CN212002368U - Lime pay-off for construction engineering - Google Patents

Lime pay-off for construction engineering Download PDF

Info

Publication number
CN212002368U
CN212002368U CN202020582683.7U CN202020582683U CN212002368U CN 212002368 U CN212002368 U CN 212002368U CN 202020582683 U CN202020582683 U CN 202020582683U CN 212002368 U CN212002368 U CN 212002368U
Authority
CN
China
Prior art keywords
box
lime
construction engineering
outlet pipe
engineering according
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020582683.7U
Other languages
Chinese (zh)
Inventor
杨艳明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020582683.7U priority Critical patent/CN212002368U/en
Application granted granted Critical
Publication of CN212002368U publication Critical patent/CN212002368U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model discloses a construction engineering is with lime pay-off relates to construction engineering technical field, the power distribution box comprises a box body, the top of box is provided with the feeder hopper, and the inside of box is provided with the storage cavity, one side fixed mounting of box has the handrail, and dust removal mechanism is installed to the opposite side, and the lower fixed surface of box installs the landing leg, the lower extreme in storage cavity runs through the box and is provided with the discharge gate. The utility model has the advantages of being scientific and reasonable in structure, convenient operation, vibrating motor through setting up, can prevent that the inside phenomenon that the material blockked up from appearing in the storage cavity, guarantee the smooth and easy nature of discharge gate unloading, through the dust removal mechanism that sets up, can spray the processing to the lime powder that the unwrapping wire in-process flows, the lime powder of avoiding the unwrapping wire in-process to produce is wafted in the air, reduce the environmental pollution phenomenon, reach certain environmental protection effect, through the flow control mechanism that sets up, can realize the regulation of lime powder outflow, improve its practicality.

Description

Lime pay-off for construction engineering
Technical Field
The utility model relates to a construction engineering technical field specifically is a construction engineering is with lime pay-off.
Background
The building engineering refers to an engineering entity formed by the construction of various building buildings and their auxiliary facilities and the installation of lines, pipes and equipment matched with them, wherein the building buildings refer to the engineering which has top covers, beams, columns, walls, foundations and can form internal spaces and meet the requirements of people for production, living, study and public activities. Before the construction of the building engineering begins, the line drawing treatment of a construction area needs to be carried out by a lime paying-off device.
However, the construction engineering on the market uses the lime pay-off device not only the structure is complicated, and the function is single moreover, and the jam of discharge gate easily appears in its use, influences the normal clear of unwrapping wire work, and simultaneously, current pay-off device can not realize the flow control of lime powder, and lime powder easily drifts in the air among the setting-out process, the polluted environment, and the practicality is relatively poor. Accordingly, those skilled in the art have provided a lime paying-off device for construction work to solve the problems set forth in the background art described above.
Disclosure of Invention
An object of the utility model is to provide a construction engineering is with lime pay-off to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a lime pay-off for construction engineering, includes the box, the top of box is provided with the feeder hopper, and the inside of box is provided with the storage chamber, one side fixed mounting of box has the handrail, and dust removal mechanism is installed to the opposite side, and the lower fixed surface of box installs the landing leg, the lower extreme of storage chamber runs through the box and is provided with the discharge gate, and the equal fixed mounting in both sides of storage chamber has vibrating motor, flow control mechanism is installed in the embedding of one side of discharge gate, the bottom fixed mounting of landing leg has the shock attenuation wheel.
As a further aspect of the present invention: the dust removal mechanism comprises a water storage tank, a water filling port is arranged at the top end of the water storage tank, a water outlet pipe is connected to the lower end of the water storage tank, a control valve is installed at the top end of the water outlet pipe, and an atomizing nozzle is arranged at the lower end of the water outlet pipe.
As a further aspect of the present invention: the water storage tank is communicated with the atomizing nozzle through a water outlet pipe.
As a further aspect of the present invention: the flow regulating mechanism comprises a telescopic cylinder and a limiting seat, a piston rod is arranged on one side of the telescopic cylinder through the limiting seat, and a regulating plate is arranged at the position, located in the discharging port, of the tail end of the piston rod.
As a further aspect of the present invention: the telescopic cylinder is fixedly connected with the adjusting plate through a piston rod.
As a further aspect of the present invention: the damping wheels are fixedly connected with the box body through supporting legs.
As a further aspect of the present invention: the upper end of shock attenuation wheel is provided with the spring, and the lower extreme of shock attenuation wheel is provided with the gyro wheel, the telescopic link is installed to the inboard of spring.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses a vibrating motor who sets up can prevent that the inside phenomenon that the material blockked up from appearing in the storage chamber, guarantees the smooth and easy nature of discharge gate unloading, overcomes the defect that traditional lime pay-off discharge gate easily blockked up, improves its practicality.
2. The utility model discloses a dust removal mechanism who sets up can spray the processing to the lime powder that the unwrapping wire in-process flows, avoids the lime powder that the unwrapping wire in-process produced to fly away in the air, reduces the environmental pollution phenomenon, reaches certain environmental protection effect, in the use, opens the control valve for water in the storage water tank sprays the processing in getting into atomizer through the outlet pipe, reaches the purpose of removing dust.
3. The utility model discloses a flow control mechanism who sets up can realize the regulation of lime powder outflow, overcomes the fixed defect of traditional lime pay-off flow, makes its unwrapping wire work that is applicable to different construction places, in the use, through telescopic cylinder shrink for the piston rod drives the regulating plate and removes in to spacing seat, reaches flow control's purpose.
4. The utility model discloses a shock attenuation wheel that sets up can absorb the vibrations phenomenon that the pay-off removed the in-process and produced, overcomes the relatively poor defect of traditional pay-off damping performance, improves the stability that the pay-off removed the in-process.
Drawings
FIG. 1 is a schematic structural view of a lime paying-off device for construction work;
FIG. 2 is a schematic structural view of a flow rate adjusting mechanism in a lime line releasing device for construction work;
FIG. 3 is a schematic structural view of a shock-absorbing wheel in a lime paying-off device for construction;
fig. 4 is a schematic structural diagram of a dust removing mechanism in a lime paying-off device for construction engineering.
In the figure: 1. a box body; 2. a feed hopper; 3. a material storage cavity; 4. a handrail; 5. a dust removal mechanism; 51. a water storage tank; 52. a water injection port; 53. a water outlet pipe; 54. a control valve; 55. an atomizing spray head; 6. a support leg; 7. a discharge port; 8. a vibration motor; 9. a flow rate adjusting mechanism; 91. a telescopic cylinder; 92. a limiting seat; 93. a piston rod; 94. an adjusting plate; 10. a shock-absorbing wheel; 101. a spring; 102. a telescopic rod; 103. and a roller.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Please refer to fig. 1-4, in the embodiment of the utility model, a lime pay-off is used in construction engineering, including box 1, box 1's top is provided with feeder hopper 2, and box 1's inside is provided with storage chamber 3, one side fixed mounting of box 1 has handrail 4, dust removal mechanism 5 is installed to the opposite side, and box 1's lower fixed surface installs landing leg 6, the lower extreme of storage chamber 3 runs through box 1 and is provided with discharge gate 7, and the equal fixed mounting in both sides of storage chamber 3 has vibrating motor 8, can prevent the inside phenomenon that the material blockked up that appears in storage chamber 3 through vibrating motor 8 that sets up, guarantee the smooth and easy nature of 7 baits of discharge gate, overcome the easy defect of blockking up of traditional lime pay-off discharge gate 7, improve its.
Further, dust removal mechanism 5 includes storage water tank 51, storage water tank 51's top is provided with water filling port 52, and storage water tank 51's lower extreme is connected with outlet pipe 53, control valve 54 is installed on outlet pipe 53's top, and outlet pipe 53's lower extreme is provided with atomizer 55, storage water tank 51 passes through outlet pipe 53 through connection with atomizer 55, dust removal mechanism 5 through the setting can spray the processing to the lime powder that the unwrapping wire in-process flows, the lime powder of avoiding the unwrapping wire in-process to produce is waved in the air, reduce the environmental pollution phenomenon, reach certain environmental protection, in the use, open control valve 54, make the water in storage water tank 51 spray the processing in outlet pipe 53 gets into atomizer 55, reach the purpose of dust removal.
Still further, flow adjustment mechanism 9 is installed in one side embedding of discharge gate 7, flow adjustment mechanism 9 includes telescopic cylinder 91 and spacing seat 92, one side of telescopic cylinder 91 is run through spacing seat 92 and is provided with piston rod 93, the terminal internal position department that is located discharge gate 7 of piston rod 93 is provided with regulating plate 94, telescopic cylinder 91 passes through piston rod 93 fixed connection with regulating plate 94, the regulation of lime powder outflow can be realized through the flow adjustment mechanism 9 that sets up, overcome the fixed defect of traditional lime pay-off flow, make its unwrapping wire work that is applicable to different construction places, in the use, shrink through telescopic cylinder 91, make piston rod 93 drive regulating plate 94 remove to spacing seat 92, reach flow control's purpose.
Still further, the bottom fixed mounting of landing leg 6 has shock attenuation wheel 10, shock attenuation wheel 10 passes through landing leg 6 fixed connection with box 1, the upper end of shock attenuation wheel 10 is provided with spring 101, and the lower extreme of shock attenuation wheel 10 is provided with gyro wheel 103, telescopic link 102 is installed to the inboard of spring 101, the shock attenuation wheel 10 through setting up can absorb the vibrations phenomenon that the pay-off removed the in-process and produced, overcome the relatively poor defect of traditional pay-off damping performance, improve the stability that the pay-off removed the in-process.
The utility model discloses a theory of operation is: firstly, lime powder is added into a storage cavity 3 through a feed hopper 2, the lime powder outflow is adjusted through an arranged flow adjusting mechanism 9, a telescopic cylinder 91 contracts to enable a piston rod 93 to drive an adjusting plate 94 to move towards a limiting seat 92, the purpose of flow adjustment is achieved, then a vibration motor 8 is started to work, the phenomenon of material blockage inside the storage cavity 3 can be prevented through the arranged vibration motor 8, the smoothness of blanking of a discharge port 7 is ensured, the defect that the discharge port 7 of a traditional lime pay-off device is easy to block is overcome, the practicability of the traditional lime pay-off device is improved, finally, a handrail 4 is pushed to move to carry out pay-off device, line drawing treatment can be carried out, the lime powder flowing out in the pay-off process can be sprayed through an arranged dust removing mechanism 5 in the actual use process, and the lime powder generated in the pay-off process is prevented from floating in the air, reduce environmental pollution phenomenon, reach certain environmental protection effect, when needs remove dust the operation, open control valve 54 for the water in the storage water tank 51 sprays the processing in getting into atomizer 55 through outlet pipe 53, reach the purpose of removing dust, and is further, can absorb the vibrations phenomenon that the pay-off removed the in-process and produced through the shock attenuation wheel 10 that sets up, overcome the relatively poor defect of traditional pay-off damping performance, improve the stability of pay-off removal in-process.
The above-mentioned, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (7)

1. The utility model provides a construction engineering is with lime pay-off, includes box (1), its characterized in that, the top of box (1) is provided with feeder hopper (2), and the inside of box (1) is provided with storage chamber (3), one side fixed mounting of box (1) has handrail (4), and dust removal mechanism (5) are installed to the opposite side, and the lower fixed surface of box (1) installs landing leg (6), the lower extreme of storage chamber (3) runs through box (1) and is provided with discharge gate (7), and the equal fixed mounting in both sides of storage chamber (3) has vibrating motor (8), flow control mechanism (9) are installed in one side embedding of discharge gate (7), the bottom fixed mounting of landing leg (6) has shock attenuation wheel (10).
2. The lime paying-off device for construction engineering according to claim 1, wherein the dust removing mechanism (5) comprises a water storage tank (51), a water filling port (52) is arranged at the top end of the water storage tank (51), a water outlet pipe (53) is connected to the lower end of the water storage tank (51), a control valve (54) is installed at the top end of the water outlet pipe (53), and an atomizing nozzle (55) is arranged at the lower end of the water outlet pipe (53).
3. The lime paying-off device for construction engineering according to claim 2, wherein the water storage tank (51) is in through connection with the atomizing nozzle (55) through a water outlet pipe (53).
4. The lime paying-off device for construction engineering according to claim 1, wherein the flow regulating mechanism (9) comprises a telescopic cylinder (91) and a limiting seat (92), one side of the telescopic cylinder (91) penetrates through the limiting seat (92) to be provided with a piston rod (93), and the tail end of the piston rod (93) is provided with a regulating plate (94) at the inner position of the discharge hole (7).
5. The lime paying-off device for construction engineering according to claim 4, wherein the telescopic cylinder (91) and the adjusting plate (94) are fixedly connected through a piston rod (93).
6. The lime paying-off device for construction engineering according to claim 1, wherein the shock-absorbing wheels (10) are fixedly connected with the box body (1) through supporting legs (6).
7. The lime paying-off device for construction engineering according to claim 1, wherein a spring (101) is arranged at the upper end of the damping wheel (10), a roller (103) is arranged at the lower end of the damping wheel (10), and a telescopic rod (102) is installed at the inner side of the spring (101).
CN202020582683.7U 2020-04-19 2020-04-19 Lime pay-off for construction engineering Expired - Fee Related CN212002368U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020582683.7U CN212002368U (en) 2020-04-19 2020-04-19 Lime pay-off for construction engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020582683.7U CN212002368U (en) 2020-04-19 2020-04-19 Lime pay-off for construction engineering

Publications (1)

Publication Number Publication Date
CN212002368U true CN212002368U (en) 2020-11-24

Family

ID=73415643

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020582683.7U Expired - Fee Related CN212002368U (en) 2020-04-19 2020-04-19 Lime pay-off for construction engineering

Country Status (1)

Country Link
CN (1) CN212002368U (en)

Similar Documents

Publication Publication Date Title
CN207987052U (en) A kind of Bridge High-pier automatic spray health preserving equipment
CN113599935A (en) Environment-friendly municipal engineering construction dust settling method and equipment
CN205277442U (en) A movable automatic spraying system for tunnel concrete maintenance
CN212002368U (en) Lime pay-off for construction engineering
CN205804253U (en) Complete three-dimensional dust Control work station
CN204073734U (en) High-altitude, job site water mist dust fall device
CN210448528U (en) Automatic raise dust prevention of building site sprays equipment
CN210684583U (en) Environment-friendly building site dust device
CN208105160U (en) Dust suppression deodorization special-purpose vehicle
CN211773247U (en) Dust fall equipment for highway construction
CN110206282A (en) A kind of simple pest control and anticorrosion wall surfacing technique
CN215462895U (en) Water smoke dust removal mechanism for environmental protection
CN209885485U (en) Novel tower crane sprays device
CN210448522U (en) Urban construction environmental protection dust device
CN211369804U (en) Novel keep out wind and press down dirt wall
CN203991067U (en) A kind of drenching installation using in bathroom cabinet surface lacquer is produced
CN209270699U (en) A kind of construction environment-friendly water-saving spray equipment
US11260408B2 (en) Sprinkler for achieving a high atomization effect under low pressure condition
CN204735062U (en) Building site presses down dirt system terminal with little fog
CN212582366U (en) Ground maintenance spray set for construction
CN221073363U (en) Decoration spraying device
CN220328237U (en) On-site dust settling equipment
CN212294502U (en) Sprinkler is taken over behind watering lorry
CN221461059U (en) Dust fall device of building site
CN216492964U (en) Municipal works are with afforestation sprinkler

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201124