CN211991075U - Drilling equipment is used in check out test set production - Google Patents

Drilling equipment is used in check out test set production Download PDF

Info

Publication number
CN211991075U
CN211991075U CN202020186624.8U CN202020186624U CN211991075U CN 211991075 U CN211991075 U CN 211991075U CN 202020186624 U CN202020186624 U CN 202020186624U CN 211991075 U CN211991075 U CN 211991075U
Authority
CN
China
Prior art keywords
workbench
bottom end
screw
groups
top end
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020186624.8U
Other languages
Chinese (zh)
Inventor
范正国
高明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Yushun Engineering Inspection Technology Service Co ltd
Original Assignee
Jiangsu Yushun Engineering Inspection Technology Service Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Yushun Engineering Inspection Technology Service Co ltd filed Critical Jiangsu Yushun Engineering Inspection Technology Service Co ltd
Priority to CN202020186624.8U priority Critical patent/CN211991075U/en
Application granted granted Critical
Publication of CN211991075U publication Critical patent/CN211991075U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Drilling And Boring (AREA)

Abstract

The utility model relates to the technical field of production and processing, in particular to a drilling device for production of detection equipment, which improves the stability and the working efficiency of materials by adding an adjusting device, and simultaneously reduces the loss of the materials and the cost; the drilling machine comprises a workbench, foot rests, a support, cross columns, two groups of cylinders, a plurality of groups of telescopic rods, a fixing frame, a power device, an installation rod and a drill bit, wherein the bottom end of the workbench is connected with the top end of the foot rests, the top end of the workbench is connected with the bottom end of the support, the cross columns are installed on the support, and the top ends of the cross columns are connected with the bottom ends of the cylinders; still include motor, lead screw, portable workstation, multiunit fixed plate, the first bearing of multiunit, multiunit screwed pipe, multiunit screw and multiunit splint, motor output and lead screw input end are connected, and the motor is fixed in the workstation outside, and the lead screw is installed inside the workstation, and portable workstation spiral shell dress is on the lead screw, and the fixed plate bottom is connected with portable workstation top.

Description

Drilling equipment is used in check out test set production
Technical Field
The utility model relates to a technical field of production and processing especially relates to a drilling equipment is used in check out test set production.
Background
As is well known, a drilling device for production of inspection equipment is a drilling device for inspection equipment, which is widely used in the field of production and processing; the drilling device for production of the existing detection equipment comprises a workbench, a foot rest, a support, a cross column, two groups of cylinders, a plurality of groups of telescopic rods, a fixing frame, a power device, an installation rod and a drill bit, wherein the bottom end of the workbench is connected with the top end of the foot rest, the top end of the workbench is connected with the bottom end of the support, the cross column is installed on the support, the top end of the cross column is connected with the bottom end of the cylinder, the top end of the telescopic rod penetrates through the cross column and is connected with the bottom end of the cylinder, the top end of the fixing frame is connected with the bottom end of the telescopic rod, the bottom end of the; when the existing drilling device for detecting equipment production is used, a power device is turned on, and materials placed on a workbench work by adjusting the height of a telescopic rod; the existing drilling device for detecting equipment production is found in use, materials are not provided with a fixing device, the materials are easy to move in the working process, the stability is poor, the working efficiency is reduced, and the accuracy is reduced.
SUMMERY OF THE UTILITY MODEL
For solving the technical problem, the utility model provides a through increasing adjusting device, make the stability and the work efficiency improvement of material, also reduced the loss of material simultaneously, reduce the drilling equipment is used in the check out test set production of cost.
The utility model discloses a drilling equipment is used in check out test set production, including workstation, foot rest, support, spreader, two sets of cylinders, multiunit telescopic link, mount, power device, installation pole and drill bit, workstation bottom and foot rest top are connected, workstation top and support bottom are connected, the spreader is installed on the support, the spreader top is connected with the cylinder bottom, the telescopic link top runs through the spreader and is connected with the cylinder bottom, the mount top is connected with the telescopic link bottom, the power device bottom is connected with the mount top, the installation pole runs through the mount and is connected with the power device bottom, the drill bit is installed in installation pole bottom; still include the motor, the lead screw, but the mobile workbench, the multiunit fixed plate, the first bearing of multiunit, the multiunit screwed pipe, multiunit screw and multiunit splint, motor output and lead screw input end are connected, the motor is fixed in the workstation outside, the lead screw is installed inside the workstation, but mobile workbench spiral shell dress is on the lead screw, fixed plate bottom and mobile workbench top are connected, first bearing is installed on the fixed plate, the screwed pipe rotates through first bearing and installs on the fixed plate, the screw spiral shell dress is inside the screwed pipe, screw and splint are connected.
The utility model discloses a drilling equipment is used in check out test set production still includes the gag lever post, and the gag lever post both ends are fixed inside the workstation, and the gag lever post both ends are provided with the limiting plate.
The utility model discloses a drilling equipment is used in check out test set production still includes guide way and guide block, and the guide way is installed in the middle of portable workstation, and the guide block is installed in the splint bottom.
The utility model discloses a drilling equipment is used in check out test set production still includes the second bearing, and the second bearing is installed on the workstation to with the portable connection of lead screw.
The utility model discloses a drilling equipment is used in check out test set production still includes protective sheath and screw, and the protective sheath top is connected with installation pole bottom, and the drill bit passes the protective sheath bottom, connects through screw and installation pole, and the screw spiral shell dress is inside the protective sheath.
The utility model discloses a drilling equipment is used in check out test set production still includes the multiunit cushion, and the cushion side is connected with the splint side.
The utility model discloses a drilling equipment is used in check out test set production still includes the callus on the sole, and the callus on the sole top is connected with the foot rest bottom.
The utility model discloses a drilling equipment is used in check out test set production is provided with the handle on the screwed pipe.
Compared with the prior art, the beneficial effects of the utility model are that: through setting up electronic fixing device, improve the stability of material, increase the operating accuracy degree, improve work efficiency.
Drawings
Fig. 1 is a schematic structural diagram of the present invention;
FIG. 2 is a schematic side sectional view of FIG. 1;
FIG. 3 is a schematic top view of the movable table connected to a guide groove or the like;
FIG. 4 is a schematic view of the movable table connected to a stop bar or the like;
FIG. 5 is an enlarged schematic view of portion A of FIG. 1;
in the drawings, the reference numbers: 1. a work table; 2. a foot rest; 3. a support; 4. a cross post; 5. a cylinder; 6. a telescopic rod; 7. a fixed mount; 8. a power plant; 9. mounting a rod; 10. a drill bit; 11. a motor; 12. a lead screw; 13. a movable work table; 14. a fixing plate; 15. a first bearing; 16. a solenoid; 17. a screw; 18. a splint; 19. a limiting rod; 20. a limiting plate; 21. a guide groove; 22. a guide block; 23. a second bearing; 24. a protective sleeve; 25. a screw; 26. a soft cushion; 27. a foot pad.
Detailed Description
The following detailed description of the embodiments of the present invention is provided with reference to the accompanying drawings and examples. The following examples are intended to illustrate the invention, but are not intended to limit the scope of the invention.
As shown in fig. 1 to 5, the utility model discloses a drilling device is used in production of check out test set, including workstation 1, foot rest 2, support 3, spreader 4, two sets of cylinders 5, multiunit telescopic link 6, mount 7, power device 8, installation pole 9 and drill bit 10, workstation 1 bottom and foot rest 2 top are connected, workstation 1 top and support 3 bottom are connected, spreader 4 is installed on support 3, spreader 4 top and cylinder 5 bottom are connected, telescopic link 6 top runs through spreader 4 and is connected with cylinder 5 bottom, mount 7 top and telescopic link 6 bottom are connected, power device 8 bottom and mount 7 top are connected, installation pole 9 runs through mount 7 and is connected with power device 8 bottom, drill bit 10 is installed in installation pole 9 bottom; the automatic screw assembling machine further comprises a motor 11, a screw rod 12, a movable workbench 13, a plurality of groups of fixing plates 14, a plurality of groups of first bearings 15, a plurality of groups of screw tubes 16, a plurality of groups of screws 17 and a plurality of groups of clamping plates 18, wherein the output end of the motor 11 is connected with the input end of the screw rod 12, the motor 11 is fixed on the outer side of the workbench 1, the screw rod 12 is installed inside the workbench 1, the movable workbench 13 is screwed on the screw rod 12, the bottom end of the fixing plate 14 is connected with the top end of the movable workbench 13, the first bearings 15 are installed on the fixing plates 14, the screw tubes 16 are movably installed on the fixing plates 14 through the first bearings 15, the screws; through setting up electronic fixing device, improve the stability of material, increase the operating accuracy degree, improve work efficiency.
The utility model discloses a drilling equipment for production of detection equipment, still include gag lever post 19, gag lever post 19 both ends are fixed inside workstation 1, and gag lever post 19 both ends are provided with limiting plate 20; through setting up stop device, play stability and restriction effect to portable workstation 13.
The utility model discloses a drilling device for production of detection equipment, which also comprises a guide groove 21 and a guide block 22, wherein the guide groove 21 is arranged in the middle of the movable workbench 13, and the guide block 22 is arranged at the bottom end of the clamping plate 18; through setting up guide way 21, make things convenient for splint 18 to remove, can more accurate fixed position, improve work efficiency.
The drilling device for production of the detection equipment of the utility model also comprises a second bearing 23, wherein the second bearing 23 is arranged on the workbench 1 and movably connected with the lead screw 12; by providing the second bearing 23, the activity of the screw 12 is improved.
The utility model discloses a drilling equipment for production of detection equipment, still include protective sheath 24 and screw 25, the top of protective sheath 24 is connected with installation pole 9 bottom, and drill bit 10 passes through the protective sheath 24 bottom, connects through screw 25 and installation pole 9, and screw 25 spiral shell dress is inside protective sheath 24; by this arrangement, the stability of the drill bit 10 may be improved.
The drilling device for production of the detection equipment of the utility model also comprises a plurality of groups of soft pads 26, the side surfaces of the soft pads 26 are connected with the side surfaces of the clamping plates 18; by providing the soft pad 26, the material can be protected from damage during fixation.
The drilling device for production of the detection equipment of the utility model also comprises a foot pad 27, wherein the top end of the foot pad 27 is connected with the bottom end of the foot rest 2; the foot pad 27 is arranged to protect the foot rest 2, increase the stress area of the workbench and improve the stability.
The utility model relates to a drilling device for production of detection equipment, a handle is arranged on a solenoid 16; through the arrangement, the solenoid can be conveniently rotated.
The utility model discloses a drilling equipment is used in check out test set production, it is at the during operation, puts the material on the workstation, opens the motor, drives driving screw and portable workstation, lets the material can the back-and-forth movement, and the adjustment position through rotating the screwed pipe, adjusts the material and controls the position, opens power device, then the drill bit begins work, accomplish the needs punch can.
The installation mode, the connection mode or the setting mode of the drilling device for production of the detection equipment of the utility model are common mechanical modes, and the drilling device can be implemented as long as the beneficial effects can be achieved; the utility model discloses a drilling equipment for production of check out test set's power device and motor are purchase on the market, and this technical staff only need according to its subsidiary operating specification install and operate can.
The foregoing is only a preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, a plurality of modifications and variations can be made without departing from the technical principle of the present invention, and these modifications and variations should also be regarded as the protection scope of the present invention.

Claims (8)

1. A drilling device for production of detection equipment comprises a workbench (1), foot rests (2), a bracket (3), a cross column (4) and two groups of cylinders (5), the multifunctional drilling machine comprises a plurality of groups of telescopic rods (6), a fixing frame (7), a power device (8), an installation rod (9) and drill bits (10), the bottom end of a workbench (1) is connected with the top end of a foot rest (2), the top end of the workbench (1) is connected with the bottom end of a support (3), a cross column (4) is installed on the support (3), the top end of the cross column (4) is connected with the bottom end of a cylinder (5), the top end of the telescopic rod (6) penetrates through the cross column (4) and is connected with the bottom end of the cylinder (5), the top end of the fixing frame (7) is connected with the bottom end of the telescopic rod (6), the bottom end of the power device (8) is connected with the top end of the fixing frame (7), the installation rod (9) penetrates through the fixing frame (7; the automatic screw assembling machine is characterized by further comprising a motor (11), a lead screw (12), a movable workbench (13), a plurality of groups of fixing plates (14), a plurality of groups of first bearings (15), a plurality of groups of screw tubes (16), a plurality of groups of screws (17) and a plurality of groups of clamping plates (18), the output end of the motor (11) is connected with the input end of the lead screw (12), the motor (11) is fixed on the outer side of the workbench (1), the lead screw (12) is installed inside the workbench (1), the movable workbench (13) is installed on the lead screw (12) in a screwed mode, the bottom end of the fixing plate (14) is connected with the top end of the movable workbench (13), the first bearings (15) are installed on the fixing plates (14), the screw tubes (16) are installed on the fixing plates (14) in a rotating mode through the first bearings (15), the screws (17) are installed inside the screw tubes.
2. The drilling device for detecting equipment production as claimed in claim 1, further comprising a limiting rod (19), wherein two ends of the limiting rod (19) are fixed inside the workbench (1), and two ends of the limiting rod (19) are provided with limiting plates (20).
3. The drilling device for detecting equipment production as claimed in claim 2, further comprising a guide groove (21) and a guide block (22), wherein the guide groove (21) is installed in the middle of the movable workbench (13), and the guide block (22) is installed at the bottom end of the clamping plate (18).
4. The drilling device for detecting equipment production as claimed in claim 3, further comprising a second bearing (23), wherein the second bearing (23) is mounted on the workbench (1) and movably connected with the lead screw (12).
5. The drilling device for detecting equipment production as claimed in claim 4, further comprising a protective sleeve (24) and a screw (25), wherein the top end of the protective sleeve (24) is connected with the bottom end of the mounting rod (9), the drill bit (10) passes through the bottom end of the protective sleeve (24) and is connected with the mounting rod (9) through the screw (25), and the screw (25) is screwed in the protective sleeve (24).
6. The drilling device for detecting equipment production as claimed in claim 5, further comprising a plurality of groups of soft pads (26), wherein the sides of the soft pads (26) are connected with the sides of the clamping plates (18).
7. The drilling device for detecting equipment production as claimed in claim 6, further comprising a foot pad (27), wherein the top end of the foot pad (27) is connected with the bottom end of the foot rest (2).
8. A drilling device for the production of inspection equipment according to claim 7 wherein the solenoid (16) is provided with a handle.
CN202020186624.8U 2020-02-19 2020-02-19 Drilling equipment is used in check out test set production Active CN211991075U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020186624.8U CN211991075U (en) 2020-02-19 2020-02-19 Drilling equipment is used in check out test set production

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020186624.8U CN211991075U (en) 2020-02-19 2020-02-19 Drilling equipment is used in check out test set production

Publications (1)

Publication Number Publication Date
CN211991075U true CN211991075U (en) 2020-11-24

Family

ID=73420597

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020186624.8U Active CN211991075U (en) 2020-02-19 2020-02-19 Drilling equipment is used in check out test set production

Country Status (1)

Country Link
CN (1) CN211991075U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112830413A (en) * 2020-12-26 2021-05-25 江苏光明环境设备有限公司 Supporting auxiliary device for mounting indoor electric heating equipment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112830413A (en) * 2020-12-26 2021-05-25 江苏光明环境设备有限公司 Supporting auxiliary device for mounting indoor electric heating equipment

Similar Documents

Publication Publication Date Title
CN211991075U (en) Drilling equipment is used in check out test set production
CN108515209A (en) A kind of mold cramping drilling machine
CN209007136U (en) A kind of turning attachment device
CN206605276U (en) A kind of miniature parts rig
CN113580082A (en) Metal workpiece assembling auxiliary device
CN108340160A (en) A kind of steel pipe cutting device for building with punching functions
CN215999008U (en) Cutting angle adjustable type fast wire moving workbench
CN212917398U (en) High-precision wire cutting machine for laboratory
CN2399150Y (en) Crankshaft stress eliminating straightener
CN208341798U (en) A kind of steel plate drilling equipment
CN206273485U (en) Fixture installs module
CN109990932B (en) Tunnel surrounding rock pressure gauge fixing device
CN220289505U (en) Detection device for wood structure defect
CN207771767U (en) Gauge block clamp
CN111659824A (en) High-precision wire cutting machine for laboratory
CN218365266U (en) Sliding table saw for wood processing
CN217095779U (en) Drilling equipment is used in processing of commercial car water-cooling board casing
CN215927366U (en) Intelligent well site data processing equipment
CN220161453U (en) Tapping device for metal parts
CN221248400U (en) Middle hole grinding device for plunger sleeve type workpiece
CN219853471U (en) Drilling device for metal product processing
CN214293526U (en) Numerical control drill press for rosewood
CN205927198U (en) Fan pincers body oilhole processingequipment
CN215700061U (en) Detachable automatic feeding device for bench drill spindle
CN217168488U (en) Carpentry board cutting and marking mechanism

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant