CN212002348U - Fastening tool for steel structure inhaul cable - Google Patents

Fastening tool for steel structure inhaul cable Download PDF

Info

Publication number
CN212002348U
CN212002348U CN202020280247.4U CN202020280247U CN212002348U CN 212002348 U CN212002348 U CN 212002348U CN 202020280247 U CN202020280247 U CN 202020280247U CN 212002348 U CN212002348 U CN 212002348U
Authority
CN
China
Prior art keywords
pair
steel structure
fastening
cable
bearing frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020280247.4U
Other languages
Chinese (zh)
Inventor
马晓华
朱银国
姜体标
赵鹏飞
刘英生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN202020280247.4U priority Critical patent/CN212002348U/en
Application granted granted Critical
Publication of CN212002348U publication Critical patent/CN212002348U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Installation Of Indoor Wiring (AREA)

Abstract

The utility model discloses a fastening tool for a steel structure inhaul cable, which comprises a steel structure clamping piece (1), a fastening screw rod (2), a fastening anchor piece (3), a bearing frame (4) and a jack (5); the steel structure clamping piece (1) is sleeved at one end of a steel structure inhaul cable (6) in a matching mode, one ends of a pair of fastening screw rods (2) are fixedly connected to the steel structure clamping piece (1) respectively, a pair of jacks (5) are installed at one end of a bearing frame (4) respectively, and the other ends of the pair of fastening screw rods (2) correspondingly penetrate through the pair of jacks (5) and the bearing frame (4); the pair of jacks (5) are respectively locked on the pair of fastening screw rods (2) through the pair of fastening anchors (3), so that the other end of the bearing frame (4) is tightly pressed against the other end of the steel structure inhaul cable (6). The utility model discloses can fasten the steel construction cable, the cable stretch-draw prestressing force's of being convenient for regulation, easy dismounting, the safety in utilization is high.

Description

Fastening tool for steel structure inhaul cable
Technical Field
The utility model relates to an erection equipment of steel construction cable among the building engineering especially relates to a fastening tool for steel construction cable.
Background
Along with the development of science and technology, building structures become more and more complicated day by day, and for the building roof adopting the stay cable support system, because the building roof has the characteristics of large number of stay cables, large coverage area, large control value of tensioning prestress, asymmetric structure and the like, the construction control and the stay cable fastening operation of the building roof adopting the stay cable support system have certain difficulty. In the prior art, large external force can only be provided by large-scale traction equipment to control the steel structure inhaul cable, the operation is time-consuming and labor-consuming, and meanwhile, the steel structure inhaul cable is usually installed at high altitude, so that certain safety risk also exists when the steel structure inhaul cable is fastened through large-scale equipment.
Disclosure of Invention
An object of the utility model is to provide a fastening tool for steel construction cable can fasten the steel construction cable, the cable stretch-draw prestressing force's of being convenient for regulation, easy dismounting, and the safety in utilization is high.
The utility model discloses a realize like this:
a fastening tool for a steel structure inhaul cable comprises a steel structure clamping piece, a fastening screw rod, a fastening anchor piece, a bearing frame and a jack; the steel structure clamping piece is sleeved at one end of the steel structure inhaul cable in a matching mode, one ends of the pair of fastening screw rods are fixedly connected to the steel structure clamping piece respectively, the pair of jacks are installed at one ends of the force bearing frames respectively, and the other ends of the pair of fastening screw rods correspondingly penetrate through the pair of jacks and the force bearing frames; the pair of jacks are respectively locked on the pair of fastening screw rods through the pair of fastening anchors, so that the other end of the bearing frame is tightly propped against the other end of the steel structure inhaul cable.
The steel structure clamping piece comprises a pair of fixing clamps and a pair of fixing seats; the pair of fixing clips are of U-shaped structures, the closed ends of the fixing clips are matched and sleeved on the convex blocks of the steel structure inhaul cables, the pair of fixing seats are connected between two sides of the opening ends of the pair of fixing clips respectively, and one ends of the pair of fastening screw rods are welded at the bottoms of the pair of fixing seats correspondingly respectively.
The pair of fastening screws are respectively arranged on two sides of the steel structure inhaul cable in parallel, so that the adjusting tool of the steel structure inhaul cable is positioned between the steel structure clamping piece and the force bearing frame.
The bearing frame is provided with a pair of screw rod through holes and a pull cable through hole, the pair of fastening screw rods correspondingly penetrate through the bearing frame through the pair of screw rod through holes on two sides of the bearing frame, and the pull cable connected to the steel structure pull cable penetrates through the bearing frame through the pull cable through hole.
Compared with the prior art, the utility model, following beneficial effect has:
1. the utility model discloses owing to adopt fixing clip and fastening anchor to fix at the both ends of steel construction cable, fastening reliability is high, and easy dismounting, swift, can effectively improve construction security and efficiency.
2. The utility model discloses can realize the regulation to cable stretch-draw prestressing force through the jack, the fastening of rethread regulation frock need not to adopt the main equipment to provide external force fastening steel construction cable, and convenient operation and safety use manpower sparingly material resources.
3. The utility model discloses ability reuse reduces construction cost, energy-concerving and environment-protective.
Drawings
Fig. 1 is a schematic structural view of a fastening tool for a steel structure inhaul cable of the present invention;
FIG. 2 is a front view of a steel structure fastener of the fastening tool for the steel structure inhaul cable of the utility model;
fig. 3 is a top view of the force bearing frame in the fastening tool for the steel structure inhaul cable.
In the figure, a steel structure clamping piece 1, a fixing clip 11, a fixing seat 12, a fastening screw rod 2, a fastening anchor 3, a force bearing frame 4, a screw rod through hole 41, a cable through hole 42, a jack 5, a steel structure cable 6, a convex block 61 and an adjusting tool 62 are arranged.
Detailed Description
The invention will be further explained with reference to the drawings and the specific embodiments.
Referring to the attached figure 1, the fastening tool for the steel structure inhaul cable comprises a steel structure clamping piece 1, a fastening screw rod 2, a fastening anchor piece 3, a bearing frame 4 and a jack 5; the steel structure clamping piece 1 is sleeved at one end of a steel structure inhaul cable 6 in a matching mode, one ends of a pair of fastening screw rods 2 are fixedly connected to the steel structure clamping piece 1 respectively, a pair of jacks 5 are installed at one end of a bearing frame 4 respectively, and the other ends of the pair of fastening screw rods 2 correspondingly penetrate through the pair of jacks 5 and the bearing frame 4; the pair of jacks 5 are respectively locked on the pair of fastening screw rods 2 through the pair of fastening anchors 3, so that the other end of the bearing frame 4 is tightly pressed against the other end of the steel structure inhaul cable 6.
Referring to fig. 2, the steel-structure clip 1 includes a pair of fixing clips 11 and a pair of fixing seats 12; the pair of fixing clips 11 are of a U-shaped structure, the closed ends of the fixing clips 11 are matched and sleeved on the convex blocks 61 of the steel structure inhaul cable 6, the pair of fixing seats 12 are respectively connected between two sides of the opening ends of the pair of fixing clips 11, and one ends of the pair of fastening screw rods 2 are respectively and correspondingly welded at the bottoms of the pair of fixing seats 12. The structure of fixing clip 11 and the lug 61 structure phase-match of steel structure cable 6, the steel structure fastener 1 of being convenient for and the fastening connection of steel structure cable 6.
The pair of fastening screws 2 are respectively arranged on two sides of the steel structure inhaul cable 6 in parallel, so that the adjusting tool 62 of the steel structure inhaul cable 6 is positioned between the steel structure clamping piece 1 and the bearing frame 4, and the inhaul cable tensioning prestress connected to the steel structure inhaul cable 6 is convenient to adjust through the adjusting tool 62 and the jack 5.
Referring to fig. 3, a pair of screw rod through holes 41 and a pull cable through hole 42 are arranged on the bearing frame 4, the pair of fastening screws 2 correspondingly penetrate through the bearing frame 4 through the pair of screw rod through holes 41 on the two sides of the bearing frame 4, the pull cable connected to the steel structure pull cable 6 penetrates through the bearing frame 4 through the pull cable through hole 42, and the bearing frame 4 does not interfere with the installation of the pull cable.
When the steel structure clamping piece is used, the pair of U-shaped fixing clamps 11 of the steel structure clamping piece 1 is sleeved on the two convex blocks 61 at one end of the steel structure inhaul cable 6 in a matching mode, the force bearing frame 4 is attached to the other end of the steel structure inhaul cable 6, the pair of fastening anchors 3 are screwed on the pair of fastening screw rods 2 through thread matching, and the force bearing frame 4 is enabled to prop against the steel structure inhaul cable 6; the fastening screw rod 2 can be a screw rod with the diameter of 16mm, the fastening anchor part 3 can be a nut matched with the screw rod with the diameter of 16mm, the assembly and disassembly are convenient, and the installation reliability is high. Adopt the moment spanner to measure the stretch-draw prestressing force of cable and whether reach the design value, if not reach the design value, the 5 afterburning stretch-draw prestressing force that make the cable of accessible jack reaches the design value, and the rethread adjusts 62 fastening cables of frock, can with after the cable fastening the utility model discloses demolish, the reuse of being convenient for.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and should not be taken as limiting the scope of the present invention, therefore, any modifications, equivalents, improvements and the like made within the spirit and principles of the present invention should be included in the scope of the present invention.

Claims (4)

1. The utility model provides a fastening tool for steel construction cable, characterized by: comprises a steel structure clamping piece (1), a fastening screw rod (2), a fastening anchor piece (3), a bearing frame (4) and a jack (5); the steel structure clamping piece (1) is sleeved at one end of a steel structure inhaul cable (6) in a matching mode, one ends of a pair of fastening screw rods (2) are fixedly connected to the steel structure clamping piece (1) respectively, a pair of jacks (5) are installed at one end of a bearing frame (4) respectively, and the other ends of the pair of fastening screw rods (2) correspondingly penetrate through the pair of jacks (5) and the bearing frame (4); the pair of jacks (5) are respectively locked on the pair of fastening screw rods (2) through the pair of fastening anchors (3), so that the other end of the bearing frame (4) is tightly pressed against the other end of the steel structure inhaul cable (6).
2. The fastening tool for the steel structure cable according to claim 1, wherein: the steel structure clamping piece (1) comprises a pair of fixing clamps (11) and a pair of fixing seats (12); a pair of fixing clips (11) are of a U-shaped structure, the closed ends of the fixing clips (11) are matched and sleeved on the convex blocks (61) of the steel structure inhaul cable (6), a pair of fixing seats (12) are connected between two sides of the opening ends of the pair of fixing clips (11) respectively, and one ends of a pair of fastening screw rods (2) are welded at the bottoms of the pair of fixing seats (12) respectively in a corresponding mode.
3. The fastening tool for the steel structure cable according to claim 1, wherein: the pair of fastening screws (2) are respectively arranged on two sides of the steel structure inhaul cable (6) in parallel, so that the adjusting tool (62) of the steel structure inhaul cable (6) is located between the steel structure clamping piece (1) and the bearing frame (4).
4. The fastening tool for the steel structure cable according to claim 1 or 3, wherein: the bearing frame (4) is provided with a pair of screw rod through holes (41) and a pull cable through hole (42), the pair of fastening screw rods (2) correspondingly penetrate through the bearing frame (4) through the pair of screw rod through holes (41) positioned on two sides of the bearing frame (4), and a pull cable connected to a steel structure pull cable (6) penetrates through the bearing frame (4) through the pull cable through hole (42).
CN202020280247.4U 2020-03-09 2020-03-09 Fastening tool for steel structure inhaul cable Active CN212002348U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020280247.4U CN212002348U (en) 2020-03-09 2020-03-09 Fastening tool for steel structure inhaul cable

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020280247.4U CN212002348U (en) 2020-03-09 2020-03-09 Fastening tool for steel structure inhaul cable

Publications (1)

Publication Number Publication Date
CN212002348U true CN212002348U (en) 2020-11-24

Family

ID=73433684

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020280247.4U Active CN212002348U (en) 2020-03-09 2020-03-09 Fastening tool for steel structure inhaul cable

Country Status (1)

Country Link
CN (1) CN212002348U (en)

Similar Documents

Publication Publication Date Title
CN110725525A (en) Supporting device of assembled cantilever scaffold and construction method thereof
CN212002348U (en) Fastening tool for steel structure inhaul cable
CN103541557B (en) For the easy device of vertical steel pipe
CN209817203U (en) Outward-inclined type point-connection full-glass curtain wall inhaul cable fixing device
CN217924999U (en) Steel construction assembled installation device and protector
JP2000017614A (en) Cable connection method for suspended structure
AU2021101229A4 (en) Roof support assembly
CN211736295U (en) Detachable multifunctional high-strength bolt construction platform device
CN214301271U (en) Ladder stand device capable of installing embedded part by utilizing hollow pier template
CN216238160U (en) Device for assisting multi-buckle cable graded tensioning in arch bridge inclined pull buckle hanging construction
CN208221768U (en) A kind of heavy type support of pipelines
CN107476563B (en) Drawknot attaches board support
CN211851163U (en) Pole guy wire installation appurtenance
CN204781997U (en) A device subassembly that is used for stretch -draw fork ear formula cable or steel pull -rod
CN219794228U (en) Fastening fastener for building steel structure
CN110700095A (en) Stay cable anchoring traction device of large-span cable-stayed bridge and traction construction method thereof
CN211369275U (en) Membrane body connection structure with 8 style of calligraphy anchor clamps
CN215889319U (en) Tool clamping groove type wall connecting piece utilizing shear wall bolt hole
CN217027459U (en) Reinforced steel structure at energy-saving steel structure joint
CN220351519U (en) Annular rail device for assembly type curtain wall hoisting
CN111411699B (en) Steel structure connecting piece with prevent stress deformation structure
CN217359545U (en) Parameter identification test platform for simulating different stress states of metal sheet
CN215211572U (en) Structure of general node of shaped steel concrete beam column
CN220359077U (en) Flexible photovoltaic supporting device for roof pasting
CN220184369U (en) Spliced curtain wall structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant