CN212053677U - Split quick-assembly type insulating operation platform - Google Patents

Split quick-assembly type insulating operation platform Download PDF

Info

Publication number
CN212053677U
CN212053677U CN202020176565.6U CN202020176565U CN212053677U CN 212053677 U CN212053677 U CN 212053677U CN 202020176565 U CN202020176565 U CN 202020176565U CN 212053677 U CN212053677 U CN 212053677U
Authority
CN
China
Prior art keywords
operation platform
bearing upright
upright post
bearing
split
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020176565.6U
Other languages
Chinese (zh)
Inventor
卢敏
胡晓斌
余杰
江颖峰
邹光涛
虞巍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiujiang Power Supply Branch Of State Grid Jiangxi Electric Power Co ltd
Original Assignee
Jiujiang Power Supply Branch Of State Grid Jiangxi Electric Power Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiujiang Power Supply Branch Of State Grid Jiangxi Electric Power Co ltd filed Critical Jiujiang Power Supply Branch Of State Grid Jiangxi Electric Power Co ltd
Priority to CN202020176565.6U priority Critical patent/CN212053677U/en
Application granted granted Critical
Publication of CN212053677U publication Critical patent/CN212053677U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a split ready-package insulation operation platform, belonging to the technical field of construction platforms, which comprises a bearing stand column, a beam and a transverse fixing plate, and also comprises a mounting piece, wherein the bearing stand column in the operation platform is matched with the mounting piece to realize the sequential installation of the operation platform; the mounting piece comprises a fixed baffle and insertion rods arranged on the upper surface and the lower surface of the fixed baffle, the insertion rods are inserted into the bearing stand columns, the fixed baffle blocks the tops of the bearing stand columns, and the bearing stand columns in the other operation platform are inserted into the insertion rods on the upper surfaces of the fixed baffles; the utility model provides an operation platform is easy to assemble and install, and convenient to use, operation safety.

Description

Split quick-assembly type insulating operation platform
Technical Field
The utility model belongs to the technical field of construction platform, specifically speaking relates to an insulating operation platform of components of a whole that can function independently ready-package.
Background
The split quick-mounting type insulating operation platform is a device which is used in the technical field of engineering construction and facilitates aerial work of people, is made of insulating materials, avoids conductive risks, is convenient for people to use and is widely used in the technical field of building construction;
the existing operation platform mainly comprises a stand column and a transverse fixing plate, wherein the stand column plays a bearing function, the transverse fixing plate is convenient for operators to stand for operation, the structure is fixed, the operation platform is convenient to use, but the operation platform in the prior art still has the following defects in use:
because current work platform structure is fixed, the highly fixed of platform, consequently, when the high of operation personnel construction was higher, current work platform need splice just can reach corresponding height, but, current work platform is difficult to splice, causes certain inconvenience for people's use.
SUMMERY OF THE UTILITY MODEL
1. Problems to be solved
Be difficult to the problem of concatenation in order to satisfy the construction height to current operation platform, the utility model provides an insulating operation platform of components of a whole that can function independently ready-package, the supporting installed part of this platform uses, can be in proper order with operation platform stack accumulation through the installed part to improve operation platform's operation height, the use of giving people provides convenience.
2. Technical scheme
In order to solve the above problems, the utility model adopts the following technical proposal.
A split fast-assembly type insulating operation platform, which comprises a bearing upright post, a cross beam and a transverse fixing plate,
the mounting piece is also included, and the bearing upright columns in the operation platform are matched with the mounting piece to realize the sequential mounting of the operation platform;
the installed part include fixed stop and set up the inserted bar on fixed stop upper and lower surface, the inserted bar insert the bearing stand, fixed stop blocks at the top of bearing stand, the bearing stand in another operation platform inserts on the inserted bar of fixed stop upper surface.
Preferably, the mounting part is provided with a bolt hole on an inserted bar, and the bearing upright post is provided with an assembly hole matched with the bolt hole, and the mounting part and the bearing upright post are stabilized by the fixing bolt through the assembly hole and the bolt hole.
Preferably, the bearing upright columns on two sides of the transverse fixing plate in the width direction are hinged to each other through stabilizing rods, the stabilizing rods are arranged in a crossed mode and hinged to each other, and the stabilizing rods are of telescopic structures.
Preferably, the transverse fixing plate is of a telescopic structure.
Preferably, the lateral surface of the bearing upright post is provided with a stabilizing component for improving the stability of the operation platform, and the stabilizing component comprises a telescopic rod hinged on the bearing upright post and an adjusting mechanism transversely hinged between the bearing upright post and the telescopic rod and used for adjusting the length of the telescopic rod.
Preferably, the adjusting mechanism comprises an adjusting barrel and a threaded rod assembled on the adjusting barrel, one end of the adjusting barrel is rotatably connected with the outer side surface of the bearing upright post, the threaded rod is installed on the inner wall of the adjusting barrel in a threaded mode, the threaded rod extends out of the adjusting barrel, and the tail end of the threaded rod is hinged to the telescopic rod.
The adjusting cylinder is of a hollow structure with one open end.
3. Advantageous effects
Compared with the prior art, the beneficial effects of the utility model are that:
(1) the utility model discloses an operation platform in use still includes the installed part, and the installed part includes fixed stop and the inserted bar that sets up on fixed stop upper and lower surface, has realized installing in proper order of bearing stand through the inserted bar inserts in the bearing stand of operation platform to improve the height of operation platform, made things convenient for people's operation, and realized quick installation, convenient operation;
(2) the bolt holes are arranged on the inserted rods of the mounting pieces, and the mounting holes are arranged on the bearing stand columns, so that the stability between the bearing stand columns and the mounting pieces is realized through the fixing bolts, and the stability of the operation platform is improved;
(3) in the utility model, the transverse fixing plate is of a telescopic structure, the stabilizing rods are hinged between the bearing upright columns and are of a telescopic structure, so that the operation platform is convenient to store and adjust and store or transport;
(4) the utility model provides an operation platform still articulates on the lateral wall of bearing stand has the subassembly of stabilizing, and the subassembly of stabilizing includes telescopic link and adjustment mechanism, adjusts the length of telescopic link through adjustment mechanism to improve operation platform's stability greatly, improved construction operation personnel's safety guarantee, avoided the problem emergence that operation platform emptys, the safety in utilization performance is high.
Drawings
FIG. 1 is a schematic structural view of a work platform according to embodiment 1;
FIG. 2 is an enlarged view of the structure at A in FIG. 1;
FIG. 3 is a schematic view showing the assembly of the mounting member in embodiment 1;
FIG. 4 is a schematic structural view of a work platform according to embodiment 2;
fig. 5 is a schematic structural view of a stabilizing member in example 2.
The corresponding relationship between the reference numbers of the figures and the names of the components in the figures is as follows:
10. a load-bearing upright post; 11. a cross beam; 12. an assembly hole; 13. a transverse fixing plate; 14. a stabilizing rod;
20. a mounting member; 21. bolt holes;
30. a stabilizing assembly; 31. a telescopic rod; 32. an adjustment mechanism; 321. an adjusting cylinder; 322. a threaded rod.
Detailed Description
The invention will be further described below in connection with specific embodiments.
Example 1
As shown in fig. 1, which is a schematic structural view of a split ready-package insulated work platform according to a preferred embodiment of the present invention, including a bearing upright 10, a cross beam 11 and a transverse fixing plate 13, wherein the corners around the transverse fixing plate 13 are fixedly mounted on the bearing upright 10, the bearing upright 10 is a hollow structure with openings at both ends, the cross beam 11 is fixedly mounted between the bearing uprights 10 at both sides of the transverse fixing plate 13, and the cross beam 11 reinforces the stability of the bearing upright 10;
in this embodiment, as shown in fig. 2 to 3, in order to implement the rapid installation of the working platform, the mounting part 20 is further included, the cross section of the mounting part 20 is matched with the cross section of the load-bearing upright post 10, the mounting part 20 includes a fixed baffle and insertion rods arranged on the upper and lower surfaces of the fixed baffle, in this embodiment, in order to implement the rapid installation of the working platform, the insertion rods are inserted into the load-bearing upright post 10, the fixed baffle blocks the top of the load-bearing upright post 10, and the load-bearing upright post 10 in another working platform is inserted into the insertion rods on the upper surface of the fixed baffle, thereby implementing the rapid installation of the working platform;
in this embodiment, in order to enhance the stability of the working platform, the inserting rod in the mounting member 20 is provided with a bolt hole 21, and the bearing upright post 10 is provided with an assembling hole 12 matched with the bolt hole 21, after the working platform is mounted through the mounting member 20, the mounting member 20 and the bearing upright post 10 are fixed by bolts, so as to improve the stability of the working platform;
in this embodiment, in order to facilitate adjustment of the work platform and to achieve expansion and storage of the work platform, the transverse fixing plate 13 is of a retractable structure; the bearing upright columns 10 on two sides of the transverse fixing plate 13 in the width direction are hinged with stabilizing rods 14, the stabilizing rods 14 are arranged in a crossed mode and hinged with each other, and the stabilizing rods 14 are of telescopic structures;
in this embodiment, when the work platform needs to be accomodate, the bearing stand 10 along the both sides of 13 length direction of horizontal fixed plate is close to each other and draws in, and horizontal fixed plate 13 contracts, has realized accomodating of work platform, has reduced work platform's volume, convenient storage or transportation.
Example 2
As shown in fig. 4 to 5, which are schematic structural views of a split quick-mounting type insulated work platform according to another preferred embodiment of the present invention, on the basis of example 1, a stabilizing assembly 30 for improving the stability of the work platform is installed on the outer side surface of the bearing upright post 10, and the stabilizing assembly 30 greatly improves the stability of the work platform;
in this embodiment, the stabilizing assembly 30 includes an expansion link 31 hinged to the bearing upright 10, and an adjusting mechanism 32 transversely hinged between the bearing upright 10 and the expansion link 31, and the length of the expansion link 31 can be adjusted by the adjusting mechanism 32, so as to support and fix the operation platform and improve the stability of the operation platform;
in this embodiment, the adjusting mechanism 32 includes an adjusting cylinder 321 and a threaded rod 322 assembled on the adjusting cylinder 321, one end of the adjusting cylinder 321 is rotatably connected to the outer side surface of the bearing upright post 10, the adjusting cylinder 321 is a hollow structure with an open end, the threaded rod 322 is installed on the inner wall of the adjusting cylinder 321 through threads, and the threaded rod 322 extends out of the adjusting cylinder 321 and the tail end of the threaded rod 322 is hinged to the telescopic rod.
In this embodiment, work platform in use rotates through adjusting a section of thick bamboo 321, adjusts a section of thick bamboo 321 and rotates and drive threaded rod 322 and stretch out to telescopic link 31 rotates and telescopic link 31 extension props admittedly at the operation subaerial, has improved work platform's stability greatly, thereby has improved constructor's safety guarantee.
The above description is for further details of the present invention, and it is not assumed that the embodiments of the present invention are limited to these descriptions, and it is obvious to those skilled in the art that the present invention can be implemented by a plurality of simple deductions or replacements without departing from the concept of the present invention, and all should be considered as belonging to the protection scope defined by the claims submitted by the present invention.

Claims (7)

1. A split fast-assembly type insulation operation platform comprises a bearing upright post (10), a cross beam (11) and a transverse fixing plate (13),
the method is characterized in that:
the mounting piece (20) is further included, and the bearing upright columns (10) in the operation platform are matched with the mounting piece (20) to realize the sequential mounting of the operation platform;
the installing part (20) comprises a fixed baffle and an inserted bar arranged on the upper surface and the lower surface of the fixed baffle, the inserted bar is inserted into the bearing upright post (10), the fixed baffle blocks the top of the bearing upright post (10), and the bearing upright post (10) in another operation platform is inserted into the inserted bar on the upper surface of the fixed baffle.
2. The split ready-package insulated work platform of claim 1, characterized in that: bolt holes (21) are formed in the inserted rods of the mounting parts (20), assembling holes (12) matched with the bolt holes (21) are formed in the bearing upright columns (10), and the mounting parts (20) and the bearing upright columns (10) are stabilized by fixing bolts through the assembling holes (12) and the bolt holes (21).
3. The split quick-assembly insulated work platform of claim 1 or 2, characterized in that: the bearing upright columns (10) on two sides in the width direction of the transverse fixing plate (13) are hinged with stabilizing rods (14), the stabilizing rods (14) are arranged in a crossed mode and hinged with each other, and the stabilizing rods (14) are of a telescopic structure.
4. The split ready-package insulated work platform of claim 3, characterized in that: the transverse fixing plate (13) is of a telescopic structure.
5. The split ready-package insulated work platform of claim 3, characterized in that: the utility model discloses a load-bearing upright post (10) lateral surface on install stable subassembly (30) that improve operation platform stability, stable subassembly (30) including articulate telescopic link (31) on load-bearing upright post (10) to and transversely articulate adjustment mechanism (32) that are used for adjusting telescopic link (31) length between load-bearing upright post (10) and telescopic link (31).
6. The split ready-package insulated work platform of claim 5, characterized in that: adjusting mechanism (32) including adjusting a section of thick bamboo (321) and threaded rod (322) of assembly on adjusting a section of thick bamboo (321), adjust a section of thick bamboo (321) one end with bearing stand (10) lateral surface rotate to be connected, threaded rod (322) are installed to the screw thread on adjusting a section of thick bamboo (321) inner wall, threaded rod (322) extend adjust a section of thick bamboo (321) and the end of threaded rod (322) with the telescopic link articulated.
7. The split ready-package insulated work platform of claim 6, characterized in that: the adjusting cylinder (321) is of a hollow structure with one open end.
CN202020176565.6U 2020-02-17 2020-02-17 Split quick-assembly type insulating operation platform Expired - Fee Related CN212053677U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020176565.6U CN212053677U (en) 2020-02-17 2020-02-17 Split quick-assembly type insulating operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020176565.6U CN212053677U (en) 2020-02-17 2020-02-17 Split quick-assembly type insulating operation platform

Publications (1)

Publication Number Publication Date
CN212053677U true CN212053677U (en) 2020-12-01

Family

ID=73537622

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020176565.6U Expired - Fee Related CN212053677U (en) 2020-02-17 2020-02-17 Split quick-assembly type insulating operation platform

Country Status (1)

Country Link
CN (1) CN212053677U (en)

Similar Documents

Publication Publication Date Title
CN212053677U (en) Split quick-assembly type insulating operation platform
CN112702007A (en) Photovoltaic outdoor application folding assembly
CN215166609U (en) Special-shaped framework for assembled steel structure house
CN218479344U (en) Steel structure node with adjusting device
CN217631500U (en) Support column for assembly type building
CN217353088U (en) Fixing frame for mounting curtain wall in constructional engineering
CN213329972U (en) Fixing base for building scaffold
CN215978820U (en) Building foundation that stability is high encloses fender
CN220556714U (en) But reuse's roofing photovoltaic mounting bracket
CN216973945U (en) Assembly type green building truss structure
CN219175853U (en) Ring beam template reinforcing device for building construction
CN220548272U (en) Frame is accomodate to construction reinforcing bar
CN219219900U (en) Auxiliary structural support equipment for trapezoidal building construction
CN220599441U (en) Bamboo shell guardrail structure convenient to installation
CN219908624U (en) Assembled cast-in-situ flange plate template support based on full framing
CN213923905U (en) Jacking device
CN212506977U (en) Assembled beam structure for assembly building
CN219451069U (en) Roof protection structure for building waterproof engineering
CN219697548U (en) Symmetrical telescopic solar photovoltaic bracket
CN220790193U (en) Mounting structure and steel structure wallboard thereof
CN212613289U (en) Stable ceiling keel structure capable of improving overall stability of ceiling keel structure
CN220711377U (en) Be used for photovoltaic supporting structure subassembly layer board
CN211063241U (en) Novel basalt fiber composite material cable support
CN215803631U (en) Novel cross arm device for power transmission line
CN220058982U (en) Can turnover formula platform top protection of unloading of encorbelmenting

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201201

Termination date: 20220217

CF01 Termination of patent right due to non-payment of annual fee