CN211949865U - Installation formula communication pole - Google Patents

Installation formula communication pole Download PDF

Info

Publication number
CN211949865U
CN211949865U CN201921819772.2U CN201921819772U CN211949865U CN 211949865 U CN211949865 U CN 211949865U CN 201921819772 U CN201921819772 U CN 201921819772U CN 211949865 U CN211949865 U CN 211949865U
Authority
CN
China
Prior art keywords
pipe
inner tube
evenly
well pipe
communication pole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921819772.2U
Other languages
Chinese (zh)
Inventor
张海燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Jujie Communication Technology Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201921819772.2U priority Critical patent/CN211949865U/en
Application granted granted Critical
Publication of CN211949865U publication Critical patent/CN211949865U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses an installation formula communication pole, which comprises a base, the last fixed surface of base installs the outer tube, the inside of outer tube is pegged graft and is had well pipe, the inside of well pipe is pegged graft and is had the inner tube, the upper end of inner tube is enclosed construction, the surface mounting of inner tube has the mounting bracket, fixing device is evenly installed to the circumference surface upper end of outer tube and well pipe, fixing device includes the first screw that well pipe and inner tube surface lower extreme were evenly seted up, the through-hole has evenly been seted up to the surface upper end of outer tube and well pipe, the inside of through-hole is pegged graft and is had fixing bolt, fixing bolt's the inside of outside surface. Compared with the prior art, the device can reduce the size through the multi-section pipe body that cup joints, is favorable to depositing, and space utilization is high, and the transportation is convenient, and the on-the-spot installation rate is fast, promotes work packaging efficiency.

Description

Installation formula communication pole
Technical Field
The utility model relates to a communication equipment technical field specifically is an installation formula communication pole.
Background
With the continuous development of modern communication technology, a large number of mobile communication base stations need to be built to meet the requirements. Various types of communication poles in a communication base station are widely used, belong to one type of signal transmitting towers, and mainly have the function of providing support for signal transmitting antennas and serving communication operators.
Similar communication pole on the existing market often adopts cast steel, and high direct welding forms according to the demand, and the whole overlength of welding back is unfavorable for depositing, and transports the difficulty, and on-the-spot welding packaging efficiency is low again, influences the installation progress, in order to solve above-mentioned problem, we propose an installation formula communication pole.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an installation formula communication pole to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides an installation formula communication pole, includes the base, the last fixed surface of base installs the outer tube, the inside of outer tube is pegged graft and is had well pipe, the inside of well pipe is pegged graft and is had the inner tube, the upper end of inner tube is enclosed construction, the surface mounting of inner tube has the mounting bracket, fixing device is evenly installed to the circumference surface upper end of outer tube and well pipe, fixing device includes the first screw that well pipe and inner tube surface lower extreme evenly seted up, the through-hole has evenly been seted up to the surface upper end of outer tube and well pipe, the inside of through-hole is pegged graft and is had fixing bolt, fixing bolt's the inside of outside surface inboard spiro union at first screw.
Compared with the prior art, the beneficial effects of the utility model are that: this installation formula communication pole can reduce the volume through the multistage body that cup joints, is favorable to depositing, and space utilization is high, and the transportation is convenient, and on-the-spot installation rate is fast, promotes work packaging efficiency.
Drawings
Fig. 1 is a schematic cross-sectional view of the structure of the present invention.
Fig. 2 is an enlarged view of a detailed structure of fig. 1.
Fig. 3 is a schematic cross-sectional view of the fixing device of the present invention.
Fig. 4 is an enlarged view schematically illustrating a detailed structure at b in fig. 1 according to the present invention.
In the figure: the electric box comprises a base 1, an electric box 12, a flange 13, an outer pipe 2, a middle pipe 3, an inner pipe 4, a fixing device 5, a first screw hole 51, a through hole 52, a fixing bolt 53, a rectangular groove 6, a rectangular sliding block 7, an installation rack 8, a rack body 81, a fixing ring 82, an installation bolt 83 and a second screw hole 84.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1, fig. 2, fig. 3 and fig. 4, the present invention provides a technical solution: the utility model provides an installation formula communication pole, which comprises a base 1, the last fixed surface of base 1 installs outer tube 2, the inside of outer tube 2 is pegged graft and is had well pipe 3, the inside of well pipe 3 is pegged graft and is had inner tube 4, the upper end of inner tube 4 is enclosed construction, the surface mounting of inner tube 4 has mounting bracket 8, fixing device 5 is evenly installed to the circumference surface upper end of outer tube 2 and well pipe 3, fixing device 5 includes well pipe 3 and the even first screw 51 of seting up of the 4 surface lower extremes of inner tube, through-hole 52 has evenly been seted up to the surface upper end of outer tube 2 and well pipe 3, the inside of through-hole 52 is pegged graft and is had fixing bolt 53, the inside spiro union of fixing.
The base 1 can be stably installed on the ground; through the relative movement of outer tube 2, well pipe 3, inner tube 4, can promote and form whole communication pole, through the spiro union assembly of the fixing bolt 53 of pegging graft in the through-hole 52 and first screw 51 among the fixing device 5, can fix the position of outer tube 2, well pipe 3, inner tube 4, accomplish the equipment fixed operation.
Two rectangular channels 6 have respectively evenly been seted up to the internal surface of outer tube 2 and well pipe 3, and the outer surface lower extreme of well pipe 3 and inner tube 4 respectively evenly fixed mounting has two rectangle sliders 7, and rectangle slider 7 slidable mounting is in the inside of rectangular channel 6.
Through the rectangle slider 7 of the inside slidable mounting of rectangular channel 6, can make well pipe 3 and inner tube 4 when outer tube 2 and well pipe 3 inside removal, keep the correct installation relation of fixing device 5, promote the installation effectiveness.
The included angle between the central axis of the rectangular groove 6 and the central axis of the adjacent fixing bolt 53 is 45 degrees.
The rectangular groove 6 which is staggered by 45 degrees with the fixing bolt 53 does not influence the mechanical property of the fixing device 5 and does not interfere with each other.
Mounting bracket 8 is including cup jointing at the solid fixed ring 82 and the support body 81 of inner tube 4 surface, and support body 81 fixed mounting has evenly seted up second screw 84 at the upside of solid fixed ring 82, the inside spiro union of second screw 84 has construction bolt 83 at the upside of solid fixed ring 82, and construction bolt 83's the inner surface with inner tube 4 closely laminates.
Can be according to specific demand, select to adorn 8 quantity of mounting bracket that cup joint and fixed mounting on the inner tube 4, it is fixed with mounting bracket 8 through the cooperation of construction bolt 83 with second screw 84, and support body 81 can continue to install telecommunication equipment above that, and the structure is nimble.
The base 1 comprises a flange 13, an electrical box 11 is fixedly arranged on the upper surface of the flange 13, and a base column 12 is fixedly arranged on the lower surface of the flange 13.
The foundation column 12 inserted into the pre-formed concrete has good stability; the electrical box 11 can be internally provided with electrical equipment by fixing the base 1 to concrete by attaching the flange 13 to the bolt.
The working principle is as follows: during transportation, the inner pipe 4 is positioned inside the middle pipe 3, the middle pipe 3 is positioned inside the outer pipe 2, and the lower side of the middle pipe is in contact with the upper surface of the base 1, so that the size is small, and the inner pipe is convenient to store and transport; during installation, the foundation column 12 is inserted into pre-formed concrete, the base 1 is fixed on the concrete through the installation of the flange 13 and the bolts, and the electrical box 11 can be internally provided with electrical equipment; the inner pipe 4 is lifted, the rectangular sliding block 7 at the lower end of the inner pipe is moved to the upper end of the rectangular groove 6, the through hole 52 in the fixing device 5 corresponds to the first screw hole 51, and the fixing bolt 53 is installed to complete the assembly of the inner pipe 4 and the middle pipe 3; according to specific requirements, the number of the mounting frames 8 sleeved and fixedly mounted on the inner pipe 4 is selected, the mounting frames 8 are fixed through the matching of the mounting bolts 83 and the second screw holes 84, and telecommunication equipment can be continuously mounted on the frame body 81; and continuously lifting the middle pipe 3, moving the rectangular sliding block 7 at the lower end to the upper end of the rectangular groove 6, assembling the middle pipe 3 and the outer pipe 2 through the fixing device 5 in a screwed manner, and finishing the integral installation.

Claims (5)

1. A mounted communication pole, its characterized in that: the device comprises a base (1), wherein an outer pipe (2) is fixedly mounted on the upper surface of the base (1), a middle pipe (3) is inserted into the outer pipe (2), an inner pipe (4) is inserted into the middle pipe (3), the upper end of the inner pipe (4) is of a closed structure, a mounting frame (8) is mounted on the outer surface of the inner pipe (4), and fixing devices (5) are uniformly mounted at the upper ends of the circumferential outer surfaces of the outer pipe (2) and the middle pipe (3);
fixing device (5) include well pipe (3) and first screw (51) that inner tube (4) surface lower extreme was evenly seted up, through-hole (52) have evenly been seted up to the surface upper end of outer tube (2) and well pipe (3), the inside grafting of through-hole (52) has fixing bolt (53), the inside spiro union of the surface of fixing bolt (53) is in the inside of first screw (51).
2. A mounted communication pole according to claim 1, wherein: two rectangular channels (6) are respectively and evenly seted up to the internal surface of outer tube (2) and well pipe (3), the surface lower extreme of well pipe (3) and inner tube (4) respectively evenly fixed mounting have two rectangle sliders (7), rectangle slider (7) slidable mounting is in the inside of rectangular channel (6).
3. A mounted communication pole according to claim 2, wherein: the included angle between the central axis of the rectangular groove (6) and the central axis of the adjacent fixing bolt (53) is 45 degrees.
4. A mounted communication pole according to claim 1, wherein: mounting bracket (8) are including cup jointing solid fixed ring (82) and support body (81) at inner tube (4) surface, support body (81) fixed mounting is at the upside of solid fixed ring (82), second screw (84) have evenly been seted up to the circumference surface of solid fixed ring (82), the inside spiro union of second screw (84) has construction bolt (83), the inner of construction bolt (83) is closely laminated with the surface of inner tube (4).
5. A mounted communication pole according to claim 4, wherein: base (1) includes ring flange (13), the last fixed surface of ring flange (13) installs electric box (11), the lower fixed surface of ring flange (13) installs pillar (12).
CN201921819772.2U 2019-10-26 2019-10-26 Installation formula communication pole Expired - Fee Related CN211949865U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921819772.2U CN211949865U (en) 2019-10-26 2019-10-26 Installation formula communication pole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921819772.2U CN211949865U (en) 2019-10-26 2019-10-26 Installation formula communication pole

Publications (1)

Publication Number Publication Date
CN211949865U true CN211949865U (en) 2020-11-17

Family

ID=73167441

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921819772.2U Expired - Fee Related CN211949865U (en) 2019-10-26 2019-10-26 Installation formula communication pole

Country Status (1)

Country Link
CN (1) CN211949865U (en)

Similar Documents

Publication Publication Date Title
CN208707971U (en) A kind of solar communications base station with angle regulating function
CN211949865U (en) Installation formula communication pole
CN201222733Y (en) Integration structure for built-in antenna and tower lay
CN109149064A (en) A kind of adjustable mounting rack of base station
CN218827827U (en) Antenna housing for reducing wind resistance and antenna
CN107959115A (en) Car antenna and its connect base
CN204834868U (en) L frequency channel direction -finder antenna
CN210042085U (en) Wireless base station fixed mounting device
CN210707972U (en) Mechanical test tool for space sun-facing orientation device
CN208674131U (en) A kind of split type component leading-out wire structure and split type component
CN209220201U (en) A kind of internal cavity of bowl washer molding structure
CN201383540Y (en) Antenna connecting structure and communication base station
CN206958515U (en) A kind of smart machine support
CN214996183U (en) Assembly type building installation calibration equipment
CN209843952U (en) Improved omnidirectional antenna for high-speed locomotive
CN211789526U (en) Beautified housing of glass fiber reinforced plastic pultrusion roof square column antenna
CN216042990U (en) 5G communication network communication tower
CN110691283A (en) 5G signal covers integration rack
CN212485527U (en) 5G antenna installing support
CN214898844U (en) X-frequency band self-tracking servo system
CN211372191U (en) Multifunctional lighting street lamp based on 5G communication
CN209923984U (en) Compression-resistant waterproof structure of well lid antenna
CN216793845U (en) Modularization battery compartment
CN220930792U (en) Supporting equipment mounting bracket based on communication pole tower
CN112758200B (en) 5G message intelligent robot

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20211019

Address after: 450000 No. 1-13101, building 13, family courtyard, Henan Vocational and technical college, No. 210, Ping'an Avenue, Zhengdong New District, Zhengzhou City, Henan Province

Patentee after: Henan Jujie Communication Technology Co.,Ltd.

Address before: 100000 room 803, information building, No. 13, Linyin North Street, Pinggu District, Beijing

Patentee before: Zhang Haiyan

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201117

Termination date: 20211026