CN212101927U - Wisdom is well lid erection equipment for community - Google Patents

Wisdom is well lid erection equipment for community Download PDF

Info

Publication number
CN212101927U
CN212101927U CN202020852798.3U CN202020852798U CN212101927U CN 212101927 U CN212101927 U CN 212101927U CN 202020852798 U CN202020852798 U CN 202020852798U CN 212101927 U CN212101927 U CN 212101927U
Authority
CN
China
Prior art keywords
well lid
wisdom
community
erection equipment
starter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020852798.3U
Other languages
Chinese (zh)
Inventor
薛虹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Yiye Chengming Intelligent Technology Co ltd
Original Assignee
Sichuan Yiye Chengming Intelligent Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Yiye Chengming Intelligent Technology Co ltd filed Critical Sichuan Yiye Chengming Intelligent Technology Co ltd
Priority to CN202020852798.3U priority Critical patent/CN212101927U/en
Application granted granted Critical
Publication of CN212101927U publication Critical patent/CN212101927U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model provides a wisdom is well lid erection equipment for community. Wisdom is well lid erection equipment for community includes the mount table, adjustment mechanism, starter and pneumatic cylinder, two specifications are the same and are used for the starter of fixed well lid to install on the mount table, and the starter is including rotating the motor, the connecting rod, axis of rotation and twitch the pole, the top fixed mounting who rotates the motor has the connecting rod of perpendicular setting, and the output fixed mounting who rotates the motor has the axis of rotation of perpendicular setting, the bottom fixed mounting of axis of rotation has the twitch pole that the level set up, and the middle part fixed connection of axis of rotation and twitch pole, an adjustment mechanism for adjusting two starter intervals installs the slip intracavity of seting up at the mount table, four edges department at the mount table lower surface are installed respectively to four pneumatic cylinders that the specification is. The utility model provides a well lid erection equipment for wisdom community has the advantage that improves well lid installation convenience and high efficiency.

Description

Wisdom is well lid erection equipment for community
Technical Field
The utility model relates to a well lid installation technical field especially relates to a wisdom is well lid erection equipment for community.
Background
The intelligent community is a mode for integrating various existing service resources of the community by using various intelligent technologies and modes and providing multiple convenient services such as government affairs, commerce, entertainment, education, medical care, life mutual assistance and the like for the community. From the application direction, the intelligent community can improve the transaction efficiency by intelligent government affairs, improve the life of people by intelligent people, build intelligent life by intelligent families, and improve the community quality by intelligent communities.
Equally divide cloth on most well lid and have two waist type holes so that the staff installs and the atmospheric pressure in the balanced sewer, and the well lid installation in the present wisdom community all adopts the manual work to install, and not only the staff wastes time and energy, and the target of the "wisdom community" of just making does not fit.
Therefore, it is necessary to provide a well lid installation device for smart communities to solve the technical problems.
SUMMERY OF THE UTILITY MODEL
The utility model provides a technical problem provide an improve well lid installation convenience and high efficiency's wisdom is well lid erection equipment for community.
For solving the technical problem, the utility model provides a wisdom is well lid erection equipment for community includes: the mount table, adjustment mechanism, starter and pneumatic cylinder, two specifications are the same and be used for the starter of fixed well lid to install on the mount table, and the starter is including rotating the motor, the connecting rod, axis of rotation and twitching the pole, the top fixed mounting who rotates the motor has the connecting rod of perpendicular setting, and the output end fixed mounting who rotates the motor has the axis of rotation of perpendicular setting, the bottom fixed mounting of axis of rotation has the twitching pole that the level set up, and the middle part fixed connection of axis of rotation and twitching pole, the slip intracavity that is seted up at the mount table is installed to the adjustment mechanism for adjusting two starter intervals, four edges department at the mount table lower surface are installed respectively to four pneumatic cylinders that the specification.
Preferably, adjustment mechanism includes the lead screw, driving motor and threaded connection piece, and the both ends of lead screw are equallyd divide do not rotate with the both sides inner wall in sliding chamber and are connected, and the one end of lead screw and fixed mounting driving motor's on the mount table output fixed connection, are equipped with two sections opposite screw threads on the lead screw, all overlap on each section screw thread section and be equipped with threaded connection's threaded connection piece, the bottom of two threaded connection pieces respectively with the top fixed connection of connecting rod in two starters.
Preferably, the two side walls of the two threaded connecting blocks are respectively connected with the inner walls of the two sides of the sliding cavity in a sliding manner, so that the problem that the threaded connecting blocks swing along with the rotation of the screw rod is solved, and the two threaded connecting blocks are symmetrically distributed on the screw rod, so that the motion tracks of the two starters are synchronous.
Preferably, the output end of the hydraulic cylinder is fixedly connected with the lower surface of the mounting table, and the bottom of the hydraulic cylinder is provided with a locking universal wheel through a mounting frame.
Preferably, the mounting table is provided with a control panel, the control panel is electrically connected with a driving motor in the adjusting mechanism and a rotating motor in the starter through leads respectively, and the hydraulic cylinder is controlled by a hydraulic system arranged in the control panel.
Preferably, the mounting table is provided with a handle for pushing the mounting table, so that the locking universal wheel arranged at the bottom of the mounting table can be pushed to move.
Compared with the prior art, the utility model provides a well lid erection equipment for wisdom community has following beneficial effect:
1. the utility model adjusts the height of the starter on the mounting platform by controlling the stroke of the hydraulic cylinder, so that the lifting rod on the starter lifts the well lid, and the hydraulic cylinder is controlled to descend after the well lid is transported to a well lid mounting area through the locking universal wheel, thereby laying the well lid on a well mouth, and leading the working personnel to save time and labor;
2. the utility model discloses open driving motor and drive the lead screw rotation, and then the interval between two starters can be adjusted according to the position of two waist type holes on the different well lids for the starter can restrict the promotion to most well lids on the market, and then has improved the application scope of well lid erection equipment;
3. the utility model discloses open and rotate the motor and drive the rotation of poker rod 90 to the skew department waist type hole of poker rod, make the mount table rise through the pneumatic cylinder, consequently, accomplish the work of mentioning of well lid, and transport the well lid behind the well lid installing zone, thereby the control pneumatic cylinder descends and lays the well lid on the well head, open and rotate the motor and drive the rotatory back of poker rod and make the mount table rise through the pneumatic cylinder, accomplish the installation of well lid, consequently, need the manual transport well lid of staff to the process on the well head when having exempted from traditional well lid installation, the convenience and the high efficiency of well lid installation have been improved.
Drawings
Fig. 1 is a schematic structural view of a preferred embodiment of the manhole cover installation device for smart communities according to the present invention;
fig. 2 is a schematic structural diagram of the starter shown in fig. 1.
Reference numbers in the figures: 1. the device comprises a mounting table, 2, a sliding cavity, 3, an adjusting mechanism, 31, a screw rod, 32, a driving motor, 33, a threaded connection block, 4, a starter, 41, a rotating motor, 42, a connecting rod, 43, a rotating shaft, 44, a lifting rod, 5, a hydraulic cylinder, 6, a locking universal wheel, 7, a control panel, 8 and a handle.
Detailed Description
The present invention will be further described with reference to the accompanying drawings and embodiments.
Please refer to fig. 1 and fig. 2 in combination, wherein fig. 1 is a schematic structural diagram of a preferred embodiment of the manhole cover installation device for smart communities according to the present invention; fig. 2 is a schematic structural diagram of the starter shown in fig. 1. Wisdom community includes with well lid erection equipment: mounting table 1, adjustment mechanism 3, starter 4 and pneumatic cylinder 5.
In the specific implementation process, as shown in fig. 1 and fig. 2, four hydraulic cylinders 5 with the same specification are respectively installed at four corners of the lower surface of the installation table 1, the output ends of the hydraulic cylinders 5 are fixedly connected with the lower surface of the installation table 1, the bottom of the hydraulic cylinders 5 is provided with locking universal wheels 6 through a mounting frame, and the installation table 1 is provided with a handle 8 for pushing the installation table 1.
It should be noted that: thereby the stroke through control pneumatic cylinder 5 is adjusted starter 4's height on 1 to the mount table to the pole 44 of encorbelmenting on starter 4 promotes the well lid and lifts by crane, transports well lid installation area back control pneumatic cylinder 5 decline with the well lid under 6 effects of locking universal wheel, thereby lay the well lid on the well head, makes staff labour saving and time saving.
Referring to fig. 1, an adjusting mechanism 3 for adjusting the distance between two starters 4 is installed in a sliding cavity 2 formed in a mounting table 1, the adjusting mechanism 3 includes a lead screw 31, a driving motor 32 and a threaded connection block 33, two ends of the lead screw 31 are equally divided and are respectively rotatably connected with inner walls of two sides of the sliding cavity 2, one end of the lead screw 31 is fixedly connected with an output end of the driving motor 32 fixedly installed on the mounting table 1, two opposite threads are arranged on the lead screw 31, the threaded connection block 33 in threaded connection is sleeved on each thread section, and bottoms of the two threaded connection blocks 33 are respectively fixedly connected with tops of connecting rods 42 in the two starters 4.
It should be noted that: open driving motor 32 and drive the lead screw 31 rotatory, because be equipped with two sections opposite screw thread sections on the lead screw 31, consequently the threaded connection piece 33 on two sections screw thread sections slides along lead screw 31 in opposite directions or back of the body mutually, and then the interval between two starters 4 can be adjusted according to the position in two waist type holes on the different well lids for starter 4 can restrict the promotion to most of well lids in the market, and then has improved well lid erection equipment's application scope.
Wherein, the both sides wall of two threaded connection blocks 33 respectively with the both sides inner wall sliding connection of sliding chamber 2, avoided threaded connection block 33 along with the rotatory wobbling problem that takes place of lead screw 31, and two threaded connection blocks 33 symmetric distribution are on lead screw 31 for two starters 4 movement tracks are synchronous.
Referring to fig. 1, two starters 4 having the same specification and used for fixing the manhole cover are installed on the installation table 1, and each starter 4 includes a rotating motor 41, a connecting rod 42, a rotating shaft 43 and a lifting rod 44, the top of the rotating motor 41 is fixedly installed with the vertically arranged connecting rod 42, the output end of the rotating motor 41 is fixedly installed with the vertically arranged rotating shaft 43, the bottom of the rotating shaft 43 is fixedly installed with the horizontally arranged lifting rod 44, and the rotating shaft 43 is fixedly connected with the middle part of the lifting rod 44.
It should be noted that: after adjusting two starters 4 and well lid waist type hole correspond on adjustment mechanism 3, make 1 decline of mount table and make the pole 44 of choosing on starter 4 pass waist type hole through pneumatic cylinder 5, open and rotate motor 41 and drive pole 44 rotatory 90 of choosing, thereby the pole 44 skew department waist type hole of choosing, make mount table 1 rise through pneumatic cylinder 5, consequently, accomplish the work of mentioning of well lid, and transport well lid to well lid installing zone back, thereby control pneumatic cylinder 5 descends and will lay the well lid on the well lid, it makes mount table 1 rise through pneumatic cylinder 5 to open to rotate motor 41 and drive pole 44 rotatory 90 back, accomplish the installation of well lid, consequently, need the manual process of carrying well lid to the well lid of staff when having exempted traditional well lid installation, the convenience and the high efficiency of well lid installation have been improved.
Wherein, install control panel 7 on the mount table 1, and control panel 7 respectively with driving motor 32 in adjustment mechanism 3, the rotation motor 41 electric connection in the starter 4 through the wire, pneumatic cylinder 5 is controlled by the hydraulic system that establishes in control panel 7.
The utility model provides a wisdom is well lid erection equipment's for community theory of operation as follows:
the driving motor 32 is started to drive the screw rod 31 to rotate, two opposite thread sections are arranged on the screw rod 31, so that the thread connecting blocks 33 on the two thread sections slide in the opposite directions or in the opposite directions along the screw rod 31, the distance between the two starters 4 can be adjusted according to the positions of two waist-shaped holes in different well covers, the starters 4 can limit and lift most of well covers in the market, the application range of well cover mounting equipment is further improved, after the two starters 4 are adjusted to correspond to the waist-shaped holes in the well covers by the adjusting mechanism 3, the mounting table 1 is lowered through the hydraulic cylinder 5, the lifting rod 44 on the starter 4 penetrates through the waist-shaped holes, the rotating motor 41 is started to drive the lifting rod 44 to rotate 90 degrees, the lifting rod 44 deviates from the waist-shaped holes, the mounting table 1 is lifted through the hydraulic cylinder 5, the lifting work of the well covers is finished, and the, thereby control pneumatic cylinder 5 descends lay the well lid on the well head, opens and rotates 41 drive of motor and choose pole 44 rotatory 90 back to make mount table 1 rise through pneumatic cylinder 5, accomplishes the installation of well lid, consequently has exempted from the manual process of carrying the well lid to the well head of staff when traditional well lid installation, has improved the convenience and the high efficiency of well lid installation.
The utility model discloses the model of the singlechip in well control panel 7 adopts AT89C52, and its structure, theory of operation and circuit diagram are this technical staff or technical manual and learn, and rotate motor 41 and adopt Y80M1-2 model, driving motor 32 adopts Y80M1-1 model, and driving motor 32 operation circuit is conventional positive and negative control program that changes, and rotate and go on the self-closing locking after every rotatory 90 of motor 41, the power supply interface of two motors passes through the switch and connects power supply system, and switch mounting is on control panel 7, realizes the rotation control of two motors, the utility model provides a circuit and control are prior art, do not carry out too much repeated here.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention.
The above is only the embodiment of the present invention, not limiting the scope of the present invention, all the equivalent structures or equivalent processes of the present invention can be used in other related technical fields, directly or indirectly, or in the same way as the present invention.

Claims (6)

1. The utility model provides a wisdom is well lid erection equipment for community which characterized in that includes:
an installation table (1);
the well lid fixing device comprises a starter (4), wherein the two starters (4) with the same specification and used for fixing the well lid are installed on an installation platform (1), each starter (4) comprises a rotating motor (41), a connecting rod (42), a rotating shaft (43) and a lifting rod (44), the top of each rotating motor (41) is fixedly provided with the vertically arranged connecting rod (42), the output end of each rotating motor (41) is fixedly provided with the vertically arranged rotating shaft (43), the bottom of each rotating shaft (43) is fixedly provided with the horizontally arranged lifting rod (44), and each rotating shaft (43) is fixedly connected with the middle of the corresponding lifting rod (44);
the adjusting mechanism (3) is used for adjusting the distance between the two starters (4) and is arranged in a sliding cavity (2) formed in the mounting table (1);
the hydraulic cylinder (5) is the same in four specifications, and the hydraulic cylinder (5) is installed at four corners of the lower surface of the installation platform (1) respectively.
2. The wisdom is well lid erection equipment for community according to claim 1, characterized in that, adjustment mechanism (3) include lead screw (31), driving motor (32) and threaded connection piece (33), the both ends of lead screw (31) are equallyd divide do not to rotate with the both sides inner wall of sliding chamber (2) and are connected, and the one end of lead screw (31) and fixed mounting are at the output fixed connection of driving motor (32) on mount table (1), be equipped with two sections opposite screw threads on lead screw (31), all overlap on each section screw thread section and be equipped with threaded connection's threaded connection piece (33), two the bottom of threaded connection piece (33) respectively with two starters (4) in the top fixed connection of connecting rod (42).
3. The wisdom community uses well lid erection equipment according to claim 2, characterized in that, two the both sides wall of threaded connection piece (33) respectively with the both sides inner wall sliding connection of sliding chamber (2), and two threaded connection piece (33) symmetric distribution are on lead screw (31).
4. The wisdom is well lid erection equipment for community of claim 1, characterized in that, the lower surface fixed connection of the output of pneumatic cylinder (5) and mount table (1), and locking universal wheel (6) are installed through the mounting bracket in the bottom of pneumatic cylinder (5).
5. The well lid erection equipment for wisdom community according to claim 1, characterized in that, install control panel (7) on mount table (1), and control panel (7) pass through the wire respectively with driving motor (32) in adjustment mechanism (3), rotation motor (41) electric connection in starter (4), hydraulic cylinder (5) are controlled by the hydraulic system of establishing in control panel (7).
6. The well lid erection equipment for wisdom community according to claim 1, characterized in that, install on mount table (1) and be used for promoting handle (8) of mount table (1).
CN202020852798.3U 2020-05-20 2020-05-20 Wisdom is well lid erection equipment for community Expired - Fee Related CN212101927U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020852798.3U CN212101927U (en) 2020-05-20 2020-05-20 Wisdom is well lid erection equipment for community

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020852798.3U CN212101927U (en) 2020-05-20 2020-05-20 Wisdom is well lid erection equipment for community

Publications (1)

Publication Number Publication Date
CN212101927U true CN212101927U (en) 2020-12-08

Family

ID=73622542

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020852798.3U Expired - Fee Related CN212101927U (en) 2020-05-20 2020-05-20 Wisdom is well lid erection equipment for community

Country Status (1)

Country Link
CN (1) CN212101927U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112723270A (en) * 2021-01-06 2021-04-30 国网山东省电力公司成武县供电公司 Electric power well lid replacing device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112723270A (en) * 2021-01-06 2021-04-30 国网山东省电力公司成武县供电公司 Electric power well lid replacing device

Similar Documents

Publication Publication Date Title
CN205915480U (en) Combined die
CN212101927U (en) Wisdom is well lid erection equipment for community
CN211624724U (en) Building engineering bid inviting management device
CN114700636A (en) Multifunctional plate cutting device for machining
CN210757730U (en) Teaching type large-scale modular robot
CN219581581U (en) Mould cooling device for gear production
CN219098578U (en) Nickel ingot transfer device
CN217419581U (en) Land leveling device for agricultural infrastructure construction
CN211346340U (en) Electric furnace building machine for refractory material production
CN210855112U (en) Simple elevator cage
CN211078260U (en) Building is built a wall and is used fragment of brick hoisting device
CN212178385U (en) Multifunctional house construction engineering reconnaissance instrument
CN211895956U (en) Electromechanical device installation engineering is with installation auxiliary device
CN206956192U (en) A kind of twin cathode turns linked to manipulator
CN110732964A (en) polishing device for processing panel furniture
CN215164454U (en) Maintenance of equipment is used in house construction municipal administration
CN206266110U (en) A kind of new gantry
CN215946555U (en) Install externally-hung wallboard hoist and mount frame of turning on one's side fast
CN218170719U (en) Carpenter hangs gong machine convenient to adjust locating plate
CN216072838U (en) Roots's fan installation overhauls specialized platform
CN217151128U (en) A mount table for green building construction
CN216355509U (en) Filtering compensation energy-saving electric device
CN215006244U (en) Turnover device of printing-down machine for printing
CN217307963U (en) Controller circuit board for air conditioner
CN219031449U (en) Suction crane for 180-degree electric turnover steel plate inspection

Legal Events

Date Code Title Description
GR01 Patent grant