CN212056150U - Comprehensive pipeline supporting and hanging frame for large building - Google Patents

Comprehensive pipeline supporting and hanging frame for large building Download PDF

Info

Publication number
CN212056150U
CN212056150U CN202020545384.6U CN202020545384U CN212056150U CN 212056150 U CN212056150 U CN 212056150U CN 202020545384 U CN202020545384 U CN 202020545384U CN 212056150 U CN212056150 U CN 212056150U
Authority
CN
China
Prior art keywords
block
fixture block
clamping block
pipeline
spring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020545384.6U
Other languages
Chinese (zh)
Inventor
王辉
祝菁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Yuheng Electric Co ltd
Original Assignee
Jiangsu Yuheng Electric Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Yuheng Electric Co ltd filed Critical Jiangsu Yuheng Electric Co ltd
Priority to CN202020545384.6U priority Critical patent/CN212056150U/en
Application granted granted Critical
Publication of CN212056150U publication Critical patent/CN212056150U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a pipeline gallows is synthesized to heavy construction, concretely relates to gallows technical field, which comprises a substrate, the top both sides of base plate are provided with the connecting plate, the surface embedding of connecting plate is provided with expansion bolts, the vertical jib that is provided with in bottom surface of base plate, the bottom of jib is provided with first fixture block, the bottom of first fixture block is connected with the second fixture block, and a side surface of first fixture block is equipped with the vacancy portion. The utility model discloses set up the inserted bar that resets, locating hole and tenon piece, stir the second fixture block through the inserted bar that resets, the tenon piece leaves from fourth of the twelve earthly branches groove this moment, second fixture block and first fixture block separation, put into the inside of first fixture block with the pipeline, first fixture block and second fixture block are closed afterwards, realize spacing to the pipeline, cushion layer and spring one have been set up, act on external force by the connecting block to spring one, can cushion the protection to the pipeline of putting into, the cushion layer can avoid the damaged phenomenon to appear on the pipeline surface.

Description

Comprehensive pipeline supporting and hanging frame for large building
Technical Field
The utility model relates to a gallows technical field, more specifically say, the utility model relates to a pipeline gallows is synthesized to heavy construction.
Background
A gallows mainly is used for power plant's soda pipeline or boiler equipment, on producing thermal displacement and equipment thereof in operation, calculate the spring gallows work and the thermal displacement requirement of confirming according to the pipeline atress condition, the requirement that the city beautified and power supply safety also improves day by day, various large buildings are more and more, in large building, the indispensable various pipelines that need set up, including air conditioner, fire control, supply water, electric power, communication, heating etc., in the construction, professional pipeline gallows is used for laying various laying pipelines, cable duct gallows generally uses assembled gallows, adopt the mode of on-the-spot combination assembly.
However, in practical use, there are still many disadvantages, such as the hanging rack is not easy to open when the pipeline is placed, and the pipeline is troublesome to disassemble and assemble.
SUMMERY OF THE UTILITY MODEL
In order to overcome prior art's above-mentioned defect, the embodiment of the utility model provides a large building integrated pipeline gallows, through having set up the inserted bar that resets, locating hole and tenon piece, the one end of inserted bar that resets is taken out from the locating hole and is entered into inside the cavity, the second fixture block is being stirred through the inserted bar that resets, the tenon piece leaves from fourth of the twelve earthly branches groove this moment, screens piece and vacancy portion separation, the second fixture block separates with first fixture block, after first fixture block and second fixture block separate, can put into the inside of first fixture block with the pipeline, close first fixture block and second fixture block afterwards, realize spacing to the pipeline, in order to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a comprehensive pipeline supporting and hanging bracket for a large building comprises a base plate, wherein connecting plates are arranged on two sides of the top end of the base plate, expansion bolts are embedded into the surfaces of the connecting plates, a hanging rod is vertically arranged on the surface of the bottom end of the base plate, a first clamping block is arranged at the bottom end of the hanging rod, a second clamping block is connected to the bottom end of the first clamping block, a hollow part is arranged on one side surface of the first clamping block, and a positioning hole is arranged on one side surface of the hollow part;
the one end of vacancy portion is provided with fourth of twelve earthly branches groove, and the inside matching of vacancy portion is provided with the screens piece, the inside of screens piece is provided with the cavity, the inside level of cavity is provided with the inserted bar that resets, the circumference side outer wall fixed mounting of inserted bar that resets has the dog, and the circumference side outer wall of the inserted bar that resets is close to a pot head of dog and is equipped with spring two, the one end of spring two and the inner wall fixed connection of cavity, the one end and the locating hole collineation setting of inserted bar that reset.
In a preferred embodiment, a tenon block is arranged inside the mortise, and one end of the tenon block is fixedly connected with the clamping block.
In a preferred embodiment, one end of the clamping block is fixedly connected with the second clamping block, and the second clamping block is movably connected with the first clamping block through a pin shaft.
In a preferred embodiment, reinforcing rods are arranged on two sides of the suspension rod, and one ends of the two reinforcing rods are fixedly connected with the first clamping block.
In a preferred embodiment, a first spring is installed inside each of the first clamping block and the second clamping block, a connecting block is fixedly connected to one end of the first spring, and an arc-shaped pressing block is arranged at one end of the connecting block.
In a preferred embodiment, two arc-shaped pressing blocks are provided, and the two arc-shaped pressing blocks are symmetrically arranged about the central positions of the first clamping block and the second clamping block.
In a preferred embodiment, a rubber cushion layer is arranged on the surface of the arc-shaped pressing block, and the arc-shaped pressing block and the rubber cushion layer are bonded through glue.
The utility model discloses a technological effect and advantage:
1. the utility model discloses a having set up the inserted bar that resets, locating hole and tenon piece, the one end of the inserted bar that resets is taken out from the locating hole and is entered into the cavity inside, stir the second fixture block through the inserted bar that resets, the tenon piece leaves from the mortise slot at this moment, the screens piece separates with vacancy portion, the second fixture block separates with first fixture block, after first fixture block separates with the second fixture block, can put into the pipeline inside of first fixture block, subsequently close first fixture block and second fixture block, realize the spacing to the pipeline, connect simply between first fixture block and the second fixture block, compared with the prior art, the problem that the gallows was difficult to open when the pipeline was placed has been solved;
2. the utility model discloses a set up cushion layer and spring one, the arc briquetting produces external force to the connecting block, is used external force to spring by the connecting block for spring one produces elastic deformation, can carry out the buffer protection to the pipeline of putting into, and the cushion layer can protect the surface of pipeline, avoids the damaged phenomenon to appear on the pipeline surface.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention.
Fig. 2 is an enlarged schematic view of a portion a in fig. 1.
Fig. 3 is a schematic view of the three-dimensional structure of the arc-shaped pressing block of the present invention.
The reference signs are: the structure comprises a base plate 1, a connecting plate 2, an expansion bolt 3, a suspender 4, a reinforcing rod 5, a first clamping block 6, a second clamping block 7, a first spring 8, a first connecting block 9, an arc-shaped pressing block 10, a hollow part 11, a clamping block 12, a positioning hole 13, a cavity 14, a reset inserted bar 15, a stop block 16, a second spring 17, a mortise 18, a tenon 19 and a cushion layer 20.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The utility model discloses a large-scale building comprehensive pipeline support and hanger frame of embodiment, including base plate 1, the top both sides of base plate 1 are provided with connecting plate 2, the surface embedding of connecting plate 2 is provided with expansion bolts 3, the bottom surface of base plate 1 is provided with jib 4 vertically, the bottom of jib 4 is provided with first fixture block 6, the bottom of first fixture block 6 is connected with second fixture block 7, and a side surface of first fixture block 6 is provided with vacancy portion 11, a side surface of vacancy portion 11 is provided with locating hole 13;
one end of vacancy portion 11 is provided with fourth of twelve earthly branches groove 18, and the inside matching of vacancy portion 11 is provided with screens piece 12, the inside of screens piece 12 is provided with cavity 14, the inside level of cavity 14 is provided with inserted bar 15 that resets, the circumference side outer wall fixed mounting that resets inserted bar 15 has dog 16, and the circumference side outer wall that resets inserted bar 15 is close to a pot head of dog 16 and is equipped with spring two 17, the one end of spring two 17 and the inner wall fixed connection of cavity 14, the one end and the 13 collineations of locating hole setting of inserted bar 15 that reset.
The mortise slot 18 is internally provided with a tenon block 19, and one end of the tenon block 19 is fixedly connected with the clamping block 12.
One end of the clamping block 12 is fixedly connected with the second clamping block 7, and the second clamping block 7 is movably connected with the first clamping block 6 through a pin shaft.
Reinforcing rods 5 are arranged on two sides of the hanging rod 4, and one ends of the reinforcing rods 5 are fixedly connected with first clamping blocks 6.
As shown in fig. 1-2, the implementation scenario specifically includes: in the practical use process, the base plate 1 is arranged on the wall top, the reset inserted rod 15 is stirred outwards, the stop block 16 moves along with the reset inserted rod 15, and the second spring 17 is pressed, the second spring 17 generates elastic deformation in the cavity 14, at the moment, one end of the reset inserted rod 15 is taken out of the positioning hole 13 and enters the cavity 14, the second fixture block 7 is shifted through the reset inserted link 15, at this time, the tenon block 19 leaves from the mortise slot 18, the clamping block 12 is separated from the vacant part 11, the second fixture block 7 is separated from the first fixture block 6, when the first fixture block 6 is separated from the second fixture block 7, can put into the inside of first fixture block 6 with the pipeline, close first fixture block 6 and second fixture block 7 afterwards, realize spacing to the pipeline, be connected simply between first fixture block 6 and the second fixture block 7, the operation of being convenient for, this embodiment has specifically solved the difficult problem of opening of gallows when placing the pipeline.
Spring 8 is all installed to the inside of first fixture block 6 and second fixture block 7, the one end fixedly connected with connecting block 9 of spring 8, the one end of connecting block 9 is provided with arc briquetting 10.
The number of the arc-shaped pressing blocks 10 is two, and the two arc-shaped pressing blocks 10 are symmetrically arranged relative to the central positions of the first clamping block 6 and the second clamping block 7.
The surface of the arc-shaped pressing block 10 is provided with a rubber cushion layer 20, and the arc-shaped pressing block 10 is bonded with the rubber cushion layer 20 through glue.
As shown in fig. 1 and fig. 3, the implementation scenario specifically includes: during the use, first fixture block 6 and second fixture block 7 are opened the back, put into the pipeline between two arc briquetting 10, and wherein arc briquetting 10 produces external force to connecting block 9, is acted on external force by connecting block 9 to spring 8 for spring 8 produces elastic deformation, can carry out buffer protection to the pipeline of putting into, and cushion 20 can protect the surface of pipeline, avoids the damaged phenomenon to appear on the pipeline surface.
The utility model discloses a theory of operation:
referring to the attached drawings 1-2 in the specification, the reset inserted rod 15, the positioning hole 13 and the tenon block 19 are arranged, one end of the reset inserted rod 15 is taken out of the positioning hole 13 and enters the cavity 14, the second fixture block 7 is shifted through the reset inserted rod 15, the tenon block 19 leaves from the mortise slot 18 at the moment, the clamping block 12 is separated from the vacant part 11, the second fixture block 7 is separated from the first fixture block 6, after the first fixture block 6 is separated from the second fixture block 7, a pipeline can be placed into the first fixture block 6, then the first fixture block 6 and the second fixture block 7 are closed, the limiting of the pipeline is achieved, the connection between the first fixture block 6 and the second fixture block 7 is simple, and the problem that a hanger is not easy to open when the pipeline is placed is solved.
Referring to the attached drawings 1 and 3 of the specification, a rubber cushion layer 20 and a first spring 8 are arranged, an arc-shaped pressing block 10 generates external force on a connecting block 9, the first spring 8 acts on the external force through the connecting block 9, the first spring 8 generates elastic deformation, the placed pipeline can be protected in a buffering mode, the rubber cushion layer 20 can protect the surface of the pipeline, and the phenomenon that the surface of the pipeline is damaged is avoided.
And finally: the above description is only for the preferred embodiment of the present invention and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (7)

1. The utility model provides a pipeline gallows is synthesized to heavy construction, includes base plate (1), its characterized in that: the clamping device is characterized in that connecting plates (2) are arranged on two sides of the top end of the base plate (1), expansion bolts (3) are embedded into the surface of each connecting plate (2), a hanging rod (4) is vertically arranged on the surface of the bottom end of the base plate (1), a first clamping block (6) is arranged at the bottom end of each hanging rod (4), a second clamping block (7) is connected to the bottom end of each first clamping block (6), a hollow part (11) is arranged on one side surface of each first clamping block (6), and a positioning hole (13) is arranged on one side surface of each hollow part (11);
the one end of vacancy portion (11) is provided with fourth of twelve earthly branches groove (18), and the inside matching of vacancy portion (11) is provided with screens piece (12), the inside of screens piece (12) is provided with cavity (14), the inside level of cavity (14) is provided with the inserted bar (15) that resets, the circumference side outer wall fixed mounting that resets inserted bar (15) has dog (16), and the circumference side outer wall that resets inserted bar (15) is close to a pot head of dog (16) and is equipped with spring two (17), the one end of spring two (17) and the inner wall fixed connection of cavity (14), the one end and locating hole (13) collineation setting of inserted bar (15) reset.
2. The integrated pipeline supporting and hanging bracket for the large building as claimed in claim 1, wherein: a tenon block (19) is arranged inside the mortise slot (18), and one end of the tenon block (19) is fixedly connected with the clamping block (12).
3. The integrated pipeline supporting and hanging bracket for the large building as claimed in claim 2, wherein: one end of the clamping block (12) is fixedly connected with the second clamping block (7), and the second clamping block (7) is movably connected with the first clamping block (6) through a pin shaft.
4. The integrated pipeline supporting and hanging bracket for the large building as claimed in claim 1, wherein: reinforcing rods (5) are arranged on two sides of the hanging rod (4), and one ends of the reinforcing rods (5) are fixedly connected with the first clamping blocks (6).
5. The integrated pipeline supporting and hanging bracket for the large building as claimed in claim 1, wherein: spring I (8) are installed in the first clamping block (6) and the second clamping block (7), one end of the spring I (8) is fixedly connected with a connecting block (9), and an arc-shaped pressing block (10) is arranged at one end of the connecting block (9).
6. The integrated pipeline supporting and hanging bracket for the large building as claimed in claim 5, wherein: the two arc-shaped pressing blocks (10) are arranged, and the two arc-shaped pressing blocks (10) are symmetrically arranged relative to the center positions of the first clamping block (6) and the second clamping block (7).
7. The integrated pipeline supporting and hanging bracket for the large building as claimed in claim 5, wherein: the surface of the arc-shaped pressing block (10) is provided with a rubber cushion layer (20), and the arc-shaped pressing block (10) is bonded with the rubber cushion layer (20) through glue.
CN202020545384.6U 2020-04-14 2020-04-14 Comprehensive pipeline supporting and hanging frame for large building Active CN212056150U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020545384.6U CN212056150U (en) 2020-04-14 2020-04-14 Comprehensive pipeline supporting and hanging frame for large building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020545384.6U CN212056150U (en) 2020-04-14 2020-04-14 Comprehensive pipeline supporting and hanging frame for large building

Publications (1)

Publication Number Publication Date
CN212056150U true CN212056150U (en) 2020-12-01

Family

ID=73524942

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020545384.6U Active CN212056150U (en) 2020-04-14 2020-04-14 Comprehensive pipeline supporting and hanging frame for large building

Country Status (1)

Country Link
CN (1) CN212056150U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112555515A (en) * 2020-12-29 2021-03-26 北京市金龙腾装饰股份有限公司 Indoor pipeline hoisting structure and construction process thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112555515A (en) * 2020-12-29 2021-03-26 北京市金龙腾装饰股份有限公司 Indoor pipeline hoisting structure and construction process thereof
CN112555515B (en) * 2020-12-29 2021-08-10 北京市金龙腾装饰股份有限公司 Indoor pipeline hoisting structure and construction process thereof

Similar Documents

Publication Publication Date Title
CN212056150U (en) Comprehensive pipeline supporting and hanging frame for large building
CN216112547U (en) Mounting structure for air pipe support and hanger of suspended ceiling
CN216810496U (en) Stone curtain wall with efficient noise reduction function in green and environment-friendly construction
CN215671117U (en) Electric power building engineering construction is with hanging mould device
CN210739578U (en) Antidetonation support convenient to installation
CN108643419A (en) A kind of curtain wall installing structure
CN204676736U (en) A kind of Building Curtain Wall Structures
CN210623799U (en) Combined type support and hanger
CN206865051U (en) A kind of fireproof bridge frame of high intensity
CN215803166U (en) A wooden template for civil engineering construction easy to assemble and disassemble
CN210568781U (en) Electromagnetic heating furnace box body convenient to be installed in parallel
CN219282602U (en) Two-way antidetonation support of installation combination formula of being convenient for
CN220768574U (en) Furred ceiling assembled mounting structure
CN215675769U (en) Air conditioner support of regulation formula
CN220540471U (en) Constant force spring support and hanger
CN204364716U (en) A kind of gear smoke glass suspension mounting structure
CN219677994U (en) Self-locking grid bridge with fixing mechanism
CN213058153U (en) A transportation equipment for cavity glass
CN113356569A (en) A wooden template for civil engineering construction easy to assemble and disassemble
CN213331632U (en) Telescopic household wall-mounted fan with good safety
CN217634771U (en) Positioning device for mounting tubular air preheater
CN221001613U (en) Assembled furred ceiling limit fossil fragments and connector
CN220395072U (en) Decorate outer wall convenient to installation is maintained
CN216713554U (en) Grating plate convenient to install
CN214658635U (en) Bearing frame for building construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant