CN212054567U - Anti-floating anchor rod drilling construction mud collection device - Google Patents

Anti-floating anchor rod drilling construction mud collection device Download PDF

Info

Publication number
CN212054567U
CN212054567U CN202020683353.7U CN202020683353U CN212054567U CN 212054567 U CN212054567 U CN 212054567U CN 202020683353 U CN202020683353 U CN 202020683353U CN 212054567 U CN212054567 U CN 212054567U
Authority
CN
China
Prior art keywords
collecting box
groove
block
arc
mud
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020683353.7U
Other languages
Chinese (zh)
Inventor
田云生
刘楚明
青松
张伟强
韩宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN202020683353.7U priority Critical patent/CN212054567U/en
Application granted granted Critical
Publication of CN212054567U publication Critical patent/CN212054567U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/20Controlling water pollution; Waste water treatment
    • Y02A20/208Off-grid powered water treatment

Abstract

The utility model discloses an anti-floating anchor rod drilling construction mud collection device, through the utility model discloses the collecting box that sets up and shelter from wallboard, entrance to a cave carry out the mud when filling work, mud spills over from sheltering from the little bin that wallboard and collecting box formed, enters into the collecting vat in the collecting box, and then can not drop subaerial, has fine collection effect to the mud that spills over, avoids causing the waste of mud, causes economic loss, avoids mud to cause the pollution to the construction face; through the first scraper blade and the second scraper blade that set up, when discharging the mud of collecting, can effectively clear up the remaining mud of inside wall in the collecting box, and then avoid causing the waste of mud, through the support fixing device of the tub wheel that sets up in the collecting box bottom and collecting box avris setting, under the prerequisite that the guaranteeing collecting box can conveniently remove according to the construction place, can also have fine position fixing device to the collecting box, guarantee that the stability of construction work goes on, guarantee work efficiency and work economic benefits.

Description

Anti-floating anchor rod drilling construction mud collection device
Technical Field
The utility model relates to a construction equipment technical field specifically is an anti-floating anchor rod drilling construction mud collection device.
Background
In recent years, in order to better solve the shortage of land, the application of underground space is more and more extensive, and large underground structures with shallow underground water level, such as underground or open-air swimming pools, large basements, large underground caverns and the like, appear in engineering. Because the underground structure has large building area, deeper foundation burial and relatively fewer building layers, the self weight of the structure is not enough to resist the upper buoyancy of underground water under the condition of the historical highest underground water level, and the anti-floating problem of the underground structure is increasingly prominent; therefore, the underground structures are often in the form of anti-floating anchor rods, anti-floating piles and the like in anti-floating design.
In the past, mud outflow causes follow-up construction working face large tracts of land to pollute easily in anti-floating anchor rod drilling work progress, can't guarantee follow-up process construction progress and quality to the difficult clearance of mud that the construction produced, the clearance time-consuming is longer, the expense is higher, and then influences construction work efficiency, reduces construction economic benefits, for this, the utility model provides an anti-floating anchor rod drilling construction mud collection device is used for solving above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an anti-floating anchor rod drilling construction mud collection device to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: an anti-floating anchor rod drilling construction slurry collecting device comprises a collecting box, a shielding wall plate, a hole, a first scraper plate, a second scraper plate and a supporting and fixing device;
a chute is formed in one adjacent inner side wall of the collecting box, idler wheels are symmetrically arranged at the bottom end of the collecting box, a shielding wall plate is inserted into the chute, a hole is formed in the corner position of the bottom end face of the collecting box, where the chute is formed, and handles are welded on the collecting box and the shielding wall plate;
a through groove is arranged on the side of the collection box which is symmetrically arranged, an inlet groove is arranged at one end of the through groove,
the through groove is provided with sliding blocks in a sliding connection mode, the sliding blocks are integrally formed and symmetrically arranged on two sides of the first scraping plate, and the other end of each sliding block is provided with a push handle in a welding connection mode;
the first scraper is provided with a convex sliding groove, a convex sliding block is arranged in the convex sliding groove in a sliding connection mode, one side of the convex sliding block is provided with a fixed circular groove, the convex sliding block is integrally connected with a second scraper, and the first scraper is integrally formed with a convex block at the side position of a notch of the convex sliding groove;
the lug is provided with a first circular groove, one end of the first circular groove is provided with a second circular groove, the first circular groove is provided with a first inserting column in an inserting manner, the second circular groove is provided with a second inserting column in an inserting manner, the second inserting column is integrally formed at one end of the first inserting column, the first inserting column is integrally formed and connected with the same end of the second inserting column to form a reset spring, the other end of the reset spring is integrally formed and connected in the first circular groove, and the other end of the first inserting column is welded with a pull ring;
and the sides of the collecting box are symmetrically provided with supporting and fixing devices.
Preferably, the supporting and fixing device comprises a box body, a connecting spring, a connecting block, a first cylinder, a second cylinder, a circular sheet, an arc-shaped extrusion block, a clamping groove, an elastic clamping block, a first extrusion spring, an arc-shaped clamping block, a second extrusion spring and a supporting block, the box body is symmetrically welded on two sides of the collecting box, the connecting spring is integrally formed and equidistantly connected in the box body, the other end of the connecting spring is integrally formed and connected at one end of the connecting block, a third circular groove is formed in the box body, a fourth circular groove is formed at one end of the third circular groove, a fifth circular groove is formed at the other end of the fourth circular groove, the first cylinder is inserted in the third circular groove, the second cylinder is inserted in the fourth circular groove, one end of the second cylinder is arranged on the first cylinder, the circular sheet is arranged at the other end of the second cylinder, the arc-shaped extrusion block is integrally formed on the, the cylindrical lateral wall of second is provided with the draw-in groove, and the joint is provided with elasticity fixture block in the draw-in groove, elasticity fixture block integrated into one piece sets up on the inside wall of fourth circular slot, a lateral symmetry of connecting block is provided with the arc recess, and integrated into one piece connects in the flower arc recess and is provided with first extrusion spring, first extrusion spring other end integrated into one piece connects and is provided with the arc fixture block, arc fixture block sliding connection sets up in the arc recess, and the joint other end is provided with square groove, integrated into one piece symmetric connection is provided with second extrusion spring in the square groove, second extrusion spring other end integrated into one piece sets up the one end at the supporting shoe, the other end welding of supporting shoe is provided with the.
Preferably, the length of the second scraper is equal to the length of the first scraper and the width of the collecting groove in the collecting box.
Preferably, the length of the male slider is greater than the length of the male runner.
Preferably, the second inserting column and the fixed circular groove are arranged in corresponding positions and in equal number, the diameters of the second inserting column and the fixed circular groove are equal, and the length of the second inserting column is larger than that of the second circular groove.
Preferably, the arc-shaped fixture blocks and the arc-shaped extrusion blocks are arranged at corresponding positions and have the same number of groups, and are provided with inclined planes, and the directions of the inclined planes are opposite.
Preferably, the height of the shielding wall plate is smaller than that of the collecting box.
Compared with the prior art, the beneficial effects of the utility model are that:
1. when the collecting box, the shielding wall plate and the hole are used for filling slurry, the slurry overflows from a small chamber formed by the shielding wall plate and the collecting box and enters a collecting tank in the collecting box, and further does not drop on the ground, so that the slurry has a good collecting effect on the overflowed slurry, on one hand, the waste of the slurry is avoided, the economic loss is caused, and on the other hand, the pollution of the slurry on a construction surface is avoided;
2. by the aid of the arranged first scraper and the second scraper, when collected mud is discharged, the mud remained on the inner side wall of the collecting box can be effectively cleaned, and accordingly waste of the mud is avoided;
3. through the pipe wheel that sets up in the collecting box bottom and the support fixing device that the collecting box avris set up, guaranteeing that the collecting box can carry out under the prerequisite that conveniently removes according to the construction place, can also have fine position fixing device to the collecting box, guarantee that the stability of construction work goes on, guarantee work efficiency and work economic benefits.
Drawings
FIG. 1 is a left side schematic view of the structure of the present invention;
FIG. 2 is a right side schematic view of the structure of the present invention;
FIG. 3 is a schematic view of the connection structure of the collecting box and the first scraper of the present invention;
fig. 4 is a partially enlarged schematic view of the connection structure of fig. 3 according to the present invention;
fig. 5 is a partial sectional view of the bump internal connection structure of the present invention;
fig. 6 is an exploded view of the connection structure of the supporting and fixing device of the present invention;
FIG. 7 is a partial sectional left side view of the connection between the box body and the connecting block structure of the present invention;
FIG. 8 is a partially enlarged view of the connection structure of FIG. 7 according to the present invention;
fig. 9 is the utility model discloses box body and connecting block structural connection partial section right side drawing.
In the figure: collecting box 1, spout 2, shelter from wallboard 3, entrance to a cave 4, logical groove 5, slider 6, first scraper blade 7, convex spout 8, convex slider 9, fixed circular slot 10, second scraper blade 11, lug 12, first post 13 of inserting, post 14 is inserted to the second, reset spring 15, support fixing device 16, box body 1601, connecting spring 1602, connecting block 1603, first cylinder 1604, second cylinder 1605, disk 1606, arc extrusion piece 1607, draw-in groove 1608, elasticity fixture block 1609, first extrusion spring 1610, arc fixture block 1611, second extrusion spring 1612, 1613.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below. The embodiments of the present invention, all other embodiments obtained by a person skilled in the art without creative work, all belong to the protection scope of the present invention.
Referring to fig. 1 to 9, the present invention provides a technical solution: an anti-floating anchor rod drilling construction slurry collecting device comprises a collecting box 1, a shielding wall plate 3, a hole 4, a first scraper 7, a second scraper 11 and a supporting and fixing device 16;
a chute 2 is arranged on one adjacent inner side wall of the collecting box 1, rollers are symmetrically arranged at the bottom end of the collecting box 1, a shielding wall plate 3 is inserted into the chute 2, a hole 4 is arranged at the corner position of the bottom end face of the collecting box 1, on which the chute 2 is arranged, in a penetrating manner, and handles are welded on the collecting box 1 and the shielding wall plate 3;
a through groove 5 is formed in the side of the collection box 1, which is symmetrically arranged, an inlet groove is formed in one end of the through groove 5, sliding blocks 6 are arranged in the through groove 5 in a sliding connection mode, the sliding blocks 6 are integrally formed and symmetrically arranged on two sides of a first scraper 7, and a push handle is arranged at the other end of each sliding block 6 in a welding connection mode;
a convex sliding groove 8 is formed in the first scraper 7, a convex sliding block 9 is arranged in the convex sliding groove 8 in a sliding connection mode, a fixed circular groove 10 is formed in one side of the convex sliding block 9, a second scraper 11 is integrally connected to the convex sliding block 9, and a convex block 12 is integrally formed in the first scraper 7 at the side position of a notch of the convex sliding groove 8;
a first circular groove is formed in the bump 12, a second circular groove is formed at one end of the first circular groove, a first inserting column 13 is inserted in the first circular groove, a second inserting column 14 is inserted in the second circular groove, the second inserting column 14 is integrally formed at one end of the first inserting column 13, a reset spring 15 is integrally formed and connected with the same end of the second inserting column 14 of the first inserting column 13, the other end of the reset spring 15 is integrally formed and connected in the first circular groove, and a pull ring is welded at the other end of the first inserting column 13;
the side of the collecting box 1 is symmetrically provided with a supporting and fixing device 16.
Further, the supporting and fixing device 16 comprises a box body 1601, a connecting spring 1602, a connecting block 1603, a first cylinder 1604, a second cylinder 1605, a circular piece 1606, an arc-shaped extrusion block 1607, a clamping groove 1608, an elastic clamping block 1609, a first extrusion spring 1610, an arc-shaped clamping block 1611, a second extrusion spring 1612 and a supporting block 1613, wherein the box body 1601 is symmetrically welded on two sides of the collecting box 1, the connecting spring 1602 is integrally formed and equidistantly arranged in the box body 1601, the other end of the connecting spring 1602 is integrally formed and connected with one end of the connecting block 1603, a third circular groove is arranged in the box body 1601, a fourth circular groove is arranged at one end of the third circular groove, a fifth circular groove is arranged at the other end of the fourth circular groove, the first cylinder 1604 is inserted in the third circular groove, the second cylinder 1605 is inserted and connected in the fourth circular groove, one end of the second cylinder 1605 is arranged on the first cylinder 1604, the other end of the second cylinder 1605 is provided, integrated into one piece is provided with arc extrusion piece 1607 on disk 1606, the lateral wall of second cylinder 1605 is provided with draw-in groove 1608, the joint is provided with elasticity fixture block 1609 in the draw-in groove 1608, elasticity fixture block 1609 integrated into one piece sets up on the inside wall of fourth circular slot, a lateral symmetry of connecting block 1603 is provided with the arc recess, integrated into one piece connects in the flower arc recess and is provided with first extrusion spring 1610, first extrusion spring 1610 other end integrated into one piece connects and is provided with arc fixture block 1611, arc fixture block 1611 sliding connection sets up in the arc recess, it is provided with square groove to connect the piece 1603 other end, integrated into one piece symmetric connection is provided with second extrusion spring 1612 in the square groove, second extrusion spring 1612 other end integrated into one piece sets up the one end at supporting shoe 1613, the other end welding of supporting shoe.
Further, the length of the second scraper 11 is equal to the length of the first scraper 7 and the width of the collection gutter in the collection bin 1.
Further, the length of the male slider 9 is greater than the length of the male chute 8.
Furthermore, the second inserting columns 14 correspond to the fixed circular grooves 10 in arrangement position, the arrangement number is equal, the diameters of the second inserting columns 14 and the fixed circular grooves are equal, and the length of the second inserting columns 14 is larger than that of the second circular grooves.
Further, the arc-shaped fixture blocks 1611 and the arc-shaped extrusion blocks 1607 are arranged at corresponding positions and in the same number of groups, and both are provided with inclined surfaces, and the directions of the inclined surfaces are opposite.
Further, the height of the shielding wall plate 3 is smaller than that of the collecting box 1.
The working principle is as follows: for the utility model, when the slurry is poured through the collection box 1, the shielding wall plate 3 and the opening 4, the slurry overflows from the small chamber formed by the shielding wall plate 3 and the collection box 1, enters the collection tank in the collection box 1 and then does not fall on the ground, so that the slurry has good collection effect on the overflowed slurry, on one hand, the waste of the slurry and economic loss are avoided, and on the other hand, the pollution of the slurry on the construction surface is avoided; in the process, the opening 4 in the collection box 1 is aligned with the drilling center point position of the anti-floating anchor rod drilling machine and placed on the flat ground, then the drilling machine drills down, as the drilling machine drills, the slurry overflows from a small bin into a collection tank in the collection box 1, and further does not flow out to the ground when the slurry is formed, so that economic loss is caused, after the work is finished, a slurry pump is placed in the collection tank to pump out the slurry, most of the slurry in the collection box 1 is pumped out, the shielding wall plate 3 is pulled out through a set handle, then the first scraper 7 is pushed to slide from one end to the other end of the collection box 1, the slurry on the inner side wall of the collection box 1 is scraped, so that residual waste of the slurry is avoided, then a pull ring on the first insert column 13 is pulled, the second insert column 14 is driven to slide downwards after being separated from a fixed circular groove 10 on the convex sliding block 9, and then the mud adhered on the first scraper 7 is cleaned, after cleaning, the second scraper 11 is pulled upwards by the convex slide block 9, when the fixed circular groove 10 on the convex slide block 9 reaches the position of the second inserting column 14, the second inserting column 14 is inserted and fixed in the fixed circular groove 10 under the action of the reset spring 15, so that the position of the second scraper 11 is fixed, then the first scraper 7 is pulled back to the initial position, when the position of the collecting box 2 needs to be moved or the next working site is operated, through the pipe wheel arranged at the bottom end of the collecting box 1 and the supporting and fixing device 16 arranged at the side of the collecting box 1, on the premise of ensuring that the collecting box 1 can be conveniently moved according to the construction site, a good position fixing device can be provided for the collecting box 1, in the process, the first cylinder 1604 is rotated, and the arc-shaped extrusion block 1607 is further driven to rotate to extrude the arc-shaped fixture block 1611 from the fifth circular groove, meanwhile, the supporting block 1613 and the connecting block 1603 are lifted upwards under the action of the connecting spring 1602 to leave the ground, the position fixing of the collecting box 1 is released, the collecting box 1 can be moved, when the next working site is reached, the collecting box 1 needs to be fixed in position, namely, the pedal is directly understood downwards, the connecting block 1603 and the supporting block 1613 are driven to move downwards, when the arc-shaped clamping block 1611 arranged in the connecting block 1603 reaches the position of the fifth circular groove, the arc-shaped clamping block 1611 is inserted and fixed in the fifth circular groove under the action of the first extrusion spring 1610, and at the moment, the second extrusion spring 1612 is in an extrusion state, so that the position fixing of the collecting box 1 is more stable.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides an anti-floating anchor rod drilling construction mud collection device which characterized in that: comprises a collecting box (1), a shielding wall plate (3), a hole (4), a first scraper (7), a second scraper (11) and a supporting and fixing device (16);
a chute (2) is arranged on one adjacent inner side wall of the collecting box (1), idler wheels are symmetrically arranged at the bottom end of the collecting box (1), a shielding wall plate (3) is inserted into the chute (2), a hole (4) is formed in the corner position of the bottom end face of the collecting box (1) where the chute (2) is arranged in a penetrating mode, and handles are welded on the collecting box (1) and the shielding wall plate (3);
a through groove (5) is arranged on the symmetrically arranged side of the collecting box (1), an inlet groove is arranged at one end of the through groove (5),
the through groove (5) is provided with sliding blocks (6) in a sliding connection mode, the sliding blocks (6) are integrally formed and symmetrically arranged on two sides of the first scraping plate (7), and the other end of each sliding block (6) is provided with a push handle in a welding connection mode;
a convex sliding groove (8) is formed in the first scraper (7), a convex sliding block (9) is arranged in the convex sliding groove (8) in a sliding connection mode, a fixed circular groove (10) is formed in one side of the convex sliding block (9), a second scraper (11) is integrally connected to the convex sliding block (9), and a convex block (12) is integrally formed in the first scraper (7) at the side position of a notch of the convex sliding groove (8);
a first circular groove is formed in the bump (12), a second circular groove is formed in one end of the first circular groove, a first inserting column (13) is inserted into the first circular groove, a second inserting column (14) is inserted into the second circular groove, the second inserting column (14) is integrally formed at one end of the first inserting column (13), a reset spring (15) is integrally formed and connected with the same end of the second inserting column (14) of the first inserting column (13), the other end of the reset spring (15) is integrally formed and connected into the first circular groove, and a pull ring is welded at the other end of the first inserting column (13);
the side of the collecting box (1) is symmetrically provided with supporting and fixing devices (16).
2. The anti-floating anchor rod drilling construction mud collection device of claim 1, characterized in that: support and contain box body (1601), coupling spring (1602), connecting block (1603), first cylinder (1604), second cylinder (1605), disk (1606), arc extrusion piece (1607), draw-in groove (1608), elasticity fixture block (1609), first extrusion spring (1610), arc fixture block (1611), second extrusion spring (1612), supporting shoe (1613) in fixing device (16), box body (1601) symmetric welding sets up the both sides in collecting box (1), integrated into one piece equidistance is connected and is provided with coupling spring (1602) in box body (1601), and the one end that sets up at connecting block (1603) is connected to coupling spring (1602) other end integrated into one piece, be provided with third circular slot in box body (1601), third circular slot one end is provided with fourth circular slot, and the fourth circular slot other end is provided with fifth circular slot, and the grafting is provided with first cylinder (1604) in the third circular slot, It is provided with second cylinder (1605) to peg graft in the fourth circular slot, the one end setting of second cylinder (1605) is on first cylinder (1604), and second cylinder (1605) other end is provided with disk (1606), integrated into one piece is provided with arc extrusion piece (1607) on disk (1606), the lateral wall of second cylinder (1605) is provided with draw-in groove (1608), and the joint is provided with elasticity fixture block (1609) in draw-in groove (1608), elasticity fixture block (1609) integrated into one piece sets up on the inside wall of fourth circular slot, a lateral symmetry of connecting block (1603) is provided with the arc recess, and integrated into one piece connects in the arc recess and is provided with first extrusion spring (1610), and first extrusion spring (1610) other end integrated into one piece connects and is provided with arc fixture block (1611), arc fixture block (1611) sliding connection sets up in the arc recess, connects the block (1603) other end to be provided with square groove, a, The second extrusion spring (1612) and the second extrusion spring (1612) are symmetrically arranged in the square groove in an integrally-formed mode, the other end of the second extrusion spring (1612) is arranged at one end of the supporting block (1613) in an integrally-formed mode, and a bottom plate is welded to the other end of the supporting block (1613).
3. The anti-floating anchor rod drilling construction mud collection device of claim 1, characterized in that: the length of the second scraper blade (11) is equal to the length of the first scraper blade (7) and the width of a collecting groove in the collecting box (1).
4. The anti-floating anchor rod drilling construction mud collection device of claim 1, characterized in that: the length of the convex sliding block (9) is greater than that of the convex sliding groove (8).
5. The anti-floating anchor rod drilling construction mud collection device of claim 1, characterized in that: the second inserting columns (14) correspond to the fixed circular grooves (10) in arrangement position and are equal in arrangement number, the diameters of the second inserting columns and the fixed circular grooves are equal, and the length of the second inserting columns (14) is larger than that of the second circular grooves.
6. The anti-floating anchor rod drilling construction mud collection device of claim 2, characterized in that: the arc-shaped fixture block (1611) and the arc-shaped extrusion block (1607) are arranged at corresponding positions and have the same number of groups, and both the arc-shaped fixture block and the arc-shaped extrusion block are provided with inclined planes, and the directions of the inclined planes are opposite.
7. The anti-floating anchor rod drilling construction mud collection device of claim 2, characterized in that: the height of the shielding wall plate (3) is smaller than that of the collecting box (1).
CN202020683353.7U 2020-04-29 2020-04-29 Anti-floating anchor rod drilling construction mud collection device Active CN212054567U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020683353.7U CN212054567U (en) 2020-04-29 2020-04-29 Anti-floating anchor rod drilling construction mud collection device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020683353.7U CN212054567U (en) 2020-04-29 2020-04-29 Anti-floating anchor rod drilling construction mud collection device

Publications (1)

Publication Number Publication Date
CN212054567U true CN212054567U (en) 2020-12-01

Family

ID=73517382

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020683353.7U Active CN212054567U (en) 2020-04-29 2020-04-29 Anti-floating anchor rod drilling construction mud collection device

Country Status (1)

Country Link
CN (1) CN212054567U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111395982A (en) * 2020-04-29 2020-07-10 中建八局第二建设有限公司 Anti-floating anchor rod drilling construction mud collection device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111395982A (en) * 2020-04-29 2020-07-10 中建八局第二建设有限公司 Anti-floating anchor rod drilling construction mud collection device

Similar Documents

Publication Publication Date Title
CN206554077U (en) A kind of stake holes cleaning equipment
CN212054567U (en) Anti-floating anchor rod drilling construction mud collection device
CN111395982A (en) Anti-floating anchor rod drilling construction mud collection device
CN201810345U (en) Sludge discharging system of mine sump
CN214738190U (en) Foundation pit drainage structure
CN112112175B (en) Drainage system for building foundation pit construction
CN207913344U (en) A kind of foundation pit recycling equipment
CN114164919B (en) Sponge city seepage drainage circulation system
CN211368757U (en) Building gallery drainage cleaning device
CN219992674U (en) Lifting well lid
CN218843234U (en) System of recycling is collected to deep basal pit system rainwater
CN212294713U (en) Local drainage structures of large-scale high building deep basal pit for construction
CN216767714U (en) Construction accumulated water drainage and drainage device for deep foundation pit
CN114134902B (en) Reinforced concrete supporting structure for soft soil deep foundation pit and construction process of reinforced concrete supporting structure
CN211872843U (en) Hydraulic engineering retaining wall
CN211080813U (en) Water collecting device for green building
CN217078821U (en) Foundation ditch drainage equipment for construction
CN117127701B (en) Temporary drainage structure for building engineering construction
CN215053677U (en) Rainfall drainage structures of building engineering construction site
CN220058038U (en) Building foundation pit ponding cleaning device
CN217432426U (en) Novel high-efficient cleaning machine of gastrodia elata
CN210917525U (en) Water conservancy construction sediment removal device
CN211596780U (en) Drainage collection system for foundation pit at bottom of ground
CN214657426U (en) Water saving fixtures for construction
CN212772731U (en) Prefabricated ditch structure of highway engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant