CN212153095U - Bridge drainage structure capable of quickly draining water - Google Patents

Bridge drainage structure capable of quickly draining water Download PDF

Info

Publication number
CN212153095U
CN212153095U CN202020418403.9U CN202020418403U CN212153095U CN 212153095 U CN212153095 U CN 212153095U CN 202020418403 U CN202020418403 U CN 202020418403U CN 212153095 U CN212153095 U CN 212153095U
Authority
CN
China
Prior art keywords
fixedly connected
butt joint
outer side
side wall
block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020418403.9U
Other languages
Chinese (zh)
Inventor
唐荣华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhuji Yulong Intelligent Technology Co Ltd
Original Assignee
Zhuji Yulong Intelligent Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhuji Yulong Intelligent Technology Co Ltd filed Critical Zhuji Yulong Intelligent Technology Co Ltd
Priority to CN202020418403.9U priority Critical patent/CN212153095U/en
Application granted granted Critical
Publication of CN212153095U publication Critical patent/CN212153095U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sink And Installation For Waste Water (AREA)

Abstract

The utility model discloses a bridge drainage structures of drainage fast, including interface, first body, second body and roof beam structure, the inside of roof beam structure is provided with the slotted hole, and the first body of the inside fixedly connected with of slotted hole, the top of first body is provided with the interface, the first filter screen of inside fixedly connected with of first body, the inside fixedly connected with second filter screen of first body, the bottom of first body is provided with mounting structure. The utility model discloses an internally mounted at first body has first filter screen and second filter screen, can filter the inside debris of rainwater, prevents to block up in the body, and the inside water guide structure that still installs of body, and the impact force of rainwash can drive the inside flabellum that sets up of water guide structure and rotate during the use, and the flabellum rotates at pivot lateral wall flying speed and forms certain swirl and drive rivers and pass through, makes the drainage effect difficult emergence jam more fast.

Description

Bridge drainage structure capable of quickly draining water
Technical Field
The utility model relates to a drainage technical field specifically is a bridge drainage structures of drainage fast.
Background
Easy ponding in bridge surface in sleet weather, there is the traffic hidden danger in the ponding phenomenon, consequently sets up drainage structures in the bridge very key, needs the bridge drainage structures that can quick drainage that the convenient drainage effect of installation is good now, but the bridge drainage structures that can quick drainage current has many problems or defects:
firstly, the traditional bridge drainage structure capable of quickly draining water has short service life, and the pipe body is easy to damage;
secondly, the connection and fixation between the pipe body and the traditional bridge drainage structure capable of quickly draining water is inconvenient, the pipeline cannot be lengthened as required, and the use applicability is poor;
thirdly, the traditional bridge drainage structure capable of quickly draining water has poor water guiding effect, the inside of the pipe body is easy to block, and the drainage speed is low.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a bridge drainage structures of drainage fast to solve the problem that the fixed effect is not good and drainage efficiency is low in the life that proposes among the above-mentioned background art short, the body between connect.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a bridge drainage structures that can drainage fast, includes interface, first body, second body and roof beam structure, the inside of roof beam structure is provided with the slotted hole, and the first body of inside fixedly connected with of slotted hole, the top of first body is provided with the interface, the first filter screen of inside fixedly connected with of first body, the inside fixedly connected with second filter screen of first body, the bottom of first body is provided with mounting structure, and mounting structure's bottom fixedly connected with second body, all be provided with the freeze proof coating on the lateral wall of first body and second body, all be provided with wear-resisting granule on the inside wall of first body and second body, the inside fixedly connected with water guide structure of first body.
Preferably, mounting structure has from left to right set gradually preformed groove, sealing washer, first butt joint piece, tie block, screw rod, second butt joint piece, joint line and nut, the bottom of first butt joint piece is provided with the second butt joint piece, and the inside of second butt joint piece and first butt joint piece all is provided with the preformed groove, the inside swing joint in preformed groove has the screw rod.
Preferably, the outer side wall of the screw rod is provided with clamping grains which are uniformly distributed on the outer side wall of the screw rod.
Preferably, the top end of the screw rod is fixedly connected with a bolt block, the outer side wall of the screw rod is movably connected with a nut, and a sealing ring is arranged at the joint of the first butt joint block and the second butt joint block.
Preferably, the water guide structure has from left to right set gradually abrasionproof decreases coating, turning block, pivot, mount and flabellum, the inside fixedly connected with pivot of mount, and be provided with the turning block on the lateral wall of pivot, fixedly connected with flabellum on the lateral wall of turning block.
Preferably, be provided with the abrasionproof and decrease the coating on the lateral wall of flabellum, and the abrasionproof decreases the coating and be evenly distributed on the lateral wall of flabellum.
Compared with the prior art, the beneficial effects of the utility model are that: this bridge drainage structures that can drain water fast is rational in infrastructure, has following advantage:
(1) the outer side walls of the first pipe body and the second pipe body are respectively provided with the evenly distributed anti-freezing coatings, so that the pipeline has certain anti-freezing capacity in low-temperature weather, and is not easy to be frozen and damaged;
(2) the mounting structure is fixed between the first pipe body and the second pipe body, the first pipe body and the second pipe body can be in seamless butt joint through the mounting structure, the first butt joint block and the second butt joint block are firmly in butt joint when the mounting structure is used, the screw rod is inserted into the reserved grooves formed in the first butt joint block and the second butt joint block, the pipe body is connected and fastened through the nut which is screwed on the outer side wall of the screw rod in a rotating mode, the sealing ring is arranged between the first butt joint block and the second butt joint block, water flow can be prevented from leaking, the pipe body is more firmly mounted and butted through the mounting structure, the length can be selected to extend according to requirements, and the applicability is stronger;
(3) through internally mounted at first body have first filter screen and second filter screen, can filter the inside debris of rainwater, prevent to block up in the body, and the inside water guide structure that still installs of body, the impact force of rainwash can drive the inside flabellum that sets up of water guide structure and rotate during the use, and the flabellum rotates at pivot lateral wall flying speed and forms certain swirl and drive rivers and pass through, makes the difficult emergence of drainage effect jam more fast.
Drawings
Fig. 1 is a schematic front view of a cross-sectional structure of the present invention;
FIG. 2 is a schematic view of the overall installation front section structure of the bridge of the present invention;
fig. 3 is a schematic front view of the water guide structure of the present invention;
fig. 4 is a schematic top view of the water guide structure of the present invention;
fig. 5 is a schematic view of the front view of the mounting structure of the present invention.
In the figure: 1. a first filter screen; 2. an interface; 3. a second filter screen; 4. a first pipe body; 5. an anti-freeze coating; 6. a second tube body; 7. abrasion resistant particles; 8. a mounting structure; 801. reserving a groove; 802. a seal ring; 803. a first butt-joint block; 804. a bolt block; 805. a screw; 806. a second butting block; 807. clamping lines; 808. a nut; 9. a water guide structure; 901. an anti-wear coating; 902. rotating the block; 903. a rotating shaft; 904. a fixed mount; 905. a fan blade; 10. a beam frame; 11. a slot hole.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-5, the present invention provides an embodiment: a bridge drainage structure capable of quickly draining water comprises a connector 2, a first pipe body 4, a second pipe body 6 and a beam frame 10, wherein a slotted hole 11 is formed in the beam frame 10, a first pipe body 4 is fixedly connected inside the slotted hole 11, a port 2 is arranged at the top end of the first pipe body 4, a first filter screen 1 is fixedly connected inside the first pipe body 4, a second filter screen 3 is fixedly connected inside the first pipe body 4, an installation structure 8 is arranged at the bottom end of the first pipe body 4, the installation structure 8 is sequentially provided with a reserved groove 801, a sealing ring 802, a first butt joint block 803, a bolt block 804, a screw 805, a second butt joint block 806, a clamping grain 807 and a nut 808 from left to right, a second butt joint block 806 is arranged at the bottom end of the first butt joint block 803, a reserved groove 801 is formed in each of the second butt joint block 806 and the first butt joint block 803, and a screw 805 is movably connected in each of the reserved grooves 801;
the outer side wall of the screw 805 is provided with clamping grains 807, and the clamping grains 807 are uniformly distributed on the outer side wall of the screw 805;
a bolt block 804 is fixedly connected to the top end of the screw 805, a nut 808 is movably connected to the outer side wall of the screw 805, and a sealing ring 802 is arranged at the joint of the first butt joint block 803 and the second butt joint block 806;
specifically, as shown in fig. 1 and 5, when in use, the mounting structure 8 is fixed between the first tube 4 and the second tube 6, the mounting structure 8 can butt the first tube 4 and the second tube 6 seamlessly, when in use, the first butt block 803 and the second butt block 806 are butted firmly, the screw 805 is inserted into the reserved groove 801 formed inside the first butt block 803 and the second butt block 806, the nut 808 is screwed on the outer side wall of the screw 805 to complete connection and fastening of the tubes, and the sealing ring 802 is arranged between the first butt block 803 and the second butt block 806, so that water leakage can be prevented, the tubes can be more firmly connected and butted through the mounting structure 8, the length can be selected to extend according to requirements, and the applicability is stronger;
the bottom end of the mounting structure 8 is fixedly connected with a second pipe body 6, the outer side walls of the first pipe body 4 and the second pipe body 6 are both provided with an anti-freezing coating 5, the inner side walls of the first pipe body 4 and the second pipe body 6 are both provided with wear-resistant particles 7, the interior of the first pipe body 4 is fixedly connected with a water guide structure 9, the water guide structure 9 is sequentially provided with an anti-wear coating 901, a rotating block 902, a rotating shaft 903, a fixing frame 904 and fan blades 905 from left to right, the interior of the fixing frame 904 is fixedly connected with the rotating shaft 903, the outer side wall of the rotating shaft 903 is provided with the rotating block 902, and the outer side wall of the;
an anti-abrasion coating 901 is arranged on the outer side wall of the fan blade 905, and the anti-abrasion coating 901 is uniformly distributed on the outer side wall of the fan blade 905;
specifically, as shown in fig. 1, 3 and 4, when in use, the first filter screen 1 and the second filter screen 3 are installed inside the first pipe 4, so that impurities inside rainwater can be filtered, and blockage inside the pipe is prevented, and the water guide structure 9 is also installed inside the pipe, when in use, the impact force of rainwater scouring can drive the fan blades 905 arranged inside the water guide structure 9 to rotate, the fan blades 905 rotate at the outer side wall of the rotating shaft 903 at a high speed to form a certain vortex to drive water flow to pass through, so that the water drainage effect is quicker and is not easy to block;
the working principle is as follows: when the anti-freezing pipeline is used, a plurality of drainage pipelines need to be arranged inside a bridge to ensure smooth drainage inside the bridge, and the arrangement of the pipelines directly determines the drainage effect, firstly, the anti-freezing coatings 5 which are uniformly distributed are arranged on the outer side walls of the first pipe body 4 and the second pipe body 6, so that the pipelines have certain anti-freezing capacity in low-temperature weather, and are not easy to freeze and crack and damage, and the wear-resistant particles 7 are arranged on the inner side walls of the first pipe body 4 and the second pipe body 6, so that the anti-rain erosion force of the inner walls of the pipe bodies is better, the pipe bodies can be effectively protected through the arrangement of the wear-resistant particles 7 and the anti-freezing coatings 5, and the;
secondly, a mounting structure 8 is fixed between the first pipe body 4 and the second pipe body 6, the first pipe body 4 and the second pipe body 6 can be in seamless butt joint through the mounting structure 8, when the connecting structure is used, the first butt joint block 803 and the second butt joint block 806 are in firm butt joint, the screw 805 is inserted into a reserved groove 801 formed in the first butt joint block 803 and the second butt joint block 806, the connecting and fastening of the pipe bodies are completed by screwing the nut 808 on the outer side wall of the screw 805 in a rotating mode, a sealing ring 802 is arranged between the first butt joint block 803 and the second butt joint block 806, water flow can be prevented from leaking outwards, the pipe bodies can be mounted and butted more tightly through the mounting structure 8, the length extension can be selected according to requirements, and the applicability is stronger;
finally, through internally mounted at first body 4 has first filter screen 1 and second filter screen 3, can filter the inside debris of rainwater, prevent to block up in the body, and the inside water guide structure 9 that still installs of body, the impact force of rainwash can drive the inside flabellum 905 that sets up of water guide structure 9 and rotate during the use, flabellum 905 rotates at pivot 903 lateral wall flying speed and forms certain swirl and drive rivers and pass through, makes the difficult emergence of drainage effect jam more fast.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. The utility model provides a bridge drainage structures of drainage fast, includes interface (2), first body (4), second body (6) and roof beam structure (10), its characterized in that: the utility model discloses a building roof beam structure, including roof beam structure (10), and the inside fixedly connected with first body (4) of slotted hole (11), the top of first body (4) is provided with interface (2), the first filter screen (1) of inside fixedly connected with of first body (4), the inside fixedly connected with second filter screen (3) of first body (4), the bottom of first body (4) is provided with mounting structure (8), and the bottom fixedly connected with second body (6) of mounting structure (8), all be provided with freeze proof coating (5) on the lateral wall of first body (4) and second body (6), all be provided with wear-resisting granule (7) on the inside wall of first body (4) and second body (6), the inside fixedly connected with water guide structure (9) of first body (4).
2. The bridge drainage structure capable of rapidly draining water according to claim 1, wherein: mounting structure (8) have set gradually reserve groove (801), sealing washer (802), first butt joint piece (803), bolt piece (804), screw rod (805), second butt joint piece (806), joint line (807) and nut (808) from left to right, the bottom of first butt joint piece (803) is provided with second butt joint piece (806), and the inside of second butt joint piece (806) and first butt joint piece (803) all is provided with reserve groove (801), the inside swing joint of reserve groove (801) has screw rod (805).
3. The bridge drainage structure capable of rapidly draining water according to claim 2, wherein: the outer side wall of the screw (805) is provided with clamping grains (807), and the clamping grains (807) are uniformly distributed on the outer side wall of the screw (805).
4. The bridge drainage structure capable of rapidly draining water according to claim 2, wherein: the top end of the screw (805) is fixedly connected with a bolt block (804), the outer side wall of the screw (805) is movably connected with a nut (808), and a sealing ring (802) is arranged at the joint of the first butt joint block (803) and the second butt joint block (806).
5. The bridge drainage structure capable of rapidly draining water according to claim 1, wherein: the water guide structure (9) is sequentially provided with an anti-abrasion coating (901), a rotating block (902), a rotating shaft (903), a fixing frame (904) and fan blades (905) from left to right, the rotating shaft (903) is fixedly connected to the inside of the fixing frame (904), the rotating block (902) is arranged on the outer side wall of the rotating shaft (903), and the fan blades (905) are fixedly connected to the outer side wall of the rotating block (902).
6. The bridge drainage structure capable of rapidly draining water according to claim 5, wherein: the outer side wall of the fan blade (905) is provided with an anti-abrasion coating (901), and the anti-abrasion coating (901) is uniformly distributed on the outer side wall of the fan blade (905).
CN202020418403.9U 2020-03-27 2020-03-27 Bridge drainage structure capable of quickly draining water Expired - Fee Related CN212153095U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020418403.9U CN212153095U (en) 2020-03-27 2020-03-27 Bridge drainage structure capable of quickly draining water

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020418403.9U CN212153095U (en) 2020-03-27 2020-03-27 Bridge drainage structure capable of quickly draining water

Publications (1)

Publication Number Publication Date
CN212153095U true CN212153095U (en) 2020-12-15

Family

ID=73716323

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020418403.9U Expired - Fee Related CN212153095U (en) 2020-03-27 2020-03-27 Bridge drainage structure capable of quickly draining water

Country Status (1)

Country Link
CN (1) CN212153095U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116722456A (en) * 2023-04-25 2023-09-08 徐州浩海电气有限公司 Power distribution cabinet with false opening prevention effect for electrical equipment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116722456A (en) * 2023-04-25 2023-09-08 徐州浩海电气有限公司 Power distribution cabinet with false opening prevention effect for electrical equipment

Similar Documents

Publication Publication Date Title
CN212153095U (en) Bridge drainage structure capable of quickly draining water
CN213329312U (en) Anti-blocking drainage pipeline
CN206971076U (en) A kind of bridge drainage system
CN212840091U (en) Multifunctional rain sewage pipeline lining repair system
CN210975854U (en) Plugging device of deep foundation pit
CN211821310U (en) Improved petroleum conveying pipeline structure
CN201386869Y (en) Reinforced concrete pipe with flexible female and male end
CN213390253U (en) Underground anti-seepage film plug-in connector
CN218719413U (en) Reinforced concrete drain pipe convenient to butt joint
CN220644512U (en) Concealed pipe drainage device suitable for water collecting well
CN215981298U (en) Stably connected drain pipe
CN219994667U (en) Glass fiber reinforced plastic pipeline convenient to butt joint
CN217056422U (en) Anti-freezing durable ball valve
CN214789496U (en) Assembled municipal administration water supply and drainage pipeline structure
CN213871624U (en) Gully mechanical four-way joint
CN215568638U (en) Reinforced concrete spigot-and-socket pipe
CN211821110U (en) Anti-leakage jacking pipe
CN216631906U (en) Water conservancy water conservancy rotation formula desilting node
CN210830866U (en) Sealing joint for rapidly installing underwater large-diameter glass fiber reinforced plastic pipeline
CN217634370U (en) Novel rubber ring for connecting socket in non-excavation pipeline
CN217081761U (en) Municipal administration water supply and drainage is with energy-conserving drainage pipe who has interface concatenation leak protection structure
CN218437869U (en) Roofing exhaust hole device of side wall installation
CN215293873U (en) Building drainage pipe installs auxiliary device
CN215367441U (en) Basement outer wall waterproof composite structure
CN220377458U (en) Anti-frost crack lead-free drainage pipe

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201215

Termination date: 20210327

CF01 Termination of patent right due to non-payment of annual fee