CN212024568U - Steel-pipe bundle production line suspended structure - Google Patents

Steel-pipe bundle production line suspended structure Download PDF

Info

Publication number
CN212024568U
CN212024568U CN201922309596.4U CN201922309596U CN212024568U CN 212024568 U CN212024568 U CN 212024568U CN 201922309596 U CN201922309596 U CN 201922309596U CN 212024568 U CN212024568 U CN 212024568U
Authority
CN
China
Prior art keywords
production line
steel
track
bundle production
pipe bundle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922309596.4U
Other languages
Chinese (zh)
Inventor
王艳英
金仕杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Dadong Wuhangxiao Green Construction Technology Co ltd
Original Assignee
Zhejiang Dadong Wuhangxiao Green Construction Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Dadong Wuhangxiao Green Construction Technology Co ltd filed Critical Zhejiang Dadong Wuhangxiao Green Construction Technology Co ltd
Priority to CN201922309596.4U priority Critical patent/CN212024568U/en
Application granted granted Critical
Publication of CN212024568U publication Critical patent/CN212024568U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)

Abstract

The utility model provides a steel-pipe bundle production line suspended structure, including setting up dolly on the track and adjacent connecting piece between the dolly, the dolly with the articulated connecting rod that is connected with between the connecting piece, be provided with on the dolly and hang the roof beam. The stability of this steel-pipe bundle suspended structure in hoist and mount transportation process is high.

Description

Steel-pipe bundle production line suspended structure
Technical Field
The utility model relates to a production line carries technical field, especially relates to a steel-pipe bundle production line suspended structure.
Background
The steel pipe bundle member is a novel steel structure wall body member and mainly has three forms of I type, L type and T type. During the shot blasting and spraying processing of the steel pipe bundle component, a lifting appliance is required to lift and move. The steel tube bundle has the following appearance specification ranges: the length ranges from about 4000 to 12000mm, the height ranges from about 630 to 2100mm, the width ranges from about 630 to 2100mm, and the wall thickness of the steel tube ranges from about 4 to 8 mm. Because the steel pipe bundle component has large overall dimension, the steel pipe bundle can tilt and shake in start and stop or speed change due to the adoption of the conventional lifting appliance, and the posture stability of the steel pipe bundle is influenced.
SUMMERY OF THE UTILITY MODEL
The utility model provides a steel-pipe bundle production line suspended structure, the stability of steel-pipe bundle in hoist and mount transportation process is high.
In order to achieve the purpose, the utility model adopts the following technical scheme:
the utility model provides a steel-pipe bundle production line suspended structure which characterized in that: the trolley comprises trolleys arranged on a track and connecting pieces arranged between the trolleys, wherein the trolleys are adjacent to each other, connecting rods are hinged between the trolleys and the connecting pieces, and suspension beams are arranged on the trolleys.
Preferably, the trolley is provided with a chain hoist, a chain of the chain hoist is provided with a lifting hook, and the suspension beam is arranged on the lifting hook.
Preferably, the suspension beam is of a rod-shaped structure, and a plurality of lifting lugs are arranged at the lower end of the suspension beam.
Preferably, the cross-sectional shape of the suspension beam is rectangular.
Preferably, the rail is an i-shaped steel.
Preferably, the connecting member includes side connecting portions located at both sides of the rail, and a roller is disposed between the side connecting portions and the rail.
To sum up, compare with prior art, the utility model has the advantages of: the double-motor drive is matched with the connecting rod structure, so that the stability of the steel pipe bundle in the moving process is ensured, and the processing effect of a production line is ensured.
Drawings
FIG. 1 is a front view of the structure of the present invention;
fig. 2 is a side view of the structure of the present invention.
The reference numbers in the figures are as follows:
1. the device comprises a track, 2 trolleys, 21 rollers, 3 connecting pieces, 31 side connecting parts, 4 connecting rods, 5 chain blocks, 6 suspension beams and 61 lifting lugs.
Detailed Description
The invention will be further described with reference to the following examples in the drawings.
As shown in fig. 1 and 2, the steel tube bundle production line suspension structure comprises two electric trolleys 2 arranged on a track 1 and a connecting piece 3 between the two adjacent trolleys 2, a connecting rod 4 is hinged between each trolley 2 and each connecting piece 3, and a suspension beam 6 is arranged on each trolley 2. The articulated axes between the connecting rod 4 and the trolley 2 and the connecting piece 3 are arranged vertically, i.e. perpendicular to the horizontal plane, i.e. perpendicular to the plane on which the track 1 lies. The connecting rod 4 is arranged on one side of the connecting piece 3 and can also be symmetrically arranged on two sides of the connecting piece 3. The track 1 is a closed loop track and the connecting rod 4 is located inside the circular track. The moving efficiency of the steel pipe bundle is guaranteed by the two electric trolleys, the stability of the suspension structure in the moving process is improved by the connecting rod 4, particularly the stability of the suspension structure in the moving process of the arc-shaped section of the track, and loads generated by the electric trolleys are transmitted simultaneously so that the suspension structure can move smoothly under different conditions.
The trolley 2 is provided with a chain hoist 5, the end part of a chain of the chain hoist 5 is provided with a lifting hook, and the suspension beam 6 is arranged on the lifting hook. The chain hoist 5 can be hinged at the lower end of the trolley 2.
The suspension beam 6 is a rod-shaped structure, and the cross section of the suspension beam is rectangular. Two lifting lugs 61 are arranged at the upper end and the lower end of the suspension beam 6, and the two lifting lugs 61 are symmetrically arranged at the side parts of the upper end and the lower end of the suspension beam 6. The lifting lug 61 is provided with a chain, and the lower end of the chain is fixed with the steel tube bundle. The chain that stretches out on the chain block 5 sets up vertically, and the chain slope setting on the lug 61 of suspension beam 6 lower extreme to hang in steel-pipe bundle tip position, adaptable different length steel-pipe bundles.
The connecting piece 3 comprises side connecting parts 31 positioned at two sides of the track 1, the side connecting parts 31 are connected through bolts, and rollers 21 are arranged between the side connecting parts 31 and the track 1. A roller 21 is arranged between the trolley 2 and the track 1. The track 1 is I-shaped steel, and the trolley 2 and the roller of the connecting piece 3 move along the lower side panel of the I-shaped steel.
The above description is only for explaining the present invention, so that the person skilled in the art can completely implement the present invention, but not for limiting the present invention, and after reading the present specification, the person skilled in the art can make modifications to the present embodiment as required without inventive contribution, which are all modifications without inventive contribution, but are protected by patent laws within the scope of the claims of the present invention.

Claims (6)

1. The utility model provides a steel-pipe bundle production line suspended structure which characterized in that: the trolley comprises trolleys (2) arranged on a track (1) and connecting pieces (3) adjacent to the trolleys (2), wherein connecting rods (4) are hinged between the trolleys (2) and the connecting pieces (3), and suspension beams (6) are arranged on the trolleys (2).
2. The steel tube bundle production line suspension structure according to claim 1, wherein: the trolley is characterized in that a chain hoist (5) is arranged on the trolley (2), a lifting hook is arranged on a chain of the chain hoist (5), and the suspension beam (6) is arranged on the lifting hook.
3. The steel tube bundle production line suspension structure according to claim 1, wherein: the suspension beam (6) is of a rod-shaped structure, and a plurality of lifting lugs (61) are arranged at the lower end of the suspension beam (6).
4. The steel tube bundle production line suspension structure according to claim 1, wherein: the cross section of the suspension beam (6) is rectangular.
5. The steel tube bundle production line suspension structure according to claim 1, wherein: the track (1) is made of I-shaped steel.
6. The steel tube bundle production line suspension structure according to claim 1, wherein: the connecting piece (3) comprises side connecting parts (31) which are positioned on two sides of the track (1), and rollers are arranged between the side connecting parts (31) and the track (1).
CN201922309596.4U 2019-12-20 2019-12-20 Steel-pipe bundle production line suspended structure Active CN212024568U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922309596.4U CN212024568U (en) 2019-12-20 2019-12-20 Steel-pipe bundle production line suspended structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922309596.4U CN212024568U (en) 2019-12-20 2019-12-20 Steel-pipe bundle production line suspended structure

Publications (1)

Publication Number Publication Date
CN212024568U true CN212024568U (en) 2020-11-27

Family

ID=73481659

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922309596.4U Active CN212024568U (en) 2019-12-20 2019-12-20 Steel-pipe bundle production line suspended structure

Country Status (1)

Country Link
CN (1) CN212024568U (en)

Similar Documents

Publication Publication Date Title
CN201220891Y (en) Bridge crane with guide elevating function
CN203959642U (en) Steel plate hoisting implement
CN202785364U (en) Movable dual-door-type mast hoisting device
CN212024568U (en) Steel-pipe bundle production line suspended structure
CN203187299U (en) C-shaped steel lifting appliance
CN205528914U (en) Oscillating guenching unit
CN215558413U (en) Lifting sling for rectangular culvert sections
CN212671145U (en) Small-size slide rail formula portable hanging flower basket
CN217972982U (en) Hot bending furnace for glass processing
CN203997408U (en) Gantry suspension hook storage rack of lifting steel scrap
CN210549043U (en) Rocker arm hanging device of welding machine
CN205346670U (en) Driving of cathode bar lateral shifting single armed line
CN108342558B (en) Moving trolley for changing roller of annealing furnace roller
CN208200074U (en) A kind of lift car
CN201981485U (en) Leg replacing mechanism for pier side bracket of bridge pier
CN213970702U (en) Shot blasting frame of casting shot blasting machine
CN203807038U (en) Lifting travelling crane
CN214495391U (en) Special hoisting device for I-shaped rib plate of steel box girder plate unit
CN204778433U (en) Trolley's cable suspension structure
CN211664076U (en) Guide rail lifting device
CN215974619U (en) GIS outgoing line pipe bus guiding device
CN204489009U (en) A kind of novel PC CP steel cylinder transport trolley
CN218911149U (en) Mobile hanging basket for repairing outer side of bridge guardrail
CN214611137U (en) H-shaped steel hoisting fixture and hoisting system
CN220761453U (en) Suspension device of internal welding arm support without participating in welding

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant