CN212056095U - Movable adjusting bracket for mounting large-diameter pipeline - Google Patents
Movable adjusting bracket for mounting large-diameter pipeline Download PDFInfo
- Publication number
- CN212056095U CN212056095U CN202020018651.4U CN202020018651U CN212056095U CN 212056095 U CN212056095 U CN 212056095U CN 202020018651 U CN202020018651 U CN 202020018651U CN 212056095 U CN212056095 U CN 212056095U
- Authority
- CN
- China
- Prior art keywords
- rods
- motor
- length adjusting
- rod
- threaded
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000007246 mechanism Effects 0.000 claims abstract description 34
- 230000008878 coupling Effects 0.000 claims abstract description 8
- 238000010168 coupling process Methods 0.000 claims abstract description 8
- 238000005859 coupling reaction Methods 0.000 claims abstract description 8
- 238000009434 installation Methods 0.000 claims description 12
- 238000002789 length control Methods 0.000 abstract description 5
- 230000000694 effects Effects 0.000 description 2
- 230000006978 adaptation Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Landscapes
- Sewage (AREA)
Abstract
The utility model relates to a piping erection technical field specifically discloses a portable regulation support for major diameter piping erection. Including four height control mechanism and two length control mechanism, height control mechanism all includes dead lever and first motor, the bottom of dead lever can be dismantled and be connected with and remove the wheel, first motor output shaft all with remove the wheel rigid coupling, all be equipped with the second motor in the dead lever, equal rigid coupling threaded rod on the second motor output shaft, the threaded rod all rotates with the dead lever to be connected, equal threaded connection has the carriage release lever on the threaded rod, all be equipped with the spout on the carriage release lever, compare with prior art, the removal of support, height control, length control has all realized the automation, time saving and labor saving, and can also adapt to the pipeline of different pipe diameters, practical value has more.
Description
Technical Field
The utility model relates to a pipe installation field.
Background
The large-diameter pipeline is large in pipe diameter and inconvenient to install, the pipeline support is required to be supported and installed, the pipeline support can be used in any place where the pipeline is laid, and the large-diameter pipeline serves as a supporting structure of the pipeline and plays an important role in pipeline installation. However, the height and the length of the current large-diameter pipeline support cannot be adjusted generally, and the current large-diameter pipeline support cannot adapt to pipelines with different pipe diameters, so that a movable adjusting support for installing the large-diameter pipeline needs to be provided.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the problem that the height of the traditional support can not be adjusted.
In order to achieve the purpose, the basic scheme of the utility model provides a movable adjusting bracket for large-diameter pipeline installation, which comprises four height adjusting mechanisms and two length adjusting mechanisms, wherein each height adjusting mechanism comprises a fixed rod and a first motor, the bottom of the fixed rod is detachably connected with a movable wheel, the output shaft of the first motor is fixedly connected with the movable wheel, a second motor is arranged in the fixed rod, the output shaft of the second motor is fixedly connected with a threaded rod, the threaded rods are rotatably connected with the fixed rods, the movable rods are all in threaded connection with the threaded rods, and each movable rod is provided with a chute;
the length adjusting mechanism comprises a plurality of rotating rods, two rotating rods are hinged in a crossed mode to form length adjusting pieces, adjacent length adjusting pieces are connected end to end, connecting rods are arranged on the rotating rods of the length adjusting pieces at two ends and are in sliding connection with sliding grooves, screw holes are formed in the connecting rods in the sliding grooves, and screws are arranged in the screw holes;
all be equipped with between height adjusting mechanism and the length adjusting mechanism and put tub mechanism, put tub mechanism and include the U-shaped board, the U-shaped board rotates with the articulated department of length adjusting part to be connected, is equipped with a plurality of arcs in the U-shaped board, a plurality of bracing pieces of equipartition on the arc, and the equal rigid coupling of free end of bracing piece has the spring, and the free end of spring all with the U-shaped board rigid coupling.
The principle and the effect of the basic scheme are that,
1. be equipped with height control mechanism and length control mechanism, the height and the length that can adjust the support respectively adapt to different installation condition, adjust length adaptation pipeline, can support the pipeline better.
2. The bottom of dead lever is equipped with first motor, starts first motor, can make support automatic movement, does not need the staff to remove to promote the support, and is laborsaving more, the dead lever on fixed back limit, and only starts the first motor in front, and the support can be elongated automatically, adjusts the length of support.
3. Be equipped with the second motor in the dead lever, the second motor rotates and drives the threaded rod and rotate, and the threaded rod rotates the removal that drives the carriage release lever to realize the automatically regulated of support height.
4, be equipped with the arc in the U-shaped board, a plurality of connecting rods of the outer wall equipartition of arc, the free end rigid coupling of connecting rod has the spring with U-shaped board rigid coupling, utilizes the elasticity of spring, can adapt to the pipe diameter of different pipelines, makes the support use more extensively.
5. Compared with the prior art, the support has the advantages that the support is moved, the height is adjusted, the length is adjusted automatically, time and labor are saved, the support can also adapt to pipelines with different pipe diameters, and the support is more practical.
Furthermore, the bottom of the fixed rod can be detachably connected with a base. The bracket can be fixed, so that the bracket is not easy to move.
Furthermore, a gasket is arranged between the screw and the sliding groove. The connecting rod can be better fixed.
Further, a bearing is arranged between the threaded rod and the fixed rod. The threaded rod is better able to turn.
Drawings
Fig. 1 is a front view of a movable adjusting bracket and a movable wheel in threaded connection for installation of a large-diameter pipeline according to an embodiment of the present invention;
fig. 2 is a left side view of a movable adjusting bracket for installation of a large diameter pipeline according to an embodiment of the present invention;
fig. 3 is a front view of the movable adjusting bracket and the base in threaded connection for installing the large-diameter pipeline according to the embodiment of the present invention.
Detailed Description
The following is further detailed by the specific embodiments:
reference numerals in the drawings of the specification include: the device comprises a moving rod 1, a threaded rod 2, a fixed rod 3, a moving wheel 4, a U-shaped plate 5, a connecting rod 6, a rotating rod 7, an arc-shaped plate 8, a supporting rod 9, a spring 10 and a base 11.
The utility model provides a support is adjusted to portable for major diameter piping erection, the embodiment is shown in figure 1, including four height control mechanism and two length control mechanism, height control mechanism is located both ends, height control mechanism all includes dead lever 3 and first motor, the equal threaded connection in bottom of dead lever 3 has removal wheel 4, the output shaft of first motor with remove wheel 4 welding, all be equipped with the second motor in the dead lever 3, all weld threaded rod 2 on the second motor output shaft, threaded rod 2 all rotates with dead lever 3 to be connected, be equipped with the bearing between threaded rod 2 and the dead lever 3, equal threaded connection has carriage release lever 1 on the threaded rod 2, all be equipped with the spout on carriage release lever 1.
The length adjusting mechanism comprises twelve rotating rods, wherein the two rotating rods 7 are hinged in a crossed mode to form length adjusting parts, the two adjacent length adjusting parts are connected end to end, connecting rods 6 are arranged on the rotating rods 7 of the length adjusting parts at the two ends, the connecting rods 6 are connected with the sliding grooves in a sliding mode, screw holes are formed in the connecting rods 6 in the sliding grooves, screws are arranged in the screw holes, and gaskets are arranged between the screws and the sliding grooves.
The embodiment is shown in fig. 2, all be equipped with between the height adjusting mechanism and put tub mechanism, be equipped with six adjusting mechanism between the length adjusting mechanism, it includes U-shaped plate 5 to put tub mechanism, U-shaped plate 5 is articulated with the articulated department of length control spare, U-shaped plate 5 between the height adjusting mechanism welds with carriage release lever 1, U-shaped plate 5 between the length adjusting mechanism is articulated with dwang 7 cross articulated department, be equipped with two arcs 8 in the U-shaped plate 5, three bracing piece 9 of equipartition on every arc 8, the free end of bracing piece 9 all welds spring 10, the free end of spring 10 all welds with U-shaped plate 5.
In the embodiment shown in fig. 3, a base 11 is further screwed to the bottom of the fixing rod 3.
When the device is used, the fixed rod 3 at the left end is in threaded connection with the moving wheel 4, the fixed rods 3 at the right end are in threaded connection with the base 11, the height of the height adjusting mechanism is adjusted according to the installation condition, the second motor is started, the output shaft of the second motor rotates in the forward direction to drive the threaded rod 2 to rotate in the forward direction, the threaded rod 2 rotates in the forward direction to drive the moving rod 1 to move upwards, the moving rod 1 moves to a required position, the second motor is closed, the length of the bracket is adjusted according to the length of a pipeline, the screw is unscrewed, the first motor is started, the moving wheel 4 at the left end moves leftwards, the connecting rod 6 slides towards the middle of the chute, after the moving wheel 4 moves to the required position, the first motor is closed, the screw is screwed down, the base 11 at the right end is taken down, the moving wheel 4 is in threaded connection with the fixed rod 3 at the right end, the pipeline is placed between the arc plates 8 at the, after the pipeline prevented, start first motor, remove the mounted position with the pipeline, take off four and remove wheel 4, with four base 11 and 3 threaded connection of dead lever, after the pipeline installation finishes, put back the support normal position can. Compared with the prior art, the support has the advantages that the support is moved, the height is adjusted, the length is adjusted automatically, time and labor are saved, the support can also adapt to pipelines with different pipe diameters, and the support is more practical.
The above description is only for the embodiments of the present invention, and the common general knowledge of the known specific structures and characteristics in the schemes is not described herein too much, and those skilled in the art will know all the common technical knowledge in the technical field of the present invention before the application date or the priority date, can know all the prior art in this field, and have the ability to apply the conventional experimental means before this date, and those skilled in the art can combine their own ability to perfect and implement the schemes, and some typical known structures or known methods should not become obstacles for those skilled in the art to implement the present application. It should be noted that, for those skilled in the art, without departing from the structure of the present invention, several modifications and improvements can be made, which should also be regarded as the protection scope of the present invention, and these will not affect the effect of the implementation of the present invention and the practicability of the patent. The scope of the claims of the present application shall be determined by the contents of the claims, and the description of the embodiments and the like in the specification shall be used to explain the contents of the claims.
Claims (4)
1. A movable adjusting support for large-diameter pipeline installation is characterized by comprising four height adjusting mechanisms and two length adjusting mechanisms, wherein each height adjusting mechanism comprises a fixed rod and a first motor, the bottom of each fixed rod is detachably connected with a movable wheel, the output shaft of each first motor is fixedly connected with the corresponding movable wheel, a second motor is arranged in each fixed rod, the output shaft of each second motor is fixedly connected with a threaded rod, the threaded rods are rotatably connected with the fixed rods, the movable rods are in threaded connection with the threaded rods, and each movable rod is provided with a sliding groove;
the length adjusting mechanism comprises a plurality of rotating rods, two rotating rods are hinged in a crossed mode to form length adjusting pieces, adjacent length adjusting pieces are connected end to end, connecting rods are arranged on the rotating rods of the length adjusting pieces at two ends and are in sliding connection with sliding grooves, screw holes are formed in the connecting rods in the sliding grooves, and screws are arranged in the screw holes;
all be equipped with between height adjusting mechanism and the length adjusting mechanism and put tub mechanism, put tub mechanism and include the U-shaped board, the U-shaped board rotates with the articulated department of length adjusting part to be connected, is equipped with a plurality of arcs in the U-shaped board, a plurality of bracing pieces of equipartition on the arc, and the equal rigid coupling of free end of bracing piece has the spring, and the free end of spring all with the U-shaped board rigid coupling.
2. A mobile adjustment bracket for large diameter pipe installation according to claim 1, wherein: the bottoms of the fixed rods are detachably connected with bases.
3. A mobile adjustment bracket for large diameter pipe installation according to claim 1, wherein: and gaskets are arranged between the screws and the sliding grooves.
4. A mobile adjustment bracket for large diameter pipe installation according to claim 1, wherein: a bearing is arranged between the threaded rod and the fixed rod.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020018651.4U CN212056095U (en) | 2020-01-06 | 2020-01-06 | Movable adjusting bracket for mounting large-diameter pipeline |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020018651.4U CN212056095U (en) | 2020-01-06 | 2020-01-06 | Movable adjusting bracket for mounting large-diameter pipeline |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212056095U true CN212056095U (en) | 2020-12-01 |
Family
ID=73535552
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020018651.4U Expired - Fee Related CN212056095U (en) | 2020-01-06 | 2020-01-06 | Movable adjusting bracket for mounting large-diameter pipeline |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212056095U (en) |
-
2020
- 2020-01-06 CN CN202020018651.4U patent/CN212056095U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2021237450A1 (en) | Clamping device for production and processing of mechanical part | |
CN215846636U (en) | Semi-automatic welding device for steel pipe pole cross arm of power transmission tower | |
CN207801835U (en) | Adjustable photovoltaic support | |
CN212056095U (en) | Movable adjusting bracket for mounting large-diameter pipeline | |
CN215721318U (en) | Auxiliary support for building pipeline installation | |
CN109129358A (en) | A kind of device can deashing computer maintenance platform | |
CN220727380U (en) | Fire control pipeline support frame with adjust structure | |
CN220760412U (en) | Water supply pipeline cleaning device | |
CN217618644U (en) | Welding auxiliary tool for stainless steel inner expanding ring | |
CN218919928U (en) | Rotatable flange bracket arm group suitable for bearing type stepless adjustment | |
CN221237641U (en) | High-definition camera shooting adjusting device for security monitoring | |
CN219677836U (en) | Power distribution system for concentrated residential area | |
CN219432632U (en) | Pipeline laying positioning structure | |
CN212495892U (en) | Double-side double-arc TIG welding device for aluminum alloy spiral welded pipe | |
CN218862640U (en) | Anchor rod mounting equipment for tunnel construction | |
CN220452947U (en) | Municipal pipeline installation mechanism | |
CN219678006U (en) | Electric power pipeline strutting arrangement convenient to it is fixed | |
CN217330257U (en) | Water heater installing support convenient to freely adjust for box-type room | |
CN219809529U (en) | Municipal pipeline support convenient to adjust | |
CN219458368U (en) | High-voltage board assembly structure | |
CN220481605U (en) | Automobile back door hinge mounting tool | |
CN219464885U (en) | Cutting device for tap water pipeline construction | |
CN218000770U (en) | High-strength nodular cast iron flange | |
CN220816808U (en) | Adjustable pipeline suspension bracket | |
CN220797624U (en) | Electromechanical installation spool device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20201201 |