CN212141832U - Industrial waste gas's preliminary treatment reaction tower - Google Patents

Industrial waste gas's preliminary treatment reaction tower Download PDF

Info

Publication number
CN212141832U
CN212141832U CN202020067079.0U CN202020067079U CN212141832U CN 212141832 U CN212141832 U CN 212141832U CN 202020067079 U CN202020067079 U CN 202020067079U CN 212141832 U CN212141832 U CN 212141832U
Authority
CN
China
Prior art keywords
fixed mounting
waste gas
air outlet
separator
treatment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020067079.0U
Other languages
Chinese (zh)
Inventor
石大庚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Tengxiang Environmental Engineering Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020067079.0U priority Critical patent/CN212141832U/en
Application granted granted Critical
Publication of CN212141832U publication Critical patent/CN212141832U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model provides a preliminary treatment reaction tower of industrial waste gas, includes treatment column, separator and discharging equipment, the even fixed mounting in both sides of treatment column bottom has the supporting leg, the upper end fixed mounting of treatment column has the fan, the air outlet department fixed mounting of fan has first air pipe, separator fixed mounting is in the other end of first air pipe, the right side of separator is seted up first air outlet, the right side fixed mounting of first air outlet has the pressure-increasing valve, the upper end fixed mounting of pressure-increasing valve has the second air pipe, discharging equipment fixed mounting is in the other end of second air pipe, the utility model discloses can very big carry out the circulation to the waste gas that the enterprise factory produced, reduce the emission, and the moisture through handling the purification department can the reutilization, fully effective waste gas treatment device that has utilized, and resource waste and cost are reduced.

Description

Industrial waste gas's preliminary treatment reaction tower
Technical Field
The utility model relates to a waste gas treatment field specifically is a pretreatment reaction tower of industrial waste gas.
Background
Industrial waste gas refers to a general term of various pollutant-containing gases discharged into air in combustion and production process engineering in a factory area of an enterprise, the waste gas contains many hazardous substances, if the waste gas is directly discharged into the atmosphere, the air can be polluted and the pollution is great to human bodies, in order to protect the ecological environment, the waste gas generated in the industrial place needs to be pretreated before being discharged, but the existing device cannot treat the waste gas with particles or much moisture, if the waste gas is directly treated by a medicament, the recycling of resources is not facilitated, the cost of the enterprise is not increased, and great waste is also caused.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an industrial waste gas's preliminary treatment reaction tower to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a preliminary treatment reaction tower of industrial waste gas, includes treatment column, separator and discharging equipment, its characterized in that: the even fixed mounting in both sides of treatment tower bottom has the supporting leg, the upper end fixed mounting of treatment tower has the fan, the air outlet department fixed mounting of fan has first air pipe, separator fixed mounting be in first air pipe's the other end, first air outlet has been seted up on separator's right side, the right side fixed mounting of first air outlet has the pressure boost valve, the upper end fixed mounting of pressure boost valve has second vent pipe way, discharging equipment fixed mounting be in the other end of second vent pipe way.
Compared with the prior art, the beneficial effects of the utility model are that: this industrial waste gas's preliminary treatment reaction tower, simple structure, it is with low costs, can be very big carry out cyclic processing to the produced waste gas in factory of enterprise, reduce the emission, and the moisture through handling purification department can reutilization, abundant effectual waste gas treatment device that has utilized has reduced wasting of resources and cost.
Drawings
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic structural view of the discharging device of the present invention.
In the figure: a treatment tower, a separation device B, a discharge device C, 1 supporting leg, 2 dosing boxes, 3 spray headers, 4 waste gas pipelines, 5 fans, 6 air outlets, 7 first ventilation pipelines, 8 second ventilation pipelines, 9 preheating catalyst layers, 10 discharge pipelines, 11 water tanks, 12 water taps, 101 separation nets, 102 compressors, 103 first air outlets, 104 booster valves and 105 waste receiving tanks.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1 and fig. 2, the present invention provides a technical solution: the utility model provides a preliminary treatment reaction tower of industrial waste gas, includes treatment column A, separator B and discharging equipment C, its characterized in that: the device comprises a treatment tower A, a fan 5, a first ventilating duct 7, a separation device B, a first air outlet 103, a pressure increasing valve 104, a second ventilating duct 8 and a discharge device C, wherein supporting legs 1 are uniformly and fixedly mounted on two sides of the bottom end of the treatment tower A, the upper end of the treatment tower A is fixedly provided with the fan 5, the air outlet of the fan 5 is fixedly provided with the first ventilating duct 7, the separation device B is fixedly mounted at the other end of the first ventilating duct 7, the right side of the separation device B is provided with the first air outlet 103, the right side of the first air outlet 103 is fixedly provided with the pressure increasing valve 104; a waste gas pipeline 4 is fixedly installed on one side of the outer part of the treatment tower A, a dosing tank 2 is fixedly installed in the treatment tower A, and a spray header 3 is fixedly installed at the top of the dosing tank 2;
specifically, when the generated waste gas is discharged into the treatment tower a through the waste gas pipeline (4), the waste gas is firstly injected with drugs to remove bacteria attached to the waste gas, then the waste gas is discharged into the separation device B through the fan 5 to be secondarily treated, and finally the waste gas is discharged into the air through the air exhaust device C.
A separation net 101 is fixedly installed in the middle of the inside of the separation device B, a compressor (102) is fixedly installed at the upper end of the separation net 101, the compressor 102 is connected with the pressure increasing valve (104), a waste receiving pool (105) is fixedly installed at the lower end of the separation net (101), a first air outlet (103) is formed in the right side of the separation device, threads are formed in the inner wall of the first air outlet (103), and one side of the pressure increasing valve (104) is sleeved with the first air outlet (103); a preheating catalyst layer (9) is fixedly installed in the discharge device (C), one side of the top end of the preheating catalyst layer (9) is communicated with one side of a discharge pipeline (10), a water tank (11) is fixedly installed at the lower end of the preheating catalyst layer (9), and a drainage faucet (12) is fixedly installed at one end of the water tank (11);
specifically, when the waste gas after sterilization treatment is discharged into the separation device (C), the inside of the separation device is pressurized through the pressurization valve (104), particulate matters in the waste gas can be separated from the waste gas due to the influence of pressure and fall into the bottom of the separation device to wait for manual treatment, the waste gas is discharged into the discharge device (C) through a pipeline in the pressurization valve (104), moisture carried by the waste gas flows into the water tank (11) through the preheating catalyst layer (9), and finally qualified waste gas is discharged into the air through an exhaust pipeline.

Claims (4)

1. A pre-treatment reaction tower for industrial waste gas comprises a treatment tower (A), a separation device (B) and a discharge device (C), and is characterized in that: the utility model discloses a wind power generation device, including handling tower (A), fan (5), air outlet department fixed mounting of fan (5), separator (B) fixed mounting have first air pipe (7), the other end of first air pipe (7), first air outlet (103) have been seted up on the right side of separator (B), the right side fixed mounting of first air outlet (103) has pressure valve (104), the upper end fixed mounting of pressure valve (104) has second air pipe (8), discharging equipment (C) fixed mounting be in the other end of second air pipe (8).
2. The pretreatment reaction tower for industrial waste gas according to claim 1, wherein: the waste gas treatment device is characterized in that a waste gas pipeline (4) is fixedly mounted on one side of the outer portion of the treatment tower (A), a dosing tank (2) is fixedly mounted inside the treatment tower (A), and a spray head (3) is fixedly mounted at the top of the dosing tank (2).
3. The pretreatment reaction tower for industrial waste gas according to claim 1, wherein: the utility model discloses a separation device, including separator (B), pressure-increasing valve (104), separator (B), separation device's (B) inside intermediate position fixed mounting has separation net (101), the upper end fixed mounting of separation net (101) has compressor (102), compressor (102) with pressure-increasing valve (104) are connected, the lower extreme fixed mounting of separation net (101) has and connects useless pond (105), first air outlet (103) have been seted up on separator's right side, the screw thread has been seted up to the inner wall of first air outlet (103), one side of pressure-increasing valve (104) with first air outlet (103) cup joint.
4. The pretreatment reaction tower for industrial waste gas according to claim 1, wherein: the inside fixed mounting of drain (C) has preheating catalysis layer (9), one side on the top of preheating catalysis layer (9) is linked together with one side of discharge line (10), the lower extreme fixed mounting who preheats catalysis layer (9) has water tank (11), the one end fixed mounting of water tank (11) has drainage tap (12).
CN202020067079.0U 2020-01-11 2020-01-11 Industrial waste gas's preliminary treatment reaction tower Expired - Fee Related CN212141832U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020067079.0U CN212141832U (en) 2020-01-11 2020-01-11 Industrial waste gas's preliminary treatment reaction tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020067079.0U CN212141832U (en) 2020-01-11 2020-01-11 Industrial waste gas's preliminary treatment reaction tower

Publications (1)

Publication Number Publication Date
CN212141832U true CN212141832U (en) 2020-12-15

Family

ID=73707520

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020067079.0U Expired - Fee Related CN212141832U (en) 2020-01-11 2020-01-11 Industrial waste gas's preliminary treatment reaction tower

Country Status (1)

Country Link
CN (1) CN212141832U (en)

Similar Documents

Publication Publication Date Title
CN209204910U (en) A kind of fountain waste gas treatment equipment
CN107297137A (en) A kind of organic waste gas treatment system
CN205461573U (en) A spray column for exhaust -gas treatment
CN210021690U (en) Industrial workshop waste gas recovery processing apparatus
CN212141832U (en) Industrial waste gas's preliminary treatment reaction tower
CN201189446Y (en) Chlorine absorption device
CN106268232B (en) A kind of processing unit and processing method of waste gas containing fluoride
CN211384519U (en) Make gas circulating water odor treatment system
CN211245973U (en) Waste gas waste heat utilization air inlet structure
CN206950959U (en) Odor gas purification system
CN205461706U (en) Take exhaust treatment device of waste heat recovery function
CN210814456U (en) High-efficient scrubbing tower of extension gaseous residence time
CN212246742U (en) Municipal sludge drying and deodorizing system
CN209180959U (en) A kind of waste liquid tank field waste gas treatment equipment
CN203043814U (en) Treatment device for toxic and harmful waste gases
CN105056709A (en) Tail gas processing method
CN207102326U (en) A kind of bio-filtration deodorization system for cesspool
CN207970677U (en) A kind of sewage disposal steam purifier
CN207137647U (en) A kind of emission-control equipment
CN216572442U (en) High-efficient biological deodorization device
CN214130935U (en) Waste gas treatment device for sewage treatment with good treatment effect
CN205287977U (en) Application exhaust gas purification device
CN110327773A (en) A kind of corona machine ozone Collection utilization system
CN204619650U (en) A kind of exhaust treatment system
CN216137010U (en) Purification spraying process system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20211105

Address after: 102600 421, floor 4, building 3, yard 38, Huangcun East Street, Daxing District, Beijing

Patentee after: Beijing TengXiang Environmental Engineering Co.,Ltd.

Address before: China Energy Construction Group Hunan Electric Power Design Institute Co., Ltd., No. 471, Laodong West Road, Changsha City, Hunan Province, 410000

Patentee before: Shi Dageng

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201215

Termination date: 20220111