CN212002290U - Template supporting structure of building structure change layer - Google Patents

Template supporting structure of building structure change layer Download PDF

Info

Publication number
CN212002290U
CN212002290U CN202020411132.4U CN202020411132U CN212002290U CN 212002290 U CN212002290 U CN 212002290U CN 202020411132 U CN202020411132 U CN 202020411132U CN 212002290 U CN212002290 U CN 212002290U
Authority
CN
China
Prior art keywords
template
connecting groove
wood
fixedly connected
shaped aluminum
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020411132.4U
Other languages
Chinese (zh)
Inventor
张余
任远敏
黄瑶
龙安臣
梁明凤
韩承成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Engineering Division Corp Ltd
Original Assignee
China Construction Fourth Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Engineering Division Corp Ltd filed Critical China Construction Fourth Engineering Division Corp Ltd
Priority to CN202020411132.4U priority Critical patent/CN212002290U/en
Application granted granted Critical
Publication of CN212002290U publication Critical patent/CN212002290U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a template supporting structure of a building structure change layer, which comprises a standard aluminum template (4), wherein one side edge of the standard aluminum template (4) is fixedly connected with a wooden template (2) through a C-shaped aluminum template connecting groove (3); two side edges of the C-shaped aluminum template connecting groove (3) are provided with 90-degree folded edges (8); a 90-degree folded edge (8) at one side of the C-shaped aluminum template connecting groove (3) is fixedly connected with one side of the standard aluminum template (4) through a bolt component (6), and a 90-degree folded edge (8) at the other side of the C-shaped aluminum template connecting groove (3) is fixedly connected with a batten (1) at one side of the wood template (2) through a bolt component (5); the batten (1) is fixedly connected with the wood template (2) through a carpenter nail (7). The utility model discloses a C type aluminum mould board spread groove is connected wooden template and standard aluminum mould board as an organic whole to satisfy the formwork needs on building structure change layer. The design requirement of the building structure change layer is met, and meanwhile, the construction cost is reduced.

Description

Template supporting structure of building structure change layer
Technical Field
The utility model relates to a structure is established to template of building structure change layer belongs to template engineering construction technical field.
Background
Because the aluminum alloy template has the characteristics of good pouring effect, convenient use and turnover use, the aluminum alloy template is more and more widely applied in the building engineering. Generally, in consideration of construction cost, a building unit is only configured with a set of aluminum formworks according to a standard floor structure. However, during the construction process, some building structures sometimes have irregular structural changes at certain parts, and in such a case, the aluminum formwork with standard configuration cannot be completely used for construction. Only the special aluminum template can be customized for construction after the change of the building structure, so that the cost of manpower and material resources from the template design to the construction is greatly increased. If all adopt traditional plank sheathing to carry out the construction, not only can influence the quality of pouring, also can cause construction cost's increase. Therefore, the prior art still has the defects and needs to be further improved.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a structure is established to template on building structure change layer to be connected wooden template and standard aluminum mould board as an organic whole through C type aluminum mould board spread groove, accomplish the formwork needs on building structure change layer, make it both can satisfy the designing requirement on building structure change layer, also can reduce construction cost simultaneously, thereby overcome the not enough that prior art exists.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model discloses a template supporting structure of a building structure change layer, which comprises a standard aluminum template, wherein one side edge of the standard aluminum template is fixedly connected with a wood template through a C-shaped aluminum template connecting groove; two side edges of a connecting groove of the C-shaped aluminum template are provided with 90-degree folded edges; the 90-degree folded edge on one side edge of the C-shaped aluminum template connecting groove is fixedly connected with one side edge of the standard aluminum template through a dowel assembly, and the 90-degree folded edge on the other side edge of the C-shaped aluminum template connecting groove is fixedly connected with the batten on one side edge of the wood template through a bolt assembly; the batten is fixedly connected with the wood template through a woodworking nail.
In the formwork erecting structure of the building structure change layer, the pouring surface of the wood formwork is parallel and level to the pouring surface of the C-shaped aluminum formwork connecting groove.
Since the technical scheme is used, the utility model discloses a compare with prior art, the utility model discloses a C type aluminum mould board spread groove that corresponds with building structure change layer corner shape is connected wooden template and standard aluminum mould board as an organic whole to satisfy the formwork needs on building structure change layer. The design requirement of the building structure change layer is met, and meanwhile, the construction cost is reduced.
Drawings
Fig. 1 is a schematic structural diagram of the present invention;
fig. 2 is a three-dimensional view of fig. 1.
The figures are labeled as follows: 1-batten, 2-wood template, 3-C type aluminum template connecting groove, 4-standard aluminum template, 5-bolt component, 6-pin component, 7-carpenter nail, 8-90 degree hem and 9-pouring surface.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings and examples.
The utility model is formed according to the following method for erecting the template of the building structure change layer, which adopts a construction method combining an aluminum template and a wood template; connecting the aluminum template with the wood template through a C-shaped aluminum template connecting groove; two sides of the connecting groove of the C-shaped aluminum template are provided with 90-degree folded edges, and the 90-degree folded edges on one side of the connecting groove of the C-shaped aluminum template are fixedly connected with the standard aluminum template through a group of pin assemblies; the 90-degree folded edge on the other side of the connecting groove of the C-shaped aluminum template is fixedly connected with the batten on one side of the wood template through a group of bolt assemblies; the technical problem that the standard aluminum template cannot independently meet the requirement of supporting the building structure change layer template is solved.
The method comprises the following steps:
a. drilling a row of connecting holes corresponding to the connecting grooves of the C-shaped aluminum template on the batten on one side of the wood template;
b. fixedly connecting the batten with the 90-degree folded edge on one side of the connecting groove of the C-shaped aluminum template through a group of bolt assemblies;
c. fixedly connecting the standard aluminum template with the 90-degree folded edge on the other side of the connecting groove of the C-shaped aluminum template through a group of pin components;
d. the wooden template is fixed on the batten through a group of carpenter nails.
When the batten is fixedly connected with the 90-degree folded edge on one side of the C-shaped aluminum formwork connecting groove, the fixed position of the wooden formwork is reserved so as to ensure that the pouring surface of the wooden formwork is flush with the pouring surface of the C-shaped aluminum formwork connecting groove after the wooden formwork is fixed.
The batten is in a long strip shape with the cross section size of 40mmx90mm, and a row of connecting holes on the batten are punched on the 90mm long side of the cross section size of the batten and are arranged along the length direction of the batten.
The bolt component comprises a bolt and a wedge plate; the wedge plate is of a triangular or right-angled trapezoidal structure; the bolt is provided with a wedge hole, and the standard aluminum mould and the C-shaped aluminum mould plate connecting groove are fixedly connected through a wedge plate in the wedge hole.
The specification of the bolt assembly is M10, and the bolt assembly comprises a bolt, a nut and a washer; the washer is positioned on the bolt between the nut and the batten; to prevent damage to the flitch when screwing the nut.
When the wood working nail fixes the wood template on the batten, the positions of the bolt components are avoided, and the wood working nail is positioned between the bolt components.
The formwork supporting structure of the building structure change layer of the utility model is formed according to the formwork supporting method of the building structure change layer, as shown in fig. 1 and fig. 2, the structure comprises a standard aluminum formwork 4, one side of the standard aluminum formwork 4 is fixedly connected with a wood formwork 2 through a C-shaped aluminum formwork connecting groove 3; two side edges of the connecting groove 3 of the C-shaped aluminum template are provided with 90-degree folded edges 8; the 90-degree folded edge 8 of one side edge of the C-shaped aluminum template connecting groove 3 is fixedly connected with one side edge of the standard aluminum template 4 through the bolt component 6, and the 90-degree folded edge 8 of the other side edge of the C-shaped aluminum template connecting groove 3 is fixedly connected with the batten 1 of one side edge of the wood template 2 through the bolt component 5; the batten 1 is fixedly connected with the wood template 2 through a woodworking nail 7; and during manufacturing, the pouring surface 9 of the wood template 2 is flush with the pouring surface 9 of the C-shaped aluminum template connecting groove 3.
Examples
The embodiment comprises a batten 1 with 40mmx90mm provided with a connecting hole, a wood template 2 with the thickness of 15mm is connected with a C-shaped aluminum template connecting groove 3 through a wood nail 7, and the C-shaped aluminum template connecting groove 3 is formed by bending an aluminum alloy plate. One side of the C-shaped aluminum template connecting groove 3 is connected with the standard aluminum template 4 through a pin component 6; the other side edge of the C-shaped aluminum template connecting groove 3 is connected with the batten 1 on one side of the wood template 2 through an M10 bolt component 5; the wooden template 2 is connected with the batten 1 through a carpenter nail 7.
The construction method comprises the following steps:
the method comprises the following steps: manufacturing battens, namely drilling a row of connecting holes on a batten 1 with the section of 40mmx90mm according to the distance between the connecting holes on a connecting groove 3 of a C-shaped aluminum template, wherein the distance between the connecting holes is controlled within 300mm, and the aperture of each connecting hole is 12 mm;
step two: the C-shaped aluminum template connecting groove 3 is fixedly connected with the batten 1, before formally installing the template, the batten 1 with a connecting hole drilled at 40mmx90mm is fixedly connected with the C-shaped aluminum template connecting groove 3 by adopting an M10 connecting bolt component 5 to form an aluminum-wood combined connecting piece; when the batten 1 is fixed, reserving a fixed position of the wood template (2) on the batten 1 according to the thickness of the wood template 2, and ensuring that a pouring surface 9 of the wood template 2 is flush with a pouring surface 9 of the C-shaped aluminum template connecting groove 3;
step three: installing a standard aluminum template 4, and installing and fixing the standard aluminum template 4 by using a pin assembly 6 according to an aluminum template construction scheme;
step four: installing a wood template 2, fixing the wood template 2 on the batten 1 with the connecting hole of 40mmx90mm by adopting a wood nail 7, and ensuring that a pouring surface 9 of the wood template 2 is flush with a pouring surface 9 of the C-shaped aluminum template connecting groove 3 during fixing; installing a wood formwork system formwork according to the wood formwork construction scheme;
the template supporting structure of the building structure change layer of the utility model is composed according to the template supporting method of the building structure change layer, as shown in fig. 1 and fig. 2, the structure comprises a standard aluminum template 4, one side of the standard aluminum template 4 is fixedly connected with a wood template 2 through a C-shaped aluminum template connecting groove 3; two side edges of the connecting groove 3 of the C-shaped aluminum template are provided with 90-degree folded edges 8; the 90-degree folded edge 8 of one side edge of the C-shaped aluminum template connecting groove 3 is fixedly connected with one side edge of the standard aluminum template 4 through the bolt component 6, and the 90-degree folded edge 8 of the other side edge of the C-shaped aluminum template connecting groove 3 is fixedly connected with the batten 1 of one side edge of the wood template 2 through the bolt component 5; the batten 1 is fixedly connected with the wood template 2 through a wood nail 7. The pouring surface 9 of the wood formwork 2 is flush with the pouring surface 9 of the C-shaped aluminum formwork connecting groove 3.
The utility model discloses a C type aluminum mould board spread groove that corresponds with building structure change layer corner shape is connected wooden template and standard aluminum mould board as an organic whole to satisfy the formwork needs on building structure change layer. The design requirement of the building structure change layer is met, and meanwhile, the construction cost is reduced.

Claims (2)

1. The utility model provides a structure is established to template of building structure change layer, includes standard aluminum mould board (4), its characterized in that: one side edge of the standard aluminum template (4) is fixedly connected with the wood template (2) through the C-shaped aluminum template connecting groove (3); two side edges of the C-shaped aluminum template connecting groove (3) are provided with 90-degree folded edges (8); a 90-degree folded edge (8) at one side of the C-shaped aluminum template connecting groove (3) is fixedly connected with one side of the standard aluminum template (4) through a bolt component (6), and a 90-degree folded edge (8) at the other side of the C-shaped aluminum template connecting groove (3) is fixedly connected with a batten (1) at one side of the wood template (2) through a bolt component (5); the batten (1) is fixedly connected with the wood template (2) through a carpenter nail (7).
2. The formwork support structure for a building structure modification layer as claimed in claim 1, wherein: and the pouring surface (9) of the wood formwork (2) is flush with the pouring surface (9) of the C-shaped aluminum formwork connecting groove (3).
CN202020411132.4U 2020-03-26 2020-03-26 Template supporting structure of building structure change layer Active CN212002290U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020411132.4U CN212002290U (en) 2020-03-26 2020-03-26 Template supporting structure of building structure change layer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020411132.4U CN212002290U (en) 2020-03-26 2020-03-26 Template supporting structure of building structure change layer

Publications (1)

Publication Number Publication Date
CN212002290U true CN212002290U (en) 2020-11-24

Family

ID=73421762

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020411132.4U Active CN212002290U (en) 2020-03-26 2020-03-26 Template supporting structure of building structure change layer

Country Status (1)

Country Link
CN (1) CN212002290U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113585744A (en) * 2021-08-27 2021-11-02 肖晗 Building templates concatenation system
CN114809619A (en) * 2022-03-16 2022-07-29 晟通科技集团有限公司 Connection structure and template system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113585744A (en) * 2021-08-27 2021-11-02 肖晗 Building templates concatenation system
CN114809619A (en) * 2022-03-16 2022-07-29 晟通科技集团有限公司 Connection structure and template system

Similar Documents

Publication Publication Date Title
CN111255234A (en) Template supporting method and structure of building structure change layer
CN212002290U (en) Template supporting structure of building structure change layer
CN203462749U (en) Modular aluminum-frame wood-plastic template
CN212154155U (en) Steel supporting template with quick positioning head
CN211850840U (en) Concrete stair template
CN113530213A (en) Formwork for fair-faced concrete, formwork mounting structure and construction method
CN210289119U (en) Concrete floor aluminum and wood template splicing structure
CN211899353U (en) Top beam assembly and wallboard mounting system
JP6919480B2 (en) Jig tool and laminated beam structure, and construction method of laminated beam structure
CN219931609U (en) Hollowed-out stair template
CN218292769U (en) Internal corner template section bar combining aluminum mold and wood mold
CN218323860U (en) U-shaped template profile combining aluminum mold and wood mold
CN211949567U (en) Wood mold height connecting structure for aluminum alloy template non-standard layer
CN218149739U (en) Internal corner and corner template of building aluminum alloy template
CN210767842U (en) Slot type stair wood formwork
CN219327326U (en) Splicing device for aluminum alloy templates
CN218347205U (en) Composite window frame with frame structure
CN218149805U (en) U-shaped template profile combining aluminum mold and wood mold batten
CN220521994U (en) Aluminum alloy template and wood template connection structure
CN220954667U (en) Wood square connecting piece for aluminum mould keel part
CN221053175U (en) Aluminum-wood combined connecting piece
CN218149755U (en) Internal corner template section bar combining aluminum mould and wood mould batten
CN216810428U (en) Prefabricated building prepositioning mounting structure
CN211817977U (en) Steel bar formwork structure of bearing column
CN211597704U (en) Dragon skeleton frame, dragon skeleton and dragon skeleton combination

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant