CN212152978U - Spiral spike anchoring frame structure - Google Patents

Spiral spike anchoring frame structure Download PDF

Info

Publication number
CN212152978U
CN212152978U CN202020701595.4U CN202020701595U CN212152978U CN 212152978 U CN212152978 U CN 212152978U CN 202020701595 U CN202020701595 U CN 202020701595U CN 212152978 U CN212152978 U CN 212152978U
Authority
CN
China
Prior art keywords
installation sleeve
telescopic shaft
installation
sleeve
spike anchor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020701595.4U
Other languages
Chinese (zh)
Inventor
仲跻和
仲伟嫱
顾皓
陈金国
王则君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU HAIXUN RAILWAY EQUIPMENT GROUP SHARE CO Ltd
Original Assignee
JIANGSU HAIXUN RAILWAY EQUIPMENT GROUP SHARE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU HAIXUN RAILWAY EQUIPMENT GROUP SHARE CO Ltd filed Critical JIANGSU HAIXUN RAILWAY EQUIPMENT GROUP SHARE CO Ltd
Priority to CN202020701595.4U priority Critical patent/CN212152978U/en
Application granted granted Critical
Publication of CN212152978U publication Critical patent/CN212152978U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a spiral spike anchor frame structure, including first installation sleeve, first telescopic shaft is installed to one side of first installation sleeve, first telescopic shaft and first installation sleeve welded connection, the internally mounted of first telescopic shaft has the second telescopic shaft. This screw spike anchor frame structure, can the staff have more the work demand through installation accommodate the lead screw, the first installation sleeve of this device of accurate regulation and second installation sleeve's interval, guarantee that every group screw spike anchor interval is all the same, effectively avoid the device to take place to rock the interval change that leads to first installation sleeve and second installation sleeve when using, increase the practicality of device, improve the result of use of device, and convenient to use, the firm gusset of installation can increase the stability of device, make device and soft pillow be in the level and place, guarantee that screw spike anchor and soft pillow are in the perpendicular dress state, increase simultaneously that the device counter weight prevents that device from toppling over, guarantee the functional complete of device.

Description

Spiral spike anchoring frame structure
Technical Field
The utility model relates to a spiral spike anchor technical field specifically is a spiral spike anchor frame structure.
Background
At present, in the installation of train rails, sleepers are required to be used as cushion blocks for installation, the sleepers are generally of a concrete structure, and for the installation of the train rails, spiral spikes on the train rails need to be arranged on the sleepers in advance, and the spiral spikes need to be pre-buried when the concrete of the sleepers is poured.
In order to facilitate subsequent train rail installation, the screw spikes need to be ensured to be upright on the sleeper and perpendicular to the sleeper, and the stable spacing between the screw spikes on two sides needs to be ensured.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a spiral spike anchor frame structure to it can not the accurate interval of adjusting between the both sides spiral spike to present spiral spike anchor frame structure in solving above-mentioned background art, and awkward problem.
In order to achieve the above object, the utility model provides a following technical scheme: a spiral spike anchoring frame structure comprises a first installation sleeve, wherein a first telescopic shaft is installed on one side of the first installation sleeve, the first telescopic shaft is in welded connection with the first installation sleeve, a second telescopic shaft is installed inside the first telescopic shaft, the second telescopic shaft is connected with the first telescopic shaft through a clamping groove, a second installation sleeve is installed at one end of the second telescopic shaft, the second installation sleeve is in welded connection with the second telescopic shaft, soft pillows are arranged at the lower ends of the second installation sleeve and the first installation sleeve, first installation blocks are installed at the front end and the rear end of the first installation sleeve, the first installation blocks are in welded connection with the first installation sleeve, second installation blocks are installed at the front end and the rear end of the second installation sleeve, the second installation blocks are in welded connection with the second installation sleeve, and a stable rib plate is installed on one side of the first installation sleeve and one side of the second installation sleeve, the fixing rib plate is connected with the first mounting sleeve and the second mounting sleeve in a welded mode, third mounting blocks are mounted at the front end and the rear end of the fixing rib plate respectively, the third mounting blocks are connected with the fixing rib plate in a welded mode, and adjusting screw rods are mounted inside the first mounting blocks, the second mounting blocks and the third mounting blocks.
Preferably, a hand wheel is installed at one end, close to the first installation sleeve, of the adjusting screw rod, and the hand wheel is connected with the adjusting screw rod through a screw.
Preferably, the first installation sleeve one side install the third telescopic shaft, third telescopic shaft and first installation sleeve welded connection, the internally mounted of third telescopic shaft has the fourth telescopic shaft, the fourth telescopic shaft passes through the draw-in groove with the third telescopic shaft and is connected, the second installation sleeve is installed to the one end of fourth telescopic shaft, second installation sleeve and fourth telescopic shaft welded connection.
Preferably, the adjusting screw rod is connected with the first mounting block and the third mounting block through bearings, and the adjusting screw rod is connected with the second mounting block through screw rod bearings.
Preferably, the first mounting sleeve and the second mounting sleeve are internally provided with a spiral spike anchor, and the spiral spike anchor is connected with the first mounting sleeve and the second mounting sleeve through clamping grooves.
Compared with the prior art, the beneficial effects of the utility model are that:
1. according to the screw spike anchoring frame structure, the distance between a first mounting sleeve and a second mounting sleeve of the device can be precisely adjusted by installing the adjusting screw rod, so that the distance between each group of screw spike anchors is ensured to be the same, the change of the distance between the first mounting sleeve and the second mounting sleeve caused by shaking of the device in use is effectively avoided, the practicability of the device is increased, the use effect of the device is improved, the device is convenient to use, the stability of the device can be increased by installing the stable rib plate, the device and the soft pillow are horizontally placed, the screw spike anchor and the soft pillow are ensured to be in a vertical mounting state, meanwhile, the device is prevented from toppling by adding the device counter weight, and the functional integrity of the device is ensured;
2. this screw spike anchor frame structure can realize the adjustment of device interval through first telescopic shaft of installation and second telescopic shaft to in satisfying the work demand, improving the flexibility of device, the installation hand wheel can make things convenient for the staff to use more, adjust this device, makes the device more humanized.
Drawings
Fig. 1 is a half sectional view of the present invention;
FIG. 2 is a schematic front view of the present invention;
FIG. 3 is a front view of the present invention;
fig. 4 is a top view of the present invention.
In the figure: 1. a first mounting sleeve; 2. a first telescopic shaft; 3. a second telescopic shaft; 4. a third telescopic shaft; 5. a fourth telescopic shaft; 6. stabilizing the rib plate; 7. a second mounting sleeve; 8. a soft pillow; 9. a first mounting block; 10. adjusting the screw rod; 11. a hand wheel; 12. a second mounting block; 13. a screw bearing; 14. a third mounting block; 15. the screw spike anchor.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: a spiral spike anchoring frame structure comprises a first mounting sleeve 1, a first telescopic shaft 2, a second telescopic shaft 3, a third telescopic shaft 4, a fourth telescopic shaft 5, a stable rib plate 6, a second mounting sleeve 7, a soft pillow 8, a first mounting block 9, an adjusting screw rod 10, a hand wheel 11, a second mounting block 12, a screw rod bearing 13, a third mounting block 14 and a spiral spike anchor 15, wherein the first telescopic shaft 2 is mounted on one side of the first mounting sleeve 1, the first telescopic shaft 2 is welded with the first mounting sleeve 1, the second telescopic shaft 3 is mounted inside the first telescopic shaft 2, the second telescopic shaft 3 is connected with the first telescopic shaft 2 through a clamping groove, the adjustment of the distance between devices can be realized by mounting the first telescopic shaft 2 and the second telescopic shaft 3, so that the working requirement is met, the flexibility of the device is improved, the second mounting sleeve 7 is mounted at one end of the second telescopic shaft 3, the second mounting sleeve 7 is welded with the second telescopic shaft 3, soft pillows 8 are arranged at the lower ends of a second mounting sleeve 7 and a first mounting sleeve 1, first mounting blocks 9 are arranged at the front end and the rear end of the first mounting sleeve 1, the first mounting blocks 9 are connected with the first mounting sleeve 1 in a welding mode, second mounting blocks 12 are arranged at the front end and the rear end of the second mounting sleeve 7, the second mounting blocks 12 are connected with the second mounting sleeve 7 in a welding mode, a stabilizing rib plate 6 is arranged on one side of each of the first mounting sleeve 1 and the second mounting sleeve 7, the stability of the device can be improved by installing the stabilizing rib plate 6, the device and the soft pillows 8 are horizontally placed, a screw spike anchor 15 and the soft pillows 8 are in a vertical mounting state, meanwhile, the counter weight of the device is increased to prevent the device from toppling over, the functionality of the device is guaranteed to be complete, the stabilizing rib plate 6 is connected with the first mounting sleeve 1 and the second mounting sleeve 7 in a welding mode, third mounting blocks 14 are arranged, third installation piece 14 and 6 welded connection of firm gusset, first installation piece 9, accommodate the lead screw 10 is all installed to the inside of second installation piece 12 and third installation piece 14, install accommodate the lead screw 10 and can have more the work demand by the staff, the interval of the first installation sleeve 1 of this device of accurate adjustment and second installation sleeve 7, it is all the same to guarantee the 15 intervals of every group screw spike anchor, effectively avoid the device to take place to rock the interval change that leads to first installation sleeve 1 and second installation sleeve 7 when using, the practicality of device is increased, the result of use of device is improved, and convenient to use.
Furthermore, a hand wheel 11 is installed at one end, close to the first installation sleeve 1, of the adjusting screw rod 10, the hand wheel 11 is connected with the adjusting screw rod 10 through a screw, and the hand wheel 11 can be installed to be more convenient for workers to use and adjust the device, so that the device is more humanized.
Further, the installation of first installation sleeve 1 one side has third telescopic shaft 4, third telescopic shaft 4 and first installation sleeve 1 welded connection, the internally mounted of third telescopic shaft 4 has fourth telescopic shaft 5, fourth telescopic shaft 5 passes through the draw-in groove with third telescopic shaft 4 and is connected, second installation sleeve 7 is installed to the one end of fourth telescopic shaft 5, second installation sleeve 7 and fourth telescopic shaft 5 welded connection, installation third telescopic shaft 4 and fourth telescopic shaft 5 can improve the intensity of device, prevent that the device from receiving external force and warping easily, guarantee the functional complete of device.
Furthermore, the adjusting screw rod 10 is connected with the first mounting block 9 and the third mounting block 14 through bearings, the adjusting screw rod 10 is connected with the second mounting block 12 through a screw rod bearing 13, and the second mounting sleeve 7 can horizontally move on the upper end of the adjusting screw rod 10 through the screw rod bearing 13, so that the functional integrity of the device is ensured.
Further, the inside of first installation sleeve 1 and second installation sleeve 7 all is provided with spiral spike anchor 15, and spiral spike anchor 15 all is connected through the draw-in groove with first installation sleeve 1 and second installation sleeve 7, installs, and spiral spike anchor 15 passes through the draw-in groove with second installation sleeve 7 to be connected, and is easy to assemble, is favorable to improving staff's work efficiency.
The working principle is as follows: firstly, a worker places the device on the upper end of the soft pillow 8 to ensure that the stable rib plate 6 is attached to the soft pillow 8, the stable rib plate 6 can be installed to increase the stability of the device, the device and the soft pillow 8 are horizontally placed to ensure that the screw spike anchor 15 and the soft pillow 8 are in a vertical installation state, meanwhile, the balance weight of the device is increased to prevent the device from toppling over, the functional integrity of the device is ensured, then the hand wheel 11 is twisted according to the installation requirement to ensure that the adjusting screw rod 10 drives the second installation sleeve 7 to move, the installation hand wheel 11 can be more convenient for the worker to use and adjust the device, the device is more humanized, the distance between the first installation sleeve 1 and the second installation sleeve 7 is adjusted, then the screw spike anchor 15 is installed into the first installation sleeve 1 and the second installation sleeve 7, the installation adjusting screw rod 10 can meet the working requirement of the worker, the distance between the first installation sleeve 1 and the second installation sleeve 7 of the device is precisely adjusted, guarantee that every group screw spike anchor 15 interval is all the same, effectively avoid the device to take place to rock the interval change that leads to first installation sleeve 1 and second installation sleeve 7 when using, increase the practicality of device, improve the result of use of device, and convenient to use, the adjustment of device interval can be realized to first telescopic shaft 2 of this device installation and second telescopic shaft 3 to in satisfying the work demand, improve the flexibility of device.
It should be finally noted that the above only serves to illustrate the technical solution of the present invention, and not to limit the scope of the present invention, and that simple modifications or equivalent replacements performed by those skilled in the art to the technical solution of the present invention do not depart from the spirit and scope of the technical solution of the present invention.

Claims (5)

1. The utility model provides a spiral spike anchor structure, includes first installation sleeve (1), its characterized in that: a first telescopic shaft (2) is installed on one side of the first installation sleeve (1), the first telescopic shaft (2) is connected with the first installation sleeve (1) in a welded mode, a second telescopic shaft (3) is installed inside the first telescopic shaft (2), the second telescopic shaft (3) is connected with the first telescopic shaft (2) through a clamping groove, a second installation sleeve (7) is installed at one end of the second telescopic shaft (3), the second installation sleeve (7) is connected with the second telescopic shaft (3) in a welded mode, soft pillows (8) are arranged at the lower ends of the second installation sleeve (7) and the first installation sleeve (1), first installation blocks (9) are installed at the front end and the rear end of the first installation sleeve (1), the first installation blocks (9) are connected with the first installation sleeve (1) in a welded mode, second installation blocks (12) are installed at the front end and the rear end of the second installation sleeve (7), second installation piece (12) and second installation sleeve (7) welded connection, firm gusset (6) are all installed to one side of first installation sleeve (1) and second installation sleeve (7), firm gusset (6) and first installation sleeve (1) and the equal welded connection of second installation sleeve (7), third installation piece (14) are all installed at both ends around firm gusset (6), third installation piece (14) and firm gusset (6) welded connection, accommodate the lead screw (10) are all installed to the inside of first installation piece (9), second installation piece (12) and third installation piece (14).
2. The spike anchor structure of claim 1 wherein: the adjusting screw rod (10) is close to one end of the first mounting sleeve (1) and is provided with a hand wheel (11), and the hand wheel (11) is connected with the adjusting screw rod (10) through a screw.
3. The spike anchor structure of claim 1 wherein: the installation of first installation sleeve (1) one side has third telescopic shaft (4), third telescopic shaft (4) and first installation sleeve (1) welded connection, the internally mounted of third telescopic shaft (4) has fourth telescopic shaft (5), fourth telescopic shaft (5) and third telescopic shaft (4) pass through the draw-in groove and are connected, second installation sleeve (7) are installed to the one end of fourth telescopic shaft (5), second installation sleeve (7) and fourth telescopic shaft (5) welded connection.
4. A spike anchor structure according to claim 3 wherein: the adjusting screw rod (10) is connected with the first mounting block (9) and the third mounting block (14) through bearings, and the adjusting screw rod (10) is connected with the second mounting block (12) through a screw rod bearing (13).
5. The spike anchor structure of claim 1 wherein: the inside of first installation sleeve (1) and second installation sleeve (7) all is provided with spiral spike anchor (15), spiral spike anchor (15) all are connected through the draw-in groove with first installation sleeve (1) and second installation sleeve (7).
CN202020701595.4U 2020-04-30 2020-04-30 Spiral spike anchoring frame structure Active CN212152978U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020701595.4U CN212152978U (en) 2020-04-30 2020-04-30 Spiral spike anchoring frame structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020701595.4U CN212152978U (en) 2020-04-30 2020-04-30 Spiral spike anchoring frame structure

Publications (1)

Publication Number Publication Date
CN212152978U true CN212152978U (en) 2020-12-15

Family

ID=73721737

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020701595.4U Active CN212152978U (en) 2020-04-30 2020-04-30 Spiral spike anchoring frame structure

Country Status (1)

Country Link
CN (1) CN212152978U (en)

Similar Documents

Publication Publication Date Title
CN210326914U (en) Insulating support device for electric power construction
CN212152978U (en) Spiral spike anchoring frame structure
CN212078601U (en) Scaffold with safety device
CN211523849U (en) Building guardrail for civil engineering
CN209482068U (en) A kind of non-fragment orbit rail is to error-correction structure
CN213143961U (en) Support arrangement at scenic spot water drift assembled glass slide bend department
CN210858099U (en) Support frame for engineering building installation
CN209742777U (en) House building is with ladder convenient to remove walking
CN211813063U (en) Fish belly formula crane beam
CN221263234U (en) Cable support that power engineering used
CN206581088U (en) A kind of movable rail supporting arrangement of multi-state
CN221374788U (en) Novel pipeline synthesizes gallows device
CN217680449U (en) Aerial work limb protective railing
CN212337822U (en) But height-adjusting's connecting device
CN218095094U (en) Engineering cost mapping device
CN211775118U (en) Ballastless track steel reinforcement framework manufacturing device
CN217922959U (en) Novel highway engineering template supports device
CN217269255U (en) Portable rail device for construction engineering
CN217835411U (en) Adjustable cantilever support device for railway tunnel
CN218758502U (en) Inclined supporting device of elevated floor system
CN215119961U (en) Cable testing bridge antidetonation gallows
CN217949346U (en) Energy-concerving and environment-protective steel construction stabilising arrangement
CN214498141U (en) Connection structure of stair railing and upright post
CN219993048U (en) Scaffold frame
CN221704632U (en) Civil construction pipeline installation supporting structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant