CN212058793U - Wall quality inspection device for construction - Google Patents

Wall quality inspection device for construction Download PDF

Info

Publication number
CN212058793U
CN212058793U CN202021230981.6U CN202021230981U CN212058793U CN 212058793 U CN212058793 U CN 212058793U CN 202021230981 U CN202021230981 U CN 202021230981U CN 212058793 U CN212058793 U CN 212058793U
Authority
CN
China
Prior art keywords
wall
fixed
pipe
groove
lateral wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021230981.6U
Other languages
Chinese (zh)
Inventor
刘炳涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202021230981.6U priority Critical patent/CN212058793U/en
Application granted granted Critical
Publication of CN212058793U publication Critical patent/CN212058793U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Investigating Or Analyzing Materials By The Use Of Ultrasonic Waves (AREA)

Abstract

The utility model discloses a wall quality inspection device for construction, including fixed pipe, fixed pipe lateral wall upper end fixed mounting grab handle, the first platform type pipe of fixed pipe back lateral wall fixed mounting, fixed pipe lower surface fixed mounting haulage rope, haulage rope lower extreme lateral wall fixed connection pouring weight, fixed intraductal wall laminating pull device, fixed pipe front side wall upper end is seted up the first groove of accomodating, the lateral wall is seted up the second before the grab handle and is accomodate the groove, the second is accomodate the groove and is communicate each other with the first groove of accomodating, it fixes at wall easy operation to have realized through adsorbing, it is constantly fixed to need not the people hand, the haulage line can be accomodate into fixed intraduct, avoid the purpose of the interference of outside effort.

Description

Wall quality inspection device for construction
Technical Field
The utility model relates to a construction technical field specifically is a wall quality inspection device for construction.
Background
The building construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, and also can be a process of changing various lines on a design drawing into a real object at a specified place. It includes the foundation engineering construction, the major structure construction, the roofing engineering construction, decorate engineering construction etc, the wall need carry out the quality detection to it after the construction, detect including the position, furred ceiling detects and ground wall, need detect its straightness that hangs down when the wall detects, current detection method is mostly the line of fishing that the manual work carried and carries out vertical detection, although carry and detect the convenience, but the fixed participation that needs a hand of device always, inconvenient human observation, and taking in of pull wire also disperses easily externally and ties knot, provide a wall quality inspection device for construction for this.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a wall quality inspection device for construction to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a wall matter examines device for construction, includes fixed pipe, fixed pipe lateral wall upper end fixed mounting grab handle, the first platform type pipe of fixed pipe rear side wall fixed mounting, fixed pipe lower surface fixed mounting haulage rope, haulage rope lower extreme lateral wall fixed connection pouring weight, fixed inside pipe wall laminating pull device, fixed pipe front side wall upper end is seted up first and is accomodate the groove, the lateral wall is seted up the second before the grab handle and is accomodate the groove, the second is accomodate the groove and is communicate each other with first groove of accomodating.
Preferably, the drawing device comprises a drawing rod, a hinge seat is fixedly installed on the rear side wall of the drawing rod, a connecting rod is fixedly installed on the rear side wall of the movable end of the hinge seat, a sliding plate is fixedly installed on the rear side wall of the connecting rod, a second type pipe is fixedly installed on the rear side wall of the sliding plate, the side wall of the sliding plate is attached to the inner wall of the fixed pipe, and the outer side wall of the second type pipe is attached to the inner wall of the first type pipe.
Preferably, the outer edge of the rear side wall of the second platform type pipe is provided with a round angle.
Preferably, the front side wall of the drawing rod is fixedly provided with a pulling plate.
Preferably, the upper surface of the grab handle is provided with a groove, and the inner wall of the groove is fixedly provided with a hanging rod.
Preferably, a sealing ring is fixedly mounted at the rear end of the outer side wall of the first platform pipe.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model provides a wall quality inspection device for construction, fixed pipe has, the pull device, first platform type pipe is hired, through the extraction of pull device to the inside air of first platform type pipe, it is fixed to make the platform type pipe fix and adsorb on the wall body surface, then put down the pull wire can, it twines the pull wire at the pull pole lateral wall to accomodate the time, the people slides in the stationary ladle after, can protect, prevent that outside effort from driving to remove and knot, it fixes at wall easy operation to have realized through adsorbing, it is fixed constantly to need not the people hand, the pull wire can be accomodate into inside the stationary ladle, avoid the purpose of the interference of outside effort.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the fixing pipe and the first platform-shaped pipe of the present invention after being half-cut and their connection structure;
fig. 3 is a schematic view of the drawing device and the connection structure thereof.
In the figure: the device comprises a fixed pipe 1, a first accommodating groove 101, a grab handle 2, a second accommodating groove 201, a groove 202, a first pipe 3, a traction rope 4, a weight 5, a drawing device 6, a drawing rod 601, a hinge seat 602, a connecting rod 603, a sliding plate 604, a second pipe 605, a 7-round corner, a 8-pulling plate, a 9-hanging rod and a 10-sealing ring.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: the utility model provides a wall quality inspection device for construction, including fixed pipe 1, fixed 1 lateral wall upper end fixed mounting grab handle 2 of pipe, the first platform type pipe of fixed 1 back lateral wall fixed mounting of pipe 3, fixed 1 lower fixed surface installation haulage rope 4 of pipe, 4 lower extreme lateral wall fixed connection pouring weights 5 of haulage rope, fixed 1 inner wall laminating pull device 6 of pipe, fixed 1 preceding lateral wall upper end of pipe is seted up first groove 101 of accomodating, 2 preceding lateral walls of grab handle are seted up the second and are accomodate groove 201, the second is accomodate groove 201 and first groove 101 of accomodating and are linked together each other, first platform type pipe is the rubber yielding material, the rear end mouth of pipe is greater than the front end mouth of pipe, fixed inside pipe wall adopts the smooth processing of polishing process.
Specifically, the drawing device 6 comprises a drawing rod 601, a hinge base 602 is fixedly arranged on the rear side wall of the drawing rod 601, a connecting rod 603 is fixedly arranged on the rear side wall of the movable end of the hinge base 602, a sliding plate 604 is fixedly arranged on the rear side wall of the connecting rod 603, a second type pipe 605 is fixedly arranged on the rear side wall of the sliding plate 604, the side wall of the sliding plate 604 is attached to the inner wall of the fixed pipe 1, the outer side wall of the second type pipe 605 is attached to the inner wall of the first type pipe 3, the second type pipe is made of soft rubber material, the pipe orifice at the rear end is larger than the pipe orifice at the front end, the outer side wall of the second type pipe is smooth, the second platform type pipe deforms, contracts and slides in the fixed pipe, so that air in the first platform type pipe is pumped into the fixed pipe, negative pressure is generated in the first platform type pipe, the first platform type pipe is pressed by external atmospheric pressure to deform, the inner wall is attached to the wall, and adsorption and fixation are formed.
Specifically, the outer edge of the rear side wall of the second platform type pipe 605 is provided with a fillet 7, and the fillet is additionally arranged, so that the rear end of the rear side wall of the second platform type pipe can be more easily attached to the inner wall of the fixed pipe when sliding on the inner wall of the fixed pipe, and the generation of gaps is reduced.
Specifically, the pulling plate 8 is fixedly installed on the front side wall of the pulling rod 601, and the pulling plate is additionally arranged, so that a user can conveniently pull the pulling device outwards.
Particularly, the upper surface of the grab handle 2 is provided with a groove 202, the inner wall of the groove 202 is fixedly provided with a suspender 9, and the suspender is additionally arranged, so that an external fixing rope can be hung and carried with the outside after being longer than the suspender, and the carrying of the device is facilitated.
Specifically, the sealing ring 10 is fixedly installed at the rear end of the outer side wall of the first platform type pipe 3, the attaching area of the outer tail end of the first platform type pipe can be increased by additionally arranging the sealing ring, the inflow of external air into the inside is reduced, and the fixing is firmer.
The working principle is as follows: when the utility model discloses when using, finish the device equipment after, the laminating is on the wall body surface like the device rear end shown in fig. 1, then hold fixed pipe 1 on one hand, another hand pulling arm-tie 8, outside pulling pull pole 601, hinge seat 602, connecting rod 603, slide 604 is so that second platform type pipe 605 outwards removes, the shrink is out of shape at fixed 1 inner wall of pipe, and with the inside air of first platform type pipe 3 to the inside suction of fixed pipe 1, make first platform type pipe 3 warp, the inner wall laminating is accomplished at the cavity lateral wall and is adsorbed fixedly, it observes through pull wire 5 to emit pouring weight 5 gold branch of academic or vocational study downwards as shown in fig. 1's pull wire 4, after finishing using, twine pull wire 5 at pull pole 601 lateral wall, to fixed 1 rear end push can, accomplish taking in of pull wire 5 and the deformation recovery of first platform type pipe 3 and the fixed of device and remove.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a wall quality inspection device for construction, includes fixed pipe (1), its characterized in that: fixed pipe (1) lateral wall upper end fixed mounting grab handle (2), the first platform type pipe of fixed mounting of lateral wall (3) behind fixed pipe (1), fixed pipe (1) lower fixed surface installation haulage rope (4), haulage rope (4) lower extreme lateral wall fixed connection pouring weight (5), fixed pipe (1) inner wall laminating pull device (6), fixed pipe (1) preceding lateral wall upper end is seted up first and is accomodate groove (101), lateral wall sets up the second before grab handle (2) and accomodates groove (201), groove (201) are accomodate to the second and first groove (101) of accomodating communicate each other.
2. A wall quality inspection device for construction according to claim 1, wherein: drawing device (6) are including pull pole (601), pull pole (601) rear wall fixed mounting hinge mount (602), hinge mount (602) remove end rear wall fixed mounting connecting rod (603), connecting rod (603) rear wall fixed mounting slide (604), slide (604) rear wall fixed mounting second platform type pipe (605), slide (604) lateral wall laminating fixed pipe (1) inner wall, first platform type pipe (3) inner wall of second platform type pipe (605) lateral wall laminating.
3. A wall quality inspection device for construction according to claim 2, wherein: and the outer edge of the rear side wall of the second platform type pipe (605) is provided with a round angle (7).
4. A wall quality inspection device for construction according to claim 2, wherein: and a pulling plate (8) is fixedly arranged on the front side wall of the drawing rod (601).
5. A wall quality inspection device for construction according to claim 1, wherein: the upper surface of the grab handle (2) is provided with a groove (202), and the inner wall of the groove (202) is fixedly provided with a suspender (9).
6. A wall quality inspection device for construction according to claim 1, wherein: and a sealing ring (10) is fixedly arranged at the rear end of the outer side wall of the first type pipe (3).
CN202021230981.6U 2020-06-29 2020-06-29 Wall quality inspection device for construction Expired - Fee Related CN212058793U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021230981.6U CN212058793U (en) 2020-06-29 2020-06-29 Wall quality inspection device for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021230981.6U CN212058793U (en) 2020-06-29 2020-06-29 Wall quality inspection device for construction

Publications (1)

Publication Number Publication Date
CN212058793U true CN212058793U (en) 2020-12-01

Family

ID=73514069

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021230981.6U Expired - Fee Related CN212058793U (en) 2020-06-29 2020-06-29 Wall quality inspection device for construction

Country Status (1)

Country Link
CN (1) CN212058793U (en)

Similar Documents

Publication Publication Date Title
CN212058793U (en) Wall quality inspection device for construction
CN103318742A (en) Pulley telescopic boom type glass sucker hanger
CN206103145U (en) Deep well rescue equipment
CN210612000U (en) Intelligent curtain wall cleaning system
CN205322243U (en) A hanging flower basket equipment for rinsing high building curtain
CN210236029U (en) Garbage can capable of quickly laying garbage bags
CN204950830U (en) Intelligence wall is capable to clean machine people
CN218498482U (en) Mobile phone fast charging data line protection device
CN110301869A (en) It is a kind of for cleaning the external wall cleaning device of external wall
CN212506921U (en) Prevent bird and hit glass curtain wall
CN209104628U (en) A kind of distribution box for hydraulic engineering
CN210262989U (en) Clear device of dragging for of river course rubbish
CN209443800U (en) A kind of type unitized curtain wall construction transport transmitting integrated vehicle
CN214583295U (en) Quality inspection device for building construction
CN209151153U (en) A kind of building inter-speaking device
CN205799451U (en) The safety workbox that a kind of curtain wall maintenance high-altitude is special
CN216703226U (en) Portable dry powder fire extinguisher
CN209207518U (en) A kind of safety partition detection robot
CN207184701U (en) A kind of lift unit building video intercom
CN217461000U (en) Light space sound absorber
CN208048689U (en) A kind of high-altitude glass washing device positioned with automatic outletting
CN218071612U (en) Camera with protection device
CN205932999U (en) Hanger
CN111288281A (en) Flagpole hanging rope device
CN210164278U (en) Windproof hanging plate for cleaning outer wall of building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201201