CN211984202U - Construction engineering budget project management equipment - Google Patents
Construction engineering budget project management equipment Download PDFInfo
- Publication number
- CN211984202U CN211984202U CN202020415629.3U CN202020415629U CN211984202U CN 211984202 U CN211984202 U CN 211984202U CN 202020415629 U CN202020415629 U CN 202020415629U CN 211984202 U CN211984202 U CN 211984202U
- Authority
- CN
- China
- Prior art keywords
- case
- plate
- project
- budget
- placing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Handcart (AREA)
Abstract
The utility model discloses a building engineering budget project management equipment, including the bottom plate, the bottom plate facial make-up is equipped with the backup pad, and the apron has been installed at the both ends of backup pad, and the first case of placing has been installed to the downside position that is located the apron on the bottom plate, and in the backup pad, correspond each first position of placing the case and installed the second and place the case, and the second is placed the case facial make-up and is equipped with the case lid, and the case lid facial make-up is equipped with the hand (hold), and the marking plate has been installed. When the supplementary budget sheet is printed, the supplementary budget sheet is put into the first placing box corresponding to the name of the project on the identification plate, when the supplementary budget sheet and the initial budget sheet of each project need to be arranged together, the corresponding supplementary budget sheet in the first placing box and the corresponding initial budget sheet in the second placing box can be taken out and arranged together one by one corresponding to the project identification on each identification plate, the arrangement error of each project budget sheet is avoided, and the classification arranging effect is good.
Description
Technical Field
The utility model belongs to the technical field of budget project management, concretely relates to building engineering budget project management equipment.
Background
The house built to meet the needs of production and life is called a building project, and before the building of the proposed house and the subsidiary projects thereof, people can calculate the consumption of physical and chemical labor and living labor required by the proposed house in advance to measure the strength of the people to build the proposed house, so that the technical and economic documents of all the expenses required by each new building, extension, reconstruction and reconstruction project are calculated and determined in advance according to the design drawing of the proposed building project, the budget quota of the building project, the quota of the expenses, the budget price of the building materials, the relevant regulations for matched use and the like, and the technical and economic documents are called the budget of the building project.
In the building engineering, there are many project branches, and in the building process, because some project branches of the blueprint have some unreasonables, add the supplementary project to some project branches before implementing, in order to reach good engineering effect, every project branch will adopt the paper to print the initial budget bill, every supplementary project will need to print the supplementary budget bill too, and put the supplementary budget bill into the initial budget bill of the corresponding project branch together, there are disadvantages: because the supplementary budget sheet can be continuously proposed by design management personnel during construction, and the replacement supervision personnel prints the supplementary budget sheet, the initial budget sheets of all project projects are put together at present, when the supplementary budget sheet and the corresponding project budget sheet are put together temporarily, the supplementary budget sheet is easy to be put in error, and the sorting and arranging effect is not good.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a building engineering budget project management equipment to solve the regular not good problem of effect of classification that exists among the prior art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a building engineering budget project management equipment, includes the bottom plate, the bottom plate facial make-up is equipped with the backup pad, the apron has been installed at the both ends of backup pad, the first case of placing has been installed to the downside position that is located the apron on the bottom plate, the second is placed to the corresponding first position of placing the case in the backup pad and has been installed and place the case, the case facial make-up is placed to the second and is equipped with the case lid, the case lid facial make-up is equipped with the hand (hold), the marking plate has been installed to the one.
Preferably, universal wheels are arranged below the bottom plate.
Preferably, the two sides of the supporting plate are provided with second handles.
Preferably, the bottom of the first placing box is provided with a sliding block, the cross section of the sliding block is isosceles trapezoid, a sliding groove is formed in the position, corresponding to the sliding block, of the bottom plate, the cross section of the sliding groove is isosceles trapezoid, the sliding block is inserted into the sliding groove, a first handle is arranged on the first placing box, and the first handle is of a U-shaped rod structure.
Preferably, the link plate has been installed to second place case one end, and the link plate is the right angle board, in the backup pad, the link has been installed to the position that corresponds each link plate, and the link plate inserts the link.
Compared with the prior art, the beneficial effects of the utility model are that:
the utility model provides a building engineering budget project management equipment, when the budget sheet of supplementarily is printed out, the name of branch project on the corresponding sign board, put into the first incasement of placing with the budget sheet of supplementarily, when needs put together every branch project's the budget sheet of supplementarily and the initial budget sheet arrangement, can correspond the branch project sign on every sign board, it takes out and arranges together its first in-box budget sheet of placing and the second in-box budget sheet of placing that corresponds one by one, avoid each branch project budget sheet arrangement mistake, categorised regular effectual.
The utility model provides a building engineering budget project management equipment, through the grafting cooperation of link plate with the link, be convenient for place the case with the second that does not need and unload from the backup pad, through the cooperation of slider with the spout, be convenient for with the first case of placing that does not need and unload from the bottom plate.
The utility model provides a building engineering budget project management equipment, the gyro wheel through the universal wheel of four sides rolls subaerial, conveniently promotes this project management equipment and removes subaerial.
Drawings
Fig. 1 is a schematic front view of the present invention;
FIG. 2 is a schematic top view of FIG. 1;
FIG. 3 is a left side schematic view of FIG. 1;
fig. 4 is a sectional view of fig. 3.
In the figure: the multifunctional box comprises a base plate 1, universal wheels 2, a supporting plate 3, a cover plate 4, a first placing box 5, a sliding block 6, a sliding chute 7, a first handle 8, a second placing box 9, a hanging plate 10, a hanging ring 11, a box cover 12, a handle 13, an identification plate 14 and a second handle 101.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1, 2, 3 and 4, a construction project budget project management device includes a bottom plate 1, the bottom plate 1 is a square plate structure, universal wheels 2 are welded to four sides of the lower surface of the bottom plate 1, the type of the universal wheels 2 is GM01, the project management device is conveniently pushed to move on the ground by rolling wheels of the universal wheels 2 on the four sides, a support plate 3 is welded to the middle side of the upper surface of the bottom plate 1, the support plate 3 is a square plate structure, second handles 101 are welded to the left and right sides of the support plate 3, the second handles 101 are U-shaped rod structures, the rolling wheels of the universal wheels 2 can roll on the ground by pulling the second handles 101 on one side, cover plates 4 are welded to the front and rear ends of the support plate 3, the cover plates 4 are square plate structures, a first placing box 5 is installed on the bottom plate 1 and at the lower side of the cover plates 4, the first placing box 5 is a, the first upper surface of placing the lower extreme sliding contact bottom plate 1 of case 5, the first lower surface of placing case 5's last port sliding contact apron 4, the first bottom middle side welded connection who places case 5 has slider 6, the cross-section of slider 6 is isosceles trapezoid, on the bottom plate 1, the position that corresponds slider 6 is equipped with spout 7, the cross-section of spout 7 is isosceles trapezoid, the inner wall of slider 6's outer wall sliding contact spout 7, slider 6 and spout 7 all are upper narrow lower wide, consequently, when slider 6 is when spout 7 back-and-forth movement, slider 6 can not upwards deviate from spout 7, sliding fit through slider 6 and spout 7, it is stable to make the first case 5 of placing go back-and-forth movement on bottom plate 1, slider 6 inserts spout 7, the first outer corresponding terminal surface welded connection who places case 5 has first in command 8, first command 8 is U type rod structure.
Referring to fig. 1, 2, 3 and 4, a second placing box 9 is arranged on the supporting plate 3 corresponding to each first placing box 5, the second placing box 9 is of a square box structure, the second placing box 9 is arranged on the upper side of the first placing box 5, a hanging plate 10 is welded on the inner corresponding end surface of the second placing box 9, the hanging plate 10 is a right-angle plate, a hanging ring 11 is welded on the supporting plate 3 corresponding to each hanging plate 10, the hanging ring 11 is of a square ring structure, the hanging plate 10 is inserted into the hanging ring 11, the outer wall of the vertical part of the hanging plate 10 is in sliding contact with the inner wall of the hanging ring 11, the top of the second placing box 9 is covered with a box cover 12, the box cover 12 is of a square cover, a handle 13 is welded on the center position of the upper surface of the box cover 12, the handle 13 is of a cylindrical structure with a wide upper part and a narrow lower part, resin adhesive is coated on the outer corresponding end surface of the box cover 12, and an identification plate 14, a marker pen may be used to record the project name of the project on the identification panel 14.
When the method is implemented, the names of different project projects can be recorded on each identification plate 14, the handle 13 is pulled up, the second placing box 9 is taken off from the box cover 12, the initial budget sheet of each project is placed into each second placing box 9, the box cover 12 is covered on the second placing box 9 again, the box cover 12 is covered on the second placing box 9 to prevent external dust from entering the second placing box 9, when the supplementary budget sheet is printed out, the corresponding first handle 8 is found out and pulled outwards corresponding to the name of the project on the identification plate 14, the upper port of the first placing box 5 is pulled away from the cover plate 4, the first placing box 5 moves stably back and forth on the bottom plate 1 through the sliding fit of the sliding block 6 and the sliding groove 7, the budget sheet is placed into the first placing box 5, finally the first placing box 5 is pushed to the lower side of the cover plate 4 again, the cover plate 4 is arranged to prevent the external dust from entering the first placing box 5, when the supplementary budget sheet and the initial budget sheet of each project are required to be put together, the corresponding supplementary budget sheet in the first placing box 5 and the corresponding initial budget sheet in the second placing box 9 can be taken out and put together one by one corresponding to the project identification on each identification plate 12, the arrangement error of each project budget sheet is avoided, the classification and arrangement effects are good, the hanging plate 10 is in plug-in fit with the hanging ring 11, the second placing box 9 is placed on the supporting plate 3, in addition, the arrangement is convenient, the unnecessary second placing box 9 is also conveniently detached from the supporting plate 3, the first handle 8 is pulled outwards until the sliding block 6 is separated from the sliding groove 7, the unnecessary first placing box 5 can be detached from the bottom plate 1, and the project management equipment can be conveniently pushed to move on the ground by rolling wheels of the universal wheels 2 on the four sides.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (5)
1. A construction project budget project management apparatus, comprising a base plate (1), characterized in that: the utility model discloses a case, including bottom plate (1), apron (4) have been installed to the both ends of backup pad (3), bottom plate (1) is gone up the dress and is equipped with backup pad (3), first case (5) of placing has been installed to the downside position that lies in apron (4), on backup pad (3), the second is installed and is placed case (9) to the corresponding first position of placing case (5) of each, the case (9) facial make-up is placed to the second and is equipped with case lid (12), case lid (12) facial make-up is equipped with hand (hold) 13, sign board (14) have been installed to the one end of case lid (12).
2. The construction project budget project management device according to claim 1, characterized in that: the lower surface of the bottom plate (1) is provided with universal wheels (2).
3. The construction project budget project management device according to claim 1, characterized in that: two sides of the supporting plate (3) are provided with second handles (101).
4. The construction project budget project management device according to claim 1, characterized in that: the first bottom of placing case (5) has been installed slider (6), and the cross-section of slider (6) is isosceles trapezoid, and on bottom plate (1), the position that corresponds slider (6) is equipped with spout (7), and the cross-section of spout (7) is isosceles trapezoid, and slider (6) insert spout (7), and first case (5) facial make-up of placing is equipped with first in command (8), and first in command (8) are U type rod structure.
5. The construction project budget project management device according to claim 1, characterized in that: hanging plate (10) have been installed to second placing box (9) one end, and hanging plate (10) are the right angle board, and link (11) have been installed to the position that corresponds each hanging plate (10) on backup pad (3), and link (11) are inserted in hanging plate (10).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020415629.3U CN211984202U (en) | 2020-03-27 | 2020-03-27 | Construction engineering budget project management equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020415629.3U CN211984202U (en) | 2020-03-27 | 2020-03-27 | Construction engineering budget project management equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211984202U true CN211984202U (en) | 2020-11-24 |
Family
ID=73421821
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020415629.3U Expired - Fee Related CN211984202U (en) | 2020-03-27 | 2020-03-27 | Construction engineering budget project management equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211984202U (en) |
-
2020
- 2020-03-27 CN CN202020415629.3U patent/CN211984202U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206826987U (en) | A kind of film-sticking device | |
CN211984202U (en) | Construction engineering budget project management equipment | |
CN207523347U (en) | A kind of Art Design Portable drawing board | |
CN203567375U (en) | Cloud printer armor | |
CN214591674U (en) | Recording device for construction engineering cost | |
CN210783389U (en) | Portable financial management equipment | |
CN208938599U (en) | A kind of dedicated propaganda board of industrial and commercial administration being conveniently replaceable poster | |
CN209589069U (en) | A kind of multifunction architecture engineering management measuring device | |
CN207207545U (en) | A kind of teaching ruler | |
CN210721695U (en) | Integrated terminal for selling and taking tickets with internet ticket business distribution | |
CN208639905U (en) | A kind of project cost does common Multifunctional storage box | |
CN206193844U (en) | Automatic clamping of card sender | |
CN206557812U (en) | A kind of clout plate reclaimer intelligent management system after sheet fabrication | |
CN201693916U (en) | Blackboard with detachable dust-receiving slot | |
CN212036756U (en) | Drawing board frame for building structure design | |
CN210353841U (en) | Economic management voucher storage rack | |
CN210895879U (en) | Teaching equipment for multimedia management and control | |
CN213812301U (en) | On-spot mapping device is used to building engineering cost | |
CN214355100U (en) | Dedicated bill storage device of financial accounting | |
CN212581062U (en) | Printer convenient to change paper | |
CN211479099U (en) | A high-efficient card reading device for patent development consultation service | |
CN215624322U (en) | Intelligent recycling box capable of verifying issued cards | |
CN215456906U (en) | Planning platform for traffic engineering | |
CN211710471U (en) | Teaching whiteboard for education and training | |
CN210077084U (en) | Management type file cabinet |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20201124 |
|
CF01 | Termination of patent right due to non-payment of annual fee |