CN212017312U - Waste gas treatment spray tower for galvanizing process - Google Patents
Waste gas treatment spray tower for galvanizing process Download PDFInfo
- Publication number
- CN212017312U CN212017312U CN202020467676.2U CN202020467676U CN212017312U CN 212017312 U CN212017312 U CN 212017312U CN 202020467676 U CN202020467676 U CN 202020467676U CN 212017312 U CN212017312 U CN 212017312U
- Authority
- CN
- China
- Prior art keywords
- tower
- tower body
- wall
- fixedly connected
- inner bag
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Nozzles (AREA)
Abstract
The utility model relates to a waste gas treatment field just discloses a waste gas treatment spray column is used in zinc-plating processing, including tower wall inner bag, tower body, base, water pipe, shower nozzle board and flow valve, the upside of base and the bottom fixed connection of tower body, and the downside and the ground contact of base, seted up on the tower body and held the liquid pond, and the left side fixedly connected with of tower body annotates the liquid hole, the top of tower body and the one end fixed connection of U type pipe, and the tail end of U type pipe and one side intercommunication of fan case, the tail end and the ball fixed connection of first spring, and the both ends of the both sides of pressing the ball and exhaust passage are contradicted. According to the waste gas treatment spray tower for galvanizing processing, gas generated in the tower body enters the air tower through the U-shaped pipe, the second spring is driven by the pressure ball to move upwards after receiving the impact of the gas, the gas is smoothly discharged outwards from the exhaust passage, the pressure ball is driven by the spring to push downwards, and the exhaust passage is blocked, so that the air tower is in a closed environment, and the function of preventing air backflow of the tower body is realized.
Description
Technical Field
The utility model relates to a waste gas treatment field specifically is a waste gas treatment spray column is used in zinc-plating processing.
Background
As is known, the main source of air pollution is industrial waste gas emission, the treatment of industrial waste gas is the most important of the treatment of air pollution, a spray tower utilizes the contact between gas and liquid to transmit pollutants in the gas into the liquid, and then clean gas is separated from the polluted liquid to achieve the purpose of purifying waste gas, along with the rapid development of the society, various industrial enterprises such as bamboo shoot boards after rain are built, the demand of people on spray tower equipment for treating waste gas is increased greatly, but the waste gas treatment spray tower used by people at present has the problems of easy backflow of tower body air, low working efficiency and low safety performance.
Therefore, the waste gas treatment spray tower for the galvanizing processing is designed.
SUMMERY OF THE UTILITY MODEL
The utility model provides a not enough to prior art, the utility model provides a waste gas treatment spray column is used in zinc-plating processing has solved the problem that the waste gas treatment spray column has tower body air easy backward flow, work efficiency is low and the security performance is low.
In order to achieve the above purpose, the utility model adopts the technical scheme that:
the utility model provides a waste gas treatment spray tower is used in zinc-plating processing, includes tower wall inner bag, tower body, base, water pipe, shower nozzle board and flow valve, the upside of base and the bottom fixed connection of tower body, and the downside and the ground contact of base, the reservoir has been seted up on the tower body, and the left side fixedly connected with of tower body annotates the liquid hole, the right side of tower body has linked firmly out the liquid hole, the top of tower body and the one end fixed connection of U type pipe, and the tail end of U type pipe and one side intercommunication of fan case, the opposite side and the motor intercommunication of fan case, and the tail end fixed connection of the top of fan case and wind tower, the exhaust passage has been seted up on the top of wind tower, and the bottom of exhaust passage and the top fixed connection of first spring, the tail end and the pressure ball fixed connection of first spring, and the both ends conflict of the both sides and.
Furthermore, the inner wall of the tower body is fixedly connected with the outer wall of the tower wall liner, a cavity is formed between the inner wall of the tower body and the outer wall of the tower wall liner, a nozzle plate is fixedly connected to the inner wall of the tower body, water pipes are fixedly connected to the outer wall of the tower wall liner, the water pipes on the tower wall liner are sleeved on two sides of the nozzle plate on the tower body, and the water pipes and the nozzle plate are both positioned in the cavity formed between the inner wall of the tower body and the outer wall of the tower wall liner.
Further, the one end and the rotatory cap screwed connection of shower nozzle board, and fixedly connected with slider on the rotatory cap, the inner wall of tower body and the lateral wall fixed connection of base station, and the top of base station and the bottom fixed connection of end cap, the spout has been seted up on the top of end cap, and the spout on the end cap and the slider joint of each other on the hood.
Further, the bottom of water pipe is contradicted with the top of fixing base, and the tail end of fixing base and the top fixed connection of second spring, the tail end of second spring and the top fixed connection of base station, the both sides fixedly connected with riser of base station, and riser symmetry fixed mounting is in the both sides of shower nozzle board.
Furthermore, a through hole is formed in the left side of the tower body, a through hole is formed in the left side of the tower wall liner, the through hole in the tower wall liner corresponds to the through hole in the tower body in position, and a flow valve is fixedly connected to the through hole in the tower body and communicated with the tower body, the tower wall liner and a water pipe.
The utility model has the advantages that:
1. the utility model discloses a, because of the tail end of second spring and the top fixed connection of base station, the both sides fixedly connected with riser of base station, and riser symmetry fixed mounting is in the both sides of shower nozzle board, when the water pipe receives the impact of tower body, because of there is first spring below the water pipe, can protect the safety of water pipe effectively, make the tower body can the steady operation, when waste gas sprays the operation, shower nozzle board sprays the atomizing liquid medicine downwards in the upper end, make the liquid medicine fully combine with waste gas, reach emission standard after by the tower discharge of wind, the function of improving work efficiency has been realized like this.
2. The utility model discloses a, produce gaseous piling up to the U type pipe on tower wall inner bag top in the tower body after spraying the operation, then get into the wind tower by U type pipe, the impact that the pressure ball received gas drives the second spring rebound to the exhaust passage is opened, and gaseous smooth outside the discharging from the exhaust passage sprays the completion back, and the spring drives the pressure ball and impels downwards, causes the exhaust passage to block up, thereby is located an inclosed environment in making the wind tower, has realized the function that the tower body prevents the air reflux.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of a connection structure of a bottom cap and a top cap;
FIG. 3 is an enlarged schematic view of the structure at A in FIG. 1;
fig. 4 is an enlarged schematic view of the structure at B in fig. 1.
In the figure: 1. a tower wall inner container; 2. a liquid injection hole; 3. a liquid storage tank; 4. a tower body; 5. a base; 6. a liquid outlet hole; 7. a bottom cap; 8. a top cap; 9. a water pipe; 10. a showerhead plate; 11. a slider; 12. a chute; 13. a vertical plate; 14. a base station; 15. a second spring; 16. a flow valve; 17. pressing the ball; 18. a first spring; 19. an exhaust passage; 20. a fixed seat; 21. a wind tower; 22. a motor; 23. a fan box; 24. a U-shaped pipe.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are some, but not all, embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts belong to the protection scope of the present invention.
Referring to FIGS. 1-4: a waste gas treatment spray tower for galvanizing processing comprises a tower wall inner container 1, a tower body 4, a base 5, a water pipe 9, a spray head plate 10 and a flow valve 16, wherein the upper side of the base 5 is fixedly connected with the bottom of the tower body 4, the lower side of the base 5 is contacted with the ground, a liquid storage tank 3 is arranged on the tower body 4, the left side of the tower body 4 is fixedly connected with a liquid injection hole 2, the right side of the tower body 4 is fixedly connected with a liquid outlet hole 6, the top end of the tower body 4 is fixedly connected with one end of a U-shaped pipe 24, the tail end of the U-shaped pipe 24 is communicated with one side of a fan box 23, the other side of the fan box 23 is communicated with a motor 22, the top end of the fan box 23 is fixedly connected with the tail end of a wind tower 21, the top end of the wind tower 21 is provided with an exhaust passage 19, the bottom of the exhaust passage 19 is fixedly connected with the top end of a, after the spraying operation, gas generated in the tower body 4 is accumulated towards the U-shaped pipe 24 at the top end of the tower wall liner 1, then enters the air tower 21 through the U-shaped pipe 24, the pressure ball 17 is impacted by the gas to drive the second spring 15 to move upwards, so that the exhaust passage 19 is opened, the gas is smoothly discharged outwards from the exhaust passage 19, after the spraying operation is completed, the spring drives the pressure ball 17 to push downwards to cause the exhaust passage 19 to be blocked, the air tower 21 is in a closed environment, and the function of preventing the air from flowing back of the tower body 4 is realized.
Wherein, the inner wall of tower body 4 and the outer wall fixed connection of tower wall inner bag 1, and the cavity has been seted up in the middle of the inner wall of tower body 4 and the outer wall of tower wall inner bag 1, fixedly connected with nozzle plate 10 on the inner wall of tower body 4, fixedly connected with water pipe 9 on the outer wall of tower wall inner bag 1, and the water pipe 9 cover on the tower wall inner bag 1 is in the both sides of nozzle plate 10 on the tower body 4, water pipe 9 and nozzle plate 10 all are in the cavity that the inner wall of tower body 4 and the outer wall of tower wall inner bag 1 seted up, when waste gas sprays the operation, nozzle plate 10 sprays the atomizing liquid medicine downwards in the upper end, make liquid medicine and waste gas fully combine, reach and discharge standard after being discharged by wind tower 21, the function of improving work efficiency has been.
Wherein, the one end and the 8 screwed connection of hood 10 of shower nozzle board, and fixedly connected with slider 11 on the hood 8, the inner wall of tower body 4 and the lateral wall fixed connection of base station 14, and the top of base station 14 and the bottom fixed connection of hood 7, spout 12 has been seted up on the top of hood 7, and spout 12 on the hood 7 and the slider 11 joint of each other on the hood 8, because of hood 7 and hood 8 inseparable joint of each other, so shower nozzle board 10 on the hood 8 closely attaches on the inner wall of water pipe 9, the stability of shower nozzle board 10 has been ensured.
Wherein, the bottom of water pipe 9 is contradicted with the top of fixing base 20, and the tail end of fixing base 20 and the top fixed connection of second spring 15, the tail end of second spring 15 and the top fixed connection of base station 14, the both sides fixedly connected with riser 13 of base station 14, and riser 13 symmetry fixed mounting is in the both sides of shower nozzle board 10, when water pipe 9 receives the impact of tower body 4, because of there is first spring 18 below the water pipe 9, can protect the safety of water pipe 9 effectively, make tower body 4 can the steady operation.
Wherein, the through-hole has been seted up in the left side of tower body 4, the through-hole has been seted up in the left side of tower wall inner bag 1, and the through-hole position on through-hole on the tower wall inner bag 1 and the tower body 4 corresponds mutually, through-hole fixedly connected with flow valve 16 on the tower body 4, and flow valve 16 intercommunication tower body 4, tower wall inner bag 1 and water pipe 9, when waste gas surge in tower body 4, if reduction atmospheric pressure that can not be timely has danger, flow valve 16 can be opened this moment, atmospheric pressure in the tower body 4 reduces fast, the security performance of spray column has been improved greatly.
To sum up, when the utility model is used, gas generated in the tower body 4 after spraying operation is accumulated to the U-shaped pipe 24 at the top end of the tower wall liner 1, then enters the wind tower 21 through the U-shaped pipe 24, the pressure ball 17 receives the impact of the gas to drive the second spring 15 to move upwards, so that the exhaust passage 19 is opened, the gas is smoothly discharged outwards from the exhaust passage 19, after spraying is completed, the spring drives the pressure ball 17 to push downwards to cause the blockage of the exhaust passage 19, so that the wind tower 21 is in a closed environment, the function of preventing the air backflow of the tower body 4 is realized, because the tail end of the second spring 15 is fixedly connected with the top end of the base 14, the two sides of the base 14 are fixedly connected with the vertical plates 13, and the vertical plates 13 are symmetrically and fixedly arranged at the two sides of the nozzle plate 10, when the water pipe 9 is impacted by the tower body 4, because the first spring 18 is arranged below the water pipe 9, make tower body 4 can stable work, when waste gas sprays the operation, shower nozzle board 10 sprays the atomizing liquid medicine downwards at the upper end for the liquid medicine fully combines with waste gas, reaches emission standard after by the discharge of wind tower 21, has realized improving work efficiency's function like this.
The above embodiments are only used to illustrate the technical solution of the present invention, and not to limit it; although the present invention has been described in detail with reference to the foregoing embodiments, it should be understood by those skilled in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; such modifications and substitutions do not depart from the spirit and scope of the present invention in its corresponding aspects.
Claims (5)
1. The utility model provides a waste gas treatment spray column is used in zinc-plating processing, includes tower wall inner bag (1), tower body (4), base (5), water pipe (9), shower nozzle board (10) and flow valve (16), its characterized in that: the upper side of the base (5) is fixedly connected with the bottom of the tower body (4), the lower side of the base (5) is contacted with the ground, the tower body (4) is provided with a liquid storage tank (3), the left side of the tower body (4) is fixedly connected with a liquid injection hole (2), the right side of the tower body (4) is fixedly connected with a liquid outlet hole (6), the top end of the tower body (4) is fixedly connected with one end of a U-shaped pipe (24), the tail end of the U-shaped pipe (24) is communicated with one side of a fan box (23), the other side of the fan box (23) is communicated with a motor (22), the top end of the fan box (23) is fixedly connected with the tail end of a wind tower (21), the top end of the wind tower (21) is provided with an exhaust passage (19), the bottom of the exhaust passage (19) is fixedly connected with the top end of a first spring (18), and the tail end of the first spring (18), and the two sides of the pressure ball (17) are abutted against the two ends of the exhaust passage (19).
2. The exhaust gas treatment spray tower for the galvanizing process according to claim 1, characterized in that: the inner wall of tower body (4) and the outer wall fixed connection of tower wall inner bag (1), and the cavity has been seted up in the middle of the inner wall of tower body (4) and the outer wall of tower wall inner bag (1), fixedly connected with nozzle plate (10) on the inner wall of tower body (4), fixedly connected with water pipe (9) on the outer wall of tower wall inner bag (1), and water pipe (9) cover on tower wall inner bag (1) are in the both sides of nozzle plate (10) on tower body (4), water pipe (9) and nozzle plate (10) all are in the cavity that the inner wall of tower body (4) and the outer wall of tower wall inner bag (1) were seted up.
3. The exhaust gas treatment spray tower for the galvanizing process according to claim 1, characterized in that: one end and the rotatory cap screwed connection of shower nozzle board (10), and fixedly connected with slider (11) on the rotatory cap, the inner wall of tower body (4) and the lateral wall fixed connection of base station (14), and the top of base station (14) and the bottom fixed connection of end cap (7), spout (12) have been seted up on the top of end cap (7), and spout (12) on end cap (7) and slider (11) on hood (8) joint each other.
4. The exhaust gas treatment spray tower for the galvanizing process according to claim 1, characterized in that: the bottom of water pipe (9) is contradicted with the top of fixing base (20), and the tail end of fixing base (20) and the top fixed connection of second spring (15), the tail end of second spring (15) and the top fixed connection of base station (14), the both sides fixedly connected with riser (13) of base station (14), and riser (13) symmetry fixed mounting is in the both sides of shower nozzle board (10).
5. The exhaust gas treatment spray tower for the galvanizing process according to claim 1, characterized in that: the through-hole has been seted up in the left side of tower body (4), the through-hole has been seted up in the left side of tower wall inner bag (1), and the through-hole position on through-hole on tower wall inner bag (1) and the tower body (4) corresponds mutually, through-hole department fixedly connected with flow valve (16) on tower body (4), and flow valve (16) intercommunication tower body (4), tower wall inner bag (1) and water pipe (9).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020467676.2U CN212017312U (en) | 2020-04-02 | 2020-04-02 | Waste gas treatment spray tower for galvanizing process |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020467676.2U CN212017312U (en) | 2020-04-02 | 2020-04-02 | Waste gas treatment spray tower for galvanizing process |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212017312U true CN212017312U (en) | 2020-11-27 |
Family
ID=73487664
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020467676.2U Active CN212017312U (en) | 2020-04-02 | 2020-04-02 | Waste gas treatment spray tower for galvanizing process |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212017312U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111249865A (en) * | 2020-04-02 | 2020-06-09 | 无锡聚永丰环保科技有限公司 | Waste gas treatment spray tower for galvanizing process |
-
2020
- 2020-04-02 CN CN202020467676.2U patent/CN212017312U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111249865A (en) * | 2020-04-02 | 2020-06-09 | 无锡聚永丰环保科技有限公司 | Waste gas treatment spray tower for galvanizing process |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN212017312U (en) | Waste gas treatment spray tower for galvanizing process | |
CN200999332Y (en) | City road purifying spraying protective fence | |
CN202237669U (en) | Dust-removing and waste gas-purifying spray tower | |
CN110841462A (en) | Novel environment-friendly air purification treatment device | |
CN211837208U (en) | A environmental protection processing apparatus for exhaust gas desulfurization denitration | |
CN210699529U (en) | Friedel-crafts reaction hydrogen chloride tail gas absorbing device | |
CN111249865A (en) | Waste gas treatment spray tower for galvanizing process | |
CN211173368U (en) | Construction safety protective guard | |
CN215027190U (en) | Multistage waste gas washing tower | |
CN213942623U (en) | Organic peculiar smell treatment device with Venturi type spray tower | |
CN111715005B (en) | Device for purifying air with dust | |
CN214233430U (en) | Energy-saving efficient type purifying column | |
CN211411594U (en) | Novel air purification of environmental protection handles device | |
CN210434227U (en) | Haze filtering device | |
CN201244435Y (en) | Horizontal type flue gas denitrating apparatus | |
CN209173646U (en) | A kind of high efficiency spray gas wash tower | |
CN202289770U (en) | Water mist sprinkling adsorption tower | |
CN212881819U (en) | Spray set for industrial waste gas treatment | |
CN206823479U (en) | A kind of new waste gas handles spray equipment | |
CN213630919U (en) | Iron ore production line exhaust-heat boiler | |
CN208049703U (en) | A kind of desulfuring and denitrifying apparatus | |
CN205308115U (en) | Vertical scrubbing tower industrial waste gas administers purifier | |
CN204672069U (en) | For having the water washing dedust device except haze function in purification of air unit | |
CN204841365U (en) | Purifying column | |
CN211739231U (en) | Gas-liquid impact flow fume purifier |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |