CN211950499U - Multifunctional tunneling trolley - Google Patents

Multifunctional tunneling trolley Download PDF

Info

Publication number
CN211950499U
CN211950499U CN201922335124.6U CN201922335124U CN211950499U CN 211950499 U CN211950499 U CN 211950499U CN 201922335124 U CN201922335124 U CN 201922335124U CN 211950499 U CN211950499 U CN 211950499U
Authority
CN
China
Prior art keywords
self
rock
frame
drilling
walking chassis
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922335124.6U
Other languages
Chinese (zh)
Inventor
覃乐
张猛
吕世强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Shuchuang Technology Co ltd
Original Assignee
Chongqing Shuchuang Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Shuchuang Technology Co ltd filed Critical Chongqing Shuchuang Technology Co ltd
Priority to CN201922335124.6U priority Critical patent/CN211950499U/en
Application granted granted Critical
Publication of CN211950499U publication Critical patent/CN211950499U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model discloses a multi-functional tunnelling platform truck, including from the walking chassis, the belly below on from the walking chassis is equipped with first guide roller or the wire rope leading wheel that an at least axis is the level and sets up. Preferably, the self-walking chassis is of a crawler-type structure and comprises a main machine carrying platform and a frame; the front end and the rear end of the frame are respectively provided with a first guide roller; the two second guide rollers and the first guide roller form a door-shaped frame structure, and a space for the scraper bucket of the scraper bucket rock loading machine to pass through is arranged in the door-shaped frame; the front end and the rear end of the frame are respectively provided with a retractable hydraulic shovel which is used for pushing the forklift to move ahead obstacles when the forklift is put down, a space with a set height is arranged below the forklift when the forklift is retracted, and the corresponding end of the trolley can be jacked up by the hydraulic shovel. The beneficial effects of the utility model are that, in the waste rock harrow advances rock loader and loading process, the tunnelling platform truck need not to withdraw from, more need not converge the car, or let the way, improves loading efficiency greatly, and then improves tunnelling efficiency.

Description

Multifunctional tunneling trolley
Technical Field
The utility model relates to an underground coal seam exploitation facility, concretely relates to multi-functional tunnelling platform truck.
Background
The main work of coal mine rock roadway tunneling comprises advanced geological drilling construction, roadway construction and the like; the advanced geological drilling is generally constructed by using a full hydraulic drilling machine, and only a drilling machine with light weight and low power can be used due to the limitation of rock loading transportation equipment and environmental conditions, and the drilling machine has long time for entering and exiting a tunneling working face, high labor intensity, low drilling speed and low comprehensive efficiency. The tunnel excavation process mainly adopts the drilling and blasting construction and the gangue loading of a steel wire rope rock raking machine: the roadway drilling and blasting method for advancing excavation mainly comprises the following working procedures of drilling and blasting: the drilling method comprises manual air hammer drilling and drill jumbo mechanical drilling, the drilling speed of the manual air hammer is low, the labor intensity of workers is high, and the efficiency is low; the drilling jumbo is high in mechanical drilling speed and efficiency, which is 2-3 times of the drilling efficiency of an artificial air hammer, but the drilling jumbo is limited by defects of the drilling jumbo and environmental conditions, so that the drilling jumbo cannot adapt to the requirements of medium and small section roadway tunneling at present, the use of the drilling jumbo in the medium and small section roadway is influenced at present, and the drilling jumbo mainly has two aspects, namely, the working mechanism for drilling is long, the width of the roadway is small, the drilling jumbo is not beneficial to construction of a cut blast hole for forming a free surface, the blasting effect is poor, and the circulation progress is low; secondly, the design of the drill jumbo is not scientific with the design of the rock loader, and the efficiency is low; drilling holes of a drilling and loading machine integrating a rock drilling jumbo with a tunneling drill carriage and rock loading; the tunneling drill carriage is matched with a rock loader to complete the tunneling process of the roadway to form the roadway. The existing tunneling drill carriage is not matched with a rock loading device, the tunneling drill carriage needs to be moved back to a rock loading machine behind the rock loading machine to load gangue before rock loading after blasting, the tunneling drill carriage and the rock loading machine cannot normally converge due to narrow tunnel in a tunnel with a medium-small section, the tunneling drill carriage needs to be moved back to a large-section tunnel before the tunneling drill carriage is moved back, the rock loading machine can return to the original place to load rock after the tunneling drill carriage is moved back, the operation is very complex, the time consumption is long, the efficiency is very low, and meanwhile, as the bottom plate of the tunnel is concave and convex after the rock loading machine goes out of a mine, the tunneling drill carriage is unsafely and stably moved, the bottom plate needs to be manually moved flat while walking, otherwise, the tunnel, pipelines and air cylinders are easily damaged by rollover, safety accidents are caused, and the tunneling drill carriage cannot adapt to drilling in medium-small section tunneling; the drilling and rock loading are integrated in design, but the drilling and rock loading are performed to achieve the design effect, a reliable continuous transportation system is required to be matched with the drilling and rock loading, most roadways of a coal mine do not have the continuous transportation condition, and meanwhile, the drilling and rock loading process of the drilling and rock loading machine cannot be operated in parallel, the efficiency is too low, and the drilling and rock loading machine cannot meet the requirement of tunneling. Therefore, there is a need for improvements to existing ripping equipment.
Disclosure of Invention
The utility model aims at providing a dig rock equipment among the prior art need withdraw from the back just can carry out the not enough of harrow cash by the harrow rock machine, provide a multi-functional tunnelling platform truck, this equipment is through setting up wire rope guide member in platform truck belly below to at the scraper bucket rock loading machine at the harrow rock in-process, wire rope, perhaps wire rope and scraper bucket can follow the vehicle bottom below and pass through smoothly, thereby under the condition that the platform truck did not withdraw from, realize harrow cash and subsequent commentaries on classics cash.
In order to achieve the above purpose, the present invention adopts the following technical solution.
A multifunctional tunneling trolley comprises a self-walking chassis, wherein at least one first guide roller or steel wire rope guide wheel with a horizontal axis is arranged below the belly of the self-walking chassis.
Adopt aforementioned technical scheme the utility model discloses, owing to be equipped with first guide roller or wire rope leading wheel below the self-walking chassis belly of tunnelling platform truck, in the scheme that adopts the wire rope leading wheel, because the wire rope main rope of scraper loader can pass from platform truck belly below through the wire rope leading wheel direction, and avoid forming with the platform truck and wipe and scrape. After the operation of the trolley is finished, the trolley moves forwards for a certain distance, so that part of gangue is exposed behind the trolley. The steel wire rope main rope for the scraper bucket of the scraper bucket rock loader passes through the lower part of the abdomen of the trolley after passing through the hanging wheel on the rock wall in front of the trolley, and the scraper bucket of the scraper bucket rock loader can operate between the trolley and the scraper bucket rock loader to rake and transport the gangue, so that the vehicle gathering link of the trolley and the scraper bucket rock loader is eliminated, and the gangue can be raked and transshipped smoothly. And in the scheme that sets up first guide roller, because the roller has sufficient length, have under the circumstances of sufficient width and high space in vehicle belly below, the rake fill can follow vehicle belly below and pass through, like this after the platform truck operation is accomplished, the guide structure of usable roller, not only wire rope main rope can pass smoothly, the rake fill also can make full use of the rolling characteristic of roller and roller surface contact and pass through smoothly, thereby under the condition that the platform truck need not remove, the rake fill can be followed the platform truck the place ahead and raked the space of passing vehicle belly below with the waste rock, then rake into the silo of rake fill mucker. Therefore, when the trolley is used for tunneling a roadway, the tunneling trolley does not need to be withdrawn after operation, or does not need to be converged with a scraper loader or to make way with each other, so that gangue loading can be completed, and the loading efficiency and the roadway tunneling efficiency are greatly improved. Wherein, when adopting the scheme of gyro wheel, the gyro wheel adopts the sheave structure can.
Preferably, the front end and the rear end of the self-walking chassis are respectively provided with a first guide roller or a steel wire rope guide wheel; and a steel wire riding wheel or a supporting roller is arranged above the self-walking chassis. The guide effect that further reinforcing wire rope or scraper bucket passed through improves the rock raking machine operational reliability, and in addition, the steel wire riding wheel can prevent to be located the wire rope tail rope of platform truck top and the equipment on the car from producing and scraping, ensures safety.
Preferably, in the scheme that the first guide roller is arranged below the belly of the self-walking chassis, the self-walking chassis further comprises two second guide rollers, the two second guide rollers can be folded upwards, the two second guide rollers are put down and then form a door-shaped frame structure with the first guide rollers, and a scraper bucket passing space of the scraper bucket rock loading machine is arranged in the door-shaped frame. According to the scheme, after the operation of the tunneling trolley is finished, the trolley can not move under the condition that the space below the belly of the trolley is large enough, and the scraper bucket of the scraper bucket rock loader can rake waste rocks from the front of the trolley to the material groove of the scraper bucket rock loader behind the trolley, so that the tunneling efficiency of a roadway is further improved; the steel wire rope guide structure can also be formed by only the first guide roller and the two turned-down second guide rollers to prevent the steel wire rope from swinging, and the scraper bucket does not need to pass through the space below the belly of the vehicle; the second guide roller is folded upwards for improving the ground clearance from the walking chassis, and the scraper loader is convenient to run on a gangue pile, so that the scraper can rake the gangue into a trough of the scraper loader from the rear of the vehicle. The retracting mode of the second guide roller comprises vertical movement, upward retraction and upward rotation retraction, and the retracting mode is selected according to the specific arrangement space of the vehicle suspension and the vehicle frame structure.
Preferably, the front end and the rear end of the self-walking chassis are respectively provided with a retractable hydraulic shovel which is used for pushing the forklift to walk ahead obstacles when the hydraulic shovel is put down, and a space with a set height is arranged below the hydraulic shovel when the hydraulic shovel is retracted. The self-obstacle-clearing structure capable of automatically clearing obstacles is formed on the trolley, so that the smoothness of a running road is guaranteed, and the running safety is guaranteed. The lifting height of the hydraulic shovel can be corresponding to the requirement of a specific scheme, and if the lower part of the abdomen of the vehicle needs to pass through the scraper bucket, the height of the hydraulic shovel is slightly higher than the height of the hydraulic shovel only passing through the steel wire rope.
Preferably, the self-walking chassis is provided with a rock drilling host and/or a drilling host. So as to form rock drilling and drilling or integrate the functions of the rock drilling and the drilling into a whole, and can carry out obstacle clearing and allow the scraper bucket to pass through the multifunctional comprehensive trolley structure below the belly, thereby further improving the tunneling efficiency.
Further preferably, a hydraulic system and an operation control system are arranged on the self-walking chassis. So as to integrate power and operation into a whole, ensure complete functions and convenient operation.
Preferably, the self-walking chassis is of a crawler-type structure and comprises a host machine carrying platform and a frame, and the frame is provided with a crawler through a suspension; the first guide roller is arranged on the frame; in the scheme of arranging two second guide rollers, the second guide rollers abut against a crawler suspension of the frame; in the scheme of arranging the hydraulic shovel, the hydraulic shovel is also arranged through the frame. The characteristics of heavy load, heavy chassis and strong obstacle crossing capability of the crawler-type vehicle are utilized to ensure the vehicle trafficability and the tunneling work safety. In addition, the scheme of the hydraulic shovel ensures that the hydraulic shovel has good connection strength and long service life by utilizing the characteristics of good rigidity and high strength of the frame of the crawler, so that when the crawler is obstructed, the end part of the crawler is jacked up and lifted by the hydraulic shovel, and the obstacle crossing capability is enhanced.
Preferably, the rock drilling host comprises a rock drilling machine, the rock drilling machine is connected with a propeller, the propeller is arranged on a propeller bracket, and the propeller bracket is connected to the front end of the mechanical arm; the rear end of the mechanical arm is connected to a rotating arm seat, the rotating arm seat is arranged on a host machine carrying platform in a longitudinally movable mode through a rock drilling slide way, and the mechanical arm is provided with a horizontal rotating structure, an axial telescopic structure and a pitching angle adjusting structure. The requirement of multidirectional and multi-angle rock drilling is met, the function is complete, and the requirement of roadway tunneling is met.
Preferably, the drilling host comprises a power head, a hydraulic clamp and a propulsion oil cylinder; the power head and the hydraulic clamp holder are both arranged on the guide rail, the hydraulic clamp holder is positioned in front of the power head, and the guide rail is arranged on the stability adjusting device; the stable adjusting device is arranged at the position of the main machine carrier close to the front end. The requirement of multidirectional and multi-angle drilling is met, the function is complete, and the requirement of roadway tunneling is met.
Further preferably, in the scheme with the rock drilling host and the drilling host, the rock drilling host and the drilling host are distributed on two sides of the host carrying platform. So as to form a structure with relatively balanced gravity center and ensure the safety of the trolley in walking and tunneling work.
The utility model has the advantages that: in the process of the gangue raking into the rock loader and the loading process, the tunneling trolley does not need to be withdrawn, and does not need to converge with or give way to the scraper bucket rock loader, so that the loading efficiency is greatly improved, and the roadway tunneling efficiency is further improved. The comprehensive trolley integrates rock drilling, hole drilling, gangue pushing and rope passing, can effectively promote the mechanized level of coal mine full-rock roadway tunneling in China to be improved, and solves the technical problem of how the comprehensive tunneling equipment forms a good match with a rock loader and a rock raker.
Drawings
Fig. 1 is a schematic front view of a part of the structure of the present invention, wherein the second guiding roller is in a laid-down state.
Fig. 2 is a schematic front view of a part of the structure of the present invention, wherein the second guiding roller is in a retracted state.
Fig. 3 is a front view of the structure of the present invention.
Fig. 4 is a top view of the present invention shown in fig. 3.
Detailed Description
The present invention will be further described with reference to the following drawings, which are illustrative only for the purpose of disclosing and explaining the present invention in order to fully understand the present invention, but not to limit the present invention within the scope of the described embodiments.
Embodiment 1, refer to fig. 1, fig. 2, fig. 3, fig. 4, a multifunctional tunneling trolley comprises a self-walking chassis, wherein at least one first guide roller 2 with a horizontal axis is arranged below the abdomen parts at the front end and the rear end of the self-walking chassis; and is crawler-type structure from the walking chassis, including host computer microscope carrier 1 and frame 6, frame 6 sets up the track through suspension 61.
As a preferable scheme, the device also comprises two second guide rollers 3, wherein the two second guide rollers 3 are positioned between two parallel tracks, and a steel wire riding wheel 5 or a carrier roller is arranged above the main machine carrying platform 1 through a riding wheel support 7, and the riding wheel support 7 is hinged on the main machine carrying platform 1 and driven to be erected or fallen down through a support oil cylinder; the two second guide rollers 3 can move vertically and retract upwards, the two second guide rollers 3 are put down and then form a door-shaped frame structure with the first guide rollers 2, and a space for the scraper bucket of the scraper bucket rock loading machine to pass through is formed in the door-shaped frame. The second guide roller 3 is arranged through a U-shaped roller support 31, the bottom surface of the roller support 31 is abutted against the suspension 61, and the other end of the roller support is connected with the frame 6 through a retraction hydraulic cylinder 32 so as to be retracted upwards or lowered downwards through the extension of a piston rod of the retraction hydraulic cylinder 32.
Preferably, the front end and the rear end of the frame 6 are respectively provided with a retractable hydraulic shovel 4, the hydraulic shovels 4 are used for pushing the forklift to move ahead obstacles when being put down, and a space with a set height is arranged below the hydraulic shovels when being retracted. The upper part of the tail end of the hydraulic shovel 4 is hinged on the frame 6, a retraction cylinder 4a is arranged between the middle part of the hydraulic shovel 4 and the frame 6, when a piston rod of the cylinder 4a extends out, the hydraulic shovel 4 is lifted up and retracted, and when the piston rod retracts, the hydraulic shovel 4 is put down to form a push shovel shape so as to push and level the traffic road; and the corresponding end of the vehicle can be jacked up and lifted up by continuously retracting the piston rod of the oil cylinder 4a, so that the corresponding end of the crawler belt is lifted up and separated from the ground, and the obstacle crossing capability is improved.
Preferably, the rock drilling main machine 100 comprises a rock drilling machine 101, the rock drilling machine 101 is connected with a propeller 102, the propeller 102 is mounted on a propeller bracket 103, and the propeller bracket 103 is connected to the front end of a mechanical arm 104; the rear end of the mechanical arm 104 is connected to a swivel base 105, the swivel base 105 is arranged on the main machine carrier 1 in a longitudinally movable manner through a rock drilling slideway, and the mechanical arm 104 has a horizontal rotating structure, an axial telescopic structure and a pitching angle adjusting structure. The drilling host 200 comprises a power head 201, a hydraulic clamp 202 and a propulsion oil cylinder 203; the power head 201 and the hydraulic clamp 202 are both arranged on the guide rail 204, the hydraulic clamp 202 is positioned in front of the power head 201, and the guide rail 204 is arranged on the stability adjusting device 205; the stability adjusting device 205 is installed at a position near the front end of the main machine stage 1. The rock drilling host 100 and the drilling host 200 are distributed on two sides of the host machine carrier 1, and the supporting roller support 7 is positioned in the middle of the host machine carrier 1 after being erected.
The tracked self-propelled chassis in this embodiment may also be replaced by a wheeled vehicle chassis.
In this embodiment, when one end of the roller support 31 is hinged to the frame, the other end is turned, so as to realize the turning-over type retraction of the second guiding roller 3.
Embodiment 2, the main difference between this embodiment and embodiment 1 is that at least one wire rope guide wheel with its axis arranged horizontally is arranged below the abdomen parts of the front and rear ends of the self-walking chassis, and the guide wheel is in a sheave structure; the lower part of the abdomen of the trolley can only pass through a steel wire rope for pulling the scraper bucket, and the scraper bucket does not pass through the lower part of the abdomen of the vehicle when in use. The structure of the present embodiment is not shown in the drawings.
The rest of the structure of this embodiment is the same as embodiment 1, and is not described herein again.
When the bogie is used, the multifunctional tunneling bogie stops in front of the scraper loader when the tunnel face is blasted, gangue raked up the tillite is accumulated in a roadway between the multifunctional tunneling platform and about 8 meters behind the working face after the working face is blasted, the working face tunneling bogie and a personnel working space are vacated, the main rope of the scraper loader penetrates through the belly of the multifunctional tunneling bogie at the moment, and the tail rope passes through the bogie to rake the gangue. After the tunneling operation space is vacated, the tunneling trolley is driven into a working face, the scraper bucket rock loading machine is driven out of the stored waste rock in the roadway, and at the moment, the scraper bucket runs behind the tunneling trolley. Therefore, the invention aims that the tunneling trolley does not need to converge with the scraper loader and the track is mutually avoided are fulfilled.
The foregoing has described in detail preferred embodiments of the present invention. It should be understood that numerous modifications and variations can be devised by those skilled in the art in light of the teachings of the present invention without undue experimentation. Therefore, the technical solutions that can be obtained by a person skilled in the art through logic analysis, reasoning or limited experiments based on the prior art according to the concepts of the present invention should be within the scope of protection defined by the claims.

Claims (10)

1. The multifunctional tunneling trolley comprises a self-walking chassis and is characterized in that at least one first guide roller (2) or steel wire rope guide wheel with a horizontal axis is arranged below the belly of the self-walking chassis.
2. The multifunctional tunneling trolley according to claim 1, wherein a first guide roller (2) or a steel wire rope guide wheel is arranged at each of the front end and the rear end of the self-walking chassis; and a steel wire riding wheel (5) or a carrier roller is arranged above the self-walking chassis.
3. A multifunctional excavating trolley according to claim 1, characterized in that in the scheme of arranging the first guide rollers (2) under the belly of the self-walking chassis, the multifunctional excavating trolley further comprises two second guide rollers (3), the two second guide rollers (3) can be folded upwards and form a door-shaped frame structure with the first guide rollers (2) after the two second guide rollers (3) are put down, and the door-shaped frame is internally provided with a space for the scraper bucket of the scraper loader to pass through.
4. A multi-function development trolley according to claim 1 wherein the self-propelled chassis is provided at each of its front and rear ends with a retractable hydraulic shovel (4), the hydraulic shovel (4) being adapted to push the forklift forward of an obstacle when it is lowered and having a space of a set height below when it is retracted.
5. A multifunctional excavation trolley according to any one of claims 1 to 4, wherein a rock drilling main machine (100) and/or a drilling main machine (200) are/is arranged on the self-walking chassis.
6. A multi-functional ripping truck according to claim 5, wherein a hydraulic system (300) and an operational control system (400) are provided on the self-propelled chassis.
7. The multifunctional tunneling trolley according to claim 5, wherein the self-walking chassis is of a crawler-type structure and comprises a main machine carrier (1) and a frame (6), and the frame (6) is provided with a crawler through a suspension (61); the first guide roller (2) is arranged on the frame (6); in the scheme of arranging two second guide rollers (3), the second guide rollers (3) are abutted against a crawler suspension (61) of a frame (6); in the scheme of arranging the hydraulic shovel (4), the hydraulic shovel (4) is also arranged through the frame (6).
8. The multifunctional excavation trolley according to claim 7, wherein the rock drilling main machine (100) comprises a rock drilling machine (101), the rock drilling machine (101) is connected with a propeller (102), the propeller (102) is arranged on a propeller bracket (103), and the propeller bracket (103) is connected to the front end of a mechanical arm (104); the rear end of the mechanical arm (104) is connected to a rotating arm seat (105), the rotating arm seat (105) is longitudinally movably arranged on the main machine carrying platform (1) through a rock drilling slide way, and the mechanical arm (104) is provided with a horizontal rotating structure, an axial telescopic structure and a pitching angle adjusting structure.
9. The multi-functional tunneling trolley according to claim 7, wherein the drilling host (200) comprises a power head (201), a hydraulic clamp (202), a thrust cylinder (203); the power head (201) and the hydraulic clamp holder (202) are both arranged on the guide rail (204), the hydraulic clamp holder (202) is positioned in front of the power head (201), and the guide rail (204) is arranged on the stability adjusting device (205); the stability adjusting device (205) is arranged at the position close to the front end of the host machine carrying platform (1).
10. A multi-functional tunnelling trolley according to claim 7, which has a rock drilling main body (100) and a drilling main body (200), wherein the rock drilling main body (100) and the drilling main body (200) are distributed on both sides of the main body carrier (1).
CN201922335124.6U 2019-12-20 2019-12-20 Multifunctional tunneling trolley Active CN211950499U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922335124.6U CN211950499U (en) 2019-12-20 2019-12-20 Multifunctional tunneling trolley

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922335124.6U CN211950499U (en) 2019-12-20 2019-12-20 Multifunctional tunneling trolley

Publications (1)

Publication Number Publication Date
CN211950499U true CN211950499U (en) 2020-11-17

Family

ID=73187108

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922335124.6U Active CN211950499U (en) 2019-12-20 2019-12-20 Multifunctional tunneling trolley

Country Status (1)

Country Link
CN (1) CN211950499U (en)

Similar Documents

Publication Publication Date Title
CN201225153Y (en) Rock lane digging and supporting construction drill
CN100494635C (en) Method for filling goaf by gangue
CN109026048B (en) A kind of climbing control method of high inclination-angle development machine
CN104695871A (en) Drilling boom device of two-boom hydraulic rock bolt drilling carriage
CN101169036B (en) Pedrail type lifting top slope anchor shaft anchor cable construction drilling machine and single-alley fast tunneling technique
AU2020103346A4 (en) A novel underground grabbing and unloading manipulator suitable for narrow space of roadway
EP0150210A1 (en) Continuous mining machine.
CN212359776U (en) Multifunctional hard rock tunneling integrated machine
CN103742176A (en) Excavating and anchor-supporting all-in-one unit
CN206655700U (en) High inclination-angle development machine with auxiliary climbing apparatus
CN203742636U (en) Tunneling, supporting and anchoring integrated unit
CN211950499U (en) Multifunctional tunneling trolley
CN209780954U (en) Coal face end triangular space filling device
CN106869956B (en) A kind of high inclination-angle development machine with auxiliary climbing apparatus
CN217632443U (en) Integral telescopic structure of cutting mechanism of heading machine
CN110985031A (en) Multifunctional tunneling trolley
CN110004953A (en) A kind of side slope or retaining wall construction trolley
CN114810113A (en) Integral telescopic structure and telescopic method of cutting mechanism of heading machine
CN204532119U (en) A kind of drill boom device of two-arm hydraulic anchor rod drill carriage
CN213654849U (en) Four-arm digging and anchoring machine for coal mine tunnel
CN210317319U (en) Small-section shield tunneling machine for coal mine
CN209925016U (en) Portal anchor protects machine
CN112727520A (en) Side-edge-recovery type digging-supporting-anchoring combined unit and using method thereof
CN215890033U (en) High-efficient tunnel operation bridge equipment
CN213928373U (en) Multifunctional stripping and loading machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant