CN212129450U - Lead wall structure and basement outer wall - Google Patents

Lead wall structure and basement outer wall Download PDF

Info

Publication number
CN212129450U
CN212129450U CN202020517173.1U CN202020517173U CN212129450U CN 212129450 U CN212129450 U CN 212129450U CN 202020517173 U CN202020517173 U CN 202020517173U CN 212129450 U CN212129450 U CN 212129450U
Authority
CN
China
Prior art keywords
connecting rod
nut
template
fixing
threaded sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020517173.1U
Other languages
Chinese (zh)
Inventor
孔凡伟
龚志鹏
刘欣
陈信安
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Original Assignee
First Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd filed Critical First Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Priority to CN202020517173.1U priority Critical patent/CN212129450U/en
Application granted granted Critical
Publication of CN212129450U publication Critical patent/CN212129450U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model provides a guide wall structure and a basement outer wall, belonging to the basement building field, the guide wall structure comprises a water stop plate and a first fixing piece arranged on a first template, wherein the bottom of the water stop plate is fixedly arranged at the top of the foundation, one end of the first connecting rod is fixedly connected with the water stop plate, the conical threaded sleeve and the first nut are sequentially and threadedly arranged at the other end of the first connecting rod, one end of the first connecting rod, which is far away from the water stop plate, penetrates through the first template, the conical threaded sleeve and the first nut are respectively arranged on two sides of the first template, the first template is fixed on the first connecting rod through the tapered thread sleeve and the first nut, this lead wall structure has reduced cost of labor and construction cycle, reduces the dislocation and the seepage of wall body, promotes the construction quality and the outside impression of wall body.

Description

Lead wall structure and basement outer wall
Technical Field
The utility model relates to a basement building field particularly, relates to a lead wall structure and basement outer wall.
Background
The guide wall is a construction measure mode of a construction unit, the guide wall is constructed before grooving of the underground continuous wall, the guide wall is a key for ensuring the accurate position and grooving quality of the underground continuous wall, and during construction, the guide wall always bears the static and dynamic loads of a reinforcement cage, a guide pipe for pouring concrete, a drilling machine and the like, so that formal construction of the underground continuous wall can be carried out only by careful design and construction. The construction of the basement outer wall guide wall is a key process for ensuring the construction quality of the wall and the water resistance of the outer wall. The existing construction method of the guide wall and the guide wall is complex, the installation and the disassembly of the outer wall and a pouring template of the guide wall are troublesome, the construction period is increased, the labor cost is increased, the position of the pouring template is not easy to determine, the outer wall body is easy to have a wrong platform phenomenon, the dislocation and the leakage of the outer wall body are caused, the construction quality of the outer wall body is greatly reduced, and the entity quality and the outside impression effect of structural concrete are influenced.
SUMMERY OF THE UTILITY MODEL
In order to compensate above not enough, the utility model provides a lead wall structure and basement outer wall aims at improving current lead wall and the construction method who leads the wall comparatively complicated, and the outer wall is comparatively troublesome with the template installation of pouring and the dismantlement of leading the wall to the difficult problem of confirming of position of pouring the template.
The utility model discloses a realize like this:
in a first aspect, the utility model provides a lead wall structure builds in the ground top, including stagnant water board, first mounting in first template.
The bottom of the water stop plate is fixedly arranged at the top of the foundation.
The first fixing piece comprises a first connecting rod, a conical threaded sleeve and a first nut, one end of the first connecting rod is fixedly connected with the water stop plate, and the conical threaded sleeve and the first nut are sequentially installed at the other end of the first connecting rod in a threaded mode.
The first template is arranged on two sides of the water stop plate, one end, far away from the water stop plate, of the first connecting rod penetrates through the first template, the tapered threaded sleeve and the first nut are arranged on two sides of the first template respectively, and the first template is fixed on the first connecting rod through the tapered threaded sleeve and the first nut.
The utility model discloses an in an embodiment, sealing plate bottom fixedly connected with fixed plate, the foot nail has been preset at the ground top, the foot nail top run through in the fixed plate, third nut is installed to foot nail top screw thread, third nut bottom is provided with the gasket, the fixed plate passes through the foot nail with the third nut is fixed in the ground.
In an embodiment of the present invention, the bottom of the foot nail is a Y-shape.
In an embodiment of the present invention, the first nut is close to one side of the tapered thread bushing, and a first pad is disposed on one side of the tapered thread bushing.
In an embodiment of the present invention, the first fixing member is provided with at least two, and the first fixing member is disposed on the water stop plate at equal intervals.
The second aspect, the utility model provides a basement outer wall in addition, including foretell lead wall structure, second template and second mounting.
And a guide wall body is poured between the two first templates, and the second templates are arranged on two sides of the guide wall body.
The second fixing part comprises a fixed thread sleeve, a second connecting rod and a second nut, the fixed thread sleeve is installed at the outer end of the first connecting rod in a threaded mode, the second connecting rod is installed at one end, away from the first connecting rod, of the fixed thread sleeve in a threaded mode, the second connecting rod penetrates through the second template, the fixed thread sleeve and the second nut are arranged on two sides of the second template, and the second template is fixed to the second connecting rod through the fixed thread sleeve and the second nut.
In another embodiment of the present invention, the second connecting rod is far away from the hexagonal block fixedly connected to one end of the first connecting rod.
In another embodiment of the present invention, a second pad is disposed on one side of the second nut close to the fixed thread bushing.
In another embodiment of the present invention, two opposite sides of the second form are provided with anti-crack net sheets.
In another embodiment of the present invention, the fixing thread bushing includes a cylindrical portion and a tapered portion in the plate portion, the cylindrical portion is configured to connect the first connecting rod and the second connecting rod, the plate portion is disposed at an end of the tapered portion away from the cylindrical portion, and the plate portion is fixed to the second mold plate by the second nut.
The utility model has the advantages that: the guide wall structure obtained by the design has the advantages that when the guide wall structure is used, the water stop plate is fixed on a foundation, the first templates on two sides of the water stop plate are arranged on the first connecting rod and are fixed through the first nuts and the tapered threaded sleeves, the first templates of the guide wall structure are convenient to install and disassemble, and labor cost and construction period are reduced; through the removal of first nut and toper threaded sleeve on the head rod, adjust the position and the angle of first template, promote the accuracy of first template mounted position, reduce the incidence of leading the wall wrong platform phenomenon, reduce the dislocation and the seepage of wall body, promote the construction quality and the outside impression of wall body.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings that are required to be used in the embodiments will be briefly described below, it should be understood that the following drawings only illustrate some embodiments of the present invention, and therefore should not be considered as limiting the scope, and for those skilled in the art, other related drawings can be obtained according to the drawings without inventive efforts.
Fig. 1 is a schematic structural diagram of a guide wall structure according to an embodiment of the present invention;
FIG. 2 is an enlarged view of position A of FIG. 1;
fig. 3 is a schematic structural diagram of a first fixing member according to an embodiment of the present invention;
fig. 4 is a schematic structural view of the guide wall body provided by the embodiment of the present invention after solidification;
fig. 5 is a schematic structural view of an underground outdoor wall according to an embodiment of the present invention;
fig. 6 is a schematic structural view of the solidified exterior wall body according to the embodiment of the present invention;
fig. 7 is a schematic structural view of a second fixing member according to an embodiment of the present invention;
fig. 8 is a schematic structural view of the second connecting rod dismantling device provided by the embodiment of the present invention.
In the figure: 100-a guide wall structure; 110-water stop plate; 111-a fixed plate; 120-a first fixture; 121-first connecting rod; 122-tapered thread bush; 123-a first nut; 124-a first padding; 130-a first template; 140-a guide wall body; 200-basement exterior wall; 210-a second template; 220-a second fixture; 221-fixing a threaded sleeve; 2211-cylindrical portion; 2212-taper; 2213-sheet section; 222-a second connecting rod; 223-a second nut; 224-hexagonal block; 225-a second pad; 230-anti-crack mesh sheet; 240-outer wall body; 300-a foundation; 310-foot nails; 320-a third nut; 321-spacer.
Detailed Description
To make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the drawings of the embodiments of the present invention are combined to clearly and completely describe the technical solutions of the embodiments of the present invention, and obviously, the described embodiments are some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Thus, the following detailed description of the embodiments of the present invention, presented in the accompanying drawings, is not intended to limit the scope of the invention, as claimed, but is merely representative of selected embodiments of the invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
It should be noted that: like reference numbers and letters refer to like items in the following figures, and thus, once an item is defined in one figure, it need not be further defined and explained in subsequent figures.
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and to simplify the description, but do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore should not be construed as limiting the present invention.
Furthermore, the terms "first", "second" and "first" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of the present invention, "a plurality" means two or more unless specifically limited otherwise.
In the present invention, unless otherwise expressly stated or limited, the terms "mounted," "connected," and "fixed" are to be construed broadly and may, for example, be fixedly connected, detachably connected, or integrally formed; either directly or indirectly through intervening media, either internally or in any other relationship. The specific meaning of the above terms in the present invention can be understood according to specific situations by those skilled in the art.
In the present disclosure, unless expressly stated or limited otherwise, the first feature "on" or "under" the second feature may comprise direct contact between the first and second features, or may comprise contact between the first and second features not directly. Also, the first feature being "on," "above" and "over" the second feature includes the first feature being directly on and obliquely above the second feature, or merely indicating that the first feature is at a higher level than the second feature. A first feature being "under," "below," and "beneath" a second feature includes the first feature being directly under and obliquely below the second feature, or simply meaning that the first feature is at a lesser elevation than the second feature.
Examples
Referring to fig. 1, the present invention provides a technical solution: a guide wall structure 100 is constructed on the top of a foundation 300 and comprises a water stop plate 110, a first fixing member 120 and a first template 130.
The bottom of the water stop plate 110 is fixedly installed on the top of the foundation 300.
Referring to fig. 2, in some specific embodiments, the bottom of the water stop plate 110 is fixedly connected with a fixing plate 111, a foot nail 310 is preset at the top of the foundation 300, the bottom of the foot nail 310 is Y-shaped to increase the fixing effect of the foot nail 310 in the foundation 300, the top of the foot nail 310 penetrates through the fixing plate 111, a third nut 320 is installed at the top of the foot nail 310 through a thread, a gasket 321 is arranged at the bottom of the third nut 320, the fixing plate 111 is fixed to the foundation 300 through the foot nail 310 and the third nut 320, so that the water stop plate 110 is conveniently fixed, and the fixing effect of the water stop plate 110 on the foundation 300 is better.
Referring to fig. 3, the first fixing member 120 includes a first connecting rod 121, a tapered threaded sleeve 122 and a first nut 123, one end of the first connecting rod 121 is fixedly connected to the water stop plate 110, and the tapered threaded sleeve 122 and the first nut 123 are sequentially installed at the other end of the first connecting rod 121 in a threaded manner.
Referring to fig. 4, the first mold plates 130 are disposed on two sides of the water stop plate 110, one end of the first connecting rod 121 away from the water stop plate 110 penetrates through the first mold plates 130, the tapered threaded sleeves 122 and the first nuts 123 are disposed on two sides of the first mold plates 130, the first mold plates 130 are fixed to the first connecting rods 121 through the tapered threaded sleeves 122 and the first nuts 123, and the guide wall body 140 is poured between the two first mold plates 130.
In some embodiments, at least two first fixing members 120 are provided, and the first fixing members 120 are disposed at equal distances above and below the water stop plate 110. The upper and lower equidistance setting of a plurality of first mountings 120 increases the fixed effect of first mounting 120 to first template 130 on the one hand, and on the other hand is convenient for adjust the angle of first template 130, improves the vertical degree after first template 130 installs.
Referring to fig. 5, the present invention further provides a basement exterior wall 200, which includes the above-mentioned guide wall structure 100, a second form 210 and a second fixing member 220.
Referring to fig. 6, the second formworks 210 are disposed at two sides of the guide wall body 140, and an outer wall body 240 is formed between the two second formworks 210 by casting.
In some specific embodiments, anti-crack meshes 230 are disposed on opposite sides of the two second formworks 210, and the anti-crack meshes 230 are disposed to reinforce the openings of the formworks of the outer wall, so as to ensure that concrete at the lower opening of the outer wall has no crack or breakage.
Referring to fig. 7, the second fixing member 220 includes a fixing thread bushing 221, a second connecting rod 222 and a second nut 223, the fixing thread bushing 221 is threadedly installed at an outer end of the first connecting rod 121, the second connecting rod 222 is threadedly installed at an end of the fixing thread bushing 221 away from the first connecting rod 121, the second connecting rod 222 penetrates through the second form 210, the fixing thread bushing 221 and the second nut 223 are disposed at two sides of the second form 210, and the second form 210 is fixed to the second connecting rod 222 through the fixing thread bushing 221 and the second nut 223.
In some specific embodiments, a hexagonal block 224 is fixedly connected to an end of the second connecting rod 222 away from the first connecting rod 121, and the hexagonal block 224 is configured to facilitate detachment of the second connecting rod 222 after the outer wall body 240 is solidified.
In some specific embodiments, a first pad 124 is disposed on one side of the first nut 123 close to the tapered threaded sleeve 122, a second pad 225 is disposed on one side of the second nut 223 close to the fixed threaded sleeve 221, and both the first pad 124 and the second pad 225 are disposed in an i-shape, so that the contact area between the first pad 124 and the part, the contact area between the second pad 225 and the part, and the pressure on the part are reduced, thereby preventing loosening and protecting the part.
In some specific embodiments, the fixing thread bushing 221 includes a cylindrical portion 2211, a tapered portion 2212 and a sheet portion 2213, the cylindrical portion 2211 is configured to connect the first connecting rod 121 and the second connecting rod 222, the sheet portion 2213 is disposed at an end of the tapered portion 2212 far from the cylindrical portion 2211, and the sheet portion 2213 and the second nut 223 fix the second template 210.
The working principle is as follows: when in use, the water stop plate 110 is fixed on the foundation 300, the first formworks 130 at both sides of the water stop plate 110 are installed on the first connecting rods 121, the first nut 123 is fixed with the tapered threaded sleeve 122, and by the movement of the first nut 123 and the tapered threaded sleeve 122 on the first connecting rod 121, the positions and angles of the first formworks 130 are adjusted, the guide wall body 140 is poured between the two first formworks 130, the first formworks 130 are dismantled after the guide wall body 140 is solidified, the second connecting rod 222 is fixed with the first connecting rod 121 by the fixing thread bushing 221, the second template 210 is fixed to the second connection rod 222 by the fixing thread bushing 221 and the second nut 223, then, the outer wall body 240 is poured, after the outer wall body 240 is solidified, the fixing thread bushing 221 is fixed in the outer wall body 240, the second formwork 210 is removed from the second connecting rod 222, and then the second connecting rod 222 is removed (as shown in fig. 8).
The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention, and various modifications and changes may be made by those skilled in the art. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (10)

1. A guide wall structure constructed on the top of a foundation (300) and comprising
The bottom of the water stop plate (110) is fixedly arranged at the top of the foundation (300);
the first fixing piece (120) comprises a first connecting rod (121), a tapered threaded sleeve (122) and a first nut (123), one end of the first connecting rod (121) is fixedly connected to the water stop plate (110), and the tapered threaded sleeve (122) and the first nut (123) are sequentially installed at the other end of the first connecting rod (121) in a threaded mode;
the water-stop plate comprises a first template (130), the first template (130) is arranged on two sides of the water-stop plate (110), one end, far away from the water-stop plate (110), of a first connecting rod (121) penetrates through the first template (130), a tapered threaded sleeve (122) and a first nut (123) are respectively arranged on two sides of the first template (130), and the first template (130) is fixed to the first connecting rod (121) through the tapered threaded sleeve (122) and the first nut (123).
2. The guide wall structure according to claim 1, wherein a fixing plate (111) is fixedly connected to the bottom of the water stop plate (110), a foot nail (310) is preset on the top of the foundation (300), the top of the foot nail (310) penetrates through the fixing plate (111), a third nut (320) is installed on the top of the foot nail (310) in a threaded manner, a gasket (321) is arranged at the bottom of the third nut (320), and the fixing plate (111) is fixed to the foundation (300) through the foot nail (310) and the third nut (320).
3. The guide wall structure according to claim 2, wherein the foot pin (310) is provided with a Y-shaped bottom.
4. The wall guide structure according to claim 1, characterized in that a first spacer (124) is provided on a side of the first nut (123) adjacent to the tapered threaded sleeve (122).
5. The wall guide structure according to claim 1, wherein the first fixing member (120) is provided in at least two, and the first fixing members (120) are provided equidistantly above and below the water stopping plate (110).
6. A basement exterior wall is characterized by comprising
The guide wall structure of any one of claims 1 to 5, and
the guide wall body (140) is poured between the two first templates (130), and the second templates (210) are arranged on two sides of the guide wall body (140);
the second fixing piece (220) comprises a fixing threaded sleeve (221), a second connecting rod (222) and a second nut (223), the fixing threaded sleeve (221) is installed at the outer end of the first connecting rod (121) in a threaded mode, the second connecting rod (222) is installed at one end, away from the first connecting rod (121), of the fixing threaded sleeve (221) in a threaded mode, the second connecting rod (222) penetrates through the second template (210), the fixing threaded sleeve (221) and the second nut (223) are arranged on two sides of the second template (210), and the second template (210) is fixed to the second connecting rod (222) through the fixing threaded sleeve (221) and the second nut (223).
7. The exterior wall of the basement according to claim 6, wherein a hexagonal block (224) is fixedly connected to one end of the second connecting rod (222) far away from the first connecting rod (121).
8. The basement exterior wall according to claim 6, characterized in that a second padding (225) is arranged on one side of the second nut (223) close to the fixing threaded sleeve (221).
9. The exterior wall of the basement according to claim 6, wherein the two second formworks (210) are provided with anti-crack meshes (230) on opposite sides.
10. The exterior basement wall according to claim 6, wherein the fixing thread bushing (221) comprises a cylindrical portion (2211), a tapered portion (2212) and a sheet portion (2213), the cylindrical portion (2211) is configured for connecting the first connecting rod (121) and the second connecting rod (222), the sheet portion (2213) is arranged at one end of the tapered portion (2212) far away from the cylindrical portion (2211), and the sheet portion (2213) and the second nut (223) fix the second formwork (210).
CN202020517173.1U 2020-04-09 2020-04-09 Lead wall structure and basement outer wall Expired - Fee Related CN212129450U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020517173.1U CN212129450U (en) 2020-04-09 2020-04-09 Lead wall structure and basement outer wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020517173.1U CN212129450U (en) 2020-04-09 2020-04-09 Lead wall structure and basement outer wall

Publications (1)

Publication Number Publication Date
CN212129450U true CN212129450U (en) 2020-12-11

Family

ID=73687206

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020517173.1U Expired - Fee Related CN212129450U (en) 2020-04-09 2020-04-09 Lead wall structure and basement outer wall

Country Status (1)

Country Link
CN (1) CN212129450U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113073846A (en) * 2021-04-14 2021-07-06 北京崇建工程有限公司 Template reinforcing structure and method for horizontal construction joint of underground outer wall

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113073846A (en) * 2021-04-14 2021-07-06 北京崇建工程有限公司 Template reinforcing structure and method for horizontal construction joint of underground outer wall

Similar Documents

Publication Publication Date Title
CN105971273A (en) Arc-shaped cast-in-place concrete beam based on set-shaped and quick-disassembling aluminum formworks and construction method
CN206829606U (en) Hang mould in a kind of tool-type toilet
CN212129450U (en) Lead wall structure and basement outer wall
CN103615112A (en) Construction process of metal reinforced frame bamboo plywood fabricated formwork
CN114368696A (en) Pre-buried construction method for tower crane wall-attached wall-connecting piece
CN211396591U (en) Concrete shear wall root reinforcing apparatus
CN106437146A (en) Template used for casting floor beam and construction method of floor beam
CN215055273U (en) A assembled template for installing support bracket embedded box
CN210420851U (en) Bridge bearing pad stone anchor bolt hole positioning device
CN210134654U (en) Adjustable floor control device
CN210483024U (en) Be used for reinforced (rfd) scalable reinforcement ware of local concrete placement template
CN217232721U (en) Aluminum mold toilet reinforcing device
CN208534040U (en) A kind of location structure positioned for controlling pre-buried vertical casing
CN207727982U (en) A kind of building wall corner Constructional Col-umn Construction template
CN111878636A (en) Positioning frame for installing wall-out waterproof casing and construction method thereof
CN111636678A (en) Manufacturing method of detachable toilet hanging mold supporting tool
CN212027126U (en) Template frame for concrete pouring
CN219387189U (en) Adjustable aluminum die K plate reinforcing device
CN209369369U (en) The slab thickness controller of concrete floor slab placement thickness qualification rate can be improved
CN209907976U (en) Fixed construction mould of wall body built-in fitting
CN215055378U (en) Vertical structure design template reinforcing apparatus
CN207862966U (en) A kind of bolt holes in equipment foundation is with exempting to tear steel reinforcement cage open
CN214942454U (en) Bevel angle reinforcing structure in aluminum die system
CN221219682U (en) PVC cup opening sleeve for shaping wood die
CN211816404U (en) Basement outer wall post-cast strip top-pulling combined side form

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201211

CF01 Termination of patent right due to non-payment of annual fee