CN211949068U - Metal curtain wall connecting structure and metal curtain wall - Google Patents

Metal curtain wall connecting structure and metal curtain wall Download PDF

Info

Publication number
CN211949068U
CN211949068U CN201922085301.XU CN201922085301U CN211949068U CN 211949068 U CN211949068 U CN 211949068U CN 201922085301 U CN201922085301 U CN 201922085301U CN 211949068 U CN211949068 U CN 211949068U
Authority
CN
China
Prior art keywords
metal
curtain wall
metal curtain
edge
slot
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922085301.XU
Other languages
Chinese (zh)
Inventor
彪鹏
石飞飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Science and Industry Corp Ltd
Original Assignee
China Construction Steel Structure Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Steel Structure Corp Ltd filed Critical China Construction Steel Structure Corp Ltd
Priority to CN201922085301.XU priority Critical patent/CN211949068U/en
Application granted granted Critical
Publication of CN211949068U publication Critical patent/CN211949068U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The utility model discloses a metal curtain wall connection structure and metal curtain wall, include: a keel; the first end of the first metal wallboard is provided with a butting part and a plugging part, and the second end of the second metal wallboard is provided with a fixing part; the connecting piece, first connecting portion, slot and second connecting portion have set gradually on the connecting piece, first connecting portion are fixed on the fossil fragments, the second connecting portion with fixed part fixed connection, the portion of inserting is arranged in the slot. The utility model discloses a first metal wall board sets up on the connecting piece through the connection of portion of inserting and slot, and the degree of depth that the portion of inserting inserted in the slot can be adjusted, can allow adjacent fossil fragments from this to have great dimensional error, reduces the installation accuracy of fossil fragments on the wall body, makes the installation rate of fossil fragments accelerate, reduces fossil fragments measurement location's working strength, raises the efficiency.

Description

Metal curtain wall connecting structure and metal curtain wall
Technical Field
The utility model belongs to the technical field of metal curtain wall and specifically relates to a metal curtain wall connection structure and metal curtain wall is related to.
Background
The metal curtain wall is a new type of building curtain wall for decoration. The glass curtain wall is a curtain wall form of replacing glass in the glass curtain wall with a metal plate, and due to the excellent processing performance, the diversity of colors and the good safety of the metal plate, the glass curtain wall can completely adapt to the design of various complex shapes, concave and convex lines can be increased at will, and various types of curve lines can be processed, so that the rapid development is obtained.
Traditional metal curtain wall need carry out accurate counterpoint to the fossil fragments, otherwise on the unable welding of metal wall board is to the fossil fragments, therefore the measurement location work that leads to the fossil fragments is heavy, consequently need improve.
SUMMERY OF THE UTILITY MODEL
The utility model discloses aim at solving one of the technical problem that exists among the prior art at least. Therefore, the utility model provides a metal curtain wall connection structure can reduce the location requirement of fossil fragments, reduces the measurement location work of fossil fragments, improves the efficiency of construction.
The utility model discloses still provide a metal curtain wall.
In a first aspect, an embodiment of the present invention provides a metal curtain wall connection structure, including: a keel; the first end of the first metal wallboard is provided with a butting part and a plugging part, and the second end of the second metal wallboard is provided with a fixing part; the connecting piece, first connecting portion, slot and second connecting portion have set gradually on the connecting piece, first connecting portion are fixed on the fossil fragments, the second connecting portion with fixed part fixed connection, the portion of inserting is arranged in the slot.
The utility model discloses metal curtain wall connection structure has following beneficial effect at least: the connecting piece is fixed on the keel through the first connecting portion, the second metal wallboard is fixed on the connecting piece through the connection of second connecting portion and fixed part, and first metal wallboard sets up on the connecting piece through the connection of inserting portion and slot, inserts the degree of depth that inserts in the slot and can adjust to insert the portion, can allow adjacent keel to have great dimensional error from this, reduce the installation accuracy of keel on the wall body, make the installation rate of keel accelerate, reduce the working strength that the location was measured to the keel, raise the efficiency.
According to the utility model discloses a metal curtain wall connection structure of other embodiments, the inner wall of slot still is provided with the arch, the arch can with connect the hub to support and hold.
According to the utility model discloses a metal curtain wall connection structure of other embodiments, first metal wall panel the first end through bend in succession be formed with support the portion with connect the portion, the body of first metal wall panel with connect the portion and be located respectively support the both sides of portion.
According to the utility model discloses a metal curtain wall connection structure of other embodiments, second metal wallboard the second end is formed with through bending the fixed part.
According to the utility model discloses a metal curtain wall connection structure of other embodiments, the connecting piece includes relative first limit and second limit, first limit with the same one end on second limit links to each other, first limit with be formed with between the second limit the slot, the second limit does the second connecting portion, first limit is kept away from one side on second limit is bent, is formed with first connecting portion.
According to the utility model discloses a metal curtain wall connection structure of other embodiments, the material of connecting piece is the aluminum alloy, the connecting piece passes through the casting shaping.
According to the utility model discloses a metal curtain wall connection structure of other embodiments, first connecting portion pass through waterproof screw locking to be fixed on the fossil fragments.
According to the utility model discloses a metal curtain wall connection structure of other embodiments, the second connecting portion with the fixed part passes through rivet riveting fixed.
According to the utility model discloses a metal curtain wall connection structure of other embodiments, support hold the portion with fixed part sealing connection.
According to the utility model discloses a metal curtain wall connection structure of other embodiments, support hold the portion with it has waterproof stick to fill between the fixed part, waterproof stick still coats towards external one side and has sealed glue.
In a second aspect, an embodiment of the present invention provides a metal curtain wall, including the above-mentioned metal curtain wall connection structure.
The utility model discloses metal curtain wall has following beneficial effect at least: through inciting somebody to action the utility model discloses metal curtain wall connection structure application is low to the location requirement of fossil fragments to adjacent metal wallboard on, can realize whole metal curtain wall's quick concatenation, improves the efficiency of construction.
Drawings
FIG. 1 is a sectional view of a metal curtain wall attachment structure of a first embodiment;
fig. 2 is a cross-sectional view of the connector of fig. 1.
Detailed Description
The conception and the resulting technical effects of the present invention will be described clearly and completely with reference to the following embodiments, so that the objects, features and effects of the present invention can be fully understood. Obviously, the described embodiments are only a part of the embodiments of the present invention, and not all embodiments, and other embodiments obtained by those skilled in the art without inventive labor based on the embodiments of the present invention all belong to the protection scope of the present invention.
In the description of the embodiments of the present invention, if an orientation description is referred to, for example, the directions or positional relationships indicated by "upper", "lower", "front", "rear", "left", "right", etc. are based on the directions or positional relationships shown in the drawings, only for convenience of description and simplification of description, but not for indicating or implying that the indicated device or element must have a specific orientation, be constructed and operated in a specific orientation, and thus should not be construed as limiting the present invention.
In the description of the embodiments of the present invention, if a feature is referred to as being "disposed", "fixed", "connected", or "mounted" on another feature, it can be directly disposed, fixed, or connected to the other feature or indirectly disposed, fixed, connected, or mounted on the other feature. In the description of the embodiments of the present invention, if "a plurality" is referred to, it means one or more, if "a plurality" is referred to, it means two or more, if "greater than", "less than" or "more than" is referred to, it is understood that the number is not included, and if "more than", "less than" or "within" is referred to, it is understood that the number is included. If reference is made to "first" or "second", this should be understood to distinguish between features and not to indicate or imply relative importance or to implicitly indicate the number of indicated features or to implicitly indicate the precedence of the indicated features.
Referring to fig. 1 and 2, fig. 1 is a sectional view of a metal curtain wall attachment structure of a first embodiment, and fig. 2 is a sectional view of a connection member 600 of fig. 1. The metal curtain wall connecting structure of the embodiment includes a first metal wall panel 100, a waterproof rod 200, a sealant 300, a second metal wall panel 400, a rivet 500, a connecting member 600, a gasket 700, a waterproof screw 800 and a keel 900, wherein the first metal wall panel 100 is located above the second metal wall panel 400, the lower end of the first metal wall panel 100 is a first end thereof, the upper end of the first metal wall panel 100 is a second end thereof, the lower end of the second metal wall panel 400 is a first end thereof, the upper end of the second metal wall panel 400 is a second end thereof, in the embodiment, the first end of the first metal wall panel 100 and the second end of the second metal wall panel 400 are connected to the keel 900 through the connecting member 600, and the keel 900 is fixed on a wall body on which a metal curtain wall needs to be arranged.
Specifically, the first end of the first metal wall panel 100 is continuously bent to form the abutting portion 110 and the inserting portion 120, the body of the first metal wall panel 100 and the inserting portion 120 are respectively located at two sides of the abutting portion 110, and the second end of the second metal wall panel 400 is bent to form the fixing portion 410. Connecting piece 600 turns left from the right side and has set gradually first connecting portion 610, protruding 620, slot 630 and second connecting portion 640, be provided with first through-hole 611 on the first connecting portion 610, be provided with second through-hole 641 on the second connecting portion 640, first connecting portion 610 locks on fossil fragments 900 through the waterproof screw 800 who passes first through-hole 611, for the stability of being connected between first connecting portion 610 and fossil fragments 900, still be provided with gasket 700 between first connecting portion 610 and the fossil fragments 900.
The connecting member 600 is made of aluminum alloy and is manufactured by casting and polishing, wherein the connecting member 600 comprises a first edge and a second edge which are opposite, the first edge is located on the left side, the second edge is located on the right side, the lower end of the first edge is connected with the lower end of the second edge, a slot 630 is formed between the first edge and the second edge, a second connecting portion 640 is formed after a second through hole 641 is formed in the upper end of the second edge, the first edge is bent on one side far away from the second edge, and a first connecting portion 640 is formed after a first through hole 611 is formed.
The fixing portion 410 is stacked on the second connecting portion 640, and a third through hole is disposed at a position corresponding to the second through hole 641, and after the rivet 500 passes through the second through hole 641 and the third through hole, the second connecting portion 640 is fixed on the first connecting portion 610 through a riveting process, thereby fixing the second metal wall panel 400 and the keel 900.
After the plug 120 is inserted into the slot 630, the holding portion 110 is aligned and stacked on the fixing portion 410, and under the action of the gravity of the first metal wall panel 100, the holding portion 110 is pressed on the fixing portion 410, so as to ensure that the plug 120 does not fall off the slot 630. In order to ensure the stability of the mating of the patch panel 120 and the slot 630, the patch panel 120 does not shake in the slot 630 to a large extent, and a protrusion 620 is disposed on the inner wall of the slot 630, and the protrusion 620 can abut against the patch panel 120, thereby limiting the range of motion of the patch panel 120 in the slot 630.
In order to satisfy the waterproof requirement, the waterproof rod 200 is filled between the supporting portion 110 and the fixing portion 410, and meanwhile, in order to further ensure the waterproof performance and improve the appearance of the metal curtain wall, the sealant 300 is filled on the left side of the waterproof rod 200.
In this embodiment, the material of the waterproof rod 200 may be selected as rubber, the sealant 300 is selected as a silicone weather-resistant sealant, and the silicone weather-resistant sealant is a main exterior panel sealing and decorating material, which is a preferable scheme of this embodiment.
In another embodiment, the material of waterproof rod 200 is also selected from polyethylene, and sealant 300 is selected from waterproof silicone.
In this embodiment, the keel 900 is a square tube, and the square tube is fixed on a wall body on which a metal curtain wall needs to be installed through a bolt and a nut, and in another embodiment, the keel 900 may also be a channel steel or an i-steel.
From this, through setting up connecting piece 600, can be connected to fossil fragments 900 with adjacent first metal wallboard 100 and second metal wallboard 400 on, avoid traditional large-scale trompil and welding process, protected first metal wallboard 100 and the paint on second metal wallboard 400 surface, reduced the construction degree of difficulty, need not to carry out the secondary to first metal wallboard 100 and second metal wallboard 400 and mend the lacquer, save engineering time. Meanwhile, the abutting portion 110 is connected with the fixing portion 410 in a sealing manner, so that water leakage between the first metal wall plate 100 and the second metal wall plate 400 is prevented, and the waterproof requirement is met.
In addition, the first metal wall panel 100 and the second metal wall panel 400 are connected with the slot 630 through the patch portion 120, and the depth of the patch portion 120 inserted into the slot 630 can be adjusted, so that a larger size error of the adjacent keel 900 can be allowed, the installation accuracy of the keel 900 on the wall is reduced, the installation speed of the keel 900 is increased, the working strength of keel measurement and positioning is reduced, and the efficiency is improved.
In this embodiment, the connecting member 600 is hidden in the first metal wall panel 100 and the second metal wall panel 400, so that the exterior finish has no rivet or welding trace, and meets the higher exterior finish requirement.
The utility model discloses still relate to a metal curtain wall of embodiment, in this metal curtain wall, adjacent metal wallboard all connects through connecting piece 600, this moment, the lower extreme that can make metal wallboard has the structure of first metal wallboard 100 lower extremes, metal wallboard's upper end has the structure of second metal wallboard 400 upper end, therefore, metal curtain wall's whole metal wallboard is unanimous structure, the preparation of being convenient for, through using foretell metal curtain wall connection structure, can realize whole metal curtain wall's concatenation, metal curtain wall does not have large-scale trompil and welding process, the paint on metal curtain wall surface has been protected, metal curtain wall's waterproof performance has been guaranteed simultaneously.
The embodiments of the present invention have been described in detail with reference to the accompanying drawings, but the present invention is not limited to the above embodiments, and various changes can be made without departing from the spirit of the present invention within the knowledge of those skilled in the art. Furthermore, the embodiments of the present invention and features of the embodiments may be combined with each other without conflict.

Claims (10)

1. The utility model provides a metal curtain wall connection structure which characterized in that includes: a keel;
the first end of the first metal wallboard is provided with a butting part and a plugging part, and the second end of the second metal wallboard is provided with a fixing part;
the connecting piece, first connecting portion, slot and second connecting portion have set gradually on the connecting piece, first connecting portion are fixed on the fossil fragments, the second connecting portion with fixed part fixed connection, the portion of inserting is arranged in the slot.
2. The metal curtain wall connection structure of claim 1, wherein a protrusion is further disposed on an inner wall of the slot, and the protrusion can abut against the insertion portion.
3. The metal curtain wall connecting structure of claim 1, wherein the first end of the first metal wall panel is formed with the abutting portion and the inserting portion by continuous bending, and the body of the first metal wall panel and the inserting portion are respectively located on two sides of the abutting portion.
4. The metal curtain wall attachment structure of claim 1, wherein the second end of the second metal wall panel is formed with the fixing portion by bending.
5. The metal curtain wall connecting structure according to claim 1, wherein the connecting piece comprises a first edge and a second edge which are opposite to each other, the first edge and the second edge are connected at the same end, the slot is formed between the first edge and the second edge, the second edge is the second connecting portion, and the first edge is bent at one side far away from the second edge to form the first connecting portion.
6. The metal curtain wall connection structure of claim 1, wherein the connecting piece is made of aluminum alloy and is formed by casting.
7. The metal curtain wall connection structure as claimed in claim 1, wherein the first connection portion is locked and fixed on the keel by a waterproof screw.
8. The metal curtain wall connecting structure as claimed in claim 1, wherein the abutting portion is hermetically connected with the fixing portion.
9. The metal curtain wall connecting structure of claim 8, wherein a waterproof rod is filled between the abutting portion and the fixing portion, and a sealant is further coated on one side of the waterproof rod facing the outside.
10. Metal curtain wall, characterized in that it comprises a metal curtain wall connection according to any one of claims 1 to 9.
CN201922085301.XU 2019-11-26 2019-11-26 Metal curtain wall connecting structure and metal curtain wall Active CN211949068U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922085301.XU CN211949068U (en) 2019-11-26 2019-11-26 Metal curtain wall connecting structure and metal curtain wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922085301.XU CN211949068U (en) 2019-11-26 2019-11-26 Metal curtain wall connecting structure and metal curtain wall

Publications (1)

Publication Number Publication Date
CN211949068U true CN211949068U (en) 2020-11-17

Family

ID=73174999

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922085301.XU Active CN211949068U (en) 2019-11-26 2019-11-26 Metal curtain wall connecting structure and metal curtain wall

Country Status (1)

Country Link
CN (1) CN211949068U (en)

Similar Documents

Publication Publication Date Title
CN211949068U (en) Metal curtain wall connecting structure and metal curtain wall
CN111188477A (en) Assembled wall leveling mounting structure
CN110863593A (en) Metal curtain wall connecting structure and metal curtain wall
CN112267638A (en) Wall connecting fastener, connecting fastener and self-locking mounting structure of heat-insulation decorative plate
CN208072737U (en) A kind of assembly type ceiling structure
CN203701355U (en) Open curtain wall joint device with full-size inter-grasping structure
CN216076011U (en) Assembled wallboard reentrant corner connection structure
CN210797989U (en) Building curtain wall decoration installation connection structure
CN206346359U (en) It is open without flanging metal plate curtain wall
CN213115321U (en) Quick mounting structure of wall aluminium square tube
CN212957460U (en) Edge folding assembly for decorative wallboard
CN212897325U (en) Hanging structure of square tube piece
CN210507848U (en) Deformation joint pre-embedded assembled cover plate structure
CN209385002U (en) A kind of shutter with damascene structures
CN208650361U (en) One kind being used for the anti-wall fern in plug-in type curtain wall panel junction and connection component
CN208551421U (en) Oven
CN216340333U (en) Self-insulation decoration integrated multifunctional lightweight concrete curtain wall
CN217053914U (en) Three-dimensional adjustable metal curtain wall hanging piece
CN216076085U (en) Assembled wall leveling structure
CN211949370U (en) Assembled wall leveling mounting structure
CN211230009U (en) Window frame and window sleeve
CN212613501U (en) Connecting piece for column body decoration modeling installation
CN218814928U (en) Dry-hanging fastener and waterproof tile dry-hanging system
CN211949171U (en) Aerated brick with compression-resistant supporting structure on surface
CN211200894U (en) Ready-package aluminium veneer

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant