.
Preferably, the pier body template and the outer bracket are provided with screw holes arranged at fixed intervals, the clamping seat is fixedly connected with the pier body template through screws, and the connecting buckle is fixedly connected with the outer bracket through screws.
Preferably, the pier body template is provided with two pairs of through holes, each pair of through holes are oppositely arranged on two sides of the clamping seat in a one-to-one correspondence manner, positioning bolts are fixed on two sides of the clamping seat, and the positioning bolts penetrate through the through holes in a one-to-one correspondence manner.
Preferably, the outer bracket is provided with a balance lifting hole.
Preferably, the pier shaft template is further connected with a hanging rod, a fixed pulley is connected to the hanging rod, the fixed pulley is located above the balance lifting hole, a steel wire rope is threaded on the fixed pulley, one end of the steel wire rope is connected with an above-ground driving device, and the other end of the steel wire rope is connected with a lifting hook used for penetrating through the balance lifting hole.
Preferably, the outer support is connected with a cable rope.
Preferably, the outer support is further provided with a building connecting hole.
Compared with the prior art, the beneficial effects of the utility model are that: the clamp seat is arranged on the pier body template, and the connecting buckle matched with the clamp seat is arranged on the outer support, so that the outer support can be simply and quickly installed without being fixed in advance, the outer support cannot be damaged due to operations such as carrying and installation, the outer support is convenient to disassemble and easy to transfer, and the construction cost is greatly reduced; the outer support can be safely and quickly disassembled by the hanger rods on the pier body template and the cable ropes connected with the outer support; in addition, the pier shaft template and the screw holes at fixed intervals on the outer bracket are arranged, and the clamping seat and the connecting buckle are installed as required, so that the construction cost is saved; the setting of balanced lifting eye on the support in addition can use the simple steady removal of crane and installation outer support, reduces the potential safety hazard, the utility model discloses can solve among the prior art pier shaft template outer support installation inconvenient, damage easily and can not obtain the problem of effective turnover.
Drawings
Fig. 1 is a schematic structural diagram of a first embodiment of the present invention;
fig. 2 is a schematic structural diagram of a second embodiment of the present invention;
fig. 3 is a schematic structural diagram of a third embodiment of the present invention;
fig. 4 is a schematic structural view of the card seat of the present invention;
fig. 5 is a schematic structural view of the middle connecting buckle of the present invention.
In the figure: the pier comprises a pier body template 1, an outer support 2, a clamping seat 3, a clamping groove 31, a connecting buckle 4, a tenon 41, a balance lifting hole 5, a connecting hole 6, a screw hole 7, a positioning bolt 8, a cable rope 9, a suspender 10, a fixed pulley 11, a lifting hook 12, a steel wire rope 13 and a driving device 14.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Example one
Referring to fig. 1, fig. 4 and fig. 5, the present embodiment provides a technical solution: the utility model provides a pier shaft template 1 installation device of outer support 2, including pier shaft template 1 and outer support 2, pier shaft template 1 is connected with two cassettes 3, be equipped with the draw-in groove 31 of dovetail groove shape on the cassette 3, the fluting direction of the draw-in groove 31 that establishes is unanimous on two cassettes 3, be connected with two connector links 4 on the outer support 2, connector link 4 one end is equipped with tenon 41 and matches the installation with draw-in groove 31 one-to-one, in this embodiment, cassette 3 adopts the welding mode to be connected with pier shaft template 1, accomplish two cassette 3 weldings before pier shaft template 1 installation, connector link 4 and outer support 2 also adopt the welding mode to connect, the interval between two connector links 4 is unanimous with the interval between two cassettes 3, in order to guarantee that connector link 4 and cassette 3 can match the installation.
Preferably, the outer support 2 is provided with a balance lifting hole 5, the crane lifts the outer support 2 through the balance lifting hole 5, so that the outer support 2 can be stably lifted and moved without inclining, the tenons 41 of the two connecting buckles 4 can be smoothly buckled into the clamping grooves 31 of the clamping base 3, the clamping grooves 31 arranged in the clamping base 3 are non-penetrating, and the outer support 2 can be automatically locked after the tenons 41 are matched with the clamping grooves 31 for installation, so that the safety construction of workers is ensured.
Preferably, the outer support 2 is further provided with a building connecting hole 6, so that the upper outer support 2 and the lower outer support 2 can be conveniently connected and fixed, the pier body templates 1 are built from bottom to top, each or every several pier body templates 1 are connected with one outer support 2, the upper outer support 2 and the lower outer support 2 can be connected in series through building the connecting hole 6, and the whole peripheral safety support structure is more stable.
The clamping seat 3 is arranged on the pier body template 1, and the connecting buckle 4 matched with the clamping seat 3 is arranged on the outer support 2, so that the outer support 2 can be simply and quickly installed without being fixed in advance, the outer support 2 cannot be damaged due to operations such as carrying and installation, the outer support 2 is convenient to disassemble and easy to transfer, and the construction cost is greatly reduced; in addition, the setting of the balance lifting hole 5 on the outer support 2 can use the simple and stable movement of the crane and the installation of the outer support 2, thereby reducing the potential safety hazard, the utility model discloses can solve the problem that the installation of the outer support 2 of the pier body template 1 in the prior art is inconvenient, easy to damage and can not obtain effective turnover.
Example two
Referring to fig. 2, fig. 4 and fig. 5, the present embodiment provides a technical solution: a mounting device for an outer bracket 2 of a pier body template 1 comprises the pier body template 1 and the outer bracket 2, wherein the pier body template 1 is provided with screw holes 7 which are arranged at fixed intervals, the outer bracket 2 is also provided with the screw holes 7 which are arranged at the same intervals, a required clamping seat 3 is mounted on the pier body template 1 by using screws before the pier body template 1 is mounted, the specific using number and the mounting interval of the clamping seats 3 are selected according to requirements, for example, the outer bracket 2 is larger, 4 screw holes 7 with larger intervals can be selected on the pier body template 1 for mounting the clamping seat 3, 4 screw holes 7 are correspondingly selected on the outer bracket 2 for mounting connecting buckles 4, the intervals between the connecting buckles 4 are consistent with the intervals between the clamping seats 3 so as to ensure that the clamping seats 3 and the connecting buckles 4 can be mounted in a matching way, in the embodiment, the clamping seats 3 are provided with dovetail groove type clamping grooves 31, and the groove type direction of the clamping grooves 31 arranged on, the tenon 41 matched with the clamping groove 31 is arranged on the connecting buckle 4, the tenon 41 and the clamping groove 31 are installed in a matched mode in a one-to-one correspondence mode, the outer support 2 is lifted through the balance lifting hole 5 in the outer support 2 by using a lifting machine, the outer support 2 can be stably lifted and moved without inclining, the tenon 41 of the connecting buckle 4 can be smoothly buckled into the clamping groove 31 of the clamping seat 3, the clamping groove 31 arranged in the clamping seat 3 is non-penetrating, and the outer support 2 can be automatically locked after the tenon 41 and the clamping groove 31 are installed in a matched mode, so that safety construction of workers is guaranteed.
Preferably, be equipped with positioner at pier shaft template 1, specifically be equipped with two pairs of through-holes on pier shaft template 1, every to through-hole one-to-one ground set up in the both sides of cassette 3 relatively, the both sides of cassette 3 are fixed with location bolt 8, and location bolt 8 wears to locate with one-to-one in the through-hole, positioner's setting limits the position of cassette 3, makes things convenient for the blind screw of wearing in the back of pier shaft template 1, and the screw just in time wears to locate in cassette 3, and convenient construction practices thrift the engineering time, and positioner's setting can prevent that cassette 3 from taking place the displacement, ensures construction safety.
Preferably, the outer support 2 is further provided with a building connection hole 6, so that the upper and lower outer supports 2 can be conveniently connected and fixed, and the whole safety support structure is more stable.
The pier shaft template 1 and the outer bracket 2 are provided with the screw holes 7 at fixed intervals, the clamping seat 3 and the connecting buckle 4 are installed as required, the clamping seat 3 does not need to be welded in advance, resources can be better utilized, and the construction cost is saved; in addition, the setting of the balance lifting hole 5 on the support 2 can use the simple and stable movement of the crane and the installation of the outer support 2, thereby reducing the potential safety hazard, the utility model discloses can solve the problem that the installation of the outer support 2 of the pier body template 1 in the prior art is inconvenient, easy to damage and can not obtain effective turnover.
EXAMPLE III
Referring to fig. 3 to 5, the present embodiment provides a technical solution: the utility model provides a pier shaft template 1 installation device of outer support 2, including pier shaft template 1 and outer support 2, pier shaft template 1 is connected with two cassettes 3, be equipped with the draw-in groove 31 of dovetail groove shape on the cassette 3, the fluting direction of the draw-in groove 31 that establishes is unanimous on two cassettes 3, be connected with two connector links 4 on the outer support 2, connector link 4 one end is equipped with tenon 41 and matches the installation with draw-in groove 31 one-to-one, in this embodiment, cassette 3 adopts the welding mode to be connected with pier shaft template 1, accomplish two cassette 3 weldings before pier shaft template 1 installation, connector link 4 and outer support 2 also adopt the welding mode to connect, the interval between two connector links 4 is unanimous with the interval between two cassettes 3, in order to guarantee that connector link 4 and cassette 3 can match the installation.
Preferably, the outer support 2 is provided with a balance lifting hole 5, the crane lifts the outer support 2 through the balance lifting hole 5, so that the outer support 2 can be stably lifted and moved without inclining, the tenons 41 of the two connecting buckles 4 can be smoothly buckled into the clamping grooves 31 of the clamping base 3, the clamping grooves 31 arranged in the clamping base 3 are non-penetrating, and the outer support 2 can be automatically locked after the tenons 41 are matched with the clamping grooves 31 for installation, so that the safety construction of workers is ensured.
Preferably, as shown in fig. 5, still be equipped with dismounting device on pier shaft template 2, specifically be connected with a jib 10 on pier shaft template 2, be connected with a fixed pulley 11 on the jib 10, fixed pulley 11 is located the top of balanced lifting eye 5, has worn a wire rope 13 on the fixed pulley 11, and wire rope 13's one end is connected with subaerial drive arrangement 14, and wire rope 13's the other end is connected with lifting hook 12, and this dismounting device's theory of operation is: the lifting hook 12 on the steel wire rope 13 is connected with the balance lifting hole 5, the driving device 14 works to pull the steel wire rope 13, the steel wire rope 13 which bypasses the fixed pulley 11 pulls the outer bracket 2 upwards, the tenon 41 connected with the outer bracket 2 is separated from the clamping groove 31, the cable wind rope 9 is connected with the outer bracket 2, the cable wind rope 9 can be controlled by manpower or a motor on the ground to pull the cable wind rope 9, the tenon 41 of the outer bracket 2 deviates from the vertical surface where the clamping groove 31 is located, for safety, the driving device 14 slowly releases the steel wire rope 13, the steel wire rope 13 slowly puts down the lifted outer bracket 2, the whole dismounting process is safe and labor-saving, and the device can be used when the outer bracket 2 is mounted.
Preferably, the outer support 2 is further provided with a building connecting hole 6, so that the upper outer support 2 and the lower outer support 2 can be conveniently connected and fixed, the pier body templates 1 are built from bottom to top, each or every several pier body templates 1 are connected with one outer support 2, the upper outer support 2 and the lower outer support 2 can be connected in series through building the connecting hole 6, and the whole peripheral safety support structure is more stable.
The clamping seat 3 is arranged on the pier body template 1, and the connecting buckle 4 matched with the clamping seat 3 is arranged on the outer support 2, so that the outer support 2 can be simply and quickly installed without being fixed in advance, the outer support 2 cannot be damaged due to operations such as carrying and installation, the outer support 2 is convenient to disassemble and easy to transfer, and the construction cost is greatly reduced; in addition, the setting of the balance lifting hole 5 on the outer support 2 can use the simple and stable movement of the crane and the installation of the outer support 2, thereby reducing the potential safety hazard, the utility model discloses can solve the problem that the installation of the outer support 2 of the pier body template 1 in the prior art is inconvenient, easy to damage and can not obtain effective turnover.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a mounting device of pier shaft template outer support, includes pier shaft template (1) and outer support (2), its characterized in that: the pier body formwork (1) is connected with two clamping seats (3), clamping grooves (31) in a dovetail groove shape are formed in the clamping seats (3), the grooving directions of the clamping grooves (31) formed in the two clamping seats (3) are consistent, the outer support (2) is connected with two connecting buckles (4), one ends of the connecting buckles (4) are provided with tenons (41), and the tenons (41) and the clamping grooves (31) are installed in a matched mode in a one-to-one mode.
2. The installation device of pier shaft template outer support of claim 1, characterized in that: the pier shaft formwork (1) and the outer support (2) are provided with screw holes (7) which are arranged at fixed intervals, the clamping seat (3) is fixedly connected with the pier shaft formwork (1) through screws, and the connecting buckle (4) is fixedly connected with the outer support (2) through screws.
3. The installation device of pier shaft template outer support of claim 2, characterized in that: the pier body template (1) is provided with two pairs of through holes, each pair of through holes are oppositely arranged on two sides of the clamping seat (3) in a one-to-one correspondence mode, positioning bolts (8) are fixed on two sides of the clamping seat (3), and the positioning bolts (8) penetrate through the through holes in a one-to-one correspondence mode.
4. The installation device of pier shaft template outer support of claim 1 or 2, characterized in that: and a balance lifting hole (5) is formed in the outer support (2).
5. The installation device of pier shaft template outer support of claim 4, characterized in that: pier shaft template (1) still is connected with a jib (10), be connected with a fixed pulley (11) on jib (10), fixed pulley (11) are located the top of balanced lifting eye (5), wear on fixed pulley (11) one wire rope (13), the one end and the subaerial drive arrangement (14) of wire rope (13) are connected, the other end of wire rope (13) is connected with lifting hook (12) that are used for wearing to establish balanced lifting eye (5).
6. The installation device of pier shaft template outer support of claim 5, characterized in that: the outer support (2) is connected with a cable rope (9).
7. The installation device of pier shaft template outer support of claim 1 or 2, characterized in that: the outer support (2) is also provided with a building connecting hole (6).
CN202020050702.1U 2020-01-10 2020-01-10 Installation device for pier body template outer support Active CN212153114U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020050702.1U CN212153114U (en) 2020-01-10 2020-01-10 Installation device for pier body template outer support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020050702.1U CN212153114U (en) 2020-01-10 2020-01-10 Installation device for pier body template outer support

Publications (1)

Publication Number Publication Date
CN212153114U true CN212153114U (en) 2020-12-15

Family

ID=73707890

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020050702.1U Active CN212153114U (en) 2020-01-10 2020-01-10 Installation device for pier body template outer support

Country Status (1)

Country Link
CN (1) CN212153114U (en)

Similar Documents

Publication Publication Date Title
CN212153114U (en) Installation device for pier body template outer support
CN211813077U (en) Prefabricated component hoist of assembly type structure
CN210460016U (en) Integrated form single power lift material platform
CN110745683A (en) Hoisting device and method for reinforcement cage of underground continuous wall
CN211948427U (en) Pile mould cofferdam assists and holds up a device
CN211899968U (en) Central suspension combined stay wire holding pole disassembling and assembling tower
CN209685129U (en) A kind of stator of steam turbine generator hanging apparatus
CN209957241U (en) Steel hanger
CN210122723U (en) Novel steel reinforcement cage gallows
CN203333224U (en) Steel structural beam upward lifting tool
CN217581111U (en) Base rigging platform for jacket of booster station
CN214935296U (en) Lifting device convenient to big inclination steel column does not have support equipment
CN215287798U (en) Material lifting device
CN218145440U (en) Large-scale aqueduct template hoist and mount balancing unit
CN217172981U (en) Be applied to jack-up hoist of water pump butt joint process
CN210823440U (en) Safe sling rack for oil tank
CN212334450U (en) Installation device for main steel structure in narrow site
CN216638729U (en) Auxiliary device is demolishd to tower crane
CN218860148U (en) Special holding pole and lifting system for hoisting shaft of Yangtze river large-span tower
CN217229918U (en) Hoisting connecting device
CN216613710U (en) Lifting appliance for carrying unit support
CN212076157U (en) Single-pile lifting appliance connected by flanges
CN217760118U (en) Steel truss integral lifting device with limiting and locking functions
CN219098494U (en) Device for hoisting and installing weight
CN213802525U (en) Hoisting device for rotor of large-scale generator motor

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210127

Address after: 214000 7-101 Xiangshan Road, Wuxi National High tech Industrial Development Zone, Wuxi City, Jiangsu Province

Patentee after: China Railway 19th Bureau Group Sixth Engineering Co.,Ltd.

Patentee after: CHINA RAILWAY 19TH BEREAU GROUP Co.,Ltd.

Address before: 214000 7-101 Xiangshan Road, Wuxi National High tech Industrial Development Zone, Wuxi City, Jiangsu Province

Patentee before: China Railway 19th Bureau Group Sixth Engineering Co.,Ltd.