CN211949408U - A building rubbish discharging equipment for in construction - Google Patents

A building rubbish discharging equipment for in construction Download PDF

Info

Publication number
CN211949408U
CN211949408U CN202020079932.0U CN202020079932U CN211949408U CN 211949408 U CN211949408 U CN 211949408U CN 202020079932 U CN202020079932 U CN 202020079932U CN 211949408 U CN211949408 U CN 211949408U
Authority
CN
China
Prior art keywords
discharging frame
frame
construction
building rubbish
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020079932.0U
Other languages
Chinese (zh)
Inventor
黄亮
马明洪
梁翃瑞
王继兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN202020079932.0U priority Critical patent/CN211949408U/en
Application granted granted Critical
Publication of CN211949408U publication Critical patent/CN211949408U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuse Collection And Transfer (AREA)

Abstract

The utility model belongs to the field of building construction, in particular to a building garbage discharging device used in building construction, which comprises an upper discharging frame, wherein one side of the upper discharging frame is provided with a feed opening, both sides of the upper end of the upper discharging frame are provided with connecting rods, a fixing frame is arranged on the connecting rods in a sliding way, one end of the upper discharging frame, which is far away from the feed opening, is provided with two groups of upper threaded holes, one end of the upper discharging frame, which is far away from the feed opening, is connected with a lower discharging frame, the upper surface of one end of the lower discharging frame, which is near to the upper discharging frame, is provided with a feed opening, the upper end and the lower end of the lower discharging frame are respectively provided with two groups of lower threaded holes; through the last discharge frame of broken line type structure, make building rubbish avoid building rubbish directly to fall when going on flowing in last discharge frame inside, reduce the speed that building rubbish fell to ground, avoid building rubbish to take place great splashing.

Description

A building rubbish discharging equipment for in construction
Technical Field
The utility model relates to a construction field specifically is a building rubbish discharging equipment for in construction.
Background
The building construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, and also can be a process of changing various lines on a design drawing into a real object in a specified place, and comprises foundation engineering construction, main structure construction, roofing engineering construction, decoration engineering construction and the like.
When construction site is under construction, can produce a large amount of building rubbish, discharge the pipeline through the installation, discharge the building rubbish from the construction site with the help of discharging the pipeline, and then accomplish the processing to building rubbish.
The existing device has the following defects:
1. when the construction waste is discharged and falls from a high place, the falling speed is high, so that the waste is easy to splash and the periphery is damaged;
2. the device is inconvenient to fix on the side of the floor to be treated.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a construction waste discharging equipment for among construction to solve the construction waste on the existing market that above-mentioned background art provided and when discharging, from the eminence whereabouts, the speed of whereabouts is very fast, makes rubbish splash easily, causes the damage to the periphery, and the inconvenient problem of fixing in the floor side that needs the processing of device.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a construction waste discharging device for in construction, includes and arranges the frame, the dog-house has been seted up to one side of going up to arranging the frame, the upper end both sides of going up to arranging the frame are provided with the connecting rod, the spout has been seted up to the side of connecting rod, slidable mounting has the mount on the connecting rod, the one end that goes up to arrange the frame and keep away from the dog-house has seted up two sets of screw holes of going up, the one end that goes up to arrange the frame and keep away from the dog-house is connected with down and arranges the frame, it is close to down to arrange the frame the one end upper surface of going up to arrange the frame and seted up the feed inlet, two sets of screw holes down have been seted up.
The further improvement lies in that: the cross section of the upper discharging frame is in a broken line shape, and the interior of the upper discharging frame is hollowed out.
The further improvement lies in that: the connecting rod passes through the spout with constitute sliding construction between the mount, the cross-section of mount is "L" type.
The further improvement lies in that: the top end of the lower discharging frame is matched with the lower end of the upper discharging frame, and a detachable structure is formed between the lower discharging frame and the upper discharging frame.
The further improvement lies in that: the position of the lower threaded hole corresponds to the position of the upper threaded hole, and the connecting bolt is connected between the lower threaded hole and the upper threaded hole.
Compared with the prior art, the beneficial effects of the utility model are that: make the mount slide in the connecting rod is inside through the spout, and then change the length of connecting rod and mount, make the different supporting beam looks blocks of interval that mount cooperation connecting rod and floor set up, and then make the side at different floors of emission frame installation, and simultaneously, through the last discharge frame of broken line type structure, make building rubbish when at last discharge frame inside flow, avoid the direct whereabouts of building rubbish, reduce the speed that building rubbish fell to ground, avoid building rubbish to take place great splashing.
Drawings
FIG. 1 is a schematic perspective view of the present invention;
fig. 2 is a schematic view of the utility model shown in fig. 1, which is a right side view in longitudinal section;
fig. 3 is the assembly structure diagram of the upper discharge rack and the lower discharge rack of the present invention.
In the figure: 1. an upper discharge rack; 2. a feeding port; 3. a connecting rod; 4. a chute; 5. a fixed mount; 6. an upper threaded hole; 7. a lower discharge rack; 8. a feed inlet; 9. a lower threaded hole; 10. and connecting the bolts.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
Referring to fig. 1, 2 and 3, the present invention provides a technical solution: the utility model provides a construction waste discharging device for among construction, including last emission frame 1, dog-house 2 has been seted up to one side of going up emission frame 1, the upper end both sides of going up emission frame 1 are provided with connecting rod 3, spout 4 has been seted up to the side of connecting rod 3, slidable mounting has mount 5 on connecting rod 3, two sets of screw holes 6 of going up have been seted up to the one end of going up emission frame 1 and keeping away from dog-house 2, the one end that goes up emission frame 1 and keep away from dog-house 2 is connected with down emission frame 7, emission frame 7 has been close to the one end upper surface of last emission frame 1 down and has been seted up feed inlet 8, two sets of screw holes 9 down have been seted up respectively at the upper and lower both ends of emission frame.
The cross sectional shape of going up emission frame 1 is the broken line type, goes up the inside fretwork setting of emission frame 1, through the last emission frame 1 of broken line type structure, makes building rubbish when going on flowing in last emission frame 1 inside, avoids the direct whereabouts of building rubbish, reduces the speed that building rubbish fell to ground, avoids building rubbish to take place great splashing.
Connecting rod 3 passes through to constitute sliding structure between spout 4 and the mount 5, and the cross-section of mount 5 is "L" type, makes mount 5 slide in connecting rod 3 is inside through spout 4, and then changes connecting rod 3 and mount 5's length, makes the supporting beam looks block that mount 5 cooperation connecting rod 3 and floor set up, and then fixes the emission frame.
The top of lower emission frame 7 is identical with the low end of last emission frame 1, constitutes detachable construction between lower emission frame 7 and the last emission frame 1, through assembling last emission frame 1 and lower emission frame 7, makes the emission frame assemble according to the height of floor, throws the building rubbish of different floors to emission frame inside and discharges.
The position of lower screw hole 9 corresponds with the position of last screw hole 6, is connected with connecting bolt 10 between lower screw hole 9 and the last screw hole 6, passes through screw hole 6 and connects with lower screw hole 9 through rotatory connecting bolt 10, and then makes and accomplishes the equipment between last emission frame 1 and the lower emission frame 7.
When the building waste discharging device for building construction is used, firstly, according to the height of a floor, a proper number of lower discharging frames 7 are selected, the fixing frame 5 slides in the connecting rod 3 through the sliding groove 4, the length of the connecting rod 3 and the fixing frame 5 is further changed, the fixing frame 5 is matched with the connecting rod 3 to be clamped with a supporting beam arranged on the floor, the upper discharging frame 1 is fixed on the uppermost layer of the floor, then the lower discharging frame 7 and the upper discharging frame 1 are spliced, the connecting bolt 10 is connected through the upper threaded hole 6 and the lower threaded hole 9 through the rotating connecting bolt 10, the upper discharging frame 1 and the lower discharging frame 7 are assembled, when the building waste is discharged, the building waste pushes the inside of the feeding port 2 to slide and fall in the upper discharging frame 1 and the lower discharging frame 7, and the building waste is discharged from the upper floor, those not described in detail in this specification are within the skill of the art.
Make mount 5 slide in connecting rod 3 inside through spout 4, and then change the length of connecting rod 3 and mount 5, make the supporting beam looks block of the different intervals that mount 5 cooperation connecting rod 3 and floor set up, and then make and discharge the frame and install the side at different floors, and simultaneously, through last discharge frame 1 of broken line type structure, make building rubbish at last discharge frame 1 inside when flowing, avoid building rubbish directly to fall down, reduce the speed that building rubbish fell to ground, avoid building rubbish to take place great splashing.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments or portions thereof without departing from the spirit and scope of the invention.

Claims (5)

1. The utility model provides a building rubbish discharging equipment for in construction, includes emission frame (1), its characterized in that: the feeding port (2) is formed in one side of the upper discharging frame (1), connecting rods (3) are arranged on two sides of the upper end of the upper discharging frame (1), sliding grooves (4) are formed in the side faces of the connecting rods (3), fixing frames (5) are slidably mounted on the connecting rods (3), two groups of upper threaded holes (6) are formed in one end, away from the feeding port (2), of the upper discharging frame (1), one end, away from the feeding port (2), of the upper discharging frame (1) is connected with a lower discharging frame (7), a feeding port (8) is formed in the upper surface of one end, close to the upper discharging frame (1), of the lower discharging frame (7), two groups of lower threaded holes (9) are formed in the upper end and the lower end of the lower discharging frame (7), and the upper discharging frame (1) and the lower discharging frame (7) are connected through connecting bolts (10.
2. A construction waste discharge device for use in construction according to claim 1, wherein: the cross section of the upper discharging frame (1) is in a broken line shape, and the interior of the upper discharging frame (1) is hollowed out.
3. A construction waste discharge device for use in construction according to claim 1, wherein: the connecting rod (3) passes through the sliding groove (4) and forms a sliding structure between the fixing frames (5), and the cross sections of the fixing frames (5) are L-shaped.
4. A construction waste discharge device for use in construction according to claim 1, wherein: the top end of the lower discharging frame (7) is matched with the lower end of the upper discharging frame (1), and a detachable structure is formed between the lower discharging frame (7) and the upper discharging frame (1).
5. A construction waste discharge device for use in construction according to claim 1, wherein: the position of the lower threaded hole (9) corresponds to the position of the upper threaded hole (6), and the connecting bolt (10) is connected between the lower threaded hole (9) and the upper threaded hole (6).
CN202020079932.0U 2020-01-15 2020-01-15 A building rubbish discharging equipment for in construction Expired - Fee Related CN211949408U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020079932.0U CN211949408U (en) 2020-01-15 2020-01-15 A building rubbish discharging equipment for in construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020079932.0U CN211949408U (en) 2020-01-15 2020-01-15 A building rubbish discharging equipment for in construction

Publications (1)

Publication Number Publication Date
CN211949408U true CN211949408U (en) 2020-11-17

Family

ID=73181362

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020079932.0U Expired - Fee Related CN211949408U (en) 2020-01-15 2020-01-15 A building rubbish discharging equipment for in construction

Country Status (1)

Country Link
CN (1) CN211949408U (en)

Similar Documents

Publication Publication Date Title
CN211573580U (en) Tunnel dust collector of adjustable pipeline height
CN211949408U (en) A building rubbish discharging equipment for in construction
CN107465387A (en) A kind of wall-mounted photovoltaic bracket
CN211640390U (en) Supporting and maintaining system for precast box girder
CN215542208U (en) Novel artificial waterfall of landscape architecture
CN207361725U (en) A kind of municipal inspection shaft easy to use takes lid equipment
CN206829339U (en) Integrated prefabricated pumping plant crushed rack bar screen framework
CN204665869U (en) For the blowing apparatus electroplated
CN1576765A (en) Method and device for directing flow in air-cooled condenser systems
CN207104342U (en) A kind of gantry machining center lathe bed of Quick drainage chip removal
CN207892338U (en) Combined self-stabilization fast-assembling communication tower
CN213268334U (en) Vertical greening steel structure house building
CN219091272U (en) Convenient cleaning device for mud sand in water collection pit
CN210439416U (en) Rain and sewage flow divider for buildings
CN110387937A (en) A kind of sewage drainage pipeline and its pipe installation method
CN214599467U (en) Discharging grid plate of cement tube mill
CN219827986U (en) Auxiliary support frame is laid to water supply and drainage pipeline
CN219508901U (en) Novel building view curtain
CN211549030U (en) Wind tower capable of draining water quickly
CN215977965U (en) Energy-saving curtain wall for architectural decoration
CN219915292U (en) Impervious test device of concrete tile
CN220166595U (en) Asphalt flat shovel device for paving machine
CN213529501U (en) Discharging grid plate with adjustable through-hole rate
CN219671590U (en) Anti-fouling water overflow type intercepting well
CN219242813U (en) Drainage pipeline supporting base

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201117