CN212077934U - Pile body connecting device and pile body construction equipment - Google Patents

Pile body connecting device and pile body construction equipment Download PDF

Info

Publication number
CN212077934U
CN212077934U CN202020619039.2U CN202020619039U CN212077934U CN 212077934 U CN212077934 U CN 212077934U CN 202020619039 U CN202020619039 U CN 202020619039U CN 212077934 U CN212077934 U CN 212077934U
Authority
CN
China
Prior art keywords
clamping
arm
pile body
clamping arm
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020619039.2U
Other languages
Chinese (zh)
Inventor
吕俊明
陶明
吴坚喜
刘国栋
刘志刚
廖小兵
杜笑芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong No 3 Water Conservancy and Hydro Electric Engineering Board Co Ltd
Original Assignee
Guangdong No 3 Water Conservancy and Hydro Electric Engineering Board Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong No 3 Water Conservancy and Hydro Electric Engineering Board Co Ltd filed Critical Guangdong No 3 Water Conservancy and Hydro Electric Engineering Board Co Ltd
Priority to CN202020619039.2U priority Critical patent/CN212077934U/en
Application granted granted Critical
Publication of CN212077934U publication Critical patent/CN212077934U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model provides a pile body connecting device and pile body construction equipment relates to construction machinery technical field. The pile body connecting device comprises a clamping component and a fixing component; the clamping assembly comprises a first clamping arm and a second clamping arm, the first clamping arm and the second clamping arm are arranged oppositely and at intervals, a clamping space is arranged between the first clamping arm and the second clamping arm, and the pile body can be inserted into the clamping space; the first clamping arm and/or the second clamping arm can move relative to the fixing component so as to clamp or loosen the pile body in the clamping space; the pile body construction equipment comprises a lifting head and the pile body connecting device, and the pile body connecting device is fixedly arranged on the lifting head. The utility model provides a pile body connecting device and pile body construction equipment have alleviated among the prior art and have carried out the inconvenient operation when the pile body construction at the soft soil foundation, and the process is loaded down with trivial details, and has the technical problem of potential safety hazard.

Description

Pile body connecting device and pile body construction equipment
Technical Field
The utility model relates to a construction machinery technical field especially relates to a pile body connecting device and pile body construction equipment.
Background
In road and bridge construction engineering, soft soil foundations are usually encountered, when soft foundation treatment is carried out under the condition, excavation of earthwork and pile cap construction are needed after pipe piles are driven, partial or individual pipe piles are deviated due to unstable lateral pressure of the soft soil foundation, and certain potential safety hazards exist. When the above situation occurs, the pile filling operation is usually performed on the pipe pile by using a pipe pile static pressure machine after earth is backfilled. However, when earth is backfilled, the earth needs to be added and backfilled for many times, so that the construction period is prolonged, and the operation is inconvenient when the earth is backfilled.
In view of the above, there is a need for a pile connecting device and a pile construction apparatus, which can solve the above problems.
The information disclosed in this background section is only for enhancement of understanding of the general background of the invention and should not be taken as an acknowledgement or any form of suggestion that this information constitutes prior art already known to a person skilled in the art.
SUMMERY OF THE UTILITY MODEL
A first object of the utility model is to provide a pile body connecting device to alleviate among the prior art inconvenient operation when the pile body construction is carried out to the soft soil foundation, the process is loaded down with trivial details, and has the technical problem of potential safety hazard.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a pile body connecting device, which comprises a clamping component and a fixing component;
the clamping assembly comprises a first clamping arm and a second clamping arm, the first clamping arm and the second clamping arm are opposite and arranged at intervals, a clamping space is arranged between the first clamping arm and the second clamping arm, and the pile body can be inserted into the clamping space; the first clamping arm and/or the second clamping arm can move relative to the fixing assembly to clamp or loosen a pile body located in the clamping space.
In any one of the above technical solutions, further, the fixing assembly includes a first mounting plate, and the first clamping arm and/or the second clamping arm are/is slidably connected to the first mounting plate.
In any one of the above technical solutions, further, one of the first mounting plate and the first clamping arm is provided with a first guide rail, and the other is provided with a first guide groove, and the first guide rail is slidably connected with the first guide groove;
and/or one of the first mounting plate and the second clamping arm is provided with a second guide rail, and the other one of the first mounting plate and the second clamping arm is provided with a second guide groove, and the second guide rail is in sliding connection with the second guide groove.
In any of the above technical solutions, further, the first clamping arm includes a first clamping surface arranged in an arc surface, and the first clamping surface is recessed in a direction away from the second clamping arm; the second clamping arm comprises a second clamping surface which is arranged in an arc surface, and the second clamping surface is sunken towards the direction far away from the first clamping arm; the clamping space is located between the first clamping surface and the second clamping surface.
In any of the above technical solutions, further, the first clamping surface and/or the second clamping surface is provided with a rough texture.
In any one of the above technical solutions, further, a first reinforcing rib is disposed on one side of the first clamping arm departing from the first clamping surface, and/or a second reinforcing rib is disposed on one side of the second clamping arm departing from the second clamping surface.
In any of the above technical solutions, further, the first reinforcing rib is provided with a first hooking portion extending in a direction away from the first clamping surface;
and/or the second reinforcing rib is provided with a second hook back portion extending in a direction away from the second clamping surface.
In any of the above technical solutions, further, the fixing assembly further includes a support frame and a second mounting plate;
the second mounting panel with first mounting panel is relative and the interval sets up, the support frame install in first mounting panel with between the second mounting panel, the second mounting panel is used for connecting the hoisting head.
In any of the above technical solutions, further, the fixing assembly further includes a fastener;
the second mounting plate is provided with a fixing hole, and the fastener can penetrate through the fixing hole to be fixedly connected with the hoisting head.
In any of the above technical solutions, further, the fixing assembly further includes a connecting hook, and the connecting hook is fixedly disposed on the support frame.
In any one of the above technical solutions, further, the pile body connecting device further includes a driving assembly, the driving assembly is mounted on the fixing assembly, and a power output end of the driving assembly is connected to the first clamping arm and/or the second clamping arm.
In any of the above technical solutions, further, the driving assembly includes a first driving member and a first mounting shaft in transmission connection with a power output end of the first driving member, the first clamping arm is provided with a first mounting portion, and the first mounting shaft is mounted on the first mounting portion;
and/or, the drive assembly still include the second driving piece and with the second installation axle that the power take off end transmission of second driving piece is connected, second joint arm is provided with the second installation department, the second installation axle install in the second installation department.
In any of the above technical solutions, further, the first mounting portion includes a first mounting hole, and the first mounting shaft is connected to a hole wall of the first mounting hole;
and/or, the second installation portion comprises a second installation hole, and the second installation shaft is connected with the hole wall of the second installation hole.
A second object of the present invention is to provide a pile construction equipment to alleviate at least one of the above technical problems.
The utility model also provides a pile body construction equipment, including lifting by crane head and foretell pile body connecting device, pile body connecting device set firmly in lifting by crane the head.
The utility model has the advantages that:
the utility model provides a pile body connecting device, which comprises a clamping component and a fixing component; the fixing assembly is used for being connected with the lifting head, the clamping assembly is installed on the fixing assembly, the clamping assembly comprises a first clamping arm and a second clamping arm, the first clamping arm and the second clamping arm are arranged oppositely and at intervals, a clamping space is arranged between the first clamping arm and the second clamping arm, and the pile body can be inserted into the clamping space. And simultaneously, the first clamping arm and/or the second clamping arm can move relative to the fixed component, so that the first clamping arm and the second clamping arm are close to each other and far away from each other. When first joint arm and second joint arm are close to each other, the tight space of clamp dwindles gradually, and first joint arm and second joint arm can press from both sides the pile body that is located tight space of clamp. After the pile body is installed, the first clamping arm and the second clamping arm are far away from each other, and then the pile body in the clamping space is loosened. This pile body connecting device presss from both sides tight pile body through first joint arm and second joint arm, realizes the fixed of the relative pile body of joint subassembly, keeps away from the one end on ground through this pile body connecting device and pile body promptly and is connected, realizes fixing the relative ground of pile body, ensures in the soft soil foundation when the pile body construction, and the pile body can not incline because of the soft soil foundation, reduces the potential safety hazard. And just because the pile body connecting device fixes the pile body, the process that needs to add soil and backfill among the prior art has been reduced, and the process is simplified, has effectively shortened construction period.
The utility model provides a pair of pile body construction equipment, including lifting by crane head and foretell pile body connecting device, pile body connecting device sets firmly in lifting by crane the head, and the pile body is installed on pile body connecting device. The lifting head is fixed relative to the pile body through the pile body connecting device, and then connected to one end of the pile body far away from the ground through the pile body construction equipment so as to stabilize the pile body and further facilitate construction of the pile body.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the embodiments or the technical solutions in the prior art will be briefly described below, and it is obvious that the drawings in the following description are some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic view of a pile body connecting device according to an embodiment of the present invention;
fig. 2 is a schematic view of a pile body connecting device provided by an embodiment of the present invention connected to a pile body;
fig. 3 is a first partial side view of a pile construction apparatus according to an embodiment of the present invention;
fig. 4 is a second partial side view of the pile construction equipment provided by the embodiment of the present invention.
Icon: 10-a clamping assembly; 11-a first snap arm; 12-a second snap arm; 13-a clamping space; 20-a stationary component; 21-a first mounting plate; 22-a support frame; 23-a second mounting plate; 24-a connecting hook; 31-a first guide rail; 32-a first guide slot; 41-coarse grain; 50-a drive assembly; 51-a first drive member; 52-first mounting shaft; 60-lifting the hoisting head; 70-pile body; 111-a first clamping surface; 112-a first stiffening rib; 121-a second clamping surface; 122-a second stiffening rib; 231-fixing holes; 1121 — first mounting hole; 1221-second hook back.
Detailed Description
The technical solution of the present invention will be described clearly and completely with reference to the accompanying drawings, and obviously, the described embodiments are some, but not all embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Examples
As shown in fig. 3 and 4, the pile construction equipment provided by the present embodiment includes a lifting head 60 and a pile connecting device, and the pile connecting device is fixed to the lifting head 60.
Generally, the pile construction equipment further includes an excavator, the pile connecting device is installed at one end of the pile 70 far from the ground, and then connected to the excavator through the hoisting head 60, the pile 70 is hoisted by the excavator, and the construction operation of the pile 70 is performed. That is to say, the excavator exerts the effort to pile body 70 through lifting head 60 and pile body connecting device to through producing the supporting role to the one end that pile body 70 keeps away from ground, and then ensure that pile body 70 can not be because of the unstable inclined pile of ground atress when meetting soft soil foundation in the work progress, improve the stability of pile body 70 construction, reduce the potential safety hazard. In addition, after the pile body connecting device is fixed relative to the pile body 70, the pile body 70 cannot incline when being constructed at a soft soil foundation, so that soil adding and backfilling are not needed for multiple times, the operation process is simplified, and the construction period is effectively shortened. The following is a concrete explanation of the pile connecting device.
As shown in fig. 1 and 2, the pile connecting device provided by the embodiment comprises a clamping assembly 10 and a fixing assembly 20; the fixing assembly 20 is used for being connected with the lifting head 60, the clamping assembly 10 is installed on the fixing assembly 20, the clamping assembly 10 comprises a first clamping arm 11 and a second clamping arm 12, the first clamping arm 11 and the second clamping arm 12 are arranged oppositely and at intervals, a clamping space 13 is arranged between the first clamping arm 11 and the second clamping arm 12, and the pile body 70 can be inserted into the clamping space 13; the first clamping arm 11 can move relative to the fixed assembly 20 to clamp or release the stub body 70 located in the clamping space 13.
Specifically, the clamping assembly 10 is mainly used for contacting with the end of the pile body 70 and can be fixed relative to the pile body 70, so that the purpose of installing the pile body connecting device relative to the end of the pile body is achieved, one end of the pile body 70, which is far away from the ground, is supported, and it is ensured that the pile body 70 is not prone to pile deflection in the construction process. The fixing assembly 20 is used for fixedly connecting with the hoisting head 60, so as to achieve the purpose of installing the pile body connecting device relative to the hoisting head 60. The clamping assembly 10 includes a first clamping arm 11 and a second clamping arm 12 which are arranged oppositely and at an interval, a clamping space 13 is formed between the first clamping arm 11 and the second clamping arm 12, and an end of the pile 70 is inserted into the clamping space 13. At this time, the first clamping arm 11 moves relative to the fixing assembly 20, so that the first clamping arm 11 can gradually approach to the second clamping arm 12, the clamping space 13 between the first clamping arm 11 and the second clamping arm 12 is gradually reduced, and the pile body 70 located in the clamping space 13 is clamped by the first clamping arm 11 and the second clamping arm 12, so that the clamping assembly 10 is installed relative to the pile body 70. When the pile driving operation is completed, the first clamping arm 11 moves in the opposite direction, i.e. moves away from the second clamping arm 12, the clamping space 13 gradually increases, so as to loosen the pile body 70 located in the clamping space 13, and the clamping assembly 10 is removed from the pile body 70, so as to remove the pile body connecting device from the pile body 70.
This pile body connecting device presss from both sides tight pile body 70 through first joint arm 11 and second joint arm 12, realizes the fixed of the relative pile body 70 of joint subassembly 10, keeps away from the one end on ground through this pile body connecting device and pile body 70 promptly and is connected, realizes fixing the relative ground of pile body 70, ensures in the soft soil foundation when constructing pile body 70, and pile body 70 can not incline because of the soft soil foundation, reduces the potential safety hazard. And just because the pile body connecting device fixes the pile body 70, the process of adding soil and backfilling in the prior art is reduced, the process is simplified, and the construction period is effectively shortened.
It should be added that, not only the first snap-in arm 11 moves relative to the fixed component 20, but also only the second snap-in arm 12 moves relative to the fixed component 20, that is, the second snap-in arm 12 moves closer to and away from the first snap-in arm 11. Or the first and second snap arms 11 and 12 move simultaneously relative to the fixed component 20, i.e. the first and second snap arms 11 and 12 move simultaneously towards each other and can move simultaneously away from each other. It is sufficient if the pile body 70 in the clamping space 13 can be clamped.
In the present embodiment, the first engaging arm 11 is moved relative to the fixing component 20 as an example, and the second engaging arm 12 is moved relative to the fixing component 20 in the same manner as the first engaging arm 11, that is, the first engaging arm 11 is a moving engaging arm, and the second engaging arm 12 is a fixed engaging arm.
With continued reference to fig. 1 and 2, the fixing assembly 20 preferably includes a first mounting plate 21, and the first snap-in arm 11 is slidably connected to the first mounting plate 21. Specifically, first joint arm 11 and second joint arm 12 all are located the below of first mounting panel 21, and second joint arm 12 is first mounting panel 21 fixed connection relatively, and first joint arm 11 is first mounting panel 21 sliding connection relatively to realize that first joint arm 11 is close to and keeps away from relatively second joint arm 12.
With continued reference to fig. 2, preferably, the first clamping arm 11 is provided with a first guide rail 31, the first mounting plate 21 is provided with a first guide groove 32, and the first guide rail 31 is slidably connected with the first guide groove 32. Specifically, the lower bottom surface of the first mounting plate 21 is provided with folded plates which are arranged in pairs, the two folded plates in pairs are arranged oppositely and at intervals, each folded plate is arranged in an L shape, and then the first guide groove 32 is formed at the folding angle of the two folded plates. Meanwhile, a first guide rail 31 is arranged on one side of the first clamping arm 11, which is far away from the clamping space 13, and the first guide rail 31 is lapped on the transverse edge of the folded plate, so that the first guide rail 31 slides along the length direction of the first guide groove 32.
It should be noted that the first guide groove 32 may be provided in the first click arm 11, and the first guide rail 31 may be provided in the first mounting plate 21, as long as the first click arm 11 is slidably connected to the first mounting plate 21.
Meanwhile, if when the second snap arm 12 is slidably coupled to the first mounting plate 21, a second guide rail is disposed on a side of the second snap arm 12 away from the clamping space 13, a second guide groove having a length extending in a direction away from the first snap arm 11 is disposed on a side of the second mounting plate 23 corresponding to the second snap arm 12, the second guide rail is overlapped in the second guide groove, and the second guide rail can slide in a length direction of the second guide groove. Alternatively, the second guide groove is provided in the second engaging arm 12, and the second guide rail is provided in the first mounting plate 21. It is sufficient if the second click arm 12 can be slidably connected to the first mounting plate 21.
With continued reference to fig. 1 and fig. 2, preferably, the first clamping arm 11 includes a first clamping surface 111 disposed in an arc shape, and the first clamping surface 111 is recessed in a direction away from the second clamping arm 12; the second clamping arm 12 comprises a second clamping surface 121 which is arranged in an arc shape, and the second clamping surface 121 is recessed towards the direction far away from the first clamping arm 11; the clamping space 13 is located between the first 111 and the second 121 clamping surfaces.
Specifically, the cross section of the first clamping arm 11 and the cross section of the second clamping arm 12 are both arc-shaped, the first clamping surface 111 is located on one side of the first clamping arm 11 facing the second clamping arm 12, the second clamping surface 121 is located on one side of the second clamping arm 12 facing the first clamping arm 11, and the clamping space 13 is located between the first clamping surface 111 and the second clamping surface 121. When the pile body 70 is inserted into the clamping space 13, the movement of the first clamping arm 11 relative to the second clamping arm 12 can cause the first clamping surface 111 to move relative to the second clamping surface 121, so that the first clamping surface 111 and the second clamping surface 121 can be pressed against the outer side wall of the pile body 70.
It should be added that only the first clamping arm 11 may be provided with the first clamping surface 111 having the arc surface, or only the second clamping arm 12 may be provided with the second clamping surface 121 having the arc surface, as long as clamping of the pile body 70 can be achieved.
With continued reference to fig. 1, the first and second clamping surfaces 111 and 121 are preferably provided with a rough texture 41. The arrangement of the rough grains 41 can increase the roughness of the contact surfaces between the first clamping surface 111 and the pile body 70 and between the second clamping surface 121 and the pile body 70, so that the friction force of the contact surfaces is improved, and the connection reliability of clamping is further improved.
Of course, it is also possible to provide only the first clamping surface 111 with the rough texture 41, or only the second clamping surface 121 with the rough texture 41, as long as it is possible to ensure a large friction in contact with the stud body 70.
With continued reference to fig. 1 and 2, preferably, a first reinforcing rib 112 is disposed on a side of the first catching arm 11 facing away from the first clamping surface 111, and a second reinforcing rib 122 is disposed on a side of the second catching arm 12 facing away from the second clamping surface 121. Specifically, the first reinforcing rib 112 and the second reinforcing rib 122 are arranged to improve the structural stability of the first clamping arm 11 and the second clamping arm 12, and ensure that the first clamping arm 11 and the second clamping arm 12 are not broken due to excessive stress when the first clamping arm 11 and the second clamping arm 12 clamp the pile body 70, so as to structurally reinforce the first clamping arm 11 and the second clamping arm 12.
It should be added that only the first snap-in arm 11 may be provided with the first reinforcing rib 112, or only the second snap-in arm 12 may be provided with the second reinforcing rib 122, as long as the first snap-in arm 11 and the second snap-in arm 12 are ensured to have structural reinforcement.
With continued reference to fig. 1, preferably, the second reinforcing rib 122 is provided with a second hooking portion 1221, the second hooking portion 1221 extending in a direction away from the second clamping surface 121. In this embodiment, the first engaging arm 11 is a movable engaging arm, the second engaging arm 12 is a fixed engaging arm, and the second hooking portion 1221 is disposed on the second engaging arm 12, and has a strong stability. The second hooking part 1221 is used for connecting a hoisting rope body, and the hoisting rope body can be bound on the pile body 70, so that the connection reliability of the pile body 70 is improved.
Of course, if the second clamping arm 12 is a movable clamping arm and the first clamping arm 11 is a fixed clamping arm, a first hooking portion is provided on the first reinforcing rib 112, the first hooking portion extends in a direction away from the first clamping surface 111, and the first hooking portion is used for connecting the rope of the binding pile 70.
With continued reference to fig. 1 and 2, the fixing assembly 20 preferably further includes a support bracket 22 and a second mounting plate 23; the second mounting plate 23 and the first mounting plate 21 are opposite and arranged at intervals, the support frame 22 is mounted between the first mounting plate 21 and the second mounting plate 23, and the second mounting plate 23 is used for connecting the hoisting head 60.
Specifically, the support frame 22 is fixedly disposed on one side of the first mounting plate 21 away from the clamping assembly 10, that is, the upper surface of the first mounting plate 21, and the support frame 22 is formed by welding with the first mounting plate 21. The support frame 22 includes a middle frame that is the tetragonal body setting and a plurality of floor that weld in the middle frame, and a plurality of floor are used for carrying out the structure to the middle frame and strengthen. The second mounting plate 23 is welded on the top of the support frame 22 and is used for being fixedly connected with the hoisting head 60 of the excavator, so that the pile body connecting device is mounted relative to the hoisting head 60. When the second clamping arm 12 is a fixed clamping arm, the second clamping arm 12 and the second reinforcing rib 122 disposed on the second clamping arm 12 are both welded to the bottom surface of the first mounting plate 21.
With continued reference to fig. 1, in actual use, the securing assembly 20 further includes a fastener; the second mounting plate 23 is provided with a fixing hole 231, and a fastener can pass through the fixing hole 231 and be fixedly connected with the lifting head 60. The fastener is a bolt, that is, the second mounting plate 23 is fixedly connected with the hoisting head 60 through the bolt. One mounting hole for each fastener, and a plurality of mounting holes spaced circumferentially around the second mounting plate 23.
Referring to fig. 1, in the present embodiment, the fixing assembly 20 further includes a connecting hook 24, and the connecting hook 24 is fixed to the supporting frame 22. The attachment hooks 24 are welded to the intermediate frame on the support frame 22, the attachment hooks 24 extending vertically upward. The connecting hook 24 can be used for connecting the rope of the binding pile body 70.
With continued reference to fig. 1, preferably, the pile connecting device further includes a driving assembly 50, the driving assembly 50 is mounted on the fixing assembly 20, and a power output end of the driving assembly 50 is connected to the first engaging arm 11. The driving assembly 50 is configured to generate power to drive the first clamping arm 11 to slide relative to the first mounting plate 21, so as to realize the approaching and departing movement of the first clamping arm 11 relative to the second clamping arm 12. The setting of drive assembly 50 can replace manual drive, and operating efficiency is higher, and operational safety is strong.
It should be added that when the second clamping arm 12 also moves, the power output end of the driving assembly 50 can also drive the second clamping arm 12 to move relative to the first clamping arm 11, as long as the size of the clamping space 13 can be changed to clamp and release the pile body 70.
In fact, the movement of the first snap-in arm 11 with respect to the second snap-in arm 12 can also be manually pushed. When the pile 70 is in a horizontal mode, the pile connecting device is manually moved, so that the end of the pile 70 is inserted into the clamping space 13, then the first clamping arm 11 is manually pushed to drive the first clamping arm 11 to move relative to the first mounting plate 21, and after the first clamping arm 11 is moved to a certain position, the first clamping arm 11 is fixed relative to the first mounting plate 21 through a bolt. At this time, the through holes for fixing are provided in plural, and the plural through holes are arranged at intervals along the moving direction of the first snap arm 11, and the through holes can be selected to be suitable according to the pile bodies 70 with different diameters, so that the first snap arm 11 and the first mounting plate 21 can be fixed. Meanwhile, the first snap arm 11 may be fixed to the pile 70 by a bolt, and the second snap arm 12 may be fixed to the pile 70 by a bolt. After the pile body connecting device is fixed relative to the pile body 70 and the hoisting head 60, the pile body 70 is hoisted by an excavator.
Referring to fig. 1, in the present embodiment, the driving assembly 50 includes a first driving member 51 and a first mounting shaft 52 in transmission connection with a power output end of the first driving member 51, the first clamping arm 11 is provided with a first mounting portion, and the first mounting shaft 52 is mounted on the first mounting portion. In the present embodiment, the first mounting portion includes a first mounting hole 1121, and the first mounting shaft 52 is connected to a hole wall of the first mounting hole 1121. That is, one end of the first mounting shaft 52 is inserted into the first mounting hole 1121 and fixed by a bolt. The power output end of the first driving member 51 is connected to the first mounting shaft 52, and the first driving member 51 is driven by a hydraulic cylinder to move the first clamping arm 11 relative to the first mounting plate 21. The first mounting hole 1121 is disposed in the first reinforcing rib 112 and penetrates through the first reinforcing rib 112 in a thickness direction.
It should be added that the driving assembly 50 further includes a second driving member and a second mounting shaft in transmission connection with the power output end of the second driving member, the second clamping arm 12 is provided with a second mounting portion, and the second mounting shaft is mounted on the second mounting portion. The second installation portion comprises a second installation hole, and the second installation shaft is connected with the hole wall of the second installation hole. The second driving member is a hydraulic cylinder, and the second clamping arm 12 moves relative to the second mounting plate 23 through hydraulic driving. The second mounting hole is disposed on the second reinforcing rib 122 and penetrates the second reinforcing rib 122 in a thickness direction thereof.
Wherein, the first driving member 51 and the second driving member can be installed on the fixing assembly 20, i.e. on the supporting frame 22. The first and second mounting portions may further include grooves, which only need to enable the first mounting shaft 52 to be mounted with respect to the first reinforcing rib 112 and the second mounting shaft to be mounted with respect to the second reinforcing rib 122.
Finally, it should be noted that: the above embodiments are only used to illustrate the technical solution of the present invention, and not to limit it; although the present invention has been described in detail with reference to the foregoing embodiments, it should be understood by those skilled in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some or all of the technical features may be equivalently replaced; such modifications and substitutions do not depart from the spirit and scope of the embodiments of the present invention.

Claims (10)

1. The pile body connecting device is characterized by comprising a clamping component (10) and a fixing component (20);
the fixing assembly (20) is used for being connected with a lifting head (60), the clamping assembly (10) is installed on the fixing assembly (20), the clamping assembly (10) comprises a first clamping arm (11) and a second clamping arm (12), the first clamping arm (11) and the second clamping arm (12) are arranged oppositely and at intervals, a clamping space (13) is formed between the first clamping arm and the second clamping arm, and the pile body (70) can be inserted into the clamping space (13); the first clamping arm (11) and/or the second clamping arm (12) can move relative to the fixing component (20) to clamp or release a pile body (70) in the clamping space (13).
2. Pile connection arrangement according to claim 1, characterized in that the fixing assembly (20) comprises a first mounting plate (21), the first (11) and/or the second (12) snap-in arm being slidingly connected to the first mounting plate (21).
3. Pile connection according to claim 2, characterized in that one of the first mounting plate (21) and the first snap-in arm (11) is provided with a first guide rail (31) and the other with a first guide groove (32), the first guide rail (31) being in sliding connection with the first guide groove (32);
and/or one of the first mounting plate (21) and the second clamping arm (12) is provided with a second guide rail, and the other one is provided with a second guide groove, and the second guide rail is in sliding connection with the second guide groove.
4. Pile connection arrangement according to claim 1, characterised in that the first snap-in arm (11) comprises a first clamping surface (111) with an arc-shaped arrangement, the first clamping surface (111) being concave away from the second snap-in arm (12); the second clamping arm (12) comprises a second clamping surface (121) which is arranged in an arc surface, and the second clamping surface (121) is sunken towards the direction far away from the first clamping arm (11); the clamping space (13) is located between the first clamping surface (111) and the second clamping surface (121).
5. Pile connection according to claim 4, characterised in that the side of the first snap-in arm (11) facing away from the first clamping surface (111) is provided with a first stiffening rib (112) and/or the side of the second snap-in arm (12) facing away from the second clamping surface (121) is provided with a second stiffening rib (122).
6. Pile connection according to claim 5, characterised in that the first reinforcement rib (112) is provided with a first hooking back, which extends in a direction away from the first clamping surface (111);
and/or the second reinforcing rib (122) is provided with a second hook back portion (1221), the second hook back portion (1221) extending in a direction away from the second clamping face (121).
7. The pile connection according to claim 2, characterized in that the fixing assembly (20) further comprises a support frame (22) and a second mounting plate (23);
the second mounting panel (23) with first mounting panel (21) is relative and the interval sets up, support frame (22) install in first mounting panel (21) with between second mounting panel (23), second mounting panel (23) are used for connecting and rise hoisting head (60).
8. The pile connection device according to any of claims 1-7, characterized by further comprising a driving assembly (50), wherein the driving assembly (50) is mounted to the stationary assembly (20) and the power output of the driving assembly (50) is connected to the first snap-in arm (11) and/or the second snap-in arm (12).
9. The pile connection device according to claim 8, characterized in that the driving assembly comprises a first driving member (51) and a first mounting shaft (52) in transmission connection with a power output end of the first driving member (51), the first snap-in arm (11) is provided with a first mounting hole (1121), and the first mounting shaft (52) is connected with a hole wall of the first mounting hole (1121);
and/or, the drive assembly still include the second driving piece and with the second installation axle that the power take off end transmission of second driving piece is connected, second joint arm is provided with the second mounting hole, the second installation axle with the pore wall of second mounting hole is connected.
10. Pile construction equipment, characterized in that it comprises a hoisting head (60) and a pile connection device according to any of claims 1-9, which is fixed to the hoisting head (60).
CN202020619039.2U 2020-04-22 2020-04-22 Pile body connecting device and pile body construction equipment Active CN212077934U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020619039.2U CN212077934U (en) 2020-04-22 2020-04-22 Pile body connecting device and pile body construction equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020619039.2U CN212077934U (en) 2020-04-22 2020-04-22 Pile body connecting device and pile body construction equipment

Publications (1)

Publication Number Publication Date
CN212077934U true CN212077934U (en) 2020-12-04

Family

ID=73597635

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020619039.2U Active CN212077934U (en) 2020-04-22 2020-04-22 Pile body connecting device and pile body construction equipment

Country Status (1)

Country Link
CN (1) CN212077934U (en)

Similar Documents

Publication Publication Date Title
EP2990539A1 (en) Bucket, and work vehicle provided with same
CN212077934U (en) Pile body connecting device and pile body construction equipment
JP5693172B2 (en) Tunnel leg reinforcement structure
CN110171777B (en) Crawler crane for reconstruction of excavator and connector for crawler crane
EP2987917B1 (en) Bucket, and work vehicle provided with same
CN211472517U (en) Advanced water stop structure between piles
CN212078060U (en) Slotter for constructing underground continuous wall
CN212052974U (en) Bucket and excavator
CN210313231U (en) Crawler crane transformed by excavator and connector used for crawler crane
CN210341940U (en) Steel sheet pile sinking construction device for foundation pit support
CN210177514U (en) Supporting structure
CN217500212U (en) Counter-force clamp
CN212582768U (en) Bulldozing device protection mechanism of excavator
CN215669768U (en) Auxiliary working device for bucket of wheel type bulldozer
CN212294796U (en) Novel excavator dozer blade
CN217105314U (en) Load-sensitive gear pump driving type walking motor for small excavator
CN218969968U (en) Detachable vibration roller for groove
KR100652525B1 (en) The land-side protection bar setting apparatus
CN217267508U (en) Deep basal pit construction safety device
CN217811309U (en) Layered assembly type battery mounting rack
CN211735393U (en) Cast-in-place pile construction protects a pull-out device
CN111877429B (en) Grooving device, grooving machine and grooving method suitable for construction of local diaphragm wall under cable trench
CN213709486U (en) Supporting structure using Larsen steel sheet pile
CN216475031U (en) Open cut foundation pit comprehensive operation platform with adjustable span
JP7164139B1 (en) Pile driving method and stationary machine