CN212075987U - Cable laying traction equipment for power construction - Google Patents
Cable laying traction equipment for power construction Download PDFInfo
- Publication number
- CN212075987U CN212075987U CN202020517585.5U CN202020517585U CN212075987U CN 212075987 U CN212075987 U CN 212075987U CN 202020517585 U CN202020517585 U CN 202020517585U CN 212075987 U CN212075987 U CN 212075987U
- Authority
- CN
- China
- Prior art keywords
- connecting piece
- pulley
- power construction
- cable
- piece
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model provides a cable laying traction device for electric power construction, which comprises a traction mechanism and a laying auxiliary mechanism, wherein the laying auxiliary mechanism comprises a fixed frame and a pulley, the fixed frame comprises a connecting piece and two inverted U-shaped fixed pieces, two ends of the connecting piece are respectively arranged at the bottom of one side of the two fixed pieces, and the pulley can be rotatably arranged between the two fixed pieces; the fixing pieces are respectively provided with a fastening piece. This pulling equipment is laid to cable for electric power construction has convenient to use, labour saving and time saving's advantage.
Description
Technical Field
The utility model relates to a traction equipment is laid to cable for electric power construction.
Background
When the cable is laid, because the cable is heavier and the laying distance is usually longer, generally, a traction device such as a cable tractor is needed. When a cable is laid on the bridge, the bridge is fixed at the indoor top and has more ninety-degree turning structures, so that the cable tractor is difficult to apply; when the cable tractor is adopted, the cable tractor is mostly placed on the ground and divided into a plurality of straight line segments to draw the cable in a segmented mode, and the efficiency is low. In most cases, the artificial traction and paving are carried out manually, and the cooperation of a plurality of people is needed, so that the time and the labor are wasted.
Disclosure of Invention
In order to solve the problem existing in the background technology, the utility model provides a.
A cable laying traction device for electric power construction comprises a traction mechanism and a laying auxiliary mechanism, wherein the laying auxiliary mechanism comprises a fixed frame and a pulley, the fixed frame comprises a connecting piece and two inverted U-shaped fixing pieces, two ends of the connecting piece are respectively arranged at the bottoms of one sides of the two fixing pieces, and the pulley is rotatably arranged between the two fixing pieces; the fixing pieces are respectively provided with a fastening piece.
Based on the above, the pulley comprises a bearing seat and a pulley body, and two ends of the pulley body are respectively and rotatably arranged in the bearing seat; connecting blocks are respectively arranged on the connecting piece and the two fixing pieces corresponding to the two bearing blocks, and the bearing blocks are connected with the connecting blocks through pins.
Based on the above, the fastener is a bolt and a bolt hole arranged on the fixing piece.
Based on the above, the traction mechanism is a winch.
Based on the above, the pulley surface is arc-shaped.
Based on the above, the connecting piece includes first connection piece and second connection piece, and first connection piece and second connection piece correspond respectively on be provided with connect the through-hole, and the one end setting of first connection piece is on a mounting, and the one end setting of second connection piece is on another mounting, and connect the through-hole and be the screw hole, and first connection piece and second connection piece pass through bolted connection.
The utility model discloses relative prior art has substantive characteristics and progress, specific theory, the utility model discloses a drive mechanism and complementary unit cooperate, and a plurality of complementary unit of interval equipartition reduce the friction of cable and crane span structure on the crane span structure, conveniently adopt drive mechanism to carry out direct, the operation of pulling of longer distance to the cable, have convenient to use, efficient advantage.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic structural view of a horizontal state of a pulley according to an embodiment of the present invention.
Fig. 2 is a schematic structural diagram of a pulley in a vertical state according to an embodiment of the present invention.
Fig. 3 is a schematic structural view of a pulley in an inclined state according to another embodiment of the present invention.
Fig. 4 is a schematic structural diagram of the laying assisting mechanism and the bridge frame of the present invention.
In the figure: 1. a fixing member; 2. a connecting member; 3. a bearing seat; 4. a pulley; 5. connecting blocks; 6. a pin hole; 7. a bolt; 8. a bridge frame.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without any creative effort belong to the protection scope of the present invention.
As shown in fig. 1, 2 and 4, a cable laying traction device for electric power construction comprises a traction mechanism and a laying auxiliary mechanism, wherein the laying auxiliary mechanism comprises a fixed frame and a pulley 4, the fixed frame comprises a connecting piece 2 and two inverted U-shaped fixing pieces 1, two ends of the connecting piece 2 are respectively arranged at the bottom of one side of the two fixing pieces 1, and the pulley 4 is rotatably arranged between the two fixing pieces 1; the fixing pieces 1 are respectively provided with a fastening piece.
During the use, lay a plurality of complementary unit at a certain distance intervals equipartition on crane span structure 8, specifically, erect the mounting 1 of falling the U type on the both sides wall of crane span structure 8 to through the fastener with mounting 1 with the inseparable butt of crane span structure 8. The traction mechanism is erected on the pulley 4, and after the tail end of the traction rope is tied with one end of the cable, the traction mechanism can be started to pull and lay the cable through the traction rope. The pulleys 4 uniformly distributed at intervals play a role in sliding support of the cable, so that the friction force of the cable in the traction process is greatly reduced, and the cable is conveniently pulled. In this embodiment, the traction mechanism is a winch, and the surface of the pulley 4 is arc-shaped, so as to limit the cable to a certain extent, i.e., prevent the cable from slipping off the pulley 4 to a certain extent. The fastener is bolt 7 and the bolt hole of setting on mounting 1, twists bolt 7, and bolt 7 and fastener are supported through the screw action and are pressed on crane span structure 8, avoid fastener and crane span structure 8 to take place relative movement. This scheme is particularly suitable for tray formula crane span structure 8, cascaded crane span structure 8 and has the slot type crane span structure 8 that can open the capping.
Preferably, the pulley 4 comprises a bearing seat 3 and a pulley body 4, and two ends of the pulley body 4 are respectively and rotatably arranged in the bearing seats 3; connecting blocks 5 are respectively arranged on the connecting piece 2 and the two fixing pieces 1 corresponding to the two bearing blocks 3, and the bearing blocks 3 are connected with the connecting blocks 5 through pins. Specifically, the connecting block 5 and the bearing block 3 are respectively and correspondingly provided with a pin hole 6, and a pin is inserted into the pin hole 6 to connect the connecting block 5 and the bearing block 3. In most cases, the pulley body 4 is connected to the connecting block 5 on the connecting piece 2 through the bearing seat 3, and the pulley body 4 is in a horizontal state and is used at the linear position of the bridge frame 8; at the position that the crane span structure 8 turns round, the one end of pulley body 4 is connected on connecting block 5 on a mounting 1, and on the connecting block 5 on connecting piece 2 was connected to the other end, pulley body 4 was vertical form to frictional force when reducing the cable and turning. In practice, the fixing member 1 is provided with a plurality of bolt holes, and the relative height position of the fixing member 1 and the bridge frame 8 can be adjusted through the matching of bolts and the bolt holes.
As shown in fig. 3, in this embodiment, one end of the pulley 4 is connected to the connecting block 5 on the fixing member 1, and after the other end of the pulley 4 is connected to the connecting block 5 on the connecting member 2, the pulley 4 is inclined at 45 degrees, so that the pulley 4 at the corner not only plays a role in reducing friction of the cable, but also plays a role in supporting the cable to a certain extent.
Preferably, the connecting piece 2 comprises a first connecting piece and a second connecting piece, the first connecting piece and the second connecting piece are correspondingly provided with connecting through holes respectively, one end of the first connecting piece is arranged on one fixing piece 1, one end of the second connecting piece is arranged on the other fixing piece 1, the connecting through holes are threaded holes, and the first connecting piece and the second connecting piece are connected through bolts. By adjusting the relative positions of the first connecting piece and the second connecting piece, the width of the fixing frame can be adjusted to adapt to bridges 8 with different sizes. In fact, the connecting block 5 is also provided with a threaded hole, the connecting block 5 is connected to the connecting piece 2 through a bolt, and the position of the pulley 4 on the connecting piece 2 can be adjusted according to actual needs.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Claims (6)
1. The utility model provides a traction equipment is laid to cable for electric power construction which characterized in that: the device comprises a traction mechanism and an auxiliary laying mechanism, wherein the auxiliary laying mechanism comprises a fixed frame and a pulley, the fixed frame comprises a connecting piece and two inverted U-shaped fixing pieces, two ends of the connecting piece are respectively arranged at the bottoms of one sides of the two fixing pieces, and the pulley is rotatably arranged between the two fixing pieces; the fixing pieces are respectively provided with a fastening piece.
2. The cable laying traction apparatus for electric power construction according to claim 1, characterized in that: the pulley comprises a bearing seat and a pulley body, and two ends of the pulley body are respectively rotatably arranged in the bearing seat; connecting blocks are respectively arranged on the connecting piece and the two fixing pieces corresponding to the two bearing blocks, and the bearing blocks are connected with the connecting blocks through pins.
3. The cable laying traction apparatus for electric power construction according to claim 1, characterized in that: the fastener is bolt and the bolt hole of setting on the mounting.
4. The cable laying traction apparatus for electric power construction according to claim 1, characterized in that: the traction mechanism is a winch.
5. The cable laying traction apparatus for electric power construction according to claim 1, characterized in that: the surface of the pulley is arc-shaped.
6. The cable laying traction apparatus for electric power construction according to claim 1, characterized in that: the connecting piece comprises a first connecting piece and a second connecting piece, connecting through holes are correspondingly formed in the first connecting piece and the second connecting piece respectively, one end of the first connecting piece is arranged on one fixing piece, one end of the second connecting piece is arranged on the other fixing piece, the connecting through holes are threaded holes, and the first connecting piece and the second connecting piece are connected through bolts.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020517585.5U CN212075987U (en) | 2020-04-09 | 2020-04-09 | Cable laying traction equipment for power construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020517585.5U CN212075987U (en) | 2020-04-09 | 2020-04-09 | Cable laying traction equipment for power construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212075987U true CN212075987U (en) | 2020-12-04 |
Family
ID=73595612
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020517585.5U Expired - Fee Related CN212075987U (en) | 2020-04-09 | 2020-04-09 | Cable laying traction equipment for power construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212075987U (en) |
-
2020
- 2020-04-09 CN CN202020517585.5U patent/CN212075987U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111392585B (en) | Movable rack for mounting electrical equipment and using method thereof | |
CN111478230A (en) | Cable laying equipment for urban rail transit | |
CN212075987U (en) | Cable laying traction equipment for power construction | |
CN209389543U (en) | A kind of installing mechanism of pole-mounted circuit breaker | |
CN206267544U (en) | Outer tensioning equipment | |
CN212928978U (en) | Municipal administration pipeline laying device | |
CN202298652U (en) | Wall-form whole-piece sliding type dismantling device | |
CN213328630U (en) | Steel box girder convenient to operation | |
CN212289968U (en) | Handling device of cable manufacture usefulness | |
CN113979193A (en) | Line erecting device for wind power generation | |
CN212076191U (en) | Special beam lifting machine for intercity light rail | |
CN209088332U (en) | A kind of scene temporary electricity distribution box support | |
CN208603520U (en) | A kind of portable construction wire dispenser | |
CN212923865U (en) | A overhead line device for electric power engineering construction | |
CN206337470U (en) | temporary track remover | |
CN218976181U (en) | Cable pipe penetrating device | |
CN218708643U (en) | Special lifting appliance for outdoor construction of transformer substation | |
CN215946615U (en) | Building engineering construction hoisting device | |
CN217692456U (en) | Lead device for erecting power supply line | |
CN218950642U (en) | Cable laying device | |
CN214995795U (en) | Convenient-to-detach steel frame for green building | |
CN218708525U (en) | Auxiliary ACC plate mounting device | |
CN216720779U (en) | Auxiliary assembly for cable laying | |
CN216982884U (en) | A automatic device of paving of afforestation vegetation blanket for sponge city | |
CN211998580U (en) | Vertical transportation device for curtain wall unit plate |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20201204 Termination date: 20210409 |
|
CF01 | Termination of patent right due to non-payment of annual fee |