CN212027079U - Die carrier for construction - Google Patents

Die carrier for construction Download PDF

Info

Publication number
CN212027079U
CN212027079U CN202020078555.9U CN202020078555U CN212027079U CN 212027079 U CN212027079 U CN 212027079U CN 202020078555 U CN202020078555 U CN 202020078555U CN 212027079 U CN212027079 U CN 212027079U
Authority
CN
China
Prior art keywords
lug
shrinkage pool
support body
frame body
connecting block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020078555.9U
Other languages
Chinese (zh)
Inventor
王军英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020078555.9U priority Critical patent/CN212027079U/en
Application granted granted Critical
Publication of CN212027079U publication Critical patent/CN212027079U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a die carrier for construction, including support body, first lug and first shrinkage pool, the support body sets up to the cuboid, the left side upper end of support body is provided with first lug, first shrinkage pool has been seted up in the upper end left side of support body, the lower extreme left side of support body is provided with the second lug, and installs the third lug in the left side of second lug, the second shrinkage pool has been seted up to the right side upper end of support body, the right side of second shrinkage pool is provided with first connecting block, and the inboard of first connecting block is connected with the connecting pipe, the third shrinkage pool has been seted up to the downside right-hand member of connecting pipe. The utility model discloses a set up the diameter of first lug and second shrinkage pool the same, can pile up the installation with the support body, and then can directly carry out the card when using and save installation time.

Description

Die carrier for construction
Technical Field
The utility model relates to a construction technical field specifically is a die carrier for construction.
Background
The building engineering refers to an engineering entity formed by the construction of various building constructions and their auxiliary facilities and the installation of lines, pipelines and equipment matched with them. The house building is characterized in that a top cover, a beam column, a wall and a foundation are arranged, an inner space can be formed, projects required by production, living, learning and public activities of people are met, and the formwork for building construction is required to be used for auxiliary construction of the building construction in the existing construction pouring process.
The existing building construction can use the templates to mutually support and fix to form a construction formwork frame, a large amount of manpower is consumed for installation, the installation time is long, the stability of fixation is general, the splicing between the formwork blocks is troublesome, the efficiency of reduced building construction is high, and the using effect is influenced.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a die carrier for construction to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a die carrier for construction, includes support body, first lug and first shrinkage pool, the support body sets up to the cuboid, the left side upper end of support body is provided with first lug, first shrinkage pool has been seted up in the upper end left side of support body, the lower extreme left side of support body is provided with the second lug, and the left side of second lug installs the third lug, the second shrinkage pool has been seted up to the right side upper end of support body, the right side of second shrinkage pool is provided with first connecting block, and the inboard of first connecting block is connected with the connecting pipe, the third shrinkage pool has been seted up to the downside right-hand member of connecting pipe, be provided with the fixture block on the first connecting block, be provided with the second connecting block on the other end of connecting pipe, and seted up the draw-.
Preferably, the number of the first convex blocks is 2, the 2 first convex blocks are symmetrically distributed on the left side of the frame body, and the convex blocks are fixedly connected with the frame body.
Preferably, first shrinkage pool sets up to 2, 2 first shrinkage pool symmetric distribution is in the upper end both sides of support body.
Preferably, the quantity of second shrinkage pool is 2, 2 be symmetric distribution between second shrinkage pool and the first lug, the diameter of second shrinkage pool is the same with the diameter of first lug.
Preferably, the diameter of the first connecting block is the same as that of the second connecting block, the number of the first connecting blocks is 4, and the first connecting blocks are symmetrically distributed at four corners of the frame body.
Preferably, the second lug sets up to 2, 2 the second lug symmetry is fixed in the lower extreme of support body, the second lug is the same with the diameter of first shrinkage pool.
Preferably, the quantity of third shrinkage pool and third lug sets up to be individual, individual both ends around the right side of support body, individual third shrinkage pool symmetric distribution is both ends around the left side of support body respectively, the diameter of third shrinkage pool and third lug is the same.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model has simple structure, the frame body can be stacked and installed by setting the diameters of the first lug and the second concave hole to be the same, and the clamping can be directly carried out when in use, thereby saving the installation time; through with block between first shrinkage pool and the second lug, can transversely install a plurality of support bodies, and then can assemble the use fast, save the installation time that needs waited for, the buckle installation is convenient for a plurality of to carry on with the structure simultaneously.
2. The utility model discloses a make and install first connecting block on the four corners of support body, can use the connecting pipe to fix the support body on the connecting pipe, and then be convenient for pour lamp building construction work; diameter through with third shrinkage pool and third lug sets up the same, can vertically install the support body, and then increase the utility model discloses a connection efficiency increases the nimble degree of use of this device simultaneously.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention.
Fig. 2 is a schematic structural diagram of the first connecting block of the present invention.
Fig. 3 is a schematic diagram of a second connecting block structure according to the present invention.
Fig. 4 is a schematic view of a connection structure of the first connection block and the second connection block of the present invention.
Fig. 5 is a perspective view of the frame body of the present invention.
In the figure: 1. a frame body; 2. a first bump; 3. a first recess; 4. a second recess; 5. a first connection block; 6. a connecting pipe; 7. a second bump; 8. a clamping block; 9. a second connecting block; 10. a card slot; 11. a third recess; 12. and a third bump.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "both ends", "one end", "the other end" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element to which the reference is made must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "disposed," "connected," and the like are to be construed broadly, and for example, "connected" may be either fixedly connected or detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-5, the present invention provides an embodiment: a die carrier for building construction comprises a frame body 1, first convex blocks 2 and first concave holes 3, wherein the frame body 1 is arranged to be a cuboid, the upper end of the left side of the frame body 1 is provided with the first convex blocks 2, the first convex blocks 2 are arranged to be 2, the 2 first convex blocks 2 are symmetrically distributed on the left side of the frame body 1, the convex blocks 2 are fixedly connected with the frame body 1, the left side of the upper end of the frame body 1 is provided with the first concave holes 3, the 2 first concave holes 3 are arranged to be 2, the 2 first concave holes 3 are symmetrically distributed on two sides of the upper end of the frame body 1, the left side of the lower end of the frame body 1 is provided with the second convex blocks 7, the 2 second convex blocks 7 are symmetrically fixed at the lower end of the frame body 1, the second convex blocks 7 are the same as the diameter of the first concave holes 3, a plurality of frame bodies 1 can be transversely installed by clamping the first concave holes 3 and the second convex, the mounting time needing waiting is saved, the clamping and the structure are convenient for a plurality of buckle mounting, the third bump 12 is mounted on the left side of the second bump 7, the second concave hole 4 is formed at the upper end of the right side of the frame body 1, the number of the second concave holes 4 is 2, the second concave holes 4 and the first bump 2 are symmetrically distributed, the diameter of the second concave holes 4 is the same as that of the first bump 2, the frame body 1 can be stacked and mounted by setting the diameters of the first bump 2 and the second concave hole 4 to be the same, the clamping can be directly carried out during use, the mounting time is saved, the first connecting block 5 is arranged on the right side of the second concave hole 4, the connecting pipe 6 is connected to the inner side of the first connecting block 5, the diameter of the first connecting block 5 is the same as that of the second connecting block 9, the number of the first connecting blocks 5 is 4, and the 4 first connecting blocks 5 are symmetrically distributed at four corners of the frame body 1, by installing the first connection blocks 5 at the four corners of the frame body 1, the frame body 1 can be fixed on the connection pipes 6 by using the connection pipes 6, further facilitating the construction of the pouring lamp, the right end of the lower side of the connecting pipe 6 is provided with a third concave hole 11, the number of the third concave hole 11 and the third convex block 12 is set to be 2, 2 third concave holes 11 are symmetrically distributed at the front and rear ends of the right side of the frame body 1, 2 third convex blocks 12 are respectively distributed at the front and rear ends of the left side of the frame body 1, the diameters of the third concave holes 11 and the third convex blocks 12 are the same, by setting the diameters of the third concave hole 11 and the third convex block 12 to be the same, the frame body 1 can be longitudinally installed, and then increase the utility model discloses a connection efficiency increases the nimble degree of use of this device simultaneously, is provided with fixture block 8 on the first connecting block 5, is provided with second connecting block 9 on the other end of connecting pipe 6, and has seted up draw-in groove 10 on the second connecting block 9.
The working principle is as follows: when the utility model is used, the utility model needs to be simply understood, a plurality of frame bodies 1 are prepared to splice the frame body 1 for the next construction, a user firstly connects the frame body 1 with a connecting pipe 6 and simultaneously fixes the clamping blocks 8 and the clamping grooves 10, thereby connecting a first connecting block 5 and a second connecting block 9, at the moment, the frame body 1 is fixed on the connecting pipe 6, the first concave holes 3 and the second convex blocks 7 are clamped, a plurality of clamping blocks are spliced between the combination of the frame body 1, the third concave holes 11 and the third convex blocks 12 are clamped, the frame body 1 is assembled, after one layer splicing is completed, the first convex blocks 2 and the second concave holes 4 are clamped and simultaneously assembled on the upper layer, the device can be assembled at random angles, different straight wall surfaces can be poured, after the construction is finished, the device is disassembled, and then the device can be repeatedly used when being used next time.
The above description is only an example of the present invention, and the common general knowledge of the known specific structures and characteristics of the embodiments is not described herein. It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (7)

1. The die carrier for building construction comprises a frame body (1), a first convex block (2) and a first concave hole (3), and is characterized in that the frame body (1) is arranged to be a cuboid, the first convex block (2) is arranged at the upper end of the left side of the frame body (1), the first concave hole (3) is formed in the left side of the upper end of the frame body (1), a second convex block (7) is arranged on the left side of the lower end of the frame body (1), a third convex block (12) is arranged on the left side of the second convex block (7), a second concave hole (4) is formed in the upper end of the right side of the frame body (1), a first connecting block (5) is arranged on the right side of the second concave hole (4), a connecting pipe (6) is connected to the inner side of the first connecting block (5), a third concave hole (11) is formed in the right end of the lower side of the connecting pipe (6, a second connecting block (9) is arranged at the other end of the connecting pipe (6), and a clamping groove (10) is formed in the second connecting block (9).
2. The formwork for construction according to claim 1, wherein: first lug (2) are provided with 2, 2 first lug (2) are the symmetric distribution in the left side of support body (1), set up to fixed connection between first lug (2) and support body (1).
3. The formwork for construction according to claim 1, wherein: first shrinkage pool (3) set up to 2, 2 first shrinkage pool (3) symmetric distribution is in the upper end both sides of support body (1).
4. The formwork for construction according to claim 1, wherein: the quantity of second shrinkage pool (4) is 2, 2 be symmetric distribution between second shrinkage pool (4) and first lug (2), the diameter of second shrinkage pool (4) is the same with the diameter of first lug (2).
5. The formwork for construction according to claim 1, wherein: the diameter of first connecting block (5) is the same with the diameter of second connecting block (9), the quantity of first connecting block (5) sets up to 4, 4 first connecting block (5) symmetric distribution is in the four corners of support body (1).
6. The formwork for construction according to claim 1, wherein: the second bump (7) is set to be 2, 2 the second bump (7) is symmetrically fixed at the lower end of the frame body (1), and the diameter of the second bump (7) is the same as that of the first concave hole (3).
7. The formwork for construction according to claim 1, wherein: the quantity of third shrinkage pool (11) and third lug (12) sets up to 2, 2 third shrinkage pool (11) symmetric distribution is both ends, 2 around the right side of support body (1) third lug (12) distributes both ends around the left side of support body (1) respectively, the diameter of third shrinkage pool (11) and third lug (12) is the same.
CN202020078555.9U 2020-01-14 2020-01-14 Die carrier for construction Expired - Fee Related CN212027079U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020078555.9U CN212027079U (en) 2020-01-14 2020-01-14 Die carrier for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020078555.9U CN212027079U (en) 2020-01-14 2020-01-14 Die carrier for construction

Publications (1)

Publication Number Publication Date
CN212027079U true CN212027079U (en) 2020-11-27

Family

ID=73487207

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020078555.9U Expired - Fee Related CN212027079U (en) 2020-01-14 2020-01-14 Die carrier for construction

Country Status (1)

Country Link
CN (1) CN212027079U (en)

Similar Documents

Publication Publication Date Title
CN212027079U (en) Die carrier for construction
CN215669013U (en) Anchorage anchoring system positioning device
CN211172507U (en) Novel energy-saving building wall
CN220335917U (en) Install elevator foundation ditch reinforcing apparatus additional
CN210597381U (en) Hot dipping is moulded and is assembled corrugated steel utility tunnel
CN217758965U (en) Combined steel formwork structure for advanced water stop of basement exterior wall
CN212836796U (en) Vertical pipe positioning device
CN210263892U (en) Building templates convenient to concatenation
CN217998425U (en) Connecting joint of frame beam and steel reinforced concrete frame column
CN216085293U (en) Antenna support
CN212641210U (en) Temporary support device for bridge construction
CN220247235U (en) Waterproof structure for outer elevation decoration
CN212715903U (en) Structure of encorbelmenting aluminum alloy template strutting arrangement
CN211967890U (en) Template for cement prefabricated tire diaphragm plate
CN219011928U (en) Concrete form for house construction
CN211200913U (en) Prefabricated external wallboard
CN212358836U (en) Fiber wallboard convenient to concatenation
CN216142278U (en) Horn-shaped elliptical cone
CN215166524U (en) Steel structure combined column and beam joint
CN217000889U (en) Wisdom building site is with high formwork anti-collapse mechanism
CN218233971U (en) Anti-seismic environment-friendly brick
CN218861547U (en) Civil engineering wall body bearing structure
CN211817114U (en) Prefabricated member for assembled fixed partition wall
CN211524052U (en) Special-shaped template convenient to use
CN218205640U (en) Adjustable horizontal rod of plate buckle frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201127

Termination date: 20220114

CF01 Termination of patent right due to non-payment of annual fee