CN212000574U - Temporary connection structure for steel pipe arch ring segments - Google Patents
Temporary connection structure for steel pipe arch ring segments Download PDFInfo
- Publication number
- CN212000574U CN212000574U CN202020503438.2U CN202020503438U CN212000574U CN 212000574 U CN212000574 U CN 212000574U CN 202020503438 U CN202020503438 U CN 202020503438U CN 212000574 U CN212000574 U CN 212000574U
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- arch ring
- otic placode
- arch
- jurisdiction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 50
- 239000010959 steel Substances 0.000 title claims abstract description 50
- 230000008878 coupling Effects 0.000 claims description 5
- 238000010168 coupling process Methods 0.000 claims description 5
- 238000005859 coupling reaction Methods 0.000 claims description 5
- 238000003466 welding Methods 0.000 abstract description 9
- 238000010276 construction Methods 0.000 abstract description 6
- 238000004134 energy conservation Methods 0.000 abstract description 4
- 230000007613 environmental effect Effects 0.000 abstract description 4
- 238000002347 injection Methods 0.000 abstract description 2
- 239000007924 injection Substances 0.000 abstract description 2
- 238000009434 installation Methods 0.000 description 8
- 230000007246 mechanism Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 239000000243 solution Substances 0.000 description 1
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
The utility model discloses a steel pipe encircles section of jurisdiction temporary connection structure, including a plurality of otic placodes that are located the outside of circle of jurisdiction, all otic placodes set up along the circumference interval of circle of jurisdiction, and the steel pipe outer wall fixed connection of otic placode and circle of jurisdiction, still are connected with a plurality of brackets between otic placode and steel pipe outer wall, are connected through the bolt between the otic placode of two adjacent circle of jurisdiction. The utility model arranges the ear plates and the brackets on the outer wall of the steel pipe of the arch ring segment, thereby not affecting the internal structure of the steel pipe, and ensuring the compactness of the concrete in the pipe without any influence on the flow of the concrete during the pressure injection of the concrete in the pipe; all the lug plates are arranged at intervals along the circumferential direction of the arch ring sections, so that the mounting workload of the connecting bolts is reduced, the lug plates are arranged outside the steel pipe, the alignment mounting operation is more convenient, the high-altitude operation time is shortened, and the construction risk is reduced; after the permanent welding seam of the arch ring segment is welded, the temporary connecting structure can be directly cut off, and steel can be recycled, so that the energy conservation and environmental protection are facilitated.
Description
Technical Field
The utility model relates to a building engineering technical field, especially a steel pipe arch ring festival section temporary connection structure.
Background
The steel pipe truss structure of the traditional steel pipe concrete arch bridge (or steel pipe concrete stiff skeleton) is usually constructed by adopting a cable hoisting inclined pull buckling hanging method, steel pipe truss sections are hoisted symmetrically on two sides, after each section is hoisted in place, the section is temporarily connected through a flange plate, a buckling anchor cable is installed after the section is temporarily connected in place, then, permanent welding seams among the sections are welded, and section installation is completed. For example, as shown in fig. 1 to 2, the first segment 1 and the second segment 2 are connected by a temporary connection structure 3 (flange) provided with a bracket 31, and the flanges of the two segments are connected by bolts 4 and welded by a permanent weld 5 after the anchor cable is installed.
However, practical application finds that the flange structure adopted at present has some defects, firstly, the number of bolts on the flange is too large, and the bolts are arranged in the steel pipe, so that the alignment and the bolt installation during the hoisting of the overhead cable are not facilitated, and particularly, when the wind power of overhead operation is large, the steel pipe is particularly difficult to align and install, so that the construction risk of the overhead operation is increased; secondly, the structure of the inner flange plate inside the steel pipe is complex, the inner space of the steel pipe is occupied greatly, and when concrete is injected into the pipe in the later stage, the compactness of the concrete at the position has problems.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a: aiming at the problems of more bolts of the traditional flange plate, difficult alignment and incompact pressure injection of concrete in the pipe in the prior art, the temporary connection structure of the steel pipe arch ring segments is provided.
In order to realize the purpose, the utility model discloses a technical scheme be:
the utility model provides a steel pipe arch ring section temporary connection structure, includes a plurality of otic placodes that are located the arch ring section outside, all the otic placode along the circumference interval of arch ring section sets up, just the otic placode with the steel pipe outer wall fixed connection of arch ring section the otic placode with still be connected with a plurality of brackets, adjacent two between the otic placode of arch ring section is connected through the bolt.
Temporary connection structure, including otic placode and bracket, the rethread bolt is connected, otic placode and bracket all set up the steel pipe outer wall at the arch ring festival section, do not influence steel pipe inner structure, therefore do not have any influence to the flow of concrete when intraductal concrete pressure is annotated, have guaranteed the closely knit nature of intraductal concrete. Simultaneously, all otic placodes set up along the circumference interval of hunch circle segment, the installation work load of connecting bolt that has significantly reduced, and the otic placode is arranged in the outside of steel pipe, is convenient for more counterpoint installation operation, has shortened high altitude construction time, has reduced the construction risk. In addition, after the permanent welding seam welding of two adjacent arch ring sections is completed, the temporary connection structure can be directly cut off, and steel can be recycled, so that the energy conservation and the environmental protection are facilitated.
As a preferred embodiment of the present invention, all of the ear plates are arranged along the circumferential symmetry of the arch ring segment.
As the utility model discloses a preferred scheme, every the symmetry is equipped with a plurality ofly on the otic placode the bracket.
As the preferred scheme of the utility model, the otic placode the bracket respectively with steel pipe outer wall welded connection.
As the preferred scheme of the utility model, the otic placode the bracket is the steel sheet.
As the utility model discloses an optimal scheme, along the circumference symmetrical welding of hunch circle segment has 4 the otic placode, every the otic placode all is through 3 the bracket with the steel pipe outer wall is connected, and every all be equipped with 2 bolt holes on the otic placode to through bolted connection adjacent two the hunch circle segment.
To sum up, owing to adopted above-mentioned technical scheme, the beneficial effects of the utility model are that:
temporary connection structure, including otic placode and bracket, the rethread bolt is connected, otic placode and bracket all set up the steel pipe outer wall at the arch ring festival section, do not influence steel pipe inner structure, therefore do not have any influence to the flow of concrete when intraductal concrete pressure is annotated, have guaranteed the closely knit nature of intraductal concrete. Simultaneously, all otic placodes set up along the circumference interval of hunch circle segment, the installation work load of connecting bolt that has significantly reduced, and the otic placode is arranged in the outside of steel pipe, is convenient for more counterpoint installation operation, has shortened high altitude construction time, has reduced the construction risk. In addition, after the permanent welding seam welding of two adjacent arch ring sections is completed, the temporary connection structure can be directly cut off, and steel can be recycled, so that the energy conservation and the environmental protection are facilitated.
Drawings
Fig. 1 is a schematic view of a conventional flange for segment connection.
Fig. 2 is a schematic cross-sectional view of a segment joint using a conventional flange.
Fig. 3 is a schematic structural view of segment connection using the I-temporary connection structure according to the present invention.
Fig. 4 is a schematic cross-sectional view of segment joining using the temporary connection configuration of the present invention.
Icon: 1-first section, 2-second section, 3-temporary connection configuration, 31-bracket, 32-ear plate, 4-bolt, 5-weld.
Detailed Description
The present invention will be described in detail with reference to the accompanying drawings.
In order to make the objects, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are for purposes of illustration only and are not intended to limit the invention.
Example 1
As shown in fig. 3-4, a temporary connection structure 3 for steel pipe arch ring segments comprises a bracket 31 and lug plates 32, wherein the lug plates 32 and the bracket 31 are both steel plates, and the lug plates 32 of two adjacent arch ring segments are connected through bolts 4.
Be provided with 4 along the circumference symmetry of arch ring section (first section 1 and second section 2) otic placode 32, every otic placode 32 with the steel pipe outer wall welded connection of arch ring section, every otic placode 32 with still welded connection has 3 between the steel pipe outer wall bracket 31. Each of the ear plates 32 is provided with 2 bolt holes, and the first segment 1 and the second segment 2 are temporarily connected by bolts 4.
The utility model discloses only need set up 8 bolts 4 (reduce 50% than the ring flange is connected), reduced bolt 4's installation work volume, the steel pipe of being convenient for is counterpointed the installation. And whole interim coupling mechanism 3 sets up in the outside of steel pipe, does not have any influence to the flow of concrete when the intraductal concrete is pressed and is annotated, has guaranteed the closely knit nature of intraductal concrete. After the first section 1 and the second section 2 complete the welding of the permanent welding seam 5, the temporary connecting mechanism 3 can be cut off, and steel can be recycled, so that the energy conservation and the environmental protection are facilitated.
The above description is only exemplary of the present invention and should not be taken as limiting the scope of the present invention, as any modifications, equivalents, improvements and the like made within the spirit and principles of the present invention are intended to be included within the scope of the present invention.
Claims (6)
1. The utility model provides a steel pipe arch ring section temporary connection structure, its characterized in that includes a plurality of otic placodes (32) that are located the arch ring section outside, all otic placode (32) along the circumference interval of arch ring section sets up, just otic placode (32) with the steel pipe outer wall fixed connection of arch ring section otic placode (32) with still be connected with a plurality of brackets (31) between the steel pipe outer wall, adjacent two be connected through bolt (4) between otic placode (32) of arch ring section.
2. A temporary coupling structure of a steel pipe arch segment according to claim 1, wherein all of the ear plates (32) are symmetrically disposed along the circumference of the arch segment.
3. A temporary coupling structure of a steel tube arch segment according to claim 1, wherein a plurality of said brackets (31) are symmetrically provided on each of said ear plates (32).
4. A temporary coupling structure of a steel tube arch segment according to claim 1, wherein the ear plate (32) and the bracket (31) are welded to the outer wall of the steel tube, respectively.
5. A temporary connection structure of a steel pipe arch segment according to any one of claims 1 to 4, wherein the ear plate (32) and the corbel (31) are both steel plates.
6. A temporary coupling structure of a steel pipe arch segment according to any one of claims 1 to 4, wherein 4 of said ear plates (32) are symmetrically welded along the circumference of said arch segment, each of said ear plates (32) is connected to the outer wall of said steel pipe by 3 of said corbels (31), and each of said ear plates (32) is provided with 2 bolt holes, and two adjacent arch segments are connected by bolts (4).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020503438.2U CN212000574U (en) | 2020-04-08 | 2020-04-08 | Temporary connection structure for steel pipe arch ring segments |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020503438.2U CN212000574U (en) | 2020-04-08 | 2020-04-08 | Temporary connection structure for steel pipe arch ring segments |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212000574U true CN212000574U (en) | 2020-11-24 |
Family
ID=73403522
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020503438.2U Expired - Fee Related CN212000574U (en) | 2020-04-08 | 2020-04-08 | Temporary connection structure for steel pipe arch ring segments |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212000574U (en) |
-
2020
- 2020-04-08 CN CN202020503438.2U patent/CN212000574U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2018152956A1 (en) | Assembled-type round steel pipe casing fiber-reinforced concrete column connecting node and mounting method | |
CN207277562U (en) | Assembled concrete-filled circular steel tube column-H-shaped girder steel Integral flange outer shroud plate node | |
CN206942782U (en) | Hole tunnel inner supporting structure under a kind of overlapping shield section up and down | |
CN112031810B (en) | Connecting channel portal structure and connecting method thereof | |
CN110130387B (en) | Construction process of integrated type sleeve cage | |
CN111335139A (en) | Temporary connection structure for steel pipe arch ring segments | |
CN212000574U (en) | Temporary connection structure for steel pipe arch ring segments | |
CN109252682A (en) | A kind of rope bearing structure hound installation method | |
CN218969809U (en) | Quick assembled closed box culvert structure | |
CN108265826B (en) | Steel plate reinforced type square steel pipe column and K-shaped steel support connecting node | |
CN112031786B (en) | Tunnel portal ring beam structure and method for connecting tunnel portal ring beam structure with steel sleeve | |
CN206784431U (en) | Telescopic joint for underground pipe gallery | |
CN211172434U (en) | Pipe truss butt joint interface | |
CN209353350U (en) | A kind of double combined bracing members work compound connector | |
CN111271068A (en) | Movable reaction frame for shield launching | |
CN111997189A (en) | Fabricated concrete slab structure and dry-type connecting method thereof | |
CN216811704U (en) | Assembled tunnel segment anti-deformation reinforcing device | |
CN207695952U (en) | A kind of face-flange-steel-pipe welding centralizer | |
CN220775253U (en) | Tensile high-strength cable protection tube | |
CN221055551U (en) | Calcium carbide furnace circulating water system | |
CN215630078U (en) | Reverse steel platform foundation structure | |
CN218437090U (en) | Steel supporting device | |
CN221216846U (en) | Auxiliary device for hoisting shield residue soil vehicle | |
CN218510305U (en) | Connecting and sealing device for joint part of pipe jacking port and vertical shaft | |
CN217402011U (en) | High-precision new-energy locomotive fluid pipe assembly |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20201124 |
|
CF01 | Termination of patent right due to non-payment of annual fee |