CN212096059U - Tool, collating unit and tool box - Google Patents
Tool, collating unit and tool box Download PDFInfo
- Publication number
- CN212096059U CN212096059U CN202020681151.9U CN202020681151U CN212096059U CN 212096059 U CN212096059 U CN 212096059U CN 202020681151 U CN202020681151 U CN 202020681151U CN 212096059 U CN212096059 U CN 212096059U
- Authority
- CN
- China
- Prior art keywords
- jig
- workpiece
- tool
- tool box
- hopper
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Workshop Equipment, Work Benches, Supports, Or Storage Means (AREA)
Abstract
The utility model discloses a tool, collating unit and frock box. The fixture is provided with a plurality of accommodating spaces arranged at intervals, the accommodating spaces are adapted to workpieces and used for placing the workpieces, and the height of each accommodating space is greater than or equal to the maximum length of each workpiece in the height direction in the accommodating space. The jig with the structure can protect the workpiece so as to reduce the possibility of damage of the workpiece under the action of external force and improve the qualification rate of the workpiece, wherein when the jig is arranged in the arranging device, the possibility of damage of the workpiece caused by collision of the workpiece and other objects is reduced; when the jig is arranged in the tool box, the jig can prevent the positioning piece from colliding with the workpiece to protect the workpiece and can play a role in guiding the installation of the positioning piece when the positioning piece is installed.
Description
Technical Field
The utility model relates to a work piece processing technology field, concretely relates to tool, collating unit and frock box.
Background
In the current industry, the size of various workpieces is gradually reduced, and the workpieces are usually placed in a jig. The work piece is moved by taking the jig in order to move the work piece during processing, for example, by moving the jig from the arranging device to the tool box.
In the prior art, a fixture is disclosed, which has an accommodating space for accommodating a workpiece, wherein the workpiece is exposed from the accommodating space. Because the part of the workpiece exposed out of the accommodating space is in an exposed state, the workpiece is easy to damage under the action of external force, and the qualification rate of the workpiece is reduced. For example, when the jig is placed in the arranging device, the workpiece may be damaged due to collision between the part of the workpiece exposed in the accommodating space and other objects; when the jig is placed in the tool box, the situation that the positioning piece shakes to touch the workpiece on the jig on the uppermost layer when being installed due to unstable hands of an operator exists, at the moment, the workpiece can obstruct the installation of the positioning piece, and the workpiece is damaged due to collision.
SUMMERY OF THE UTILITY MODEL
Therefore, the to-be-solved technical problem of the utility model lies in overcoming among the prior art the part that the work piece on the tool exposes in accommodation space receives the defect of damage easily to a tool, collating unit and frock box are provided.
The fixture is provided with a plurality of accommodating spaces arranged at intervals, the accommodating spaces are adapted to workpieces and used for placing the workpieces, and the height of each accommodating space is greater than or equal to the maximum length of each workpiece in the accommodating space along the height direction.
Furthermore, the outer wall surface of the jig is provided with a first marking unit.
Further, the workpiece is a special-shaped piece.
An alignment device comprising:
arranging and installing the bodies;
a plurality of tool as above-mentioned, the tool is located arrange the installation body on.
Further, still include the piece of gathering materials, through position control spare locking the piece butt of gathering materials in the tool.
Further, the piece that gathers materials includes receiving hopper and blowing fill, the tool is located the receiving hopper with between the blowing fill, position control spare connect in the receiving hopper and/or the blowing fill.
Further, the position adjusting member includes a screw acting member and a fixing mounting member, the screw acting member is screwed to the fixing mounting member and abuts against the material receiving hopper and/or the material discharging hopper, and the fixing mounting member is fixed to the arrangement mounting body.
A tool box, comprising:
a tool box body;
a plurality of tool as above-mentioned, the tool is located in the frock box body.
Furthermore, the fixture further comprises a positioning piece which is inserted on the fixture box body and connected with the fixture on the uppermost layer.
Further, the outer wall surface of the tool box body is provided with a second marking unit.
The utility model discloses technical scheme has following advantage:
1. the utility model provides a pair of tool, be equipped with the accommodation space that a plurality of intervals set up on the tool, accommodation space adaptation is in order to be used for placing in the work piece, wherein accommodation space's high more than or equal to the work piece is arranged in along the direction of height's maximum length in the accommodation space. The jig with the structure can protect the workpiece so as to reduce the possibility of damage of the workpiece under the action of external force and improve the qualification rate of the workpiece, wherein when the jig is arranged in the arranging device, the possibility of damage of the workpiece caused by collision of the workpiece and other objects is reduced; when the jig is arranged in the tool box, the jig can prevent the positioning piece from colliding with the workpiece to protect the workpiece and can play a role in guiding the installation of the positioning piece when the positioning piece is installed.
2. The utility model provides a pair of jig, the outer wall of jig is equipped with first mark unit. The jig with the structure is provided with the first marking units, so that when a plurality of jigs are installed, the first marking units on the plurality of jigs can be positioned in a specific position relation, for example, all face to the same direction or other position relations, the installation is convenient, and the installation accuracy of the jig can be ensured.
3. The utility model provides a pair of tool, the work piece is dysmorphism piece. The fixture with the structure is convenient for enabling the special-shaped piece to be in a specific position state by arranging the workpiece to be the special-shaped piece.
4. The utility model provides a pair of collating unit, include: arranging and installing the bodies; a plurality of tool as above-mentioned, the tool is located arrange the installation body on. The arrangement device with the structure comprises the jig, so that the arrangement device naturally has the advantages brought by the jig.
5. The utility model provides a pair of collating unit still includes the piece that gathers materials, locks through position control piece gather materials a butt in the tool. The arrangement device with the structure is provided with the material collecting part and the position adjusting part, wherein the material collecting part provides a space for placing the workpieces which are not arranged and/or recycling redundant workpieces, and the position adjusting part is used for adjusting the material collecting part to be abutted or not abutted to the jig, so that the jig is convenient to take out or install.
6. The utility model provides a pair of tool box, include: a tool box body; a plurality of tool as above-mentioned, the tool is located in the frock box body. The tool box with the structure has the advantages of the tool.
7. The utility model provides a pair of tool box still includes the setting element, and it inserts and locates on the tool box body, and with be located the superiors the tool meets. The tool box with the structure is convenient for positioning and fixing the tool by being provided with the positioning piece, and ensures the stability of the tool when the tool box body moves or rotates.
8. The utility model provides a pair of tool box, tool box's outer wall is equipped with second mark unit. According to the tool box with the structure, the second marking units are arranged, so that when a plurality of jigs are installed in the tool box, the first marking units and the second marking units on the plurality of jigs can be located in a specific position relation, for example, the first marking units and the second marking units all face the same direction or other position relations, the installation is convenient, and the installation accuracy of the jigs can be ensured.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the embodiments or the technical solutions in the prior art will be briefly described below, and it is obvious that the drawings in the following description are some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic structural view of a jig provided in embodiment 1 of the present invention;
fig. 2 is a schematic structural view of a special-shaped magnet as a workpiece provided in embodiments 1 to 3 of the present invention;
fig. 3 is a schematic structural view of an arranging apparatus provided in embodiment 2 of the present invention;
fig. 4 is a schematic structural diagram of the tool box provided in embodiment 3 of the present invention;
description of reference numerals:
1-a fixture, 11-an accommodating space, 12-a first marking unit;
2-a shaped magnet;
31-bottom plate, 32-side plate;
41-discharge hopper, 42-receiving hopper;
5-a limiting rod;
61-screw action, 62-fixed mount;
71-U-shaped structure, 711-second marking unit, 72-blocking projection;
8-a positioning element;
91-handle, 92-reinforcement connection.
Detailed Description
The technical solution of the present invention will be described clearly and completely with reference to the accompanying drawings, and obviously, the described embodiments are some, but not all embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Furthermore, the technical features mentioned in the different embodiments of the invention described below can be combined with each other as long as they do not conflict with each other.
Example 1
The present embodiment provides a jig 1 as shown in fig. 1, wherein the jig 1 is provided with a plurality of accommodating spaces 11 arranged at intervals, and the accommodating spaces 11 are adapted to a workpiece for placing the workpiece. Wherein the height of the accommodating space 11 is equal to or greater than the maximum length of the workpiece in the height direction placed in the accommodating space 11. In particular, the workpiece may be a shaped piece, for example, a shaped magnet 2 as shown in fig. 2, and correspondingly, the accommodating space 11 is a matched shaped structure. The workpiece is a special-shaped piece, so that the special-shaped piece is convenient to be in a specific position state.
As shown in fig. 1, the outer wall surface of the jig 1 in this embodiment is provided with a first marking unit 12, wherein the first marking unit 12 may be a color coating or a color label or others. When a plurality of jigs 1 are installed, the first marking units 12 on the plurality of jigs 1 can be located in a specific position relation, for example, all face to the same direction or other position relations, so that the installation is convenient and the installation accuracy of the jigs 1 can be ensured.
The utility model discloses a tool 1, make the work piece be in accommodation space 11 and not expose in accommodation space 11, tool 1 can protect the work piece to reduce the possibility of work piece damage under the effect that receives the external force, in order to improve the qualification rate of work piece, wherein for example when putting this tool 1 in the collating unit mentioned below, reduced the work piece and other objects and collided and led to the possibility of work piece damage; when the jig 1 is placed in a tool box mentioned below, the jig 1 can prevent the positioning member 8 from colliding with the workpiece to protect the workpiece and can guide the installation of the positioning member 8 when the positioning member 8 is installed.
Example 2
The present embodiment provides an alignment apparatus as shown in fig. 3, which includes an alignment installation body, a plurality of jigs 1 as mentioned in embodiment 1, a material collecting member, a limiting member, and a position adjusting member.
As shown in fig. 3, the arrangement installation body in this embodiment includes a bottom plate 31 and two side plates 32, wherein the two side plates 32 are disposed opposite to each other and protrude from the bottom plate 31 to form an installation space. The jig 1, the material collecting part, the limiting part and the position adjusting part are all located in the installation space.
As shown in fig. 3, three jigs 1 are provided in the present embodiment, and of course, one, two, or more than three jigs 1 may be provided, which may be determined according to actual requirements. Wherein the upper wall surfaces of the plurality of jigs 1 are arranged in parallel and level.
As shown in fig. 3, the material collecting member in this embodiment includes a receiving hopper 42 and a discharging hopper 41, the jig 1 is located between the receiving hopper 42 and the discharging hopper 41, and the position adjusting member is connected to the discharging hopper 41, and the material collecting member is locked to abut against the jig 1 by the position adjusting member. Wherein the structure of receiving hopper 42 and blowing fill 41 is the same, all includes mounting panel and U template, and the mounting panel is close to bottom plate 31 and sets up, and the U template bulges the opening of the U template of mounting panel setting and receiving hopper 42 and the opening of the U template of blowing fill 41 and sets up in opposite directions, and the last wall of the mounting panel of receiving hopper 42, the last wall of the mounting panel of blowing fill 41 and the last wall parallel and level of tool 1 set up.
As shown in fig. 3, the limiting member in this embodiment is a limiting rod 5, the limiting rod 5 is fixedly connected to the bottom plate 31 and disposed on one side of the material receiving hopper 42 away from the jig 1 to limit the material receiving, and two limiting rods 5 are disposed therein. Of course, the number of the limiting rods 5 is not limited, and one, three or more than three limiting rods may be provided, and the limiting members may be limiting plates or other structures.
As shown in fig. 3, the position adjusting member in the present embodiment includes a screw operating member 61 and a fixing member 62, the screw operating member 61 is screwed to the fixing member 62 and abuts against the hopper 41, and the fixing member 62 is fixed to the array mounting body.
Through being provided with collecting part and position control spare, wherein collecting part provides the space and places the work piece of arranging not and/or retrieve unnecessary work piece to and adjust collecting part butt or not butt in tool 1 through position control spare, be convenient for take out or install tool 1.
Wherein, one of the receiving hopper 42 and the bottom plate 31 is provided with a sliding convex strip, and the other is provided with a sliding chute; and/or, one of the material placing hopper 41 and the bottom plate 31 is provided with a sliding convex strip, and the other is provided with a sliding chute; and/or, one of the jig 1 and the bottom plate 31 is provided with a sliding convex strip, and the other is provided with a sliding groove which is connected with the sliding convex strip in a sliding way. Of course, the receiving hopper 42 may be overlapped on the bottom plate 31, and/or the discharging hopper 41 may be overlapped on the bottom plate 31, and/or the jig 1 may be overlapped on the bottom plate 31.
As an alternative embodiment, the position adjusting element is connected to the material receiving hopper 42, and the limiting element is disposed on the side of the material discharging hopper 41 away from the jig 1; or two position adjusting members are provided and connected to the material receiving hopper 42 and the material discharging hopper 41, respectively, and in this case, the position adjusting member may not be provided.
Alternatively, a hopper may be provided, which is suitable for receiving and discharging materials and is connected to the position adjusting member, wherein the jig 1 is located between the position limiting member and the hopper.
The utility model discloses a using process of the arranging device, firstly, the number of the jigs 1 is determined according to the actual requirement; secondly, moving the discharging hopper 41 to be abutted against the limiting rod 5, and enabling the first marking units 12 to be in the same direction and placing the jig 1 along the direction towards the discharging hopper 41 or the direction far away from the discharging hopper 41; then placing the material taking hopper 42, and rotating a screw to lock the material discharging hopper 41 to abut against the jig 1; then, the work pieces are placed in the discharge hopper 41, and manually shaken or shaken by a shaker, so that the work pieces enter the accommodating space 11 to be arranged, and then the redundant work pieces are moved into the receiving hopper 42.
Example 3
The present embodiment provides a tool box as shown in fig. 4, including: the tool box comprises a tool box body, a plurality of jigs 1 mentioned in embodiment 1, a positioning part 8, a handle 91 and a reinforcing connecting piece 92.
As shown in fig. 4, the tool box body in this embodiment is a U-shaped structure 71, and the side walls of the U-shaped structure 71 are both provided with a blocking protrusion 72, and the blocking protrusion 72 protrudes toward the opening of the U-shaped structure 71. The side wall, the bottom wall and the blocking protrusion 72 of the U-shaped structure 71 form an accommodating space, wherein the jig 1 and the positioning member 8 are stacked and arranged in the accommodating space.
As shown in fig. 4, the positioning element 8 in this embodiment is inserted into the slot on the stopping protrusion 72 and connected to the jig 1 on the uppermost layer. Of course, the slot may be set not to be connected to the jig 1 on the uppermost layer but to satisfy the requirement that the distance between the two is smaller than the maximum length of the workpiece along the height direction. Through being provided with setting element 8, be convenient for location, fixed tool 1, when the frock box body takes place to remove or rotate, ensure tool 1's steady.
As shown in fig. 4, the grips 91 in the present embodiment are provided in a pair, and the pair of grips 91 are provided on the blocking projections 72; and the reinforcing connecting member 92 in the present embodiment connects the barrier projection 72 and the bottom wall to reinforce the connecting strength of the both.
The outer wall surface of the tool box body in this embodiment is provided with the second marking unit 711, specifically referring to fig. 4, which is disposed on the side portion of the bottom wall of the tool box body, when the fixture 1 is installed in the tool box, the second marking unit 711 and the first marking unit 12 can be located on the same side, that is, the second marking unit 711 and the first marking unit 12 face the same direction, but other positional relationships may also be used. Wherein the second marking unit 711 may be a color coating or a color label or others. By providing the second marking unit 711, when a plurality of jigs 1 are installed in the tool box, the first marking unit 12 and the second marking unit 711 on the plurality of jigs 1 can be located in a specific positional relationship, for example, both face the same direction or other positional relationships, which is convenient for installation and can ensure the installation accuracy of the jigs 1.
In the using process of the tool box of the present invention, a plurality of jigs 1 are first placed into the accommodating space from the top to the bottom in fig. 4, wherein the first marking unit 12 and the second marking unit 711 are required to be located at the same side; secondly, inserting the positioning piece 8 into the slot; the box can be moved by the handle 91, for example, when the workpiece is the shaped magnet 2 in fig. 2, whether to rotate the box according to the magnetizing direction of the magnetizing device can be selected to make the magnetizing direction correspond to the magnetic pole direction of the shaped magnet 2.
It should be understood that the above examples are only for clarity of illustration and are not intended to limit the embodiments. Other variations and modifications will be apparent to persons skilled in the art in light of the above description. And are neither required nor exhaustive of all embodiments. And obvious variations or modifications can be made without departing from the scope of the invention.
Claims (10)
1. The fixture is characterized in that a plurality of accommodating spaces are arranged on the fixture at intervals, the accommodating spaces are adapted to workpieces and used for placing the workpieces, and the height of each accommodating space is larger than or equal to the maximum length of each workpiece in the height direction in the accommodating space.
2. The jig of claim 1, wherein the outer wall surface of the jig is provided with a first marking unit.
3. A jig according to claim 1 or 2 wherein the workpiece is a profiled member.
4. An alignment device, comprising:
arranging and installing the bodies;
a plurality of jigs as claimed in any one of claims 1 to 3, the jigs being provided on the array mounting body.
5. The aligning apparatus of claim 4 further comprising a material collecting member, wherein the material collecting member is locked against the jig by a position adjusting member.
6. A sorting device according to claim 5, characterised in that the collecting element comprises a receiving hopper and a discharge hopper, the jig being located between the receiving hopper and the discharge hopper, and the position adjustment element being connected to the receiving hopper and/or the discharge hopper.
7. An arrangement according to claim 6, wherein the position adjustment member comprises a screw operator threadedly connected to the fixed mounting member and abutting the hopper and/or the discharge hopper, and a fixed mounting member fixed to the arrangement mounting body.
8. The utility model provides a frock box which characterized in that includes:
a tool box body;
a plurality of jigs according to any one of claims 1 to 3, the jigs being provided in the tool box.
9. The tool box of claim 8, further comprising a positioning member inserted into the tool box body and connected to the jig located at the uppermost layer.
10. The tool box according to claim 8 or 9, wherein the outer wall surface of the tool box body is provided with a second marking unit.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020681151.9U CN212096059U (en) | 2020-04-28 | 2020-04-28 | Tool, collating unit and tool box |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020681151.9U CN212096059U (en) | 2020-04-28 | 2020-04-28 | Tool, collating unit and tool box |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212096059U true CN212096059U (en) | 2020-12-08 |
Family
ID=73618321
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020681151.9U Active CN212096059U (en) | 2020-04-28 | 2020-04-28 | Tool, collating unit and tool box |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212096059U (en) |
-
2020
- 2020-04-28 CN CN202020681151.9U patent/CN212096059U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20130136975A1 (en) | Battery device | |
EP3783690B1 (en) | Battery pack manufacturing apparatus and method, and battery pack | |
KR102503639B1 (en) | Apparatus and method for charging a robotic load handling device | |
EP3667767B1 (en) | Energy storage apparatus using hook structure, and energy storage system comprising energy storage apparatus | |
CN114683952A (en) | Electric automobile battery replacement positioning system and method | |
CN212096059U (en) | Tool, collating unit and tool box | |
CN111284343A (en) | No-load vehicle board charging connecting device and charging system | |
US6449223B1 (en) | Library apparatus for disc cartridge | |
KR102191400B1 (en) | Cassette assembly for width adjusment and tray for battery hving the same | |
KR102247190B1 (en) | Tray assembly and tray for battery hving the same | |
CN217946814U (en) | Automatic wafer feeding device | |
CN209922446U (en) | Automatic feeding mechanism for car lamp controller | |
CN212098463U (en) | No-load vehicle board charging connecting device and charging system | |
KR102191403B1 (en) | Cassette assembly for height adjusment and tray for battery hving the same | |
CN211732285U (en) | Feeding device | |
CN210516849U (en) | Installation frock of battery package busbar | |
CN218334089U (en) | Trade power station tray | |
CN221065672U (en) | Feed bin device and chamfering machine comprising same | |
US6290072B1 (en) | Library apparatus | |
CN214956967U (en) | Full-automatic assembling equipment for button cell | |
CN220402120U (en) | Instrument and equipment controller fixing device | |
CN218309381U (en) | Wafer sorting blocking device | |
CN217881795U (en) | Battery pack | |
CN220700872U (en) | New energy electric vehicle battery box base | |
CN113070853B (en) | Tool storage device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |