CN212001203U CN202020578053.2U CN202020578053U CN212001203U CN 212001203 U CN212001203 U CN 212001203U CN 202020578053 U CN202020578053 U CN 202020578053U CN 212001203 U CN212001203 U CN 212001203U
Authority
CN
China
Prior art keywords
water
pipe
tank
sedimentation tank
booster pump
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020578053.2U
Other languages
Chinese (zh)
Inventor
邢静静
李涛
马龙岗
陈胜男
申帅帅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Shifeng Construction Engineering Testing Co ltd
Original Assignee
Zhengzhou Shifeng Construction Engineering Testing Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Shifeng Construction Engineering Testing Co ltd filed Critical Zhengzhou Shifeng Construction Engineering Testing Co ltd
Priority to CN202020578053.2U priority Critical patent/CN212001203U/en
Application granted granted Critical
Publication of CN212001203U publication Critical patent/CN212001203U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model provides a building site energy-saving equipment, including basin, sedimentation tank, pond, first booster pump, basin one side sets up the water pump, and sedimentation tank and pond and booster pump can make be used for other water source places of using of building site behind the sediment of water source silt impurity deposits. The utility model discloses thereby reach the extravagant phenomenon of water source when construction site excavates the ground, improved the phenomenon at the energy-conserving water source of construction site greatly, make the better water resource that utilizes of constructor.

Description

Building site energy-saving equipment
Technical Field
The utility model relates to a building site energy-saving technology field, concretely relates to building site energy-saving equipment.
Background
When the foundation is excavated in the building site, the condition that groundwater spills over often can appear, under the general condition, take out groundwater through the water pump and put, long-time use not only needs the artifical guard that does not have night, it is bigger to make constructor work burden, and the extravagant water resource of a large amount of moreover, bring bigger destruction for the environment, when the water pump fortune, a large amount of electric quantities also can be lost in long-time use, the use resource in building site has been increased greatly, constructor's work burden has been greatly increased.
However, when excavating a foundation in a construction site, it is possible to use a device that temporarily stores groundwater without wasting groundwater.
Therefore, there is a need for a construction site energy saving apparatus that can not only allow groundwater overflowing when excavating a foundation to be stored in a certain storage device, but also allow groundwater to be used in other places.
SUMMERY OF THE UTILITY MODEL
In view of this, the utility model provides a building site energy-saving equipment, not only can be by certain strorage device when excavating the ground groundwater that overflows, can also launch in time and can apply to other local devices.
In order to solve the technical problem, the utility model provides a building site energy-saving equipment, its characterized in that: the method comprises the following steps: basin, sedimentation tank, pond, first booster pump, set up the water pump on the basin, set up the outlet pipe on the water pump, set up the inlet tube on the water pump, advance the water piping connection basin, go out the water piping connection sedimentation tank, sedimentation tank upper portion sets up the drain pipe, water piping connection the pond, set up the feed pipe on the pond, feed pipe and pond bolted connection, feed pipe bolted connection first booster pump, first booster pump one side sets up the water trap, set up a plurality of connecting pipes on the water trap, set up the valve between connecting pipe and the water trap, valve one end and water trap are connected, valve one end is connected with the connecting pipe.
Further, the drain pipe is arranged at the upper end of the sedimentation tank, a water quantity monitoring meter is arranged on the sedimentation tank, and the water quantity monitoring meter is communicated with the sedimentation tank.
Further, set up the overflow mouth on the pond, the sewer pipe is set up to overflow mouth bottom, pond one side sets up the cistern, set up the second booster pump on the cistern, set up the intercommunication pipeline on the second booster pump, intercommunication pipeline and second booster pump bolted connection.
And a fire hydrant is arranged on one side of the reservoir, and the connecting pipeline is communicated with the fire hydrant.
The utility model discloses an above-mentioned technical scheme's beneficial effect as follows:
through the water tank arranged on one side of the bureau digging pool, the underground water can be pumped into the sedimentation tank arranged on one side of the excavating pool through the water pump arranged in the water tank, after mud impurities mixed in the underground water are precipitated through the sedimentation tank, the precipitated underground water is discharged into the water tank arranged on one side of the sedimentation tank through the drainage pipeline arranged on the upper part of the sedimentation tank, the first booster pump is arranged on one side of the water tank, the water body can enter the water storage pipe arranged on the first booster pump after being boosted through the water supply pipe arranged on the water tank, the connecting pipe is arranged on the water storage pipe, the underground water after being precipitated can be more conveniently used by constructors through the control valve between the water storage pipe and the connecting pipe, the water quantity monitoring meter arranged on the sedimentation tank can enable constructors to know the water quantity in the sedimentation tank, and the underground water can not be slightly collided and damaged when in use, can use effectively, the setting is at the overflow mouth of pond upper end, and the sewer pipe that overflow mouth lower extreme set up, can make when the pond internal water volume is higher than the overflow mouth, the overflow mouth can be handled unnecessary groundwater, through the cistern of setting in pond one side, can make unnecessary groundwater deposit, the second booster pump of setting in cistern one side, connect the fire control pipeline through the second booster pump, can make groundwater can be used for other places, under the effect through the second booster pump, when making a large amount of application groundwater, can have sufficient demand, can not only make groundwater not extravagant, more energy-conserving water resource of having used, constructor's convenience has greatly increased.
Drawings
Fig. 1 is the utility model relates to a building site economizer's the schematic diagram of the plane of looking down.
1. A water tank; 2. a sedimentation tank; 3. a pool; 4. a first booster pump; 5. a water pump; 6. a water outlet pipe; 7. a water inlet pipe; 8. a drain pipe; 9. a water supply pipe; 10. a water storage pipeline; 11. a connecting pipe; 12. a valve; 13. a water quantity monitoring meter; 14. an overflow port; 15. a sewer pipeline; 16. a reservoir; 17. a second booster pump; 18. a communicating pipe; 19. a fire hose.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the following description will be made with reference to fig. 1 of the embodiments of the present invention to clearly and completely describe the technical solutions of the embodiments of the present invention. It is to be understood that the embodiments described are only some of the embodiments of the present invention, and not all of them. All other embodiments, which can be derived from the description of the embodiments of the present invention by a person skilled in the art, are within the scope of the present invention.
Example one
As shown in fig. 1: a construction site energy saving device comprising: a water tank 1, a sedimentation tank 2, a water tank 3 and a first booster pump 4, wherein one side of the water tank 1 is provided with a water pump 5, the water pump 5 is provided with a water inlet pipe 7 and a water outlet pipe 6, the water stored in the water tank 1 can be pumped into the water pump 5 under the action of the water pump 5 and then enters the sedimentation tank 2 through the water outlet pipe 6 arranged on the water pump 5, a water outlet pipe 8 arranged on the sedimentation tank 2 can ensure that impurities and mud in the water can enter the water tank 3 after sedimentation, a water supply pipe 9 arranged on the water tank 3 and the first booster pump 4 arranged on one side of the water tank 3 can ensure that water in the water tank 3 enters a water storage pipeline 10 arranged on the first booster pump 4 under the action of the first booster pump 4, the water storage pipeline 10 is provided with a connecting pipe 11, the connecting pipe 11 can ensure that personnel can use the water more conveniently, and the water can be used by the valve 12 arranged between the water storage, the water body can be better used by constructors, and the loss of water flow can be better controlled.
Particularly, the water pump is arranged on one side of the water tank, so that water in the water tank can be pumped into the sedimentation tank, water flow in a foundation is reduced, silt and impurities in the water flow can be precipitated under the action of the sedimentation tank through the sedimentation tank, when the impurities in the sedimentation tank are stored in a certain amount, the impurities are periodically removed by constructors, the continuous operation in the sedimentation tank can be ensured, the water tank is communicated with and drained out of the sedimentation tank, the precipitated water can enter the water tank, the water tank can also enable the precipitated water flow to be subjected to simple secondary precipitation, the water tank is used for water source use under the action of a first booster pump arranged on one side of the water tank for construction sites, when the water pump is used by constructors, the loss of a tax source can be better controlled through a valve, the water resource reuse benefit is greatly increased, and the constructors can obtain more convenient use conditions of the water source, greatly increasing the working efficiency of construction units.
According to the utility model discloses an embodiment, as shown in fig. 1, the water yield monitoring meter 13 of setting on sedimentation tank 2 can make 3 interior water volumes of pond reach a certain amount, and the water is deposited in sedimentation tank 2 and can not discharge in basin 1, and water yield monitoring meter 13 can in time feed back to constructor, makes the water source can not appear extravagantly, greatly increased the energy-conserving effect in building site.
According to the utility model discloses an embodiment, as shown in fig. 1, the overflow mouth 14 of setting on pond 3, busy in other during operations at constructor, in time can not discover the water yield and reach a certain amount, discharge through setting up sewer pipe 15 at overflow mouth 14 lower extreme and set up in 3 one side cistern 16 in the pond, with possessing water source impurity in the process of deposiing on the cistern 16, through setting up at 16 one side second booster pumps 17 of cistern, can make rivers be used for more water sources places of use, protect water source run-off phenomenon more.
According to an embodiment of the present invention, as shown in fig. 1, the water source of the reservoir can be used for site watering or other purposes by providing a fire hose 19 on one side of the reservoir 16, greatly increasing the phenomenon of water source reuse.
Certainly, if need under the condition that intelligence was used, through the filter equipment who sets up intercommunication pond and cistern, can bring better domestic water source for the construction workman, greatly increased construction workman's convenience, improved the benefit of construction unit.
The utility model discloses a use method: will have the water source suction sedimentation tank of silt impurity through the water pump and deposit, through pond and cistern, can make the water source purify, make the water source reuse, make the building site water more energy-conserving greatly, improve the benefit nature of construction site greatly.
The foregoing is a preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, a plurality of improvements and decorations can be made without departing from the principle of the present invention, and these improvements and decorations should also be regarded as the protection scope of the present invention.

Claims (4)

1. A building site energy-saving equipment which is characterized in that: the method comprises the following steps: the water tank comprises a water tank (1), a sedimentation tank (2), a water tank (3) and a first booster pump (4), wherein a water pump (5) is arranged on one side of the water tank (1), a water outlet pipe (6) is arranged on the water pump (5), a water inlet pipe (7) is arranged on the water pump (5), the water inlet pipe (7) is connected with the water tank (1), the water outlet pipe (6) is connected with the sedimentation tank (2), a water drain pipe (8) is arranged on the upper portion of the sedimentation tank (2), the water drain pipe (8) is connected with the water tank (3), a water supply pipe (9) is arranged on the water tank (3), the water supply pipe (9) is in bolt connection with the first booster pump (4), a water storage pipeline (10) is arranged on one side of the first booster pump (4), a plurality of connecting pipes (11) are arranged on the water, one end of the valve (12) is connected with the water storage pipeline (10), and one end of the valve (12) is connected with the connecting pipe (11).
2. A construction site energy saving device according to claim 1, wherein: the water discharge pipe (8) is arranged at the upper end of the sedimentation tank (2), a water quantity monitoring meter (13) is arranged on the sedimentation tank (2), and the water quantity monitoring meter (13) is communicated with the sedimentation tank (2).
3. A construction site energy saving device according to claim 1, wherein: set up overflow mouth (14) on pond (3), sewer pipe (15) are set up to overflow mouth (14) bottom, pond (3) one side sets up cistern (16), cistern (16) one side sets up second booster pump (17), set up intercommunication pipeline (18) on second booster pump (17), intercommunication pipeline (18) and second booster pump (17) bolted connection.
4. A construction site energy saving device according to claim 3, wherein: a fire-fighting pipe (19) is arranged on one side of the water storage tank (16), and the communication pipeline (18) is connected with the fire-fighting pipe (19).
CN202020578053.2U 2020-04-17 2020-04-17 Building site energy-saving equipment Active CN212001203U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020578053.2U CN212001203U (en) 2020-04-17 2020-04-17 Building site energy-saving equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020578053.2U CN212001203U (en) 2020-04-17 2020-04-17 Building site energy-saving equipment

Publications (1)

Publication Number Publication Date
CN212001203U true CN212001203U (en) 2020-11-24

Family

ID=73415577

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020578053.2U Active CN212001203U (en) 2020-04-17 2020-04-17 Building site energy-saving equipment

Country Status (1)

Country Link
CN (1) CN212001203U (en)

Similar Documents

Publication Publication Date Title
CN206267267U (en) A kind of rainwater-collecting reclaiming system
CN212001203U (en) Building site energy-saving equipment
CN112523239A (en) Foundation pit gas lift reverse circulation dewatering device and method
CN211228566U (en) Recoverable vacuum light well point dewatering system
CN215441978U (en) Light well point dewatering device under condition of muddy saturated soil texture
CN212327645U (en) Flushing type soft filtering device in front of pump
CN210976044U (en) Wall-mounted micro drainage pump station for sewage interception engineering
CN211547778U (en) Centralized drainage system for water burst of subway station deep foundation pit step-by-step excavation
CN210764623U (en) Orchard water storage, pollution discharge and oxygenation system
CN207597464U (en) A kind of new structure sewage disposal pump
RU193335U1 (en) SPRAY PUMP FOR SILT DRAINAGE AND TRANSPORTATION
CN207776085U (en) A kind of drainage dredging device
CN219508782U (en) Drainage device convenient for building construction
CN214461081U (en) Integrated intelligent pump station silt-preventing device
CN219690569U (en) Water pumping and draining system for draining water in winter of dewatering well
CN110424218A (en) A kind of Metro station excavation dewatering well water-source recovering-utilizing system
CN213987247U (en) Device for observing water level of check dam and taking water for utilization
CN109750718A (en) Farm field irrigation drainage condominium system
CN220336046U (en) Sewage pipeline supercharging dredging facility and sewage discharge system
CN216156674U (en) Water conservancy water and electricity is ditch desilting device for construction
CN218620372U (en) Top-inlet up-flow point-to-point water distributor
CN215562992U (en) Construction structure of temporary fire-fighting water pump house
CN211143267U (en) Environment-friendly buried rainwater recycling system
CN212248353U (en) Can realize utility tunnel system of catchmenting, irrigation
CN220441510U (en) Irrigation system is collected to stony desertification slope stone bud ditch precipitation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant