CN212026513U - Municipal works drainage open channel construction fixing device - Google Patents
Municipal works drainage open channel construction fixing device Download PDFInfo
- Publication number
- CN212026513U CN212026513U CN202020721138.1U CN202020721138U CN212026513U CN 212026513 U CN212026513 U CN 212026513U CN 202020721138 U CN202020721138 U CN 202020721138U CN 212026513 U CN212026513 U CN 212026513U
- Authority
- CN
- China
- Prior art keywords
- baffle
- open channel
- plate
- upper cover
- cover plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Sewage (AREA)
Abstract
The utility model relates to a municipal construction field specifically discloses a municipal works drainage open channel construction fixing device, including the open channel, the top of open channel is provided with the upper cover plate, the inside of upper cover plate is provided with first baffle, the surface of lagging is provided with outer pinhole, the both sides of upper cover plate are provided with flexible fixed plate, the upper surface of flexible fixed plate is provided with the screw hole, the inside of first baffle is provided with the recess. The threaded holes in the upper surface of the telescopic fixing plate are connected with the ground outside the open channel through threaded rods, so that the whole device can be prevented from displacing due to scouring of water flow, the tip of the bottom of the first baffle and the tip of the bottom of the second baffle can guarantee the partition effect of the baffles on water, the sleeve plate is placed on the step inside the open channel, the water level can temporarily rise when water flow is intercepted at the bottom of the open channel, and the intercepting effect on water is guaranteed by utilization.
Description
Technical Field
The utility model relates to a municipal administration construction field specifically is a municipal works drainage open channel construction fixing device.
Background
The open channel is a channel with free surface water flow, and can be divided into a natural open channel such as a natural river channel and an artificial open channel such as an artificial water delivery channel, a canal and a pipeline which is not filled with water flow according to the formation of the channel, the flowing water needs to be blocked when the drainage open channel is constructed manually, the construction quality is influenced if the blocking is not carried out, the construction difficulty is increased, and the manual excavation and the mechanical filling are generally used for the usual measures for blocking the water.
However, the manual blocking method of the open channel in the current market is generally easy to generate leakage in use, and the manual plugging adding efficiency is low. Accordingly, one skilled in the art provides a municipal drainage open channel construction fixing device to solve the problems set forth in the background art.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a municipal works drainage open channel construction fixing device to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
the utility model provides a municipal works drainage open channel construction fixing device, includes the open channel, the top of open channel is provided with the upper cover plate, the inside of upper cover plate is provided with first baffle, the internally mounted that one side of first baffle is located the upper cover plate has the second baffle, the lower surface of upper cover plate is provided with the lagging, the surface of lagging is provided with outer pinhole, the both sides of upper cover plate are provided with flexible fixed plate, the upper surface of flexible fixed plate is provided with the screw hole, be provided with the spout between flexible fixed plate and the upper cover plate, the inside of first baffle is provided with the recess, the installation lug is installed to the one end of second baffle, the outside of installation lug is provided with the locator card strip, locator card strip is provided with the draw-in groove with the junction of recess.
As a further aspect of the present invention: the second baffle and the second baffle are clamped through an installation lug and a groove, the positioning clamp strip is clamped with the clamping groove, and the outer pin hole is communicated with the sleeve plate.
As a further aspect of the present invention: the threaded hole is connected with the telescopic fixing plate in a penetrating mode, the telescopic fixing plate is connected with the sliding groove in a sliding mode, and the first baffle, the second baffle and the upper cover plate are connected in a penetrating mode.
As a further aspect of the present invention: rings are mounted on the upper surfaces of the second baffle and the first baffle, and inner pin holes are formed in the outer surfaces of the first baffle and the second baffle inside the outer pin holes.
As a further aspect of the present invention: the inner pin hole is communicated with the first baffle plate and the second baffle plate, and the hanging ring is fixedly connected with the first baffle plate and the second baffle plate.
As a further aspect of the present invention: the lower extreme of first baffle, second baffle all is provided with the tip, the anticreep fixture block is installed to the one end of flexible fixed plate.
As a further aspect of the present invention: the pointed end is fixedly connected with the first baffle and the second baffle through welding, and the anti-falling fixture block is fixedly connected with the telescopic fixing plate.
Compared with the prior art, the beneficial effects of the utility model are that: the designed device main body can effectively perform a water-proof function on the inside of the open channel, the telescopic fixing plates are pulled out from two ends of the upper cover plate, the threaded holes on the upper surfaces of the telescopic fixing plates are connected with the ground outside the open channel through the threaded rods, so that the displacement of the whole device caused by water flow scouring can be prevented, the first baffle plate and the second baffle plate are plugged into the inside of the upper cover plate, the sharp head is pressed into the ground at the bottom end of the open channel by pressing the first baffle plate, the outer pin holes, the first baffle plate and the inner pin holes on the outer sides of the second baffle plate are fixed through the pins, the blocking function of the two baffle plates on water can be ensured, the water level inside the open channel can be intercepted, the follow-up operation of constructors is ensured, when the whole device is intercepted, the sleeve plate is placed on steps inside the open channel, so that the water level can temporarily rise when the water flow at the bottom of the open channel is intercepted, thereby ensuring the interception function of water.
Drawings
FIG. 1 is a schematic structural view of a municipal drainage open channel construction fixture;
FIG. 2 is a schematic view of a mounting structure of a baffle plate in a municipal drainage open channel construction fixing device;
FIG. 3 is a schematic structural view of a telescopic fixing plate in the fixing device for municipal drainage open channel construction;
fig. 4 is a sectional view of the whole device in the municipal drainage open channel construction fixing device.
In the figure: 1. open channel canals; 2. an upper cover plate; 3. a first baffle plate; 4. a second baffle; 5. a hoisting ring; 6. sheathing; 7. An outer pin hole; 8. a telescopic fixed plate; 201. a chute; 301. a groove; 302. a card slot; 303. a tip; 401. mounting a bump; 402. positioning the clamping strip; 701. an inner pin hole; 801. a threaded hole; 802. and (4) an anti-falling clamping block.
Detailed Description
Please refer to fig. 1-4, in an embodiment of the present invention, a municipal drainage open channel construction fixing device, including open channel 1, the top of open channel 1 is provided with upper cover plate 2, the inside of upper cover plate 2 is provided with first baffle 3, the internally mounted that one side of first baffle 3 is located upper cover plate 2 has second baffle 4, the lower surface of upper cover plate 2 is provided with lagging 6, the surface of lagging 6 is provided with outer pinhole 7, the both sides of upper cover plate 2 are provided with flexible fixed plate 8, the upper surface of flexible fixed plate 8 is provided with screw hole 801, be provided with spout 201 between flexible fixed plate 8 and the upper cover plate 2, the inside of first baffle 3 is provided with recess 301, installation lug 401 is installed to the one end of second baffle 4, the outside of installation lug 401 is provided with locator card strip 402, locator card strip 402 is provided with draw-in groove 302 with the junction of recess 301.
In fig. 1-4: the second baffle 4 is clamped with the second baffle 4 through a mounting convex block 401 and a groove 301, a positioning clamp strip 402 is clamped with a clamping groove 302, an outer pin hole 7 is communicated with a sleeve plate 6, a threaded hole 801 is communicated with a telescopic fixing plate 8, the telescopic fixing plate 8 is slidably connected with a sliding groove 201, a first baffle 3 and a second baffle 4 are communicated with an upper cover plate 2, the upper surfaces of the second baffle 4 and the first baffle 3 are both provided with a hanging ring 5, the inner part of the outer pin hole 7 is positioned on the first baffle 3, the outer surface of the second baffle 4 is provided with an inner pin hole 701, the inner pin hole 701 is communicated with the first baffle 3 and the second baffle 4, the hanging ring 5 is fixedly connected with the first baffle 3 and the second baffle 4, the lower ends of the first baffle 3 and the second baffle 4 are both provided with a tip 303, one end of the telescopic fixing plate 8 is provided with an anti-off clamping block 802, the tip 303 is fixedly connected with the first baffle 3 and the, the anti-falling clamping block 802 is fixedly connected with the telescopic fixing plate 8.
In fig. 1, 3: through placing upper cover plate 2 in the top of open channel 1, the utilization is taken flexible fixed plate 8 out, through the threaded hole 801 that will pass through threaded rod and the ground connection in the open channel 1 outside at flexible fixed plate 8 upper surface to the convenient location of placing to open channel 1, flexible fixed plate 8's inboard anticreep fixture block 802 can prevent that flexible fixed plate 8 from being taken upper cover plate 2 out.
The utility model discloses a theory of operation is: the upper cover plate 2 is placed at a position needing to be operated above the open channel 1, the telescopic fixing plate 8 is pulled out from two ends of the upper cover plate 2, the threaded hole 801 on the upper surface of the telescopic fixing plate 8 is connected with the ground outside the open channel 1 through the threaded rod, the first baffle plate 3 is firstly plugged into the upper cover plate 2, the sharp head 303 is pressed into the soil at the bottom end of the open channel 1 by pressing the first baffle plate 3, the outer pin hole 7 and the inner pin hole 701 outside the first baffle plate 3 are firstly fixed through the pin, the second baffle plate 4 is plugged into the upper cover plate 2, the mounting lug 401 at one end of the second baffle plate 4 corresponds to the groove 301 inside the first baffle plate 3, the positioning clamping strip 402 at the outer side of the mounting lug 401 is ensured to be clamped with the clamping groove 302 inside the groove 301, and then the second baffle plate 4 is pressed, so that the sharp head 303 at the lower end of the second baffle plate 4 is also pressed into the soil inside the open channel 1, the first baffle 3 and the second baffle 4 are ensured to be at the same horizontal height, then the pins are plugged into the inner pin holes 701 on the outer side surface of the second baffle 4 from the inner pin holes 7, so that the water level in the open channel 1 can be intercepted, thereby ensuring the subsequent operation of constructors, the volume of the whole device is not fixed according to the water flow condition in the open channel 1, when the water flow is large, the first baffle plate 3 and the second baffle plate 4 with large mass can be selected so as to ensure the intercepting effect on the water flow, the hanging ring 5 can be used for placing or taking out the first baffle plate 3 and the second baffle plate 4, when the whole device is intercepted, the sleeve plate 6 is placed on a step inside the open channel 1, so that the water level can rise temporarily when water flow at the bottom of the open channel 1 is intercepted, and the interception effect on water is ensured by the sleeve plate 6.
The above-mentioned, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
Claims (7)
1. The utility model provides a municipal works drainage open channel construction fixing device, includes open channel (1), its characterized in that, the top of open channel (1) is provided with upper cover plate (2), the inside of upper cover plate (2) is provided with first baffle (3), the internally mounted that one side of first baffle (3) is located upper cover plate (2) has second baffle (4), the lower surface of upper cover plate (2) is provided with lagging (6), the surface of lagging (6) is provided with outer pinhole (7), the both sides of upper cover plate (2) are provided with flexible fixed plate (8), the upper surface of flexible fixed plate (8) is provided with screw hole (801), be provided with spout (201) between flexible fixed plate (8) and upper cover plate (2), the inside of first baffle (3) is provided with recess (301), installation lug (401) are installed to the one end of second baffle (4), the outer side of the mounting convex block (401) is provided with a positioning clamping strip (402), and a clamping groove (302) is arranged at the joint of the positioning clamping strip (402) and the groove (301).
2. The municipal engineering drainage open channel construction fixing device according to claim 1, wherein the second baffle (4) and the second baffle (4) are clamped by a mounting lug (401) and a groove (301), the positioning clamping strip (402) is clamped with a clamping groove (302), and the outer pin hole (7) is communicated with the sleeve plate (6).
3. The municipal engineering drainage open channel construction fixing device according to claim 1, wherein the threaded hole (801) is connected with a telescopic fixing plate (8) in a penetrating manner, the telescopic fixing plate (8) is connected with the sliding chute (201) in a sliding manner, and the first baffle plate (3) and the second baffle plate (4) are connected with the upper cover plate (2) in a penetrating manner.
4. The municipal engineering drainage open channel construction fixing device according to claim 1, wherein the second baffle (4) and the first baffle (3) are provided with hanging rings (5) on the upper surfaces thereof, and the outer pin holes (701) are formed in the outer pin holes (7) on the outer surfaces of the first baffle (3) and the second baffle (4).
5. The municipal engineering drainage open channel construction fixing device according to claim 4, wherein the inner pin hole (701) is in through connection with the first baffle plate (3) and the second baffle plate (4), and the hanging ring (5) is fixedly connected with the first baffle plate (3) and the second baffle plate (4).
6. The municipal engineering drainage open channel construction fixing device according to claim 1, wherein the lower ends of the first baffle (3) and the second baffle (4) are provided with pointed ends (303), and one end of the telescopic fixing plate (8) is provided with an anti-dropping clamping block (802).
7. The municipal engineering drainage open channel construction fixing device according to claim 6, wherein the pointed end (303) is fixedly connected with the first baffle (3) and the second baffle (4) by welding, and the anti-dropping clamping block (802) is fixedly connected with the telescopic fixing plate (8).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020721138.1U CN212026513U (en) | 2020-05-06 | 2020-05-06 | Municipal works drainage open channel construction fixing device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020721138.1U CN212026513U (en) | 2020-05-06 | 2020-05-06 | Municipal works drainage open channel construction fixing device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212026513U true CN212026513U (en) | 2020-11-27 |
Family
ID=73497026
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020721138.1U Expired - Fee Related CN212026513U (en) | 2020-05-06 | 2020-05-06 | Municipal works drainage open channel construction fixing device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212026513U (en) |
-
2020
- 2020-05-06 CN CN202020721138.1U patent/CN212026513U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN217931290U (en) | Dam osmotic pressure detection device | |
CN212026513U (en) | Municipal works drainage open channel construction fixing device | |
CN211951793U (en) | Clamping device is fixed to hydraulic engineering construction pipeline | |
CN210693340U (en) | Communication cable bearing structure | |
CN112726962A (en) | Assembled grout sleeve | |
CN214274701U (en) | Building water supply and drainage pipe leak protection structure | |
CN207453012U (en) | A kind of same layer Water-logged draining device of new structure | |
CN211646287U (en) | Bottom water stop structure of flap gate | |
CN212200264U (en) | Water conservancy construction is with breakwater that has integrated configuration | |
CN209482256U (en) | A kind of ecological water channel for installing tiles for water channels attachment device | |
CN213358514U (en) | Reservoir reinforcing and risk removing structure | |
CN216948387U (en) | Anchor rope drill way shutoff auxiliary device that leaks | |
CN205937066U (en) | Non - excavation top is advanced with constant voltage slip casting device | |
CN212338481U (en) | Hydraulic pipeline for hydraulic engineering | |
CN212298007U (en) | Combined water conservancy pipeline | |
CN214805305U (en) | Water replenishing tank for freezing weight-reducing beauty instrument | |
CN215593920U (en) | Dam corridor drainage device | |
CN217923968U (en) | Municipal works water supply and drainage pipe prevention of seepage device | |
CN216201356U (en) | Water supply and drainage pipeline sealing device | |
CN216306946U (en) | Pipeline fixing and supporting device | |
CN213926599U (en) | Connecting structure for municipal engineering construction water supply and drainage pipeline | |
CN214273928U (en) | Drainage pump with leak protection structure | |
CN210013685U (en) | Water prevention and control device for coal mine geological engineering | |
CN216238371U (en) | Reservoir removes dangerous reinforced structure | |
CN214305616U (en) | Water conservancy pipeline fixing device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20201127 Termination date: 20210506 |