CN212002383U CN201922098452.9U CN201922098452U CN212002383U CN 212002383 U CN212002383 U CN 212002383U CN 201922098452 U CN201922098452 U CN 201922098452U CN 212002383 U CN212002383 U CN 212002383U
Authority
CN
China
Prior art keywords
way nut
chute
concrete wall
fixing block
block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922098452.9U
Other languages
Chinese (zh)
Inventor
马江龙
常群峰
刘骅锐
赵文志
侯乐
龚林伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN201922098452.9U priority Critical patent/CN212002383U/en
Application granted granted Critical
Publication of CN212002383U publication Critical patent/CN212002383U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a concrete building technical field specifically is a whole bearing diagonal device of assembled concrete wall body, including first fixed block, the first connecting screw of connecting bolt fixedly connected with is passed through on the right side of first fixed block, and the other end of first connecting screw rotates the one end of connecting first one-way nut, and the other end screw thread of first one-way nut rotates and connects first accommodate the lead screw, and beneficial effect is: the length of the pull rod can be adjusted in one way by arranging the matching of the one-way nut and the lead screw, so that the length of the pull rod is in line with the pre-embedded position, and meanwhile, after the assembled concrete outer wall enters the field, the diagonal pull rod is installed firstly, so that the pull rod can be pulled to correct the position of the wall body in the hoisting process of workers; through setting up L type mounting in the wall body lower part, and then height-adjusting is in order to adapt to the uneven quick adjustment of bottom floor concrete about available gasket for the construction progress utilizes the cooperation of lead screw and spout to realize the regulation of the twice different precision of thickness.

Description

一种装配式混凝土墙体整体斜支撑装置A prefabricated concrete wall integral inclined support device

技术领域technical field

本实用新型涉及混凝土建筑技术领域,具体为一种装配式混凝土墙体整体斜支撑装置。The utility model relates to the technical field of concrete construction, in particular to a prefabricated concrete wall integral inclined support device.

背景技术Background technique

随着建筑装配式混凝土结构被大量采用,建筑业整体在由传统的作业方式向建筑工业化方式升级和转型。各种预制装配式混凝土墙板得到广泛应用,预制混凝土墙板在安放后,需要通过拉梁及支撑件来保证整面墙体的混凝土墙板都能处于同一平面内,不发生倾斜、倾覆。With the mass adoption of prefabricated concrete structures in buildings, the construction industry as a whole is upgrading and transforming from traditional operation methods to construction industrialization methods. Various prefabricated concrete wall panels are widely used. After the prefabricated concrete wall panels are placed, beams and supports are required to ensure that the concrete wall panels of the entire wall can be in the same plane without tilting or overturning.

此类施工方式存在以下问题:This type of construction has the following problems:

1.不同的施工项目中,墙体的长度是千差万别的,因此,为适应不同长度的墙体,需要设计多种不同长度的拉梁,如此导致了拉梁的种类和数量大为增加,且使用率不高。1. In different construction projects, the length of the wall is very different. Therefore, in order to adapt to the wall of different lengths, it is necessary to design a variety of tie beams of different lengths, which leads to a great increase in the types and number of tie beams, and The usage rate is not high.

2.工人在墙体吊装过程中整面墙无可拖拉部位。2. There is no dragging part on the whole wall during the hoisting process of the wall.

3.单根斜支撑及单根横杆支撑墙体底部不平时,无法上下调节。3. The bottom of the wall supported by a single oblique support and a single cross bar is uneven and cannot be adjusted up and down.

实用新型内容Utility model content

本实用新型的目的在于提供一种装配式混凝土墙体整体斜支撑装置,以解决上述背景技术中提出的问题。The purpose of the present utility model is to provide a prefabricated concrete wall integral inclined support device to solve the problems raised in the above background technology.

为实现上述目的,本实用新型提供如下技术方案:To achieve the above object, the utility model provides the following technical solutions:

一种装配式混凝土墙体整体斜支撑装置,包括第一固定块,所述第一固定块的右侧通过连接螺栓固定连接有第一连接丝杆,所述第一连接丝杆的另一端转动连接第一单向螺母的一端,所述第一单向螺母的另一端螺纹转动连接第一调节丝杆,所述第一调节丝杆的另一端固定焊接在横杆的端部,所述横杆固定插接在底座的左端面,所述底座的另一端安装在直角固定块上,底座的上端面左侧设置有滑槽,所述滑槽的前后两侧设置有相互对称的一对固定槽,滑槽的上端安装有滑动安装块,所述滑动安装块的上端通过安装螺栓转动连接第二连接丝杆的一端,所述第二连接丝杆的另一端转动连接在第二单向螺母上,所述第二单向螺母的另一端转动连接第二调节丝杆,所述第二调节丝杆的另一端固定焊接在斜杆的下端面,所述斜杆的上端固定安装在第二固定块上,所述第二固定块与直角固定块的右端面齐平。A prefabricated concrete wall integral oblique support device includes a first fixing block, a first connecting screw rod is fixedly connected to the right side of the first fixing block through connecting bolts, and the other end of the first connecting screw rod rotates One end of the first one-way nut is connected, the other end of the first one-way nut is threadedly connected to the first adjusting screw rod, and the other end of the first adjusting screw rod is fixedly welded to the end of the cross rod, and the horizontal The rod is fixedly inserted on the left end face of the base, the other end of the base is mounted on the right-angle fixing block, the upper end face of the base is provided with a chute on the left side, and the front and rear sides of the chute are provided with a pair of mutually symmetrical fixed A sliding mounting block is installed on the upper end of the chute, the upper end of the sliding mounting block is rotatably connected to one end of the second connecting screw rod through the mounting bolt, and the other end of the second connecting screw rod is rotatably connected to the second one-way nut The other end of the second one-way nut is rotatably connected to the second adjusting screw, the other end of the second adjusting screw is fixedly welded to the lower end surface of the inclined rod, and the upper end of the inclined rod is fixedly installed on the second adjusting screw. On the fixing block, the second fixing block is flush with the right end surface of the right-angle fixing block.

优选的,所述直角固定块的右端面固定安装在混凝土墙壁的底部,直角固定块的前端通过固定螺栓固定连接底座的右端。Preferably, the right end surface of the right-angle fixing block is fixedly installed at the bottom of the concrete wall, and the front end of the right-angle fixing block is fixedly connected to the right end of the base through fixing bolts.

优选的,所述滑槽的左端延伸至底座的左端面,滑槽的右端延伸至底座的上端面中间位置,滑槽位于横杆的正上方。Preferably, the left end of the chute extends to the left end face of the base, the right end of the chute extends to the middle of the upper end face of the base, and the chute is located just above the crossbar.

优选的,所述滑动安装块的下端面设置有与滑槽配合插接的滑块,滑动安装块通过滑块滑动插接在滑槽内,滑动安装块的前后两侧垂直焊接有侧板,所述侧板覆盖在固定槽上,侧板与固定槽之间通过锁紧螺栓固定连接。Preferably, the lower end surface of the sliding installation block is provided with a slider that is matched and inserted with the chute, the sliding installation block is slidably inserted into the chute through the slider, and the front and rear sides of the sliding installation block are vertically welded with side plates, The side plate covers the fixing groove, and the side plate and the fixing groove are fixedly connected by locking bolts.

优选的,所述第一单向螺母和第二单向螺母的左右两端均开设有螺纹孔,第一单向螺母和第二单向螺母的中间段长度大于第二连接丝杆的两倍。Preferably, the left and right ends of the first one-way nut and the second one-way nut are provided with threaded holes, and the length of the middle section of the first one-way nut and the second one-way nut is greater than twice the length of the second connecting screw .

与现有技术相比,本实用新型的有益效果是:Compared with the prior art, the beneficial effects of the present utility model are:

1.本实用新型通过设置单向螺母和丝杆的配合,可单向调节拉杆长度,使拉杆长度符合预埋的位置,同时在装配式混凝土外墙进场后,先进行斜拉杆的安装可在工人吊装过程中拖拽拉杆进行墙体位置校正;1. The utility model can adjust the length of the tie rod in one direction by arranging the cooperation of the one-way nut and the screw rod, so that the length of the tie rod conforms to the pre-embedded position. During the hoisting process of workers, drag the rod to correct the wall position;

2.本实用新型通过在墙体下部设置L型固定件,进而可用垫片上下调节高度以适应底部楼板混凝土不平快速调节,加快施工进度;整体式装配式外墙斜支撑可有效控制斜支撑的固定尺寸不需再工厂加工不同尺寸以适应不同长度需求,利用丝杆和滑槽的配合实现粗细两次不同精度的调节。2. The utility model can speed up the construction progress by arranging L-shaped fixing parts at the lower part of the wall, and then the height can be adjusted up and down with spacers to adapt to the rapid adjustment of the unevenness of the bottom floor concrete; The fixed size does not need to be processed in different sizes in the factory to meet the needs of different lengths, and the combination of the screw rod and the chute can adjust the thickness twice with different precision.

附图说明Description of drawings

图1为本实用新型的立体结构示意图;Fig. 1 is the three-dimensional structure schematic diagram of the present utility model;

图2为本实用新型的斜杆立体安装结构示意图;2 is a schematic diagram of a three-dimensional installation structure of an oblique rod of the present invention;

图3为本实用新型的底座立体安装结构示意图;3 is a schematic diagram of the three-dimensional installation structure of the base of the present invention;

图4为图2中A处结构放大图。FIG. 4 is an enlarged view of the structure at A in FIG. 2 .

图中:1第一固定块、2第一单向螺母、3底座、4直角固定块、5滑动安装块、6第二单向螺母、7斜杆、8第二固定块、9第一连接丝杆、10第一调节丝杆、11第二调节丝杆、12第二连接丝杆、13横杆、14滑槽、15固定槽、16固定螺栓、17连接螺栓、18安装螺栓、19锁紧螺栓、20滑块、21侧板。In the figure: 1. the first fixing block, 2. the first one-way nut, 3. the base, 4. the right-angle fixing block, 5. the sliding mounting block, 6. the second one-way nut, 7. the oblique rod, 8. the second fixing block, 9. the first connection Screw, 10 first adjusting screw, 11 second adjusting screw, 12 second connecting screw, 13 cross bar, 14 chute, 15 fixing slot, 16 fixing bolt, 17 connecting bolt, 18 mounting bolt, 19 lock Tightening bolts, 20 sliders, 21 side plates.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the implementations. example. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative work fall within the protection scope of the present invention.

请参阅图1至图4,本实用新型提供一种技术方案:Please refer to FIG. 1 to FIG. 4, the present utility model provides a technical solution:

一种装配式混凝土墙体整体斜支撑装置,包括第一固定块1,第一固定块1的右侧通过连接螺栓17固定连接有第一连接丝杆9,第一连接丝杆9的另一端转动连接第一单向螺母2的一端,第一单向螺母2的另一端螺纹转动连接第一调节丝杆10,第一调节丝杆10的另一端固定焊接在横杆13的端部,利用横杆13上的第一调节丝杆10在第一单向螺母2的内腔中的转动,实现横杆13距离混凝土墙面的距离。A prefabricated concrete wall integral inclined support device, comprising a first fixing block 1, the right side of the first fixing block 1 is fixedly connected with a first connecting screw 9 through a connecting bolt 17, and the other end of the first connecting screw 9 One end of the first one-way nut 2 is rotatably connected, the other end of the first one-way nut 2 is threadedly connected to the first adjusting screw rod 10, and the other end of the first adjusting screw rod 10 is fixedly welded to the end of the cross bar 13. The rotation of the first adjusting screw 10 on the cross bar 13 in the inner cavity of the first one-way nut 2 realizes the distance between the cross bar 13 and the concrete wall.

横杆13固定插接在底座3的左端面,底座3的另一端安装在直角固定块4上,直角固定块4的右端面固定安装在混凝土墙壁的底部,直角固定块4的前端通过固定螺栓16固定连接底座3的右端,利用固定螺栓16实现底座3与直角固定块4之间的固定安装,通过在墙体下部设置直角固定块4,进而可用垫片上下调节高度以适应底部楼板混凝土不平快速调节,加快施工进度。The cross bar 13 is fixedly inserted on the left end face of the base 3, the other end of the base 3 is installed on the right angle fixing block 4, the right end face of the right angle fixing block 4 is fixedly installed at the bottom of the concrete wall, and the front end of the right angle fixing block 4 is fixed by fixing bolts 16 Fix the right end of the connection base 3, and use the fixing bolts 16 to realize the fixed installation between the base 3 and the right-angle fixing block 4. By setting the right-angle fixing block 4 in the lower part of the wall, the height can be adjusted up and down with spacers to adapt to the unevenness of the bottom floor concrete. Quick adjustment to speed up construction progress.

底座3的上端面左侧设置有滑槽14,滑槽14的左端延伸至底座3的左端面,滑槽14的右端延伸至底座3的上端面中间位置,滑槽14位于横杆13的正上方,滑槽14的上端安装有滑动安装块5,滑动安装块5的下端面设置有与滑槽14配合插接的滑块20,滑动安装块5通过滑块20滑动插接在滑槽14内,利用滑块20与滑槽14的配合,实现斜杆7的位置粗调。The left end of the upper end face of the base 3 is provided with a chute 14 , the left end of the chute 14 extends to the left end face of the base 3 , the right end of the chute 14 extends to the middle of the upper end face of the base 3 , and the chute 14 is located at the positive side of the cross bar 13 . Above, a sliding mounting block 5 is installed on the upper end of the sliding slot 14 , and a sliding block 20 is arranged on the lower end surface of the sliding mounting block 5 to cooperate with the sliding slot 14 . Inside, the position of the inclined rod 7 is roughly adjusted by the cooperation of the slider 20 and the chute 14 .

滑槽14的前后两侧设置有相互对称的一对固定槽15,滑动安装块5的前后两侧垂直焊接有侧板21,侧板21覆盖在固定槽15上,侧板21与固定槽15之间通过锁紧螺栓19固定连接,利用固定槽15与锁紧螺栓19的配合,进而使得滑动安装块5实现位置固定。The front and rear sides of the chute 14 are provided with a pair of mutually symmetrical fixing grooves 15. The front and rear sides of the sliding mounting block 5 are vertically welded with side plates 21. The side plates 21 cover the fixing grooves 15, and the side plates 21 and the fixing grooves 15. They are fixedly connected by locking bolts 19, and the sliding mounting block 5 is fixed in position by the cooperation between the fixing groove 15 and the locking bolts 19.

滑动安装块5的上端通过安装螺栓18转动连接第二连接丝杆12的一端,第二连接丝杆12的另一端转动连接在第二单向螺母6上,第二单向螺母6的另一端转动连接第二调节丝杆11,第二调节丝杆11的另一端固定焊接在斜杆7的下端面,利用第二单向螺母6与第二调节丝杆11之间的转动配合,实现斜杆7距离混凝土墙面的细调节。The upper end of the sliding mounting block 5 is rotatably connected to one end of the second connecting screw 12 through the mounting bolt 18 , the other end of the second connecting screw 12 is rotatably connected to the second one-way nut 6 , and the other end of the second one-way nut 6 The second adjusting screw rod 11 is rotatably connected, and the other end of the second adjusting screw rod 11 is fixedly welded to the lower end surface of the inclined rod 7. By using the rotational cooperation between the second one-way nut 6 and the second adjusting screw rod 11, the inclined rod is realized. Fine adjustment of the rod 7 from the concrete wall.

斜杆7的上端固定安装在第二固定块8上,第二固定块8与直角固定块4的右端面齐平,利用第二固定块8实现斜杆7与混凝土墙面之间的固定连接。The upper end of the inclined rod 7 is fixedly installed on the second fixed block 8, and the second fixed block 8 is flush with the right end surface of the right-angle fixed block 4, and the second fixed block 8 is used to realize the fixed connection between the inclined rod 7 and the concrete wall. .

第一单向螺母2和第二单向螺母6的左右两端均开设有螺纹孔,第一单向螺母2和第二单向螺母6的中间段长度大于第二连接丝杆12的两倍,利用第一单向螺母2和第二单向螺母6实现单向调节拉杆长度,使拉杆长度符合预埋的位置,同时在装配式混凝土外墙进场后,先进行斜拉杆的安装可在工人吊装过程中拖拽拉杆进行墙体位置校正。The left and right ends of the first one-way nut 2 and the second one-way nut 6 are provided with threaded holes, and the length of the middle section of the first one-way nut 2 and the second one-way nut 6 is greater than twice that of the second connecting screw 12 , use the first one-way nut 2 and the second one-way nut 6 to realize one-way adjustment of the length of the tie rod, so that the length of the tie rod conforms to the pre-embedded position. During the hoisting process, the worker drags the rod to correct the wall position.

工作原理:首先利用横杆13上的第一调节丝杆10在第一单向螺母2的内腔中的转动,实现横杆13距离混凝土墙面的距离,利用固定螺栓16实现底座3与直角固定块4之间的固定安装,通过在墙体下部设置直角固定块4,进而可用垫片上下调节高度以适应底部楼板混凝土不平快速调节,加快施工进度。Working principle: First, the rotation of the first adjusting screw 10 on the cross bar 13 in the inner cavity of the first one-way nut 2 is used to realize the distance between the cross bar 13 and the concrete wall, and the fixing bolt 16 is used to realize the base 3 and the right angle. For the fixed installation between the fixed blocks 4, right-angle fixed blocks 4 are arranged at the lower part of the wall, and then the height can be adjusted up and down with spacers to adapt to the rapid adjustment of the unevenness of the bottom floor concrete and speed up the construction progress.

利用滑块20与滑槽14的配合,实现斜杆7的位置粗调,利用固定槽15与锁紧螺栓19的配合,进而使得滑动安装块5实现位置固定,利用第二单向螺母6与第二调节丝杆11之间的转动配合,实现斜杆7距离混凝土墙面的细调节,进而使得距离调节的精度大大提高,支撑装置的适用范围增大。The position of the inclined rod 7 is roughly adjusted by the cooperation of the slider 20 and the chute 14, and the position of the sliding mounting block 5 is fixed by the cooperation of the fixing groove 15 and the locking bolt 19. The second one-way nut 6 and the The rotational cooperation between the second adjusting screw rods 11 realizes fine adjustment of the distance between the inclined rod 7 and the concrete wall, thereby greatly improving the accuracy of the distance adjustment and increasing the application range of the support device.

在进行吊装过程中,利用第一单向螺母2和第二单向螺母6实现单向调节斜杆7和横杆13的长度,使斜杆7和横杆13长度符合预埋的位置,同时在装配式混凝土外墙进场后,先进行斜杆7的安装可在工人吊装过程中拖拽斜杆7进行墙体位置校正。During the hoisting process, the first one-way nut 2 and the second one-way nut 6 are used to realize one-way adjustment of the lengths of the inclined rods 7 and the cross rods 13, so that the lengths of the inclined rods 7 and the cross rods 13 conform to the pre-embedded positions, and at the same time After the prefabricated concrete outer wall enters the site, the installation of the inclined rod 7 can be carried out first, and the inclined rod 7 can be dragged by the workers to correct the wall position during the hoisting process.

尽管已经示出和描述了本实用新型的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本实用新型的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本实用新型的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes and modifications can be made to these embodiments without departing from the principles and spirit of the present invention , alternatives and modifications, the scope of the present invention is defined by the appended claims and their equivalents.

Claims (5)

1.一种装配式混凝土墙体整体斜支撑装置,包括第一固定块(1),其特征在于:所述第一固定块(1)的右侧通过连接螺栓(17)固定连接有第一连接丝杆(9),所述第一连接丝杆(9)的另一端转动连接第一单向螺母(2)的一端,所述第一单向螺母(2)的另一端螺纹转动连接第一调节丝杆(10),所述第一调节丝杆(10)的另一端固定焊接在横杆(13)的端部,所述横杆(13)固定插接在底座(3)的左端面,所述底座(3)的另一端安装在直角固定块(4)上,底座(3)的上端面左侧设置有滑槽(14),所述滑槽(14)的前后两侧设置有相互对称的一对固定槽(15),滑槽(14)的上端安装有滑动安装块(5),所述滑动安装块(5)的上端通过安装螺栓(18)转动连接第二连接丝杆(12)的一端,所述第二连接丝杆(12)的另一端转动连接在第二单向螺母(6)上,所述第二单向螺母(6)的另一端转动连接第二调节丝杆(11),所述第二调节丝杆(11)的另一端固定焊接在斜杆(7)的下端面,所述斜杆(7)的上端固定安装在第二固定块(8)上,所述第二固定块(8)与直角固定块(4)的右端面齐平。1. An integral inclined support device for a prefabricated concrete wall, comprising a first fixing block (1), characterized in that: the right side of the first fixing block (1) is fixedly connected with a first fixing block (1) through a connecting bolt (17). A connecting screw (9), the other end of the first connecting screw (9) is rotatably connected to one end of the first one-way nut (2), and the other end of the first one-way nut (2) is threadedly connected to the first one-way nut (2). An adjusting screw (10), the other end of the first adjusting screw (10) is fixedly welded to the end of the cross rod (13), and the cross rod (13) is fixedly inserted at the left end of the base (3) The other end of the base (3) is mounted on the right-angle fixing block (4), and the left side of the upper end surface of the base (3) is provided with a chute (14), and the front and rear sides of the chute (14) are provided with There are a pair of mutually symmetrical fixing grooves (15), and a sliding mounting block (5) is installed on the upper end of the sliding groove (14), and the upper end of the sliding mounting block (5) is rotatably connected to the second connecting wire through the mounting bolt (18). One end of the rod (12), the other end of the second connecting screw (12) is rotatably connected to the second one-way nut (6), and the other end of the second one-way nut (6) is rotatably connected to the second one-way nut (6). An adjusting screw (11), the other end of the second adjusting screw (11) is fixedly welded to the lower end face of the inclined rod (7), and the upper end of the inclined rod (7) is fixedly mounted on the second fixing block (8) ), the second fixing block (8) is flush with the right end surface of the right-angle fixing block (4). 2.根据权利要求1所述的一种装配式混凝土墙体整体斜支撑装置,其特征在于:所述直角固定块(4)的右端面固定安装在混凝土墙壁的底部,直角固定块(4)的前端通过固定螺栓(16)固定连接底座(3)的右端。2. A kind of prefabricated concrete wall integral oblique support device according to claim 1, characterized in that: the right-angle fixing block (4) is fixedly installed on the bottom of the concrete wall, and the right-angle fixing block (4) The front end of the connecting base (3) is fixedly connected to the right end of the base (3) by fixing bolts (16). 3.根据权利要求1所述的一种装配式混凝土墙体整体斜支撑装置,其特征在于:所述滑槽(14)的左端延伸至底座(3)的左端面,滑槽(14)的右端延伸至底座(3)的上端面中间位置,滑槽(14)位于横杆(13)的正上方。3. A prefabricated concrete wall integral inclined support device according to claim 1, characterized in that: the left end of the chute (14) extends to the left end face of the base (3), and the left end of the chute (14) The right end extends to the middle position of the upper end face of the base (3), and the chute (14) is located just above the crossbar (13). 4.根据权利要求1所述的一种装配式混凝土墙体整体斜支撑装置,其特征在于:所述滑动安装块(5)的下端面设置有与滑槽(14)配合插接的滑块(20),滑动安装块(5)通过滑块(20)滑动插接在滑槽(14)内,滑动安装块(5)的前后两侧垂直焊接有侧板(21),所述侧板(21)覆盖在固定槽(15)上,侧板(21)与固定槽(15)之间通过锁紧螺栓(19)固定连接。4. A prefabricated concrete wall integral inclined support device according to claim 1, characterized in that: the lower end surface of the sliding installation block (5) is provided with a sliding block that is matched and inserted with the chute (14). (20), the sliding mounting block (5) is slidably inserted into the chute (14) through the slider (20), and side plates (21) are vertically welded on the front and rear sides of the sliding mounting block (5). (21) is covered on the fixing groove (15), and the side plate (21) and the fixing groove (15) are fixedly connected by locking bolts (19). 5.根据权利要求1所述的一种装配式混凝土墙体整体斜支撑装置,其特征在于:所述第一单向螺母(2)和第二单向螺母(6)的左右两端均开设有螺纹孔,第一单向螺母(2)和第二单向螺母(6)的中间段长度大于第二连接丝杆(12)的两倍。5. The prefabricated concrete wall integral inclined support device according to claim 1, wherein the left and right ends of the first one-way nut (2) and the second one-way nut (6) are provided with There are threaded holes, and the length of the middle section of the first one-way nut (2) and the second one-way nut (6) is greater than twice that of the second connecting screw (12).
CN201922098452.9U 2019-11-29 2019-11-29 Whole bearing diagonal device of assembled concrete wall body Active CN212002383U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922098452.9U CN212002383U (en) 2019-11-29 2019-11-29 Whole bearing diagonal device of assembled concrete wall body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922098452.9U CN212002383U (en) 2019-11-29 2019-11-29 Whole bearing diagonal device of assembled concrete wall body

Publications (1)

Publication Number Publication Date
CN212002383U true CN212002383U (en) 2020-11-24

Family

ID=73412024

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922098452.9U Active CN212002383U (en) 2019-11-29 2019-11-29 Whole bearing diagonal device of assembled concrete wall body

Country Status (1)

Country Link
CN (1) CN212002383U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113833164A (en) * 2021-09-27 2021-12-24 中建八局第一建设有限公司 A kind of construction method of super high-rise core tube conical variable section shear wall

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113833164A (en) * 2021-09-27 2021-12-24 中建八局第一建设有限公司 A kind of construction method of super high-rise core tube conical variable section shear wall

Similar Documents

Publication Publication Date Title
CN105735625B (en) A kind of side form support system for floor construction
CN205369958U (en) A support frame for prefabricating wallboard installation
CN211058093U (en) A stone curtain wall that is convenient for the plane adjustment of the curtain wall
CN212002383U (en) Whole bearing diagonal device of assembled concrete wall body
CN207668781U (en) A kind of adjustable grating steelframe processing mold
CN210888054U (en) A New Type of Reinforced Secondary Casting Reverse Sill Formwork
CN203145475U (en) Foundation of floor concrete leveling device
CN213710355U (en) Construction pouring plate structure
CN212154211U (en) Adjustable slurry spreading device
CN209457405U (en) Floor concrete leveling device
CN206408953U (en) A kind of prefabricated components vertical adjustment component and its attachment structure
CN217812449U (en) Position calibrating device during installation based on superimposed sheet
CN215594893U (en) Descending plate formwork device
CN210858037U (en) Special chute for pouring constructional column concrete
CN205189403U (en) A steel instrument for making enclosure bears down on one
CN211037221U (en) Flatness control device in gap type drainage ditch installation process
CN204475877U (en) Infilled wall mortar joint flatness control device
CN210857740U (en) A new type of steel composite beam support structure
CN209620638U (en) Accurate control mold for horizontal mortar joint of masonry engineering
CN115592038A (en) House building construction steel processing device
CN210369955U (en) Prefabricated external wall panel mounting structure
CN206722433U (en) A kind of slurry spreading device with reel
CN109945019B (en) Temporary fixing device for foundation bolt with reserved hole and using method of temporary fixing device
CN217461548U (en) High-fluidity mortar paving device
CN207620379U (en) A kind of side mould fixing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant