Prior art keywords
fastening
fixed block
otic placode
fastening screw
shaped steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020087947.1U
Other languages
Chinese (zh)
Inventor
杨树国
邓斌
刘铃
袁桂生
薛珊
赵坚
施伟峰
栾泽恩
朱承林
范光瑞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Ming Hui Construction Co ltd
Original Assignee
Nanjing Ming Hui Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Ming Hui Construction Co ltd filed Critical Nanjing Ming Hui Construction Co ltd
Priority to CN202020087947.1U priority Critical patent/CN212122176U/en
Application granted granted Critical
Publication of CN212122176U publication Critical patent/CN212122176U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a shaped steel beam overhead installation temporary positioning fixing clamp, including fastening otic placode, steel sheet, interior nut, outer nut, fastening screw, fixed block, draw-in groove and cross the weld joint, the steel sheet sets up in the middle part of the fastening screw perpendicularly, cross the weld joint and set up at the steel sheet lower limb, the fastening otic placode is opened has the through-hole, and the fastening otic placode sets up on the fixed block, the inboard side of fixed block is provided with the draw-in groove, the fastening screw passes the fastening otic placode and sets up on the fixed block through interior nut and outer nut are fixed; the cross section of the fixing block is U-shaped, and the fixing blocks are symmetrically arranged left and right. The utility model has the advantages that: the utility model discloses a shaped steel roof beam is installed temporarily and is fixed a position mounting fixture in air has set up bilateral symmetry's fixed block and fastening screw, and simple structure is firm, easy dismounting, but cyclic utilization, the operation is assembled in the welding of being convenient for during hoist and mount shaped steel roof beam, does not influence the shaped steel roof beam outward appearance moreover.

Description

Temporary positioning and fixing clamp for overhead installation of section steel beam
Technical Field
The utility model relates to a mounting fixture especially relates to a shaped steel roof beam is installation temporarily location mounting fixture in air.
Background
At present, the steel structure construction technology in China is rapidly developed, all components are generally connected into a unit body by welding seams, bolts or rivets, and then are installed, so that the steel structure is widely applied to the fields of large-scale factory buildings, venues, super-high floors and the like. In these steel structure buildings, H-shaped steel beams are used in large quantities. The traditional H-shaped steel beam installation method is mainly characterized in that a temporary metal steel plate is welded to temporarily fix the shaped steel beam, so that the high-strength bolt installation and welding processes of the steel beam are completed, and the temporary metal steel plate is cut off after the shaped steel beam is installed. The installation method wastes a large amount of manpower, material resources and financial resources in the whole installation process, and the appearance of the steel beam is influenced by cutting off the temporary metal steel plate.
In summary, it is very important to seek a temporary positioning and fixing clamp for the overhead installation of the section steel beam, which has a stable structure, can be assembled and disassembled quickly and can be recycled.
SUMMERY OF THE UTILITY MODEL
The utility model aims at overcoming not enough among the prior art, providing a shaped steel roof beam is installation fixing fixture temporarily in the air.
This kind of interim location mounting fixture of shaped steel roof beam aerial installation, including fastening otic placode, steel sheet, interior nut, outer nut, fastening screw, fixed block, draw-in groove and cross the weld bead, the steel sheet sets up at the fastening screw middle part perpendicularly, cross the weld bead setting and follow under the steel sheet, the fastening otic placode is opened there is the through-hole, and the fastening otic placode sets up on the fixed block, the inboard side of fixed block is provided with the draw-in groove, fastening screw passes the fastening otic placode and sets up on the fixed block through interior nut and outer nut are fixed.
Preferably, the method comprises the following steps: the cross section of the fixing block is U-shaped, and the fixing blocks are symmetrically arranged left and right.
Preferably, the method comprises the following steps: the width of the notch of the clamping groove is matched with the thickness of the upper flange plate of the H-shaped steel beam.
The utility model has the advantages that: the utility model discloses a shaped steel roof beam is installed temporarily and is fixed a position mounting fixture in air has set up bilateral symmetry's fixed block and fastening screw, and simple structure is firm, easy dismounting, but cyclic utilization, the operation is assembled in the welding of being convenient for during hoist and mount shaped steel roof beam, does not influence the shaped steel roof beam outward appearance moreover.
Drawings
FIG. 1 is a schematic view of a temporary positioning and fixing clamp for overhead installation of section steel beams;
FIG. 2 is a schematic view of the temporary positioning and fixing clamp for the steel section beam in the air installation and the steel section beam fixing;
FIG. 3 is a top view of FIG. 2;
fig. 4 is a side view of fig. 2.
Description of reference numerals: 1-fastening ear plate; 2-steel plate; 3-inner nut; 4-external nut; 5-fastening screw; 6-fixed block; 7-a card slot; 8-passing the weld crater; 9-upper flange plate; 10-web; 11-lower flange plate.
Detailed Description
The present invention will be further described with reference to the following examples. The following description of the embodiments is merely provided to aid in understanding the invention. It should be noted that, for those skilled in the art, without departing from the principle of the present invention, the present invention can be further modified and modified, and such modifications and modifications also fall within the protection scope of the appended claims.
The temporary positioning and fixing clamp for overhead installation of the section steel beam comprises a fastening lug plate 1, a steel plate 2, an inner nut 3, an outer nut 4, a fastening screw 5, a fixing block 6, a clamping groove 7 and a cross welding opening 8, wherein the H-shaped steel beam consists of an upper flange plate 9, a web plate 10 and a lower flange plate 11; the steel plate 2 sets up at 5 middle parts of fastening screw perpendicularly, cross weld bead 8 and set up edge under steel plate 2, fastening otic placode 1 is opened there is the through-hole, and fastening otic placode 1 sets up on fixed block 6, the inboard side of fixed block 6 is provided with draw-in groove 7, fastening screw 5 passes fastening otic placode 1 and through the fixed setting on fixed block 6 of interior nut 3 and outer nut 4. The section of the fixed block 6 is u-shaped, and the fixed block 6 is arranged in a left-right symmetrical mode. The width of the notch of the clamping groove 7 is matched with the thickness of an upper flange plate 9 of the H-shaped steel beam.
The manufacturing and mounting method of the temporary positioning and fixing clamp for overhead mounting of the section steel beam comprises the following steps:
firstly, as shown in fig. 1, a temporary positioning and fixing clamp for overhead installation of section steel beams is manufactured and comprises a fastening lug plate 1, a steel plate 2, an inner nut 3, an outer nut 4, a fastening screw 5, a fixing block 6, a clamping groove 7 and a welding gap 8, wherein the steel plate 2 is vertically welded and fixed in the middle of the fastening screw 5, the welding gap 8 is arranged at the lower edge of the steel plate 2, the fastening lug plate 1 is provided with a through hole and welded on the fixing block 6, the clamping groove 7 is arranged on the inner side edge of the fixing block 6, the width of the clamping groove 7 is determined according to the thickness of an upper flange plate 9 of the installed H-shaped steel beam, the fastening screw 5 penetrates through the fastening lug plate 1, and the inner nut 3 and the outer nut 4.
Step two, as shown in fig. 2, fig. 3 and fig. 4, before the H-shaped steel beam is hoisted, temporary positioning fixing fixtures are installed at two ends of the H-shaped steel beam, the fastening screw 5 with the steel plate 2 is placed at the center line position of the upper flange plate 9 at the end part of the H-shaped steel beam, the inner nut 3 is screwed at the two ends of the fastening screw 5, the upper flange plate 9 is clamped by the clamping groove 7 on the fixing block 6, the through hole on the fastening lug plate 1 is penetrated into the fastening screw 5, the outer nut 4 is screwed on the fastening screw 5, the fixing block 6 and the fastening screw 5 with the steel plate 2 are fixedly connected into a whole by the inner nut 3 and the outer nut 4, and the installation of the temporary positioning fixing fixtures for the steel beam is completed.

Claims (3)

1. Shaped steel roof beam is installation fixing fixture temporarily in the air, its characterized in that: including fastening otic placode (1), steel sheet (2), interior nut (3), outer nut (4), fastening screw (5), fixed block (6), draw-in groove (7) and cross weld (8), steel sheet (2) set up perpendicularly in fastening screw (5) middle part, cross weld (8) and set up edge under steel sheet (2), fastening otic placode (1) is opened there is the through-hole, and fastening otic placode (1) sets up on fixed block (6), the inboard side of fixed block (6) is provided with draw-in groove (7), fastening screw (5) pass fastening otic placode (1) and through interior nut (3) and outer nut (4) fixed the setting on fixed block (6).
2. A profiled steel beam aerial installation temporary positioning and fixing clamp as claimed in claim 1, wherein: the cross section of the fixing block (6) is U-shaped, and the fixing block (6) is arranged in a left-right symmetrical mode.
3. A profiled steel beam aerial installation temporary positioning and fixing clamp as claimed in claim 1, wherein: the width of the notch of the clamping groove (7) is matched with the thickness of an upper flange plate (9) of the H-shaped steel beam.
CN202020087947.1U 2020-01-15 2020-01-15 Temporary positioning and fixing clamp for overhead installation of section steel beam Expired - Fee Related CN212122176U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020087947.1U CN212122176U (en) 2020-01-15 2020-01-15 Temporary positioning and fixing clamp for overhead installation of section steel beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020087947.1U CN212122176U (en) 2020-01-15 2020-01-15 Temporary positioning and fixing clamp for overhead installation of section steel beam

Publications (1)

Publication Number Publication Date
CN212122176U true CN212122176U (en) 2020-12-11

Family

ID=73674848

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020087947.1U Expired - Fee Related CN212122176U (en) 2020-01-15 2020-01-15 Temporary positioning and fixing clamp for overhead installation of section steel beam

Country Status (1)

Country Link
CN (1) CN212122176U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113186794A (en) * 2021-04-16 2021-07-30 中铁十六局集团有限公司 Construction method of corrugated steel web reinforced concrete combined prestressed box girder
CN113294003A (en) * 2021-06-18 2021-08-24 中冶天工集团有限公司 Steel beam height difference adjusting tool and using method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113186794A (en) * 2021-04-16 2021-07-30 中铁十六局集团有限公司 Construction method of corrugated steel web reinforced concrete combined prestressed box girder
CN113294003A (en) * 2021-06-18 2021-08-24 中冶天工集团有限公司 Steel beam height difference adjusting tool and using method thereof

Similar Documents

Publication Publication Date Title
CN212122176U (en) Temporary positioning and fixing clamp for overhead installation of section steel beam
CN206844322U (en) Rigid connection node of steel pipe column and H-shaped steel beam
CN110747744B (en) Positioning method of corrugated steel web and bidirectional adjusting and positioning device adopted by same
CN207260325U (en) A kind of modular architectural connection structure
CN214264430U (en) Take corbel H shaped steel roof beam butt joint crater adjusting device that staggers
CN206707016U (en) A kind of hold-down support structure of steel structural roof purlin
CN212428044U (en) Attachment device for integral lifting scaffold on steel beam
CN114809621A (en) Economical building template pulling piece and construction method thereof
CN220036183U (en) Clamp type code plate for steel beam installation
CN218025125U (en) Tower machine adjustable adheres to staple bolt device
CN218779997U (en) Safety protection device for H-shaped steel beam
CN212535184U (en) Flexural steel member reinforced structure
CN216616283U (en) Assembly type steel structure H-shaped column installation correction connection assembly
CN212169455U (en) Auxiliary tool for welding steel structure in air
CN212866373U (en) Large-size connecting plate mounting assembly for beam column node
CN219219347U (en) Connection structure of steel structural beam
CN216866040U (en) Electrolytic steel plate mounting buckle
CN221422233U (en) Steel frame structure Liang Yongka connector
CN208380096U (en) Oblique pull wirerope and I-steel fixed connection structure
CN221609218U (en) Supporting and hanging bracket mounting structure on I-shaped steel beam
CN217500545U (en) Standardized connecting node of H-shaped steel column and H-shaped steel beam
CN218091340U (en) Steel structure assembly for building factory building
CN217454397U (en) Beam end anchor sealing device for prefabricated T-shaped beam
CN220133124U (en) Steel column and I-steel beam connection structure
CN221095598U (en) Steel structure beam clamp

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201211