CN212104988U - Wall body fitment excess material mortar collecting plate that plasters - Google Patents

Wall body fitment excess material mortar collecting plate that plasters Download PDF

Info

Publication number
CN212104988U
CN212104988U CN201922067144.XU CN201922067144U CN212104988U CN 212104988 U CN212104988 U CN 212104988U CN 201922067144 U CN201922067144 U CN 201922067144U CN 212104988 U CN212104988 U CN 212104988U
Authority
CN
China
Prior art keywords
side plate
plate
bottom side
edge
side edge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922067144.XU
Other languages
Chinese (zh)
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Yigao New Energy Saving Building Materials Co ltd
Original Assignee
Yunnan Yigao New Energy Saving Building Materials Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Yigao New Energy Saving Building Materials Co ltd filed Critical Yunnan Yigao New Energy Saving Building Materials Co ltd
Priority to CN201922067144.XU priority Critical patent/CN212104988U/en
Application granted granted Critical
Publication of CN212104988U publication Critical patent/CN212104988U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model provides a wall body decoration plastering residual material mortar collecting plate, which can help collect residual material mortar falling off during plastering, reduce waste, is convenient to operate and does not interfere construction, and comprises a bottom side plate and an upper side plate, wherein the front side edge of the bottom side plate is fixedly provided with a top leaning edge, the rear side edge of the bottom side plate is fixedly provided with a rear baffle plate along the upper part, the lower part of the rear side edge of the rear side plate is fixedly provided with a support rod, the two sides of the middle part of the rear baffle plate are fixedly provided with grab handles, the rear side edge of the upper side plate is fixedly provided with an outer baffle plate along the lower part, the upper side plate can completely cover the upper part of the bottom side plate, meanwhile, the outer baffle plate leans against the outer side position of the rear baffle plate to avoid the upper side plate from deviating when the upper side plate is pressed, the middle part of the outer side plate is fixedly, the problem of the mortar on ground that drops is wasted in the construction is solved, and the foot station position of plastering workman is not influenced.

Description

Wall body fitment excess material mortar collecting plate that plasters
Technical Field
The utility model relates to a fitment construction technical field especially relates to a wall body fitment excess material mortar collecting plate that plasters.
Background
In the building decoration construction, the wall and the wall decoration occupy a large area, the wall is usually treated by whitewashing decoration, the cost is low, the effect is simple and beautiful, the wall is generally formed by pouring cast-in-place concrete or building bricks during the civil construction, the wall is rough and uneven, the coating on the surface cannot be whitewashed, the wall must be firstly subjected to a wall mortar plastering process, the wall is leveled and plastered by mortar, the whole body is leveled, the next process can be carried out, when the wall is plastered by mortar, the mortar can not be well adhered to the wall and can fall onto the ground (due to improper operation or thick plastering thickness and the like), the fallen residual mortar can be wasted, the mortar can bring troubles for cleaning the ground after solidification, but a device for collecting the residual mortar of wall plastering is lacked, to assist in collection and reduce waste.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problem of providing a wall body decoration plastering residual material mortar collecting plate which can help collect residual material mortar falling from wall body plastering, reduce waste, is convenient to operate and does not interfere construction, comprising a bottom side plate and an upper side plate, wherein the bottom side plate and the upper side plate are strip-shaped thin panels, the lengths of the bottom side plate and the upper side plate are the same, the front side edge of the bottom side plate is fixedly provided with a top-leaning edge, the rear side edge of the bottom side plate is fixedly provided with a rear baffle plate along the upper part, the lengths of the top-leaning edge and the rear baffle plate are also the same as the length of the bottom side plate, a support rod is fixedly arranged at the lower part of the rear side of the bottom side plate, the support rods can be arranged at the left side and the right side below the rear part of the bottom side plate, when the bottom position of the support rod and the front side edge of the bottom side plate are both arranged on a, the included angle formed by the top leaning edge and the bottom side plate is an acute angle, grab handles are fixedly arranged at the two sides of the middle part of the rear baffle plate, and the bottom side plate and the connected parts can be picked up by holding the grab handles by hands.
The rear side edge of the upper side plate is fixedly provided with an outer baffle plate along the lower part, the front end edge position of the upper side plate is placed to be abutted against the upper side edge part, the upper side plate completely covers the upper side edge of the bottom side plate, in addition, the outer baffle plate is abutted against the outer side position of the rear baffle plate, namely, the upper side plate can completely cover the bottom side plate from the front side edge to the rear side edge, meanwhile, the outer baffle plate is abutted against the outer side position of the rear baffle plate, so that the upper side plate can be prevented from being laterally deviated when being pressed, in addition, the outer middle position of the outer baffle plate is fixedly provided with a handle, and the handle is gripped to take up the upper side plate.
The utility model discloses a favourable effect is, it can arrange in the wall body below of operation of plastering needs, collects the clout mortar that falls down among the plastering process, solves the mortar on ground that drops in traditional construction and is by extravagant problem, just the utility model discloses do not influence the workman's of plastering foot station.
The concrete operation flow is that the front side edge of the bottom side plate is firstly propped against the lower corner position of the wall body to be plastered, meanwhile, the front side edge of the bottom side plate and the support rod are placed on the ground, the propping side edge is in a vertical state, the outer surface of the wall body is also in a vertical state, so that the propping side edge can be better attached to the lower end surface of the wall body, gaps between the propping side edge and the lower end surface of the wall body are reduced, then plastering operation can be carried out on the wall body, mortar which is not well adhered to the wall surface can be prevented from falling off in the plastering process, the mortar can fall onto the bottom side plate to be collected, the falling mortar can not be polluted by dust on the ground, in the construction process, because the bottom side plate is lifted by the support rod, a gap can exist between the bottom side plate and the ground, a worker can also extend into the gap, namely, the foot standing position of the worker is not influenced, after the wall, make the preceding end border position of top plate lean on to the limit position of leaning on to the top, like this alright cover the mortar clout that drops, the grab handle is held to back two palm positions, can press on top plate top through the thumb simultaneously, make top plate stable cover in the top, and outer baffle supports and leans on and can avoid the top plate to take place the sideslip when receiving the holding down force in the outside position of backplate, like this alright lift whole device together, later empty out the clout mortar from both sides, the clout mortar can be used for mixing once more and supplies reuse in the new mortar material, thereby reduce extravagantly, save construction material.
Specifically, the included angle that forms between the straight line that the line formed between the front side border of bottom side board and the bottom of cradling piece and the cradling piece is the acute angle, arranges in the subaerial back of level in the front side border of bottom side board and the bottom of cradling piece jointly like this, and the cradling piece is the outside tilt state, and the cradling piece forms firm acute angle triangle with bottom side board and ground like this, can improve the steadiness of supporting and prevent bottom side board skew backward.
As a further improvement, the bottom end of the support rod is fixedly provided with the support plate, the contact surface between the bottom end of the support rod and the ground can be expanded, and the support stability is improved.
As a further improvement of the above embodiment, the bottom side of the supporting plate is provided with a rubber pad, which can improve the contact friction force between the bottom side surface and the ground surface, thereby improving the supporting stability and preventing the bottom side plate from being deviated backwards.
As another improvement, a large number of micro stabs are arranged on the bottom side of the supporting plate, and as the ground of a common construction site is rough concrete, the contact friction force between the bottom side surface of the supporting plate and the ground can be improved, so that the effect is achieved.
Drawings
Fig. 1 is a perspective view of the present invention.
Fig. 2 is a schematic side view of the present invention.
Fig. 3 is a schematic perspective view of the bottom side of the supporting plate in the improved embodiment of the present invention.
Detailed Description
The following describes in detail embodiments of the present invention with reference to the accompanying drawings.
A wall body finishing plastering residual material mortar collecting plate is shown in figure 1 and comprises a bottom side plate 1 and an upper side plate 2, wherein the bottom side plate 1 and the upper side plate 2 are both strip-shaped thin panels, the lengths of the bottom side plate 1 and the upper side plate are the same, a propping side edge 11 is fixedly arranged on the front side edge of the bottom side plate 1, a rear baffle plate 12 is fixedly arranged above the rear side edge of the bottom side plate 1, the lengths of the propping side edge 11 and the rear baffle plate 12 are also the same as the length of the bottom side plate 1, a support rod 3 is fixedly arranged at the lower part of the rear side of the bottom side plate 1, the support rods 3 can be arranged at the left side and the right side below the rear side part of the bottom side plate 1, when the bottom end position of the support rod 3 and the front side edge position of the bottom side plate 1 are both arranged on a horizontal ground, as shown in a side view of figure 2, the propping side edge 11 is in a vertical state, and, handles 13 are fixedly arranged at two sides of the middle part of the rear baffle 12, and as shown in fig. 1, the bottom side plate 1 and the connected components can be taken up by holding the handles 13 by hands.
An outer baffle 21 is fixedly arranged below the rear side edge of the upper side plate 2, as shown in fig. 2, when the front end edge of the upper side plate 2 is placed to abut against the position of the top abutting edge 11, the upper side plate 2 completely covers the upper side of the bottom side plate 1, and in this state, the outer baffle 21 abuts against the outer side position of the rear baffle 12, that is, the upper side plate 2 can just completely cover the bottom side plate 1 from the front side edge to the rear side edge, and the outer baffle 21 abuts against the outer side position of the rear baffle 12 to prevent the upper side plate 2 from deviating when being pressed down, in addition, as shown in fig. 1, a handle 22 is fixedly arranged at the middle position of the outer side of the outer baffle 21, and the upper side plate 2 can be taken up by holding the handle 22.
The utility model discloses a favourable effect is, it can arrange in the wall body below of operation of plastering needs, collects the clout mortar that falls down among the plastering process, solves the mortar on ground that drops in traditional construction and is by extravagant problem, just the utility model discloses do not influence the workman's of plastering foot station.
The concrete operation flow is that the front side edge of the bottom side plate 1 is firstly abutted to the lower corner position of the wall body to be plastered, and simultaneously the front side edge of the bottom side plate 1 and the support rod 3 are placed on the ground, as shown in figure 2, the abutting side edge 11 is in a vertical state at the moment, the outer surface of the wall body is also in a vertical state, so that the abutting side edge 11 can be better attached to the lower end surface of the wall body, gaps between the abutting side edge and the support rod are reduced, then the plastering operation can be carried out on the wall body, mortar which is not well adhered to the wall surface can be prevented from falling off in the plastering process, the mortar can fall onto the bottom side plate 1 to be collected, the falling mortar can not be polluted by dust on the ground, in the construction process, because the bottom side plate 1 is lifted by the support rod 3, a gap can exist between the bottom side plate and the ground, the feet of workers can also extend into the gap, namely the feet of the, put the side plate lid of upside in the bottom side plate top, make the front end edge position of the side plate 2 lean on the limit 11 position of leaning on in the top, like this alright cover the mortar clout that drops, the grab handle 13 is held to two back palm positions, can press the top at the side plate 2 through the thumb simultaneously, make the side plate 2 stabilize the lid in the top, and outer baffle 21 supports and leans on the outside position of backplate 12 and can avoid the side deviation of the side plate 2 to take place when receiving the holding down force, like this alright lift up whole device together, later pour out the clout mortar from both sides, the clout mortar can be used for mixing again in the new mortar material for reuse, thereby reduce extravagantly, save construction material.
Specifically, as shown in fig. 2, an included angle formed between a straight line formed by a connecting line between the front side edge of the bottom side plate 1 and the bottom end of the support rod 3 and the support rod 3 is an acute angle, so that after the front side edge of the bottom side plate 1 and the bottom end of the support rod 3 are jointly placed on a horizontal ground, the support rod 3 is in an outward inclined state, so that the support rod 3, the bottom side plate 1 and the ground form a stable acute triangle, the support stability can be improved, and the bottom side plate 1 is prevented from being deviated backwards.
As a further improvement, as shown in fig. 2, a supporting plate 31 is fixedly arranged at the bottom end of the support rod 3, so that the contact surface between the bottom end of the support rod 3 and the ground can be expanded, and the supporting stability can be improved.
As a further improvement of the above embodiment, as shown in fig. 2, a rubber pad 32 is disposed on the bottom side of the supporting plate 31 to improve the contact friction force between the bottom side surface thereof and the ground, so as to improve the supporting stability and prevent the bottom side plate 1 from being deviated backward.
As another improvement, as shown in fig. 3, a large number of minute protrusions 33 are formed on the bottom side of the support plate 31, and since the ground of a general construction site is a rough concrete ground, the contact friction force between the bottom side surface of the support plate 31 and the ground can be increased, thereby achieving the aforementioned effects.
The above description of the embodiments is only intended to help understand the core idea of the present invention. It should be noted that, for those skilled in the art, without departing from the principle of the present invention, the present invention can be further modified and modified, and such modifications and modifications also fall within the protection scope of the appended claims.

Claims (5)

1. The utility model provides a wall body fitment excess material mortar collecting plate that plasters which characterized in that: the structure comprises a bottom side plate (1) and an upper side plate (2), wherein the bottom side plate (1) and the upper side plate (2) are strip-shaped thin panels, the lengths of the bottom side plate and the upper side plate are the same, a top leaning side edge (11) is fixedly arranged on the front side edge of the bottom side plate (1), a rear baffle (12) is fixedly arranged above the rear side edge of the bottom side plate (1), the lengths of the top leaning side edge (11) and the rear baffle (12) are also the same as the length of the bottom side plate (1), a support rod (3) is fixedly arranged at the lower part of the rear side of the bottom side plate (1), when the bottom end position of the support rod (3) and the front side edge position of the bottom side plate (1) are both arranged on a horizontal ground, in this state, the top leaning side edge (11) is in a vertical state, and handles (13) are fixedly arranged at the two;
the rear side edge of the upper side plate (2) is fixedly provided with an outer baffle plate (21) along the lower part, when the front end edge position of the upper side plate (2) is placed and abutted to the position abutting against the edge (11), the upper side plate (2) completely covers the upper part of the bottom side plate (1), in addition, the outer baffle plate (21) abuts against the outer side position of the rear baffle plate (12) in the state, and in addition, the middle position of the outer side of the outer baffle plate (21) is fixedly provided with a handle (22).
2. The wall finishing plastering residual mortar collecting plate as claimed in claim 1, wherein: an included angle formed between a straight line formed by a connecting line between the front side edge of the bottom side plate (1) and the bottom end of the support rod (3) and the support rod (3) is an acute angle.
3. The wall finishing plastering residual mortar collecting plate as claimed in claim 2, wherein: the bottom end of the support rod (3) is fixedly provided with a support plate (31).
4. The wall finishing plastering residual mortar collecting plate as claimed in claim 3, wherein: the bottom side of the supporting plate (31) is provided with a rubber pad (32).
5. The wall finishing plastering residual mortar collecting plate as claimed in claim 3, wherein: the bottom side of the supporting plate (31) is provided with a large number of tiny thorns (33).
CN201922067144.XU 2019-11-26 2019-11-26 Wall body fitment excess material mortar collecting plate that plasters Active CN212104988U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922067144.XU CN212104988U (en) 2019-11-26 2019-11-26 Wall body fitment excess material mortar collecting plate that plasters

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922067144.XU CN212104988U (en) 2019-11-26 2019-11-26 Wall body fitment excess material mortar collecting plate that plasters

Publications (1)

Publication Number Publication Date
CN212104988U true CN212104988U (en) 2020-12-08

Family

ID=73620004

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922067144.XU Active CN212104988U (en) 2019-11-26 2019-11-26 Wall body fitment excess material mortar collecting plate that plasters

Country Status (1)

Country Link
CN (1) CN212104988U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113445766A (en) * 2021-07-21 2021-09-28 江苏蓝圈新材料股份有限公司 Light plaster mortar construction is with floating device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113445766A (en) * 2021-07-21 2021-09-28 江苏蓝圈新材料股份有限公司 Light plaster mortar construction is with floating device

Similar Documents

Publication Publication Date Title
CN212104988U (en) Wall body fitment excess material mortar collecting plate that plasters
CN106193633A (en) One builds horizontal mortar joint controller and construction method by laying bricks or stones
CN207296442U (en) Build device by laying bricks or stones
CN201981797U (en) Mortar laying device for concrete building block
CN212897589U (en) Water collecting well mouth part mold
US7818844B2 (en) Mason's hand trowel
CN207863189U (en) A kind of secondary structure metope leak-proof device
CN211286527U (en) Ceramic tile mortar spreading tool
CN214658581U (en) Wall brick paving machine
CN210598159U (en) Mortar conveyer for construction
CN208857852U (en) A kind of waterproof layer protective device
CN207484981U (en) Secondary structure vertical member concrete construction pours device
CN211051837U (en) Anti-slip agent construction turnover box
CN201809987U (en) Mortar paving machine
CN210947599U (en) Novel civil construction structure is energy-conserving device
CN210508294U (en) Supplementary component that levels of floor tile
CN213867354U (en) Paint spraying device of green building material guardrail
CN206815767U (en) Simple vertical plastering plate
CN217610843U (en) Electric floor brush convenient for water tank separation
CN212359020U (en) Ceramic tile plastering device
CN214169754U (en) Ceramic tile installation leveling member
CN218779988U (en) Wall building assistor
CN214786158U (en) Quick mortar spreader for masonry mortar
CN217782939U (en) Plastering tool for abutted seam grooves at bottom of laminated slab
CN217537971U (en) Bricklaying tool

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant