CN212101655U - Pipeline hoist device for hydraulic engineering - Google Patents

Pipeline hoist device for hydraulic engineering Download PDF

Info

Publication number
CN212101655U
CN212101655U CN202020353968.3U CN202020353968U CN212101655U CN 212101655 U CN212101655 U CN 212101655U CN 202020353968 U CN202020353968 U CN 202020353968U CN 212101655 U CN212101655 U CN 212101655U
Authority
CN
China
Prior art keywords
wall
pipeline
sliding block
sliding
block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020353968.3U
Other languages
Chinese (zh)
Inventor
熊永贤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi Zonghao Construction Group Co ltd
Original Assignee
Jiangxi Zonghao Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangxi Zonghao Construction Group Co ltd filed Critical Jiangxi Zonghao Construction Group Co ltd
Priority to CN202020353968.3U priority Critical patent/CN212101655U/en
Application granted granted Critical
Publication of CN212101655U publication Critical patent/CN212101655U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a pipeline hoist device for hydraulic engineering, including handling pillar and two spacing rings, the sliding tray has all been seted up to handling pillar both sides outer wall, and sliding tray inner wall sliding connection has a sliding block, spacing frame has been cup jointed to the outside that the sliding block was kept away from each other, and the sliding block keeps away from the outside that the handling pillar has cup jointed linking frame, linking frame bottom outer wall installs the mount, and mount both ends inner wall top installs same fixed block, and fixed block top outer wall is connected with the threaded rod through the screw thread rotation. The utility model discloses in, through the connected frame who sets up sliding connection on the sliding block, can make the fixed not pipeline of unidimensional size of mount, through spacing frame, spacing ring and second locking bolt, can fix connected frame fast, rotate the threaded rod and drive the arc stripper plate and fix the pipeline, guaranteed the stability fixed to the pipeline.

Description

Pipeline hoist device for hydraulic engineering
Technical Field
The utility model relates to a hydraulic engineering technical field especially relates to a pipeline hoist device for hydraulic engineering.
Background
Hydraulic engineering is an engineering built for controlling and allocating surface water and underground water in nature to achieve the purposes of removing harmful substances and benefiting. Also known as water engineering. Water is a valuable resource essential for human production and life, but its naturally occurring state does not completely meet the needs of human beings. Only when hydraulic engineering is built, water flow can be controlled, flood disasters are prevented, and water quantity is adjusted and distributed to meet the requirements of people on water resources in life and production. Hydraulic engineering needs to build various types of hydraulic buildings such as dams, dikes, spillways, water gates, water inlets, channels, transition troughs, rafts, fishways and the like so as to achieve the aims.
At hydraulic engineering construction in-process, when installing the pipeline, need use hoist device to remove it, use the promotion to bring the pipeline now mostly and fix, but fixed insecure like this, there is danger, therefore the pipeline hoist device for hydraulic engineering that needs a urgent need solves above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the shortcoming that exists among the prior art, and the pipeline hoist device for hydraulic engineering who proposes, the problem that can effectual solution background art propose.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a pipeline hoist device for hydraulic engineering, includes handling pillar and two spacing rings, the sliding tray has all been seted up to handling pillar both sides outer wall, and sliding tray inner wall sliding connection has a sliding block, spacing frame has been cup jointed to the outside that the sliding block was kept away from each other, and the sliding block keeps away from the outside of handling pillar and has cup jointed linking frame, linking frame bottom outer wall installs the mount, and same fixed block is installed at mount both ends inner wall top, and fixed block top outer wall is connected with the threaded rod through the screw thread rotation, and handling pillar bottom outer wall both sides all rotate and are connected with first locking bolt.
Preferably, the outer wall of the bottom of the threaded rod is rotatably connected with an arc-shaped extrusion plate through a bearing, and the outer wall of the bottom of the arc-shaped extrusion plate is provided with rubber lugs distributed equidistantly.
Preferably, the outer wall of one side of the sliding block is provided with a threaded hole, and the outer wall of one side of the limiting ring is rotatably connected with a second locking bolt matched with the threaded hole through threads.
Preferably, lifting ropes are installed at four corners of the outer wall of the top of the lifting support column, and the other ends of the four lifting ropes are provided with the same connecting block.
Preferably, the outer wall of the top of the connecting block is provided with a fixed semi-ring.
Preferably, the outer wall of the top of the hoisting support column is provided with a limiting groove, the inner wall of the limiting groove is connected with a limiting plate in a sliding manner, and the other end of the limiting plate is fixedly connected with the outer wall of the top of the sliding block through a bolt.
Preferably, the mounting block is installed on one side of the outer wall of one end of the limiting plate, and the outer wall of the top of the mounting block is rotatably connected with a rotating bolt.
Compared with the prior art, the beneficial effects of the utility model are that:
1. through being provided with handling pillar, sliding block and first locking bolt, can the different length's of handling pipeline, improve the application range of device, and the sliding block can contract, makes things convenient for the staff to remove it.
2. Through the connecting frame who sets up sliding connection on the sliding block, can make the fixed not unidimensional pipeline of mount, through spacing frame, spacing ring and second locking bolt, can fix connecting frame fast, rotate the threaded rod and drive the arc stripper plate and fix the pipeline, guaranteed the stability fixed to the pipeline.
3. Embodiment 2 can support sliding block one end at the in-process of handling through setting up the limiting plate on sliding block and handling pillar, avoids the pipeline too heavily to lead to the device to damage, has improved the security of device work, through setting up rotating bolt and installation piece in limiting plate one end, can fix the limiting plate, has guaranteed fixed stability.
Drawings
Fig. 1 is a schematic view of a front view structure of a pipeline hoisting device for hydraulic engineering provided by the present invention;
fig. 2 is a schematic view of a partially enlarged structure of a pipeline hoisting device for hydraulic engineering according to the present invention;
fig. 3 is a schematic view of a locally enlarged structure of a lifting pillar according to embodiment 2 of the pipeline lifting device for hydraulic engineering of the present invention;
fig. 4 is the utility model provides a pipeline hoist device for hydraulic engineering's embodiment 2 handling pillar part cut-out structure schematic diagram.
In the figure: the device comprises a fixing frame 1, a first locking bolt 2, a lifting support 3, a connecting frame 4, a limiting frame 5, a sliding block 6, a lifting rope 7, a fixing half ring 8, a connecting block 9, a limiting ring 10, a second locking bolt 11, a fixing block 12, an arc-shaped extrusion plate 13, a threaded rod 14, a limiting plate 15, a rotating bolt 16 and an installation block 17.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, rather than all embodiments, and in the present invention, unless explicitly specified or limited otherwise, the terms "mounting", "setting", "connecting", "fixing", "screwing", and the like are to be understood in a broad sense, for example, they may be fixedly connected, detachably connected, or integrated; can be mechanically or electrically connected; they may be directly connected or indirectly connected through an intermediate medium, and may be connected through the inside of two elements or in an interaction relationship between two elements, unless otherwise specifically defined, and the specific meaning of the above terms in the present invention will be understood by those skilled in the art according to specific situations.
Example 1
Referring to fig. 1-2, a pipeline hoist device for hydraulic engineering, including handling pillar 3 and two spacing rings 10, the sliding tray has all been seted up to handling pillar 3 both sides outer wall, and sliding tray inner wall sliding connection has sliding block 6, spacing frame 5 has been cup jointed to the outside that sliding block 6 kept away from each other, and sliding block 6 keeps away from the outside that handling pillar 3 has cup jointed linking frame 4, linking frame 4 bottom outer wall installs mount 1, and same fixed block 12 is installed at mount 1 both ends inner wall top, fixed block 12 top outer wall is connected with threaded rod 14 through the screw rotation, handling pillar 3 bottom outer wall both sides all rotate and are connected with first locking bolt 2.
The utility model discloses in, 14 bottom outer walls of threaded rod are connected with arc stripper plate 13 through the bearing rotation, and 13 bottom outer walls of arc stripper plate install the rubber convex block that the equidistance distributes, and the threaded hole has been seted up to 6 one side outer walls of sliding block, and 10 one side outer walls of spacing ring rotate through the screw thread and be connected with screw hole assorted second locking bolt 11, lifting rope 7 is all installed in 3 top outer wall four corners of handling pillar, and same connecting block 9 is installed to four lifting rope 7 other ends, and fixed semi-ring 8 is installed to 9 top outer walls of connecting block.
The working principle is as follows: according to treating the length of hoist and mount pipeline during the use and pull out sliding block 6 suitable position, then use first locking bolt 2 to fix, then select with pipeline external diameter assorted mount 1, the rubber slipmat is installed to mount 1 bottom inner wall, pass the pipeline with mount 1, will connect frame 4 again slide to sliding block 6 on, limit frame 5 blocks it, then come to fix spacing ring 10 on sliding block 6 through second locking bolt 11, come to fix connecting frame 4, avoid its during operation to drop, it fixes the pipeline to rotate threaded rod 14 and drive arc stripper plate 13, it can on external sling cart to be connected to fixed semi-ring 8.
Example 2
Referring to fig. 1-4, a pipeline hoist device for hydraulic engineering still includes that 3 top outer walls of handling pillar have seted up the spacing groove, and spacing inslot wall sliding connection has limiting plate 15, and the limiting plate 15 other end passes through bolt and 6 top outer walls fixed connection of sliding block, and installation piece 17 is installed to limiting plate 15 one end outer wall one side, and installation piece 17 top outer wall rotates to be connected with and rotates bolt 16.
The working principle is as follows: compared with the embodiment 1, through setting up limiting plate 15 on sliding block 6 and handling pillar 3, can support sliding block 6 one end at the in-process of handling, avoid the pipeline too heavily to cause the device to damage, improved the security of device work, through setting up at the rotation bolt 16 and the installation piece 17 of limiting plate 15 one end, can fix limiting plate 15, guaranteed fixed stability.
The utility model discloses the standard part that well used all can be purchased from market, and the concrete connection mode of each part all adopts conventional means such as ripe bolt, rivet, welding among the prior art, and machinery, part and equipment all adopt conventional model among the prior art.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (7)

1. The utility model provides a pipeline hoist device for hydraulic engineering, includes handling pillar (3) and two spacing rings (10), its characterized in that, the sliding tray has all been seted up to handling pillar (3) both sides outer wall, and sliding tray inner wall sliding connection has sliding block (6), spacing frame (5) have been cup jointed to the outside that sliding block (6) kept away from each other, and sliding block (6) keep away from the outside of handling pillar (3) and cup jointed linking frame (4), linking frame (4) bottom outer wall is installed mount (1), and same fixed block (12) are installed at mount (1) both ends inner wall top, and fixed block (12) top outer wall is connected with threaded rod (14) through the screw rotation, and handling pillar (3) bottom outer wall both sides all rotate and are connected with first locking bolt (2).
2. The pipeline hoisting device for the water conservancy project according to claim 1, wherein the outer wall of the bottom of the threaded rod (14) is rotatably connected with an arc-shaped extrusion plate (13) through a bearing, and rubber lugs distributed at equal intervals are arranged on the outer wall of the bottom of the arc-shaped extrusion plate (13).
3. The pipeline hoisting device for the water conservancy project according to claim 1, wherein a threaded hole is formed in the outer wall of one side of the sliding block (6), and a second locking bolt (11) matched with the threaded hole is rotatably connected to the outer wall of one side of the limiting ring (10) through threads.
4. The pipeline hoisting device for the water conservancy project according to claim 1, wherein hoisting ropes (7) are installed at four corners of the outer wall of the top of the hoisting support column (3), and the same connecting block (9) is installed at the other ends of the four hoisting ropes (7).
5. The pipeline hoisting device for the water conservancy project according to claim 4, wherein the top outer wall of the connecting block (9) is provided with a fixed half ring (8).
6. The pipeline hoisting device for the water conservancy project according to claim 1, wherein a limiting groove is formed in the outer wall of the top of the hoisting support column (3), a limiting plate (15) is connected to the inner wall of the limiting groove in a sliding manner, and the other end of the limiting plate (15) is fixedly connected with the outer wall of the top of the sliding block (6) through a bolt.
7. The pipeline hoisting device for the water conservancy project according to claim 6, wherein a mounting block (17) is mounted on one side of the outer wall of one end of the limiting plate (15), and a rotating bolt (16) is rotatably connected to the outer wall of the top of the mounting block (17).
CN202020353968.3U 2020-03-19 2020-03-19 Pipeline hoist device for hydraulic engineering Expired - Fee Related CN212101655U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020353968.3U CN212101655U (en) 2020-03-19 2020-03-19 Pipeline hoist device for hydraulic engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020353968.3U CN212101655U (en) 2020-03-19 2020-03-19 Pipeline hoist device for hydraulic engineering

Publications (1)

Publication Number Publication Date
CN212101655U true CN212101655U (en) 2020-12-08

Family

ID=73638511

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020353968.3U Expired - Fee Related CN212101655U (en) 2020-03-19 2020-03-19 Pipeline hoist device for hydraulic engineering

Country Status (1)

Country Link
CN (1) CN212101655U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114030981A (en) * 2021-10-22 2022-02-11 廖寿佳 Petroleum pipeline installation lifting appliance capable of achieving closed polishing

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114030981A (en) * 2021-10-22 2022-02-11 廖寿佳 Petroleum pipeline installation lifting appliance capable of achieving closed polishing
CN114030981B (en) * 2021-10-22 2024-04-12 江苏飞特嘉信息技术工程有限公司 Petroleum pipeline installation lifting appliance capable of conducting closed polishing

Similar Documents

Publication Publication Date Title
CN212101655U (en) Pipeline hoist device for hydraulic engineering
CN212133787U (en) Water level monitor for hydraulic engineering monitoring
CN107747566B (en) A kind of immersible pump underground fixed mechanism
CN213039966U (en) Fixed device that holds that adds of hydraulic engineering construction pipeline
CN211948288U (en) Over-and-under type water sluicegate for hydraulic engineering
CN210013827U (en) High-lift submersible pump
CN208054764U (en) Construction material is vertical and horizontal transporter
CN210262905U (en) Novel hydraulic engineering construction drainage device
CN212475945U (en) Tower crane hoisting mechanism brake protection device
CN211521316U (en) Single-rope winding type hoister for coal mine
CN212002629U (en) Foundation pit safety protection device for highway safety management
CN211110700U (en) Hoisting accessory is used in construction of integrated house
CN212716008U (en) A dish is hung in construction for municipal works and room are built
CN217972366U (en) Construction lifting device for engineering
CN212616208U (en) Novel horizontal speed reducer
CN214368234U (en) Hydraulic pipeline strutting arrangement for hydraulic engineering
CN217948965U (en) Reservoir flashboard that hydraulic engineering construction was used
CN209758921U (en) Endless chain elevator
CN210507305U (en) Hydraulic engineering flood prevention composite module fixing device
CN214050586U (en) A filter equipment for water conservancy water and electricity
CN215671991U (en) Hydraulic engineering construction auxiliary device that ascends a height
CN211256899U (en) Gate intercepting device for hydraulic engineering
CN212837879U (en) Star-shaped tray for anchor rod
CN209308382U (en) A kind of band limit safety lock is used for the climbing frame of assembled architecture
CN211340699U (en) Water sluicegate lifting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201208