CN212101615U CN202020556320.6U CN202020556320U CN212101615U CN 212101615 U CN212101615 U CN 212101615U CN 202020556320 U CN202020556320 U CN 202020556320U CN 212101615 U CN212101615 U CN 212101615U
Authority
CN
China
Prior art keywords
hoisting
water
head
convenient
cooled wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020556320.6U
Other languages
Chinese (zh)
Inventor
丁石磊
孟庆君
柴建忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020556320.6U priority Critical patent/CN212101615U/en
Application granted granted Critical
Publication of CN212101615U publication Critical patent/CN212101615U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model discloses a boiler construction water wall rapid construction hoisting device, which comprises a balancing pole, the top end of the balancing pole is provided with a hanging head, the bottom surface of the hanging head is provided with two balancing chains, the bottom ends of the balancing chains are connected with the balancing pole, the bottom end of the balancing rod is provided with a pull head which is connected with the balancing rod in a sliding way, two sides in the balancing rod are provided with hydraulic cylinders, the output end of the hydraulic cylinder is connected with the pull head, the utility model solves the problem that the existing chain for hoisting the water-cooled wall has single functionality, and the position is inconvenient to adjust, so that the process of hoisting the water-cooled wall is not stable enough, the installation of workers on the water-cooled wall is affected, through the structure to hoist chain improvement and optimization for cooperation hoisting machine and water-cooled wall that hoist chain can be stable are convenient for remove the water-cooled wall that can be stable at the in-process to water-cooled wall hoist and mount.

Description

Quick construction hoisting device for boiler construction water-cooled wall
Technical Field
The utility model relates to a hoist device technical field specifically is a quick construction hoist device of boiler construction water-cooling wall.
Background
The water-cooled wall is the main heated portion of boiler, and it comprises several rows of steel pipes, distributes around boiler furnace, and its inside is flowing water or steam, and the external world accepts the heat of boiler furnace's flame, and the pipe wall is heated, and the water-cooled wall often need align through hoisting machine and hoist because the volume is great and the quality is heavier, often need utilize the chain when hoisting to the water-cooled wall, but the current chain to the water-cooled wall hoist and mount has following problem: the chain function of the existing chain for hoisting the water-cooled wall is too single, and the position is inconvenient to adjust, so that the process of hoisting the water-cooled wall is not stable enough, and workers are influenced to install the water-cooled wall.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a boiler construction water-cooling wall is hoist device that is under construction fast aims at improving the current chain functionality of hoist and mount to the water-cooling wall too singlely, and the position is inconvenient to be adjusted, leads to the process of carrying out the hoist and mount to the water-cooling wall to be stable inadequately, influences the problem that the staff carries out the installation to the water-cooling wall.
The utility model discloses a realize like this:
a boiler construction water-cooled wall rapid construction hoisting device comprises a balance rod, wherein a hoisting head is arranged at the top end of the balance rod, two balance chains are arranged on the bottom surface of the hoisting head, the bottom ends of the balance chains are connected with the balance rod, a pulling head is arranged at the bottom end of the balance rod, the pulling head is connected with the balance rod in a sliding manner, hydraulic cylinders are arranged on two sides inside the balance rod, and the output end of each hydraulic cylinder is connected with the pulling head; the balancing pole is convenient for install each part of individual hoist device, be convenient for whole hoist device's equipment and use, the hanging head is convenient for cooperate the hoist machine, thereby make things convenient for and the output of hoist machine to link together, balanced chain is convenient for with stable connection between hanging head and the balancing pole, be convenient for whole balancing pole can be stable when hoist and mount be in same horizontal position, the pull head is convenient for be connected with the water-cooling wall, thereby conveniently hoist the water-cooling wall through the balancing head, and also can carry out the regulation of minizone at the in-process of hoist and mount to the position of water-cooling wall through the regulation of pull head, the staff of being convenient for installs the water-cooling wall, the pneumatic cylinder is convenient for drive the pull head, and then the position of making things.
Furthermore, connecting buckles are symmetrically arranged at the positions, close to the two sides, of the top end of the balancing rod, and sliding openings are formed in the bottom end of the balancing rod; the connecting buckle is convenient for the balance bar to be connected with the hanging head, so that the hanging head is convenient to be matched with the balance bar to be used, the sliding opening is convenient for the pull head to be in sliding connection with the bottom end of the balance bar, and the position of the water-cooled wall being hoisted can be adjusted conveniently through adjustment of the pull head.
Furthermore, a hanging ring is welded at the top end of the hanging head, and connecting rings are symmetrically arranged on two sides of the bottom surface of the hanging head; the hoisting ring is convenient for the hoisting head to be connected with the output end of the hoisting machine, so that the whole hoisting device is convenient to connect with the hoisting machine, the connecting ring is convenient for installing the balance chain, and the balance chain is convenient to use.
Further, the pull head comprises a slide block, an adapter, hoisting chains and a hook, the adapter is connected to the bottom end of the slide block, the two hoisting chains are connected to the bottom of the adapter, and the hook is rotatably connected to the bottom of the hoisting chains; the slider is convenient for pull head and balancing pole sliding connection, and the regulation and the use of the pull head of being convenient for, the adapter is convenient for the slider and links together with the hoist and mount chain, and the hoist and mount chain of being convenient for cooperates the slider to use, and the couple is convenient for pull head and water-cooled wall link together, the use of the pull head of being convenient for.
Furthermore, clamping grooves are formed in two sides of the sliding block, a connecting ring is arranged on the bottom surface of the sliding block, the adapter is integrally 8-shaped, a connecting rod is arranged at the bottom end of the hoisting chain, and the connecting rod is connected with the hook through a pin; the draw-in groove is convenient for the slider card and is located the sliding opening, the stable use of the slider of being convenient for, the go-between is convenient for slider and adapter and is connected, the use of the adapter of being convenient for, the adapter is 8 fonts to make things convenient for adapter and slider and hoist and mount chain to be connected, the connecting rod is convenient for hoist and mount chain and couple to rotate and connect, the use of the chain of being convenient for hoist and mount.
Furthermore, connecting plates are arranged at two ends of the hydraulic cylinder, and connecting holes are arranged at four corners of each connecting plate; the connecting plate is convenient for the hydraulic cylinder to be connected with the balance rod and the sliding block together, the hydraulic cylinder is convenient to use, the connecting hole is convenient for the bolt to pass, and therefore the hydraulic cylinder is convenient to be connected with the balance rod and the sliding block together through the bolt.
Link together hanging head and balancing pole earlier during the use, it is stable to guarantee to connect between pneumatic cylinder and the pull head simultaneously, later link together the output of hanging head and hoisting machine, later drive whole hoisting device and remove to the water-cooled wall next door under the defeated of hoisting machine, later link together couple and water-cooled wall, then alright lift by crane the water-cooled wall through hoisting machine, if need finely tune the position of water-cooled wall at the in-process that lifts by crane, the flexible water-cooled wall that can stimulate of hoist and mount chain removes in the certain extent of accessible control pneumatic cylinder, and then conveniently improved the use flexibility of chain, the whole hoisting device's of being convenient for use.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model discloses a structure to hoist and mount chain improves and optimizes for cooperation hoisting machine and water-cooling wall that hoist and mount chain can be stable is convenient for remove the water-cooling wall that the in-process that hoists the water-cooling wall can be stable, and the in-process that the hoist and mount chain of this kind of water-cooling wall used also can be adjusted according to the user demand, thereby makes the use flexibility that hoist and mount are connected obtain effectual improvement.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings that are required to be used in the embodiments will be briefly described below, it should be understood that the following drawings only illustrate some embodiments of the present invention, and therefore should not be considered as limiting the scope, and for those skilled in the art, other related drawings can be obtained according to the drawings without inventive efforts.
Fig. 1 is a schematic structural view of the hoisting device of the present invention;
fig. 2 is a schematic structural view of the balance bar of the present invention;
FIG. 3 is a schematic structural view of the hanging head of the present invention;
FIG. 4 is a schematic view of the structure of the slider according to the present invention;
fig. 5 is a schematic structural view of the hydraulic cylinder of the present invention;
in the figure: 1-a balance bar; 11-a sliding port; 12-connecting buckles; 2-hanging a head; 21-a hoisting ring; 22-a connecting ring; 23-a balancing chain; 3-pulling the head; 31-a slide block; 311-card slot; 32-an adapter; 33-hoisting chains; 331-connecting rod; 34-a hook; 4-a hydraulic cylinder; 41-connecting plate; 42-connecting hole.
Detailed Description
To make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the drawings of the embodiments of the present invention are combined to clearly and completely describe the technical solutions of the embodiments of the present invention, and obviously, the described embodiments are some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention. Thus, the following detailed description of the embodiments of the present invention, presented in the accompanying drawings, is not intended to limit the scope of the invention, as claimed, but is merely representative of selected embodiments of the invention.
Example (b): referring to fig. 1 and 3: a boiler construction water wall rapid construction hoisting device comprises a balance rod 1, wherein a hanging head 2 is arranged at the top end of the balance rod 1, two balance chains 23 are arranged on the bottom surface of the hanging head 2, the bottom ends of the balance chains 23 are connected with the balance rod 1, a pull head 3 is arranged at the bottom end of the balance rod 1, the pull head 3 is in sliding connection with the balance rod 1, hydraulic cylinders 4 are arranged on two sides inside the balance rod 1, and the output ends of the hydraulic cylinders 4 are connected with the pull head 3; the balance rod 1 is convenient for installing each part for installing the lifting device, the whole lifting device is convenient to assemble and use, the lifting head 2 is convenient to match with the lifting machine, so that the balance chain 23 is convenient to connect the lifting head 2 and the balance rod 1 stably, the whole balance rod 1 can be stably positioned at the same horizontal position during lifting, the pull head 3 is convenient to connect with the water-cooled wall, so that the water-cooled wall is convenient to lift through the balance head, the position of the water-cooled wall can be adjusted within a small range in the lifting process through the adjustment of the pull head 3, a worker can conveniently install the water-cooled wall, the hydraulic cylinder 4 is convenient for driving the pull head 3, and the position of the pull head 3 is convenient to adjust; this kind of structure makes cooperation hoisting machine and water-cooling wall that hoist chain 33 can be stable, is convenient for can be stable remove the water-cooling wall at the in-process of hoisting the water-cooling wall, and this kind of water-cooling wall's hoist chain 33 also can be adjusted according to the user demand at the in-process that uses to make the use flexibility of hoist and mount connection obtain effectual improvement.
Referring to FIG. 2: the positions of the top end of the balancing pole 1, which are close to the two sides, are symmetrically provided with connecting buckles 12, and the bottom end of the balancing pole 1 is provided with a sliding opening 11; the connecting buckle 12 is convenient for the balance bar 1 and the hanging head 2 to be connected, so that the hanging head 2 is convenient to be matched with the balance bar 1 for use, the sliding opening 11 is convenient for the pull head 3 to be in sliding connection with the bottom end of the balance bar 1, and therefore the position of the water-cooled wall being hoisted can be conveniently adjusted through the adjustment of the pull head 3.
Referring to FIG. 3: the top end of the hanging head 2 is welded with a hanging ring 21, and two sides of the bottom surface of the hanging head 2 are symmetrically provided with connecting rings 22; rings 21 are convenient for the output of hoisting head 2 and hoisting machine to be connected to make things convenient for whole hoist device and hoisting machine to link together, go-between 22 is convenient for install balanced chain 23, and then makes things convenient for balanced chain 23's use.
Referring to FIG. 4: the slider 3 comprises a slider 31, an adapter 32, hoisting chains 33 and a hook 34, the adapter 32 is connected to the bottom end of the slider 31, the two hoisting chains 33 are connected to the bottom of the adapter 32, and the hook 34 is rotatably connected to the bottom of the hoisting chains 33; the slider 31 is convenient for the slider 3 and the balance bar 1 to be connected in a sliding way, so that the slider 3 is convenient to adjust and use, the adapter 32 is convenient for the slider 31 and the hoisting chain 33 to be connected together, the hoisting chain 33 is convenient to be matched with the slider 31 for use, and the hook 34 is convenient for the slider 3 and the water wall to be connected together, so that the slider 3 is convenient to use; clamping grooves 311 are formed in two sides of the sliding block 31, the connecting ring 22 is arranged on the bottom surface of the sliding block 31, the adapter 32 is integrally 8-shaped, the connecting rod 331 is arranged at the bottom end of the hoisting chain 33, and the connecting rod 331 is connected with the hook 34 through a pin; draw-in groove 311 is convenient for slider 31 card in the sliding opening 11 department, the stable use of the slider 31 of being convenient for, go-between 22 is convenient for slider 31 and adapter 32 to be connected, the use of the adapter 32 of being convenient for, adapter 32 is 8 types, thereby make things convenient for adapter 32 and slider 31 and hoist and mount chain 33 to be connected, connecting rod 331 is convenient for hoist and mount chain 33 and couple 34 to rotate and connect, the use of the hoist and mount chain 33 of being convenient for.
Referring to FIG. 5: two ends of the hydraulic cylinder 4 are respectively provided with a connecting plate 41, and four corners of the connecting plates 41 are respectively provided with a connecting hole 42; the connecting plate 41 facilitates the connection of the hydraulic cylinder 4 with the balance bar 1 and the slider 31, and facilitates the use of the hydraulic cylinder 4, and the connecting hole 42 facilitates the penetration of a bolt, thereby facilitating the connection of the hydraulic cylinder 4 with the balance bar 1 and the slider 31 through the bolt.
The using method comprises the following steps: connect together hanging head 2 and balancing pole 1 during the use earlier, it is stable to guarantee to connect between pneumatic cylinder 4 and the pull head 3 simultaneously, later link together hanging head 2 and hoisting machine's output, later drive whole hoisting device and remove to the water-cooling wall next door under hoisting machine's the output, later link together couple 34 and water-cooling wall, then alright lift by crane the water-cooling wall through hoisting machine, if need finely tune the position of water-cooling wall at the in-process that lifts by crane, accessible control pneumatic cylinder 4 is flexible to make hoist and mount chain 33 can stimulate the water-cooling wall and remove in the certain extent, and then conveniently improved the use flexibility of chain, the whole hoisting device's of being convenient for use.
The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention, and various modifications and changes may be made by those skilled in the art. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. The utility model provides a boiler construction water-cooled wall is hoist device that is under construction fast which characterized in that: including balancing pole (1), balancing pole (1) top is equipped with hangs head (2), it is equipped with two balanced chain (23) to hang head (2) bottom surface, balanced chain (23) bottom and balancing pole (1) are connected, balancing pole (1) bottom is equipped with pull head (3), pull head (3) and balancing pole (1) sliding connection, the inside both sides of balancing pole (1) are equipped with pneumatic cylinder (4), the output and the pull head (3) of pneumatic cylinder (4) link together.
2. The boiler construction water wall rapid construction hoisting device according to claim 1, characterized in that the top end of the balance bar (1) is symmetrically provided with connecting buckles (12) at positions close to both sides, and the bottom end of the balance bar (1) is provided with a sliding opening (11).
3. The boiler construction water wall rapid construction hoisting device according to claim 2, characterized in that a hoisting ring (21) is welded at the top end of the hoisting head (2), and connecting rings (22) are symmetrically arranged on two sides of the bottom surface of the hoisting head (2).
4. The boiler construction water wall rapid construction hoisting device according to claim 3, wherein the pull head (3) comprises a slide block (31), an adapter (32), hoisting chains (33) and a hook (34), the adapter (32) is connected to the bottom end of the slide block (31), the two hoisting chains (33) are connected to the bottom of the adapter (32), and the hook (34) is rotatably connected to the bottom of the hoisting chains (33).
5. The boiler construction water wall rapid construction hoisting device according to claim 4, wherein clamping grooves (311) are formed in two sides of the sliding block (31), the connecting ring (22) is arranged on the bottom surface of the sliding block (31), the adapter (32) is integrally in a shape of 8, a connecting rod (331) is arranged at the bottom end of the hoisting chain (33), and the connecting rod (331) and the hook (34) are connected through a pin.
6. The boiler construction water wall rapid construction hoisting device according to claim 5, wherein both ends of the hydraulic cylinder (4) are provided with connecting plates (41), and four corners of the connecting plates (41) are provided with connecting holes (42).
CN202020556320.6U 2020-04-15 2020-04-15 Quick construction hoisting device for boiler construction water-cooled wall Expired - Fee Related CN212101615U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020556320.6U CN212101615U (en) 2020-04-15 2020-04-15 Quick construction hoisting device for boiler construction water-cooled wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020556320.6U CN212101615U (en) 2020-04-15 2020-04-15 Quick construction hoisting device for boiler construction water-cooled wall

Publications (1)

Publication Number Publication Date
CN212101615U true CN212101615U (en) 2020-12-08

Family

ID=73640491

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020556320.6U Expired - Fee Related CN212101615U (en) 2020-04-15 2020-04-15 Quick construction hoisting device for boiler construction water-cooled wall

Country Status (1)

Country Link
CN (1) CN212101615U (en)

Similar Documents

Publication Publication Date Title
CN211338515U (en) Novel but prefabricated slat lifting device of leveling
CN212101615U (en) Quick construction hoisting device for boiler construction water-cooled wall
CN207684788U (en) Hand pulling block frame
CN107487713B (en) integral combination hoisting and positioning process for upper part of water behind pi-shaped boiler
CN213622865U (en) Adjustable balance hoisting tool
CN211037773U (en) Hanging basket suspension device
CN214780231U (en) Lifting appliance for large-diameter ring-shaped part
CN212799331U (en) Movable lifting appliance using I-shaped steel as lifting point
CN114148885A (en) Height-adjustable cab lifting appliance
CN213231194U (en) Prefabricated component transfer device is built in room
CN201136735Y (en) Tool for lifting cathode carbon block set of aluminum cell
CN107473070A (en) The Electromagnetic slings for lifting loads and its adjusting method of a kind of adjustable angle
CN219670043U (en) Portable on-spot soot blower of boiler overhauls hoist device
CN216583770U (en) Lifting and pulling assembly for LED screen mounting steel frame
CN221027157U (en) Lifting appliance for upper component of aluminum electrolysis cell
CN213202081U (en) Multipoint adjustable lifting appliance
CN208684228U (en) A kind of single armed double hook
CN217972341U (en) Installation device of double T plates
CN220485048U (en) Special hoisting tool for water spraying component of cooling tower
CN214059605U (en) Screw forming die's hoist and mount frock
CN218371202U (en) Assembled wallboard hoisting balance Liang Gongzhuang
CN217947340U (en) Integral quick hoisting tool for frame type equipment
CN211444709U (en) Steel coil hook
CN211594755U (en) Lifting appliance for overhauling equipment under plant girder
CN219259304U (en) Adjustable auxiliary device for hoisting heavy objects in narrow space

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201208