CN212038728U - Temporary supporting device for rapid positioning and installation of indoor fire-fighting pipeline - Google Patents

Temporary supporting device for rapid positioning and installation of indoor fire-fighting pipeline Download PDF

Info

Publication number
CN212038728U
CN212038728U CN202020435588.4U CN202020435588U CN212038728U CN 212038728 U CN212038728 U CN 212038728U CN 202020435588 U CN202020435588 U CN 202020435588U CN 212038728 U CN212038728 U CN 212038728U
Authority
CN
China
Prior art keywords
supporting
seat
block
fixed
adjusting pin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020435588.4U
Other languages
Chinese (zh)
Inventor
王东东
刘得利
曾剑
邱弘为
余德智
李炫道
文清
牙侯凡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fourth Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Original Assignee
Fourth Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fourth Engineering Co Ltd of CCCC First Highway Engineering Co Ltd filed Critical Fourth Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Priority to CN202020435588.4U priority Critical patent/CN212038728U/en
Application granted granted Critical
Publication of CN212038728U publication Critical patent/CN212038728U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses an indoor fire-fighting pipeline quick positioning and mounting temporary supporting device, which comprises a supporting component and a U-shaped pipe bracket arranged at the top of the supporting component, wherein the supporting component comprises a supporting seat and a supporting rod, the top end of the supporting rod is fixed with a top seat, the supporting rod is arranged in the supporting seat, a quick positioning component is arranged between the supporting rod and the supporting seat, the quick positioning component comprises an adjusting pin and a side block, and the surfaces of the two sides of the supporting seat are both provided with through holes matched with the adjusting pin; through setting up the quick locating component who comprises adjusting pin, side base piece, through hole, pinhole, rectangle end block, spring groove, telescopic stopper, draw-in groove and shadoof for the vaulting pole can be quick after sliding from top to bottom in the inside of propping the seat obtains spacingly, causes supporting component's length adjustment mode can be more simple and convenient, thereby makes the interim carriage of pipeline accomplish altitude mixture control that can be quick in the in-service use, improves the convenience of use.

Description

Temporary supporting device for rapid positioning and installation of indoor fire-fighting pipeline
Technical Field
The utility model belongs to the technical field of the fire-fighting pipeline supports utensil, concretely relates to interim strutting arrangement of quick location installation of indoor fire-fighting pipeline.
Background
Indoor fire control pipeline needs to use a pipeline temporary support frame to fix a position fast and support fire control pipeline in the installation to it is spacing to ensure that fire control pipeline can obtain good lifting in follow-up installation, and this kind of pipeline temporary support frame mainly comprises seat of propping, vaulting pole and U-shaped pipe support.
Current interim strutting arrangement of pipeline is when using, and a length adjustable supporting component can be constituteed with the support seat to the vaulting pole for the adjustment of certain degree can be carried out to the height of pipeline interim bracing frame, nevertheless because current supporting component's length adjustment mode is comparatively loaded down with trivial details, for traditional bolt adjustment, leads to the unable quick adjustment of pipeline interim strutting arrangement to suitable height in the in-service use, thereby reduces and uses the convenience, for this reason the utility model provides an interim strutting arrangement of quick location installation of indoor fire control pipeline.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an interim strutting arrangement of quick location installation of indoor fire control pipeline to solve the interim carriage of current pipeline that proposes in the above-mentioned background art when using, a length adjustable supporting component can be constituteed with propping the seat to the vaulting pole, make the adjustment of certain degree can be carried out to the height of the interim carriage of pipeline, nevertheless because the length adjustment mode of current supporting component is comparatively loaded down with trivial details, for traditional bolt adjustment, lead to the interim carriage of pipeline to adjust to suitable height that can't be quick in the in-service use, thereby reduce the convenience problem of use.
In order to achieve the above object, the utility model provides a following technical scheme: the temporary supporting device for the rapid positioning and installation of the indoor fire fighting pipeline comprises a supporting component and a U-shaped pipe bracket arranged at the top of the supporting component, wherein the supporting component comprises a supporting seat and a supporting rod, a top seat is fixed at the top end of the supporting rod, the supporting rod is positioned in the supporting seat, a rapid positioning component is arranged between the supporting rod and the supporting seat, the rapid positioning component comprises an adjusting pin and a side block, through holes matched with the adjusting pin are formed in the surfaces of the two sides of the supporting seat, a plurality of pin holes matched with the adjusting pin are uniformly formed in the supporting rod, the side block is fixed on one side surface of the supporting seat, an integrated rectangular end block is arranged at the top end of the adjusting pin, a spring groove is formed in the side block, a telescopic limiting block is connected to the bottom end of the spring groove, and two clamping grooves corresponding to the telescopic limiting block are symmetrically formed in the surface of the bottom end of the, the top surface of the telescopic limiting block is fixed with a lifting rod, and the top end of the lifting rod is located at the top of the side base block.
Preferably, the bottom swivelling joint of U-shaped conduit saddle has rotatory hand wheel, and the bottom of rotatory hand wheel is fixed with the threaded rod, the top of footstock is fixed with the U-shaped frame, the threaded hole corresponding with the threaded rod is seted up at the top of U-shaped frame, and the bottom of threaded rod runs through to the inboard of U-shaped frame.
Preferably, a rotating block is fixed on the top surface of the rotating hand wheel, a rotating seat corresponding to the rotating block is fixed on the bottom surface of the U-shaped pipe bracket, and the top end of the rotating block is located inside the rotating seat.
Preferably, the bottom of threaded rod is equipped with the anticreep piece of integral type, the surface of rotatory hand wheel evenly is provided with the anti-skidding sand grip of a plurality of integral types.
Preferably, the top end of the spring groove is provided with a first through hole corresponding to the lifting rod, and the bottom end of the spring groove is provided with a second through hole corresponding to the telescopic limiting block.
Preferably, a pull ring is fixed on the side face of the rectangular end block, and the top cross sections of the support seat and the support rod are rectangular.
Preferably, the bottom end of the supporting seat is fixed with a base, and the top of the base is fixedly welded with a plurality of triangular supporting blocks.
Compared with the prior art, the beneficial effects of the utility model are that:
1. through setting up the quick locating component who comprises adjusting pin, side base piece, through hole, pinhole, rectangle end block, spring groove, telescopic stopper, draw-in groove and shadoof for the vaulting pole can be quick after sliding from top to bottom in the inside of propping the seat obtains spacingly, causes supporting component's length adjustment mode can be more simple and convenient, thereby makes the interim carriage of pipeline accomplish altitude mixture control that can be quick in the in-service use, improves the convenience of use.
2. Through the U-shaped frame, rotatory hand wheel, threaded rod and the screw hole that set up for operating personnel accomplishes the length adjustment back of supporting component, can be further carry out appropriate adjustment to the height of U-shaped pipe support, thereby ensure that the U-shaped pipe support can play good supporting role to the pipeline.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a cross-sectional view of the junction of the adjusting pin and the side block of the present invention;
FIG. 3 is an enlarged view of a portion of the area A in FIG. 2 according to the present invention;
fig. 4 is a cross-sectional view of the junction between the U-shaped tube holder and the U-shaped frame according to embodiment 2 of the present invention;
in the figure: 1. a support seat; 2. a rectangular end block; 3. a threaded rod; 4. a U-shaped pipe bracket; 5. rotating a hand wheel; 6. a U-shaped frame; 7. a top seat; 8. a side base block; 9. an adjustment pin; 10. a stay bar; 11. a pin hole; 12. a spring slot; 13. a telescopic limiting block; 14. a card slot; 15. lifting a rod; 16. a rotating base; 17. the block is rotated.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Example 1
Referring to fig. 1 to 3, the present invention provides a technical solution: the temporary supporting device for the rapid positioning and installation of the indoor fire fighting pipeline comprises a supporting component and a U-shaped pipe support 4 arranged at the top of the supporting component, wherein the supporting component comprises a supporting seat 1 and a supporting rod 10, a top seat 7 is welded at the top end of the supporting rod 10, the supporting rod 10 is positioned in the supporting seat 1, so that the supporting rod 10 can slide up and down in the supporting seat 1 to change the length of the supporting component, a rapid positioning component is arranged between the supporting rod 10 and the supporting seat 1 and comprises an adjusting pin 9 and a side block 8, through holes matched with the adjusting pin 9 are formed in the two side surfaces of the supporting seat 1, a plurality of pin holes 11 matched with the adjusting pin 9 are uniformly formed in the supporting rod 10, the side block 8 is welded on one side surface of the supporting seat 1, a rectangular end block 2 is arranged at the top end of the adjusting pin 9, an integrated spring groove 12 is formed in the side block 8, and the bottom end of the spring groove 12 is connected with a telescopic limiting, two draw-in grooves 14 corresponding to telescopic stopper 13 have been seted up to the bottom surface symmetry of adjusting pin 9, and telescopic stopper 13's top surface welding has lifting lever 15, and the top of lifting lever 15 is in the top of side base block 8 for vaulting pole 10 can be quick after propping the inside of seat 1 and slide from top to bottom obtain spacingly, cause the length adjustment mode of supporting component can be more simple and convenient.
In this embodiment, preferably, the top end of the spring slot 12 is provided with a first through hole corresponding to the lifting rod 15, and the bottom end of the spring slot 12 is provided with a second through hole corresponding to the telescopic limiting block 13.
In this embodiment, preferably, the side of the rectangular end block 2 is welded with a pull ring, so that the rectangular end block 2 is easy to pull laterally, and the top cross sections of the support base 1 and the stay bar 10 are both rectangular, so that the stay bar 10 cannot rotate during sliding up and down.
In this embodiment, preferably, the base is welded to the bottom end of the supporting seat 1, and a plurality of triangular supporting blocks are welded and fixed to the top of the base, so that the temporary pipeline supporting frame can be stably placed on the ground.
Example 2
Referring to fig. 1 to 4, the present invention provides a technical solution: the temporary supporting device for the rapid positioning and installation of the indoor fire fighting pipeline comprises a supporting component and a U-shaped pipe support 4 arranged at the top of the supporting component, wherein the supporting component comprises a supporting seat 1 and a supporting rod 10, a top seat 7 is welded at the top end of the supporting rod 10, the supporting rod 10 is positioned in the supporting seat 1, so that the supporting rod 10 can slide up and down in the supporting seat 1 to change the length of the supporting component, a rapid positioning component is arranged between the supporting rod 10 and the supporting seat 1 and comprises an adjusting pin 9 and a side block 8, through holes matched with the adjusting pin 9 are formed in the two side surfaces of the supporting seat 1, a plurality of pin holes 11 matched with the adjusting pin 9 are uniformly formed in the supporting rod 10, the side block 8 is welded on one side surface of the supporting seat 1, a rectangular end block 2 is arranged at the top end of the adjusting pin 9, an integrated spring groove 12 is formed in the side block 8, and the bottom end of the spring groove 12 is connected with a telescopic limiting, two draw-in grooves 14 corresponding to telescopic stopper 13 have been seted up to the bottom surface symmetry of adjusting pin 9, and telescopic stopper 13's top surface welding has lifting lever 15, and the top of lifting lever 15 is in the top of side base block 8 for vaulting pole 10 can be quick after propping the inside of seat 1 and slide from top to bottom obtain spacingly, cause the length adjustment mode of supporting component can be more simple and convenient.
In this embodiment, preferably, the bottom of the U-shaped pipe support 4 is rotatably connected with a rotating hand wheel 5, the bottom of the rotating hand wheel 5 is welded with a threaded rod 3, the top of the top seat 7 is welded with a U-shaped frame 6, the top of the U-shaped frame 6 is provided with a threaded hole corresponding to the threaded rod 3, and the bottom end of the threaded rod 3 penetrates through the inner side of the U-shaped frame 6, so that after the operator finishes adjusting the length of the supporting component, the height of the U-shaped pipe support 4 can be further adjusted appropriately.
In this embodiment, preferably, the rotating block 17 is welded on the top surface of the rotating handwheel 5, the rotating base 16 corresponding to the rotating block 17 is welded on the bottom surface of the U-shaped pipe support 4, and the top end of the rotating block 17 is located inside the rotating base 16, so that the U-shaped pipe support 4 can be rotated at the top of the rotating handwheel 5 after the height adjustment is completed, and the U-shaped pipe support 4 can be rotated to be aligned with an external pipeline.
In this embodiment, preferably, the bottom of threaded rod 3 is equipped with the anticreep piece of integral type, can prevent that threaded rod 3 from coming off from 6 tops of U-shaped frame, and the surface of rotatory hand wheel 5 evenly is provided with the anti-skidding sand grip of a plurality of integral types for rotatory hand wheel 5 is easily rotated and is twisted.
In this embodiment, preferably, the top end of the spring slot 12 is provided with a first through hole corresponding to the lifting rod 15, and the bottom end of the spring slot 12 is provided with a second through hole corresponding to the telescopic limiting block 13.
In this embodiment, preferably, the side of the rectangular end block 2 is welded with a pull ring, so that the rectangular end block 2 is easy to pull laterally, and the top cross sections of the support base 1 and the stay bar 10 are both rectangular, so that the stay bar 10 cannot rotate during sliding up and down.
In this embodiment, preferably, the base is welded to the bottom end of the supporting seat 1, and a plurality of triangular supporting blocks are welded and fixed to the top of the base, so that the temporary pipeline supporting frame can be stably placed on the ground.
The utility model discloses a theory of operation and use flow: when an operator needs to adjust the length of the supporting component, the lifting rod 15 is pulled upwards only to draw the top end of the telescopic limiting block 13 into the spring groove 12, then the rectangular end block 2 is pulled laterally to draw the adjusting pin 9 away from the supporting rod 10 and the supporting seat 1, and the supporting rod 10 is not limited any more, the bottom end of the supporting rod 10 can be directly slid upwards and downwards in the supporting seat 1 to change the length of the supporting component, in the process of sliding the supporting rod 10 upwards and downwards, the pin holes 11 at other positions can be aligned with the through holes on the surface of the supporting seat 1, then the lifting rod 15 is pulled upwards, the adjusting pin 9 penetrates through the supporting seat 1 and the inside of the supporting rod 10, then the lifting rod 15 is loosened, so that the end part of the telescopic limiting block 13 can be clamped into the inner side of the clamping groove 14 under the pushing of the spring in the spring groove 12, the adjusting pin 9 can be quickly limited, and the limiting of the supporting rod 10 is completed, the length adjusting mode of the supporting component can be simpler and more convenient, so that the use convenience of the whole body is improved;
after operating personnel accomplished supporting component's length adjustment, if the U-shaped pipe holds in the palm 4 height still has certain deviation with the pipeline height that needs support, operating personnel can twist rotatory hand wheel 5 this moment, make threaded rod 3 top spin or spiral down, thereby make U-shaped pipe support 4 can reciprocate, hold in the palm 4 and pipeline highly uniform until the U-shaped pipe, then hold in the palm 4 bottom that needs support the pipeline with the U-shaped pipe again, and support the pipeline can, thereby improve the use precision of pipeline temporary support frame.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. Interim strutting arrangement of quick location installation of indoor fire control pipeline, including supporting component and U-shaped conduit saddle (4) of setting at the supporting component top, the supporting component is including propping seat (1) and vaulting pole (10), the top of vaulting pole (10) is fixed with footstock (7), vaulting pole (10) are in the inside of propping seat (1), its characterized in that: the quick positioning assembly is arranged between the support rod (10) and the support seat (1) and comprises an adjusting pin (9) and a side block (8), through holes matched with the adjusting pin (9) are formed in the surfaces of the two sides of the support seat (1), a plurality of pin holes (11) matched with the adjusting pin (9) are uniformly formed in the support rod (10), the side block (8) is fixed on one side surface of the support seat (1), the top end of the adjusting pin (9) is provided with an integrated rectangular end block (2), a spring groove (12) is formed in the side block (8), the bottom end of the spring groove (12) is connected with a telescopic limiting block (13), two clamping grooves (14) corresponding to the telescopic limiting block (13) are symmetrically formed in the surface of the bottom end of the adjusting pin (9), and a lifting rod (15) is fixed on the surface of the top of the telescopic limiting block (13), and the top end of the lifting rod (15) is positioned at the top of the side base block (8).
2. The indoor fire fighting pipeline quick positioning and mounting temporary supporting device as claimed in claim 1, wherein: the bottom swivelling joint of U-shaped conduit saddle (4) has rotatory hand wheel (5), and the bottom of rotatory hand wheel (5) is fixed with threaded rod (3), the top of footstock (7) is fixed with U-shaped frame (6), the screw hole corresponding with threaded rod (3) is seted up at the top of U-shaped frame (6), and the inboard of U-shaped frame (6) is run through to the bottom of threaded rod (3).
3. The indoor fire fighting pipeline quick positioning and mounting temporary supporting device as claimed in claim 2, wherein: the top surface of rotatory hand wheel (5) is fixed with rotation piece (17), and the bottom surface of U-shaped conduit saddle (4) is fixed with roating seat (16) corresponding with rotation piece (17), the top of rotation piece (17) is in the inside of roating seat (16).
4. The indoor fire fighting pipeline quick positioning and mounting temporary supporting device as claimed in claim 2, wherein: the bottom of threaded rod (3) is equipped with the anticreep piece of integral type, the surface of rotatory hand wheel (5) evenly is provided with the anti-skidding sand grip of a plurality of integral types.
5. The indoor fire fighting pipeline quick positioning and mounting temporary supporting device as claimed in claim 1, wherein: the top end of the spring groove (12) is provided with a first through hole corresponding to the lifting rod (15), and the bottom end of the spring groove (12) is provided with a second through hole corresponding to the telescopic limiting block (13).
6. The indoor fire fighting pipeline quick positioning and mounting temporary supporting device as claimed in claim 1, wherein: the side surface of the rectangular end block (2) is fixed with a pull ring, and the overlooking cross sections of the support seat (1) and the support rod (10) are rectangular.
7. The indoor fire fighting pipeline quick positioning and mounting temporary supporting device as claimed in claim 1, wherein: the bottom of the supporting seat (1) is fixed with a base, and the top of the base is fixedly welded with a plurality of triangular supporting blocks.
CN202020435588.4U 2020-03-30 2020-03-30 Temporary supporting device for rapid positioning and installation of indoor fire-fighting pipeline Expired - Fee Related CN212038728U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020435588.4U CN212038728U (en) 2020-03-30 2020-03-30 Temporary supporting device for rapid positioning and installation of indoor fire-fighting pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020435588.4U CN212038728U (en) 2020-03-30 2020-03-30 Temporary supporting device for rapid positioning and installation of indoor fire-fighting pipeline

Publications (1)

Publication Number Publication Date
CN212038728U true CN212038728U (en) 2020-12-01

Family

ID=73539433

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020435588.4U Expired - Fee Related CN212038728U (en) 2020-03-30 2020-03-30 Temporary supporting device for rapid positioning and installation of indoor fire-fighting pipeline

Country Status (1)

Country Link
CN (1) CN212038728U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114798577A (en) * 2022-04-12 2022-07-29 昆山宝兴精密五金有限公司 Machining device and method for precise composite screw tap

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114798577A (en) * 2022-04-12 2022-07-29 昆山宝兴精密五金有限公司 Machining device and method for precise composite screw tap
CN114798577B (en) * 2022-04-12 2023-10-03 昆山宝兴精密五金有限公司 Machining device and method for precise composite tap

Similar Documents

Publication Publication Date Title
CN212038728U (en) Temporary supporting device for rapid positioning and installation of indoor fire-fighting pipeline
CN207806982U (en) A kind of welding fixture for large-scale workpiece
CN208749145U (en) A kind of architectural engineering support device
CN219925990U (en) Multi-angle detection clamp
CN210254794U (en) Welded tube device with locate function
CN208695469U (en) For placing the jig of sebific duct
CN202388187U (en) Welding position frame
CN110340694A (en) A kind of stainless steel tube processing tubulation auxiliary mould
CN208196035U (en) The fixation device connect for motor damping boxing
CN109397151B (en) Gear ring processing is with adjustable inner ring anchor clamps
CN210060460U (en) Sleeve fixing device
CN208468168U (en) A kind of pipeline connection intersection positioning device
CN208358650U (en) A kind of fixture with air performance
CN211077450U (en) Wood grain stove loading attachment
CN217999002U (en) Steel chimney installation overturn-preventing device
CN210232228U (en) Novel machining workbench
CN216573725U (en) Fire control outside of tubes coating processingequipment
CN210132397U (en) Processing stop device of valve polishing plate
CN215787674U (en) Stainless steel screen processing is with welding equipment that has multi-angle clamping function
CN210010642U (en) Cold-drawing precision welding steel pipe production equipment
CN220161678U (en) Welding positioning fixture
CN211053411U (en) Fixing device for stainless steel wire drawing
CN213034756U (en) High-stability fixing device for plastic pipeline machining
CN216815176U (en) Tube bundle cleaning support
CN215807744U (en) Agricultural economy is with statistics device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201201