CN212078922U - Fast-assembling site operation pedestrian's escape way - Google Patents

Fast-assembling site operation pedestrian's escape way Download PDF

Info

Publication number
CN212078922U
CN212078922U CN202020687260.1U CN202020687260U CN212078922U CN 212078922 U CN212078922 U CN 212078922U CN 202020687260 U CN202020687260 U CN 202020687260U CN 212078922 U CN212078922 U CN 212078922U
Authority
CN
China
Prior art keywords
support column
placing
inserted bar
groove
connecting plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020687260.1U
Other languages
Chinese (zh)
Inventor
卢圣祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fuzhou Dexing Yuxiang Metal Products Co ltd
Original Assignee
Fuzhou Dexing Yuxiang Metal Products Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fuzhou Dexing Yuxiang Metal Products Co ltd filed Critical Fuzhou Dexing Yuxiang Metal Products Co ltd
Priority to CN202020687260.1U priority Critical patent/CN212078922U/en
Application granted granted Critical
Publication of CN212078922U publication Critical patent/CN212078922U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a site operation pedestrian escape way of fast-assembling relates to construction technical field. Including the support column, the quantity of support column is two, be provided with first rail guard through the connection structure activity between two support columns, the quantity of first rail guard is two, the opposite face of two first rail guards is provided with the second rail guard, connection structure is including placing board and connecting plate, and the fixed upper surface that sets up placing the board of connecting plate, it has seted up the standing groove to place the board and keep away from the side of support column, and the inside activity of standing groove is provided with the inserted bar, the spread groove has been seted up on the surface of connecting plate, the inside activity of spread groove is provided with the movable rod. This site operation pedestrian's escape way of fast-assembling through setting up support column, stand and supporting seat, has improved this pedestrian's escape way's of in-process stability using, and the installation between stand and the support column, convenient operation are convenient for realize in the setting of screw hole simultaneously.

Description

Fast-assembling site operation pedestrian's escape way
Technical Field
The utility model relates to a construction technical field specifically is a pedestrian's escape way of site operation of fast-assembling.
Background
At present, in the building construction process, a construction pedestrian safety channel needs to be built on a construction site, construction safety is convenient to strengthen, and walking of personnel in the construction process is convenient to ensure construction efficiency, and the existing safety channel is formed by splicing construction guardrails of a fixed structure.
When the construction guardrail for the pedestrian safety passage in the prior art needs to be built on a construction site, the construction guardrail is not convenient and quick to install, troubles are brought to constructors, construction efficiency is reduced, and for the purpose, the rapid-installation site construction pedestrian safety passage is provided to solve the problems.
SUMMERY OF THE UTILITY MODEL
The utility model provides a not enough to prior art, the utility model provides a site operation pedestrian escape way of fast-assembling possesses operating personnel and installs and improved advantages such as work efficiency at the site operation, has solved the general problem of current pedestrian escape way result of use.
For the purpose that realizes that above-mentioned operating personnel installs and has improved work efficiency at the site operation, the utility model provides a following technical scheme: a fast-assembled on-site construction pedestrian safety passage comprises two support columns, wherein a first protective guard is movably arranged between the two support columns through a connecting structure, the number of the first protective guard is two, and a second protective guard is arranged on the opposite surface of the two first protective guards;
the utility model discloses a support column, including placing board and connecting plate, connection structure is including placing board and connecting plate, and the fixed upper surface that sets up placing the board of connecting plate, place the board and keep away from the side of support column and seted up the standing groove, and the inside activity of standing groove is provided with the inserted bar, the spread groove has been seted up on the surface of connecting plate, the inside activity of spread groove is provided with the movable rod, the last fixed surface of connecting plate inlays and has the bearing, the internal fixed surface of bearing is provided with the threaded rod, threaded rod threaded connection is in the thread groove that the movable rod upper.
As a preferred technical scheme of the utility model, the bottom threaded connection of support column has the stand, and the bottom of support column sets up threaded hole, the bottom mounting of stand is provided with the supporting seat.
As a preferred technical scheme of the utility model, the fixed expanding spring that is provided with of one end of inserted bar, and expanding spring keeps away from the one end of inserted bar and the fixed setting in one side of standing groove inner wall.
As an optimized technical solution of the present invention, the slots are disposed on both side surfaces of the first guard rail, and the one end of the pull rod, which is far away from the extension spring, is movably inserted into the slots.
As an optimized technical scheme of the utility model, the fixed knob that sets up in top of threaded rod, and the surface of knob has seted up anti-skidding line.
As a preferred technical scheme of the utility model, the fixed surface of inserted bar is provided with the pull rod, and the pull rod is kept away from the one end of inserted bar and is run through and extend to the below of placing the board.
As a preferred technical scheme of the utility model, the fixed connecting block that is provided with in bottom of placing inboard wall, and the jack has been seted up on the surface of connecting block, the bottom of movable rod runs through the spread groove and extends to the inside of placing the board and the activity is pegged graft in the inside of jack.
Compared with the prior art, the utility model provides a site operation pedestrian escape way of fast-assembling possesses following beneficial effect:
1. this site operation pedestrian escape way of fast-assembling, through setting up connection structure, when needs build construction pedestrian escape way at the job site, place first rail guard and second rail guard in the centre of support column, place the board, the inserted bar, the cooperation of expanding spring and pull rod is used down, the pulling pull rod, it moves to drive the inserted bar, make the one end of pull rod peg graft in the slot of first rail guard both sides, it is rotatory that rotatory knob drives the threaded rod simultaneously, thereby it moves down to drive the movable rod, thereby make the bottom of movable rod peg graft in the jack on connecting block surface, thereby fix the inserted bar, and then realize the fixed of first rail guard and second rail guard, this site operation pedestrian escape way's installation effectiveness has been guaranteed.
2. This site operation pedestrian's escape way of fast-assembling through setting up support column, stand and supporting seat, has improved this pedestrian's escape way's of in-process stability using, and the installation between stand and the support column, convenient operation are convenient for realize in the setting of screw hole simultaneously.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of a partially enlarged structure of the portion A in FIG. 1 according to the present invention;
fig. 3 is a schematic view of the column structure of the present invention.
In the figure: 1. a support pillar; 101. a threaded hole; 102. a column; 103. a supporting seat; 2. a connecting structure; 21. placing the plate; 211. a placement groove; 212. inserting a rod; 213. a tension spring; 214. connecting blocks; 215. a pull rod; 22. a connecting plate; 221. connecting grooves; 222. a movable rod; 223. a threaded rod; 224. a bearing; 3. a first guard rail; 4. and a second guard rail.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the utility model discloses a fast-assembling site construction pedestrian passageway, including support columns 1, the quantity of support columns 1 is two, two support columns 1 between through connecting structure 2 activity be provided with first rail guard 3, the quantity of first rail guard 3 is two, two first rail guard 3's opposite face is provided with second rail guard 4;
connection structure 2 is including placing board 21 and connecting plate 22, and the fixed upper surface that sets up placing board 21 of connecting plate 22, place board 21 and keep away from the side of support column 1 and seted up standing groove 211, and the inside activity of standing groove 211 is provided with inserted bar 212, connecting groove 221 has been seted up on the surface of connecting plate 22, the inside activity of connecting groove 221 is provided with movable rod 222, the last fixed surface of connecting plate 22 inlays and has bearing 224, the internal fixed surface of bearing 224 is provided with threaded rod 223, threaded rod 223 threaded connection is in the thread groove that the upper surface of movable rod 222 was seted up.
Specifically, the bottom end of the support column 1 is connected with a stand column 102 in a threaded manner, the bottom of the support column 1 is provided with a threaded hole 101, and the bottom end of the stand column 102 is fixedly provided with a support seat 103.
In this embodiment, under the effect of screw hole 101, be convenient for with the top of stand 102 and the bottom threaded connection of support column 1, be convenient for realize the installation between stand 102 and the support column 1, the stability of this pedestrian's escape way in the use has been guaranteed in the setting of stand 102 and supporting seat 103.
Specifically, the fixed expanding spring 213 that is provided with of one end of inserted bar 212, and expanding spring 213 keep away from one side fixed setting of one end of inserted bar 212 and standing groove 211 inner wall, the slot has all been seted up to the both sides face of first rail guard 3, and pull rod 215 keeps away from the one end activity grafting of expanding spring 213 in the inside of slot, the fixed knob that sets up in top of threaded rod 223, and the surface of knob has seted up anti-skidding line, the fixed surface of inserted bar 212 is provided with pull rod 215, and the one end that pull rod 215 kept away from inserted bar 212 runs through and extends to the below of placing board 21.
In this embodiment, the pull rod 215 is pulled to drive the insertion rod 212 to move, so that one end of the pull rod 215 is inserted into the slots on the two sides of the first guard rail 3, and meanwhile, the rotary knob drives the threaded rod 223 to rotate, so as to drive the movable rod 222 to move downwards, so that the bottom end of the movable rod 222 is inserted into the insertion hole on the surface of the connecting block 214, so as to fix the insertion rod 212, and further, the first guard rail 3 and the second guard rail 4 are fixed, and the installation is convenient and the operation is simple.
Specifically, the bottom of the inner wall of the placing plate 21 is fixedly provided with a connecting block 214, the surface of the connecting block 214 is provided with a jack, and the bottom end of the movable rod 222 penetrates through the connecting groove 221 and extends to the inside of the placing plate 21 and is movably inserted into the jack.
In this embodiment, the setting of connecting block 214 is convenient for fix movable rod 222 at the in-process that uses to be convenient for fix inserted bar 212, and then guaranteed this escape way's in the installation stability.
The utility model discloses a theory of operation and use flow: when the pedestrian safety passage is used, when a pedestrian safety passage needs to be constructed on a construction site, under the action of the threaded hole 101, the top of the upright post 102 is in threaded connection with the bottom of the support column 1, the first guard rail 3 and the second guard rail 4 are placed in the middle of the support column 1, the pull rod 215 is pulled, the insertion rod 212 is driven to move inside the placement groove 211, the telescopic spring 213 is further driven to move, one end of the pull rod 215 is inserted into the insertion grooves in the two sides of the first guard rail 3, meanwhile, the rotary knob drives the threaded rod 223 to rotate, the movable rod 222 is driven to move downwards, the bottom end of the movable rod 222 is inserted into the insertion hole in the surface of the connecting block 214, the insertion rod 212 is fixed, the first guard rail 3 and the second guard rail 4 are fixed, and therefore installation of the pedestrian safety passage is achieved.
In summary, by arranging the connecting structure 2, when the pedestrian safety passage needs to be constructed on a construction site, the first guard rail 3 and the second guard rail 4 are placed in the middle of the supporting column 1, and the pull rod 215 is pulled under the matching use of the placing plate 21, the inserting rod 212, the telescopic spring 213 and the pull rod 215, so as to drive the inserting rod 212 to move, so that one end of the pull rod 215 is inserted into the slots on the two sides of the first guard rail 3, and meanwhile, the rotary knob drives the threaded rod 223 to rotate, so as to drive the movable rod 222 to move downwards, so that the bottom end of the movable rod 222 is inserted into the jack on the surface of the connecting block 214, so as to fix the inserting rod 212, further fix the first guard rail 3 and the second guard rail 4, and ensure the installation efficiency of the pedestrian safety passage on the construction site; through setting up support column 1, stand 102 and supporting seat 103, improved this pedestrian's escape way's of in-process that uses stability, the installation between stand 102 and the support column 1 of being convenient for to realize, convenient operation is simultaneously screwed hole 101's setting.
It should be noted that, in this document, terms such as "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other identical elements in a process, method, article, or apparatus that comprises the element.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a site operation pedestrian's escape way of fast-assembling, includes support column (1), its characterized in that: the number of the support columns (1) is two, first guard rails (3) are movably arranged between the two support columns (1) through connecting structures (2), the number of the first guard rails (3) is two, and second guard rails (4) are arranged on the opposite surfaces of the two first guard rails (3);
connection structure (2) are including placing board (21) and connecting plate (22), and connecting plate (22) is fixed to be set up at the upper surface of placing board (21), place board (21) and keep away from a side of support column (1) and seted up standing groove (211), and the inside activity of standing groove (211) is provided with inserted bar (212), connecting groove (221) have been seted up on the surface of connecting plate (22), the inside activity of connecting groove (221) is provided with movable rod (222), the fixed surface of connecting plate (22) is inlayed and is had bearing (224), the internal fixed surface of bearing (224) is provided with threaded rod (223), threaded rod (223) threaded connection is in the thread groove that movable rod (222) upper surface was seted up.
2. The quick-install site construction pedestrian safety passage as claimed in claim 1, further comprising: the bottom end of the supporting column (1) is in threaded connection with an upright column (102), the bottom of the supporting column (1) is provided with a threaded hole (101), and the bottom end of the upright column (102) is fixedly provided with a supporting seat (103).
3. The quick-install site construction pedestrian safety passage as claimed in claim 1, further comprising: one end of the inserted bar (212) is fixedly provided with a telescopic spring (213), and one end of the telescopic spring (213) far away from the inserted bar (212) is fixedly arranged on one side of the inner wall of the placing groove (211).
4. The quick-install site-construction pedestrian safety passage as claimed in claim 3, further comprising: slots are formed in two side faces of the first guard rail (3), and one end, far away from the telescopic spring (213), of the pull rod (215) is movably inserted into the slots.
5. The quick-install site construction pedestrian safety passage as claimed in claim 1, further comprising: the top of the threaded rod (223) is fixedly provided with a knob, and the surface of the knob is provided with anti-skid grains.
6. The quick-install site construction pedestrian safety passage as claimed in claim 1, further comprising: the surface of the inserted bar (212) is fixedly provided with a pull rod (215), and one end of the pull rod (215) far away from the inserted bar (212) penetrates through and extends to the lower part of the placing plate (21).
7. The quick-install site construction pedestrian safety passage as claimed in claim 1, further comprising: the bottom of placing the inner wall of the plate (21) is fixedly provided with a connecting block (214), the surface of the connecting block (214) is provided with a jack, and the bottom end of the movable rod (222) penetrates through the connecting groove (221) and extends to the inside of the placing plate (21) and is movably inserted in the jack.
CN202020687260.1U 2020-04-29 2020-04-29 Fast-assembling site operation pedestrian's escape way Expired - Fee Related CN212078922U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020687260.1U CN212078922U (en) 2020-04-29 2020-04-29 Fast-assembling site operation pedestrian's escape way

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020687260.1U CN212078922U (en) 2020-04-29 2020-04-29 Fast-assembling site operation pedestrian's escape way

Publications (1)

Publication Number Publication Date
CN212078922U true CN212078922U (en) 2020-12-04

Family

ID=73588172

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020687260.1U Expired - Fee Related CN212078922U (en) 2020-04-29 2020-04-29 Fast-assembling site operation pedestrian's escape way

Country Status (1)

Country Link
CN (1) CN212078922U (en)

Similar Documents

Publication Publication Date Title
CN211851223U (en) Safety device is used in multi-use architecture construction
CN211446695U (en) Rail drainage device that culture venue face identification entered place
CN212078922U (en) Fast-assembling site operation pedestrian's escape way
CN213710356U (en) Steel pipe scaffold for supporting wood formwork with strong installation stability
CN217106028U (en) Safe and stable type scaffold for building construction
CN213710664U (en) A safety protective guard for building engineering
CN213573356U (en) Safety protective guard is used in civil engineering
CN211923789U (en) Protective structure of hydraulic and hydroelectric engineering side slope
CN214615300U (en) Scaffold for construction
CN212201572U (en) Quick-assembling quick-disassembling type limb guardrail
CN212105415U (en) Edge guardrail is faced to instrument formula
CN212743590U (en) Construction engineering construction management uses portable rail guard
CN215167826U (en) Construction operation platform for municipal construction
CN214328516U (en) Road and bridge engineering is with making an uproar protection rail that falls
CN220117727U (en) Construction support for construction
CN219411717U (en) Safety protection structure of building
CN218234597U (en) Security protection device for construction
CN211900005U (en) Building engineering warning fence that stability is strong and be convenient for remove
CN214532764U (en) Municipal drainage well structure
CN216665227U (en) Guardrail is used in municipal administration road bridge construction of easy assembly
CN217176080U (en) Rail guard is used in railway construction
CN212743337U (en) Construction frame reinforcing apparatus
CN218116329U (en) Slope protection network of convenient equipment
CN211922419U (en) Buffer stop is used in municipal construction
CN213806693U (en) Edge protection structure is faced in assembly type building construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201204

CF01 Termination of patent right due to non-payment of annual fee