CN212072454U - Building construction auxiliary device - Google Patents

Building construction auxiliary device Download PDF

Info

Publication number
CN212072454U
CN212072454U CN202020278551.5U CN202020278551U CN212072454U CN 212072454 U CN212072454 U CN 212072454U CN 202020278551 U CN202020278551 U CN 202020278551U CN 212072454 U CN212072454 U CN 212072454U
Authority
CN
China
Prior art keywords
fixed
parallel
plates
gear
mounting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020278551.5U
Other languages
Chinese (zh)
Inventor
姚瑶
罗嘉聪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020278551.5U priority Critical patent/CN212072454U/en
Application granted granted Critical
Publication of CN212072454U publication Critical patent/CN212072454U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Drilling And Boring (AREA)

Abstract

The utility model relates to the technical field of building construction, and discloses a building construction auxiliary device, which solves the problems that workers need to hold an electric drill for punching in real time in a punching mode, the labor intensity is high, and the arm is easy to cause ache, and comprises two parallel fixed plates, two parallel mounting plates are fixed between the two parallel fixed plates, a gear is installed between the two parallel mounting plates through the rotation of a rotating shaft, one end of the rotating shaft extends to one side of the mounting plates, a rotating handle is fixed at the outer end of the rotating shaft, a mounting pipe is arranged at one side of the gear, the mounting pipe is fixed between the two fixed plates, a sliding rod is installed inside the mounting pipe in a sliding manner, a rack is fixed at one side of the sliding rod, the sliding rod is driven to move upwards in the mounting pipe by rotating the rotating handle, and the electric drill is enabled to move upwards at the same time, the electric drill is used for punching the wall top, so that the labor intensity of workers is reduced.

Description

Building construction auxiliary device
Technical Field
The utility model relates to a construction technical field especially relates to a construction auxiliary device.
Background
In the building work progress, often need make some great holes of diameter at the wall crown for installation lamps and lanterns or wiring, the mode of punching commonly used adopts electric hand drill directly to go on, this kind of mode of punching, and the workman needs the often support the electric drill and punches, and intensity of labour is big, causes the aching pain of arm easily, consequently, we have proposed a building construction auxiliary device and have solved above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the adoption electric hand drill that exists among the prior art and directly going on, this kind of mode of punching, workman need hold the electric drill often and punch, and intensity of labour is big, causes the shortcoming of the aching of arm easily, and the building construction auxiliary device who proposes.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a building construction auxiliary device comprises two parallel fixing plates, two parallel mounting plates are fixed between the two parallel fixing plates, a gear is rotatably mounted between the two parallel mounting plates through a rotating shaft, one end of the rotating shaft extends to one side of the mounting plates, and a rotating handle is fixed at the outer end of the rotating shaft;
one side of gear is provided with the installation pipe, the installation pipe is fixed two between the fixed plate, and the both sides of installation pipe have seted up the opening along its length direction to the inside slidable mounting of installation pipe has the slide bar, one side of slide bar is fixed with the rack, and the opposite side of slide bar is fixed with the clamp through the connecting plate.
Preferably, the gear is engaged with the rack.
Preferably, the fixing plate is provided with a mounting hole.
Preferably, the rack and the connecting plate are respectively inserted into the two openings, and the rack, the connecting plate and the inner wall of the opening are in sliding fit.
Preferably, one end of the connecting plate is welded and fixed with the sliding rod, and the other end of the connecting plate is fixed on the hoop through a screw.
The utility model has the advantages that:
fix this device on the crest through the fixed plate, and install the electric drill in the clamp, through rotating rotatory handle, drive the slide bar and move up in the installation pipe, make the electric drill rebound simultaneously, punch to the crest by the electric drill to workman's intensity of labour has been reduced.
Drawings
Fig. 1 is a schematic structural view of a building construction auxiliary device provided by the present invention;
fig. 2 is a schematic structural view of the gear installation in the auxiliary device for building construction provided by the utility model;
fig. 3 is the utility model provides a structure schematic diagram of clamp among construction auxiliary device.
In the figure: the device comprises a fixing plate 1, a mounting plate 2, a gear 3, a rotary handle 4, a mounting pipe 5, a sliding rod 6, a rack 7, an opening 8, a connecting plate 9 and a hoop 10.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-3, a building construction auxiliary device, includes two fixed plates 1 that are parallel to each other, has seted up the mounting hole on the fixed plate 1, welded fastening has two mounting panels 2 that are parallel to each other between two fixed plates 1 that are parallel to each other, installs gear 3 through the rotation axis rotation between two mounting panels 2 that are parallel to each other, and the rotation axis passes through the bearing and rotates and install between two mounting panels 2, and the one end of rotation axis extends to one side of mounting panel 2, and the outer end welded fastening of rotation axis has rotatory handle 4.
One side of gear 3 is provided with installation pipe 5, installation pipe 5 welded fastening is between two fixed plates 1, and the both sides of installation pipe 5 have seted up opening 8 along its length direction, and the inside slidable mounting of installation pipe 5 has slide bar 6, one side welded fastening of slide bar 6 has rack 7, gear 3 and rack 7 mesh, and the opposite side of slide bar 6 is fixed with clamp 10 through connecting plate 9, rack 7 and connecting plate 9 are inserted respectively and are established in two openings 8, and rack 7, connecting plate 9 and 8 inner wall sliding fit of opening, the one end and the slide bar 6 welded fastening of connecting plate 9, and the other end of connecting plate 9 passes through the fix with screw on clamp 10.
In this embodiment, at first on the roof some with the through-hole of the mounting hole looks adaptation on the fixed plate 1, because this hole diameter is less, so it is laborsaving to punch than the hole of winding displacement, and fix this device on the roof through fixed plate 1, and open the electric drill after fixing the electric drill through clamp 10, through rotating rotatory handle 4, rotatory handle 4 drives gear 3 and rotates, gear 3 drives slide bar 6 rebound in installation pipe 5, make the electric drill rebound simultaneously, punch to the roof by the electric drill, thereby workman's intensity of labour has been reduced.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (5)

1. The building construction auxiliary device comprises two parallel fixing plates (1), and is characterized in that two parallel mounting plates (2) are fixed between the two parallel fixing plates (1), a gear (3) is rotatably mounted between the two parallel mounting plates (2) through a rotating shaft, one end of the rotating shaft extends to one side of the mounting plates (2), and a rotating handle (4) is fixed at the outer end of the rotating shaft;
one side of gear (3) is provided with installation pipe (5), installation pipe (5) are fixed two between fixed plate (1), and the both sides of installation pipe (5) have seted up opening (8) along its length direction to the inside slidable mounting of installation pipe (5) has slide bar (6), one side of slide bar (6) is fixed with rack (7), and the opposite side of slide bar (6) is fixed with clamp (10) through connecting plate (9).
2. A construction aid according to claim 1, characterised in that the gear wheel (3) is in engagement with the gear rack (7).
3. The construction auxiliary device according to claim 1, wherein the fixing plate (1) is provided with a mounting hole.
4. A construction aid according to claim 1, wherein the rack (7) and the connecting plate (9) are inserted in the two openings (8) respectively, and the rack (7) and the connecting plate (9) are in sliding fit with the inner walls of the openings (8).
5. A construction aid according to claim 1, characterised in that one end of the web (9) is welded to the slide bar (6) and the other end of the web (9) is fixed to the clamp (10) by means of screws.
CN202020278551.5U 2020-03-09 2020-03-09 Building construction auxiliary device Expired - Fee Related CN212072454U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020278551.5U CN212072454U (en) 2020-03-09 2020-03-09 Building construction auxiliary device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020278551.5U CN212072454U (en) 2020-03-09 2020-03-09 Building construction auxiliary device

Publications (1)

Publication Number Publication Date
CN212072454U true CN212072454U (en) 2020-12-04

Family

ID=73560835

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020278551.5U Expired - Fee Related CN212072454U (en) 2020-03-09 2020-03-09 Building construction auxiliary device

Country Status (1)

Country Link
CN (1) CN212072454U (en)

Similar Documents

Publication Publication Date Title
CN212656554U (en) Building construction concrete placement template
CN212072454U (en) Building construction auxiliary device
CN213900128U (en) Fixing clamp device for drain pipe
CN212945509U (en) Shell tapping device for switch processing
CN210256768U (en) House building construction wall drilling device
CN208408637U (en) A kind of perforating device for steel construction
CN213777431U (en) Tunnel lighting equipment for traffic engineering easy to assemble
CN212398182U (en) Steel member drilling equipment that shifts
CN207686613U (en) The positioning device and drilling machine of drilling machine rotating platform
CN211736448U (en) Fixing device for mounting prefabricated external wall panel
CN216027414U (en) Fixed orifices trompil device for steel construction
CN207188826U (en) shaped steel special punching device
CN204819298U (en) Dysmorphism spanner
CN109333809B (en) Reinforcing bar carding unit
CN111749483A (en) Wall skin dismounting device for construction
CN216043047U (en) Assembled building construction encloses fender
CN215199737U (en) Drilling device for wind power generation equipment support
CN221236679U (en) Device for bearing upper body of workover rig derrick
CN216939320U (en) Portable bridge screw installation fixer
CN215168234U (en) Assembled steel construction house built-in fitting construction equipment
CN218946783U (en) Multi-angle rotation welding auxiliary device
CN215239194U (en) Steel pipe supporting and cutting device reaming device for low-level hunting canopy production
CN214575933U (en) Quick bar planting device for subway rail top air duct
CN216780372U (en) Tapping device for building steel structure
CN210755281U (en) Door strip perforating machine convenient for feeding

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201204

CF01 Termination of patent right due to non-payment of annual fee