CN212054046U - Tombstone tower in cemetery - Google Patents
Tombstone tower in cemetery Download PDFInfo
- Publication number
- CN212054046U CN212054046U CN202020303156.8U CN202020303156U CN212054046U CN 212054046 U CN212054046 U CN 212054046U CN 202020303156 U CN202020303156 U CN 202020303156U CN 212054046 U CN212054046 U CN 212054046U
- Authority
- CN
- China
- Prior art keywords
- plate
- tombstone
- bottom plate
- fixed
- tower
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Devices For Use In Laboratory Experiments (AREA)
Abstract
The utility model discloses a cemetery tombstone tower, comprising a base plate, the last fixed surface of bottom plate is connected with the tombstone, the last fixed surface of tombstone is connected with the fixed plate, the round hole has been seted up in the front of fixed plate, the inner wall swing joint of round hole has the dead lever, the one end fixedly connected with swash plate of dead lever, the last fixed surface of swash plate is connected with the connecting rod, the fixed orifices has been seted up to the upper surface of bottom plate, the inner wall sliding connection of fixed orifices has the kelly, the last fixed surface of kelly is connected with the disc, the tongue has been seted up to the side of kelly. The cemetery tombstone tower is convenient to drive the tombstone to be fixed on the ground by arranging the bottom plate, the clamping rod, the disc, the convex groove, the spring, the clamping plate and the limiting rod, the disc drives the clamping rod to be clamped into the fixing hole in the surface of the bottom plate, and the limiting rod on the side surface of the clamping rod is clamped on the inner wall of the fixing hole in the surface of the bottom plate through the spring in an extending mode, so that the cemetery tombstone tower has the effect of being convenient to fixedly install.
Description
Technical Field
The utility model relates to a cemetery stele tower technical field specifically is a cemetery stele tower.
Background
At present, the well-known funeral and interment modes of large and medium-sized city cemetery are loose cemetery soil burial and intensive cemetery soil burial, and some cemeteries build a stele tower for commemorating heroes so as to ask for revetment and commemoration of predecessors.
However, the existing tombstone towers in the cemetery are different in size, so that the tombstone towers are very troublesome to install and fix, have certain difficulty and danger for installation personnel and the following condolence personnel, and are not beneficial to the use of the tombstone and the personnel.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a tombstone tower in cemetery to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a cemetery stele tower, includes the bottom plate, the last fixed surface of bottom plate is connected with the tombstone, the last fixed surface of tombstone is connected with the fixed plate, the round hole has been seted up in the front of fixed plate, the inner wall swing joint of round hole has the dead lever, the one end fixedly connected with swash plate of dead lever, the last fixed surface of swash plate is connected with the connecting rod, the fixed orifices has been seted up to the upper surface of bottom plate, the inner wall sliding connection of fixed orifices has the kelly, the last fixed surface of kelly is connected with the disc, the tongue has been seted up to the side of kelly, the inner wall fixedly connected with spring of tongue, the one end fixedly connected with cardboard of spring, the side fixedly connected with gag.
Preferably, the quantity of swash plate is two, two through connecting rod and dead lever fixed connection between the swash plate, and two swash plates are the card of type of falling V at the upper surface of fixed plate.
Preferably, two round holes are formed in the front transverse axis of the fixing plate, the number of the round holes and the number of the fixing rods are two, and the front surface and the back surface of the fixing plate are fixedly connected with the inclined plate on the front surface and the back surface of the fixing plate through the fixing rods.
Preferably, the bottom plate is provided with fixing holes on both sides of the tombstone on the upper surface, and the number of the fixing holes, the clamping rods and the discs is two.
Preferably, the bottom of kelly is conical, and the kelly passes through the disc and the upper surface joint of bottom plate, the arc groove with gag lever post one end looks adaptation is seted up to the fixed orifices inner wall of bottom plate upper surface.
Preferably, the convex groove is all seted up to the both sides of kelly, and the convex groove inner wall joint of cardboard and kelly side is passed through to the one end of gag lever post.
Advantageous effects
The utility model provides a cemetery stele tower possesses following beneficial effect:
1. the cemetery tombstone tower is provided with the bottom plate, the tombstone, the fixing plate, the round hole, the fixing rod, the inclined plate and the connecting rod, so that the fixing rod can conveniently penetrate through the fixing plate on the surface of the tombstone, the opposite surface of the opened and fixed inclined plate is fixedly connected with the two ends of the fixing rod, and the cemetery tombstone tower has the effect of preventing rainwater from washing.
2. The cemetery tombstone tower is convenient to drive the tombstone to be fixed on the ground by arranging the bottom plate, the clamping rod, the disc, the convex groove, the spring, the clamping plate and the limiting rod, the disc drives the clamping rod to be clamped into the fixing hole in the surface of the bottom plate, and the limiting rod on the side surface of the clamping rod is clamped on the inner wall of the fixing hole in the surface of the bottom plate through the spring in an extending mode, so that the cemetery tombstone tower has the effect of being convenient to fixedly install.
Drawings
FIG. 1 is a schematic front sectional view of the structure of the present invention;
FIG. 2 is a schematic side view of the structure of the present invention;
fig. 3 is an enlarged schematic view of a in fig. 1 of the present invention.
In the figure: the tombstone comprises a base plate 1, a tombstone 2, a fixing plate 3, a round hole 4, a fixing rod 5, an inclined plate 6, a connecting rod 7, a fixing hole 8, a clamping rod 9, a disc 10, a convex groove 11, a spring 12, a clamping plate 13 and a limiting rod 14.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: the utility model provides a cemetery tombstone tower, comprising a base plate 1, the last fixed surface of bottom plate 1 is connected with tombstone 2, the last fixed surface of tombstone 2 is connected with fixed plate 3, round hole 4 has been seted up in the front of fixed plate 3, the inner wall swing joint of round hole 4 has dead lever 5, the one end fixedly connected with swash plate 6 of dead lever 5, two round holes 4 have been seted up to the positive transverse axis of fixed plate 3, and the quantity of round hole 4 and dead lever 5 is two, the swash plate 6 fixed connection at the dead lever 5 and the fixed plate 3 dead back is passed through to the dead lever 3 dead back, the last fixed surface of swash plate 6 is connected with connecting rod 7, the quantity of swash plate 6 is two, pass through connecting rod 7 and dead lever 5 fixed connection between two swash plates 6, and two swash.
The working principle is as follows: when the cemetery tombstone tower is installed and fixed, the fixed rod 5 penetrates through the fixed plate 3 on the surface of the tombstone 2, the opposite surface of the opened and fixed inclined plate 6 is fixedly connected with two ends of the fixed rod 5, the bottom plate 1 drives the tombstone 2 to stand on the ground, the disc 10 drives the clamping rod 9 to be clamped into the fixed hole 8 on the surface of the bottom plate 1, the limiting rod 14 on the side surface of the clamping rod 9 extends through the spring 12 to be clamped on the inner wall of the fixed hole 8 on the surface of the bottom plate 1, and the bottom end of the clamping rod 9 is inserted into soil or a hole which is drilled in advance, so that the cemetery tombstone tower has the effect of being.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. A cemetery stele tower, includes bottom plate (1), its characterized in that: the upper surface of the bottom plate (1) is fixedly connected with a gravestone (2), the upper surface of the gravestone (2) is fixedly connected with a fixing plate (3), the front surface of the fixing plate (3) is provided with a round hole (4), the inner wall of the round hole (4) is movably connected with a fixing rod (5), one end of the fixing rod (5) is fixedly connected with an inclined plate (6), the upper surface of the inclined plate (6) is fixedly connected with a connecting rod (7), the upper surface of the bottom plate (1) is provided with a fixing hole (8), the inner wall of the fixing hole (8) is slidably connected with a clamping rod (9), the upper surface of the clamping rod (9) is fixedly connected with a disc (10), the side surface of the clamping rod (9) is provided with a convex groove (11), the inner wall of the convex groove (11) is fixedly connected with a spring (12), and one end of the spring, the side surface of the clamping plate (13) is fixedly connected with a limiting rod (14).
2. The tombstone tower of claim 1, wherein: the quantity of swash plate (6) is two, two through connecting rod (7) and dead lever (5) fixed connection between swash plate (6), and two swash plate (6) are the upper surface of the style of calligraphy card of falling V at fixed plate (3).
3. The tombstone tower of claim 1, wherein: two round holes (4) have been seted up to the positive horizontal axis of fixed plate (3), and the quantity of round hole (4) and dead lever (5) is two, the swash plate (6) fixed connection through dead lever (5) and fixed plate (3) obverse and reverse of fixed plate (3) is passed through to the obverse and reverse of fixed plate (3).
4. The tombstone tower of claim 1, wherein: fixing holes (8) are formed in the two sides of the tombstone (2) on the upper surface of the bottom plate (1), and the number of the fixing holes (8), the clamping rods (9) and the number of the discs (10) are two.
5. The tombstone tower of claim 1, wherein: the bottom of kelly (9) is conical, and kelly (9) pass through disc (10) and the upper surface joint of bottom plate (1), the arc groove with gag lever post (14) one end looks adaptation is seted up to fixed orifices (8) inner wall of bottom plate (1) upper surface.
6. The tombstone tower of claim 1, wherein: tongue (11) have all been seted up to the both sides of kelly (9), and the one end of gag lever post (14) passes through cardboard (13) and the tongue (11) inner wall joint of kelly (9) side.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020303156.8U CN212054046U (en) | 2020-03-12 | 2020-03-12 | Tombstone tower in cemetery |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020303156.8U CN212054046U (en) | 2020-03-12 | 2020-03-12 | Tombstone tower in cemetery |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212054046U true CN212054046U (en) | 2020-12-01 |
Family
ID=73532662
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020303156.8U Expired - Fee Related CN212054046U (en) | 2020-03-12 | 2020-03-12 | Tombstone tower in cemetery |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212054046U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115370224A (en) * | 2022-09-26 | 2022-11-22 | 江西钰石实业有限公司 | Stone tombstone breakage-proof fixing device |
-
2020
- 2020-03-12 CN CN202020303156.8U patent/CN212054046U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115370224A (en) * | 2022-09-26 | 2022-11-22 | 江西钰石实业有限公司 | Stone tombstone breakage-proof fixing device |
CN115370224B (en) * | 2022-09-26 | 2023-09-08 | 江西钰石实业有限公司 | Breakage-proof fixing device for stone tombstone |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN212054046U (en) | Tombstone tower in cemetery | |
CN211256542U (en) | Glass fiber reinforced plastic grid with good stability | |
CN214993891U (en) | Connecting structure of foundation pit stand column and foundation pit bidirectional support | |
CN213269200U (en) | Grandma tower of multilayer tower structure | |
CN205422126U (en) | Over -and -under type grave system | |
CN208981501U (en) | A kind of landscape design ecological roof of emulation | |
CN211473604U (en) | Novel combined bone ash storage rack | |
CN109661924B (en) | Vertical greening structure | |
CN208456164U (en) | A kind of safety protection device of municipal road foundation pit | |
CN209082511U (en) | A kind of foundation pit support device | |
CN218759126U (en) | Imitative jade Dan Woshi tombstone | |
CN205884117U (en) | Balcony afforestation rail | |
CN205727264U (en) | A kind of flowerpot | |
CN2189631Y (en) | Combined bone ash tower | |
CN219019794U (en) | Afforestation green plant transplanting auxiliary mechanism | |
CN205502716U (en) | Commemorative tombstone | |
CN214801097U (en) | Crop planting frame for mine restoration | |
CN214696039U (en) | Landscape corridor frame based on landscape design | |
CN211458128U (en) | Collapsible apple root soaking pond | |
CN211872869U (en) | Slope protection net for hydraulic engineering | |
CN213710662U (en) | Rail guard is used in gardens river course | |
CN212544777U (en) | Fastening type cave basin rack for wall greening | |
CN207296601U (en) | A kind of ornamental trees and shrubs dedicated guardrail being easily installed with dismounting | |
CN207609240U (en) | A kind of bodhi Holy Ghost arbor burial ceremony park | |
CN214879786U (en) | Tower crane with assembled tower crane foundation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20201201 |
|
CF01 | Termination of patent right due to non-payment of annual fee |