CN211948199U - Device for reducing road construction dust - Google Patents

Device for reducing road construction dust Download PDF

Info

Publication number
CN211948199U
CN211948199U CN202020602456.6U CN202020602456U CN211948199U CN 211948199 U CN211948199 U CN 211948199U CN 202020602456 U CN202020602456 U CN 202020602456U CN 211948199 U CN211948199 U CN 211948199U
Authority
CN
China
Prior art keywords
water
dust
fixedly connected
road construction
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020602456.6U
Other languages
Chinese (zh)
Inventor
田甜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020602456.6U priority Critical patent/CN211948199U/en
Application granted granted Critical
Publication of CN211948199U publication Critical patent/CN211948199U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Machines (AREA)

Abstract

The utility model discloses a device for reducing road construction dust, which comprises a base, the top of base is fixedly connected with the dust fall shell, the top of dust fall shell has seted up the basin, the top of dust fall shell is fixedly connected with the water collecting ring, the top welding of water collecting ring has the roof, the top of roof is fixedly connected with the fixed plate, the lateral wall of water collecting ring is seted up eight and is the hole for water spraying that the centre point of water collecting ring is the centre of a circle and be annular distribution, the bottom of roof is seted up eight and is the smooth hole that the centre point of roof is the centre of a circle and be annular distribution; this reduce device of road construction dust can be manual adjust the direction that sprays, and the staff can drive even board rebound through the bull stick for even through-hole and the hole for spraying coincidence of board, rivers pass through-hole and hole for spraying, make the staff can the manual regulation spray the number of rivers and the direction of spraying, satisfy the dust fall demand of complex environment.

Description

Device for reducing road construction dust
Technical Field
The utility model relates to a road construction technical field specifically is a reduce device of road construction dust.
Background
Road engineering refers to the whole process of planning, designing, constructing, maintaining and managing work performed by taking a road as an object and the engineering entity engaged in the whole process. Road works, like civil engineering of any other gate type, have obvious technical, economic and regulatory aspects. The road construction process is often accompanied by a large amount of dust, so a dust reducing device is needed to treat the dust.
At present, general dust device structure is comparatively simple, through water pump and fog gun discharge water smoke, carries out the dust fall, and general fog gun only sprays single direction, consequently is difficult to satisfy the comparatively complicated road construction engineering dust fall demand of environment, for this reason, provides a device that reduces the road construction dust.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a reduce device of road construction dust to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a device for reducing road construction dust comprises a base, wherein a dust-settling shell is fixedly connected to the top of the base, a water tank is arranged at the top of the dust-settling shell, a water collecting ring is fixedly connected to the top of the dust-settling shell, a top plate is welded to the top of the water collecting ring, a fixed plate is fixedly connected to the top of the top plate, eight water spray holes which are annularly distributed by taking the central point of the water collecting ring as the center of a circle are formed in the outer side wall of the water collecting ring, eight slide holes which are annularly distributed by taking the central point of the top plate as the center of a circle are formed in the bottom of the top plate, eight first slide grooves which are annularly distributed by taking the central point of the fixed plate as the center of a circle are formed in the bottom of the fixed plate, a second slide groove is formed in the first slide groove, a connecting plate is slidably, the inside sliding connection of spring has the sliding ring, the inside wall of sliding ring and the lateral wall fixed connection of even board.
As further preferable in the present technical solution: the lateral wall of dust fall shell is seted up quantity and is eight recesses that are the annular distribution with the central point of dust fall shell as the centre of a circle, the bottom sliding connection of even board is in the inside of recess.
As further preferable in the present technical solution: one side of the connecting plate is provided with a through hole, and a honeycomb plate is arranged in the water spraying hole.
As further preferable in the present technical solution: even the lateral wall fixedly connected with of board links the seat, one side of linking the seat is rotated and is connected with the bull stick, the lateral wall fixedly connected with quantity of dust fall shell is eight and is the U template that the central point that uses the dust fall shell is the annular distribution as the centre of a circle, the bull stick is kept away from the one end of linking the seat and is matchd with the inside wall of U template.
As further preferable in the present technical solution: the utility model discloses a water pump, including base, water tank, water pump, water tank, lateral wall bottom intercommunication and the water discharge pipe of water tank, the top fixedly connected with water pump of base, the welding of base's top has the water tank, the top water inlet threaded connection of water tank has the case lid, the lateral wall bottom intercommunication of water tank has the drain pipe, the end intercommunication that absorbs water of water pump has the pipe that absorbs water, the one end that the water pump was kept away from to the pipe that absorbs water is linked together with the water tank, the one end that the water pump was kept away from to the outlet pipe is linked together with.
As further preferable in the present technical solution: the push rod is fixedly connected to one side of the top of the base, and the four universal wheels which are uniformly distributed are welded to the bottom of the base.
Compared with the prior art, the beneficial effects of the utility model are that: this reduce device of road construction dust can be manual adjust the direction of spraying, has set up eight directions of equalling divide the distribution altogether, and the staff can drive even board rebound through the bull stick for even the through-hole and the hole for water spraying coincidence of board, rivers pass through-hole and hole for water spraying blowout, make the staff can manually adjust the number that sprays rivers and the direction of spraying, satisfy the dust fall demand of complex environment among the road construction.
Drawings
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic structural view of the dust falling shell of the present invention;
FIG. 3 is a schematic top view of the water collecting ring and the top plate of the present invention;
fig. 4 is an enlarged schematic view of the structure of the area a in fig. 1 according to the present invention.
In the figure: 1. a base; 2. a push rod; 3. a dust falling shell; 4. a water tank; 5. a box cover; 6. a drain pipe; 7. a water pump; 8. a suction pipe; 9. a water outlet pipe; 10. a water tank; 11. a universal wheel; 12. a groove; 13. connecting plates; 14. connecting seats; 15. a rotating rod; 16. a U-shaped plate; 17. a water spray hole; 18. a honeycomb panel; 19. a through hole; 20. a water collecting ring; 21. a top plate; 22. a fixing plate; 23. a first chute; 24. a second chute; 25. a spring; 26. a slip ring; 27. and (4) a slide hole.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Examples
Referring to fig. 1-4, the present invention provides a technical solution: a device for reducing road construction dust comprises a base 1, a dust-settling shell 3 is fixedly connected to the top of the base 1, a water tank 10 is arranged at the top of the dust-settling shell 3, a water collecting ring 20 is fixedly connected to the top of the dust-settling shell 3, a top plate 21 is welded to the top of the water collecting ring 20, a fixing plate 22 is fixedly connected to the top of the top plate 21, eight water spraying holes 17 which are annularly distributed by taking the central point of the water collecting ring 20 as the center of a circle are formed in the outer side wall of the water collecting ring 20, eight sliding holes 27 which are annularly distributed by taking the central point of the top plate 21 as the center of a circle are formed in the bottom of the top plate 21, eight first sliding grooves 23 which are annularly distributed by taking the central point of the fixing plate 22 as the center of a circle are formed in the bottom of the fixing plate 22, a second sliding groove 24 is formed in the first sliding groove 23, the inside of the spring 25 is slidably connected with a sliding ring 26, and the inner side wall of the sliding ring 26 is fixedly connected with the outer side wall of the connecting plate 13.
In this embodiment, specifically: the recess 12 that quantity is eight and is the annular distribution with the central point of dust fall shell 3 as the centre of a circle is seted up to the lateral wall of dust fall shell 3, and the bottom sliding connection of even board 13 can shelter from slide opening 27 in the inside of recess 12, the top of even board 13 to prevent rivers blowout.
In this embodiment, specifically: one side of the connecting plate 13 is provided with a through hole 19, a honeycomb plate 18 is arranged in the water spraying hole 17, and water flow is atomized and sprayed out through the honeycomb plate 18.
In this embodiment, specifically: even outer wall fixedly connected with of board 13 links seat 14, one side of even seat 14 is rotated and is connected with bull stick 15, the outer wall fixedly connected with quantity of dust fall shell 3 is eight the U template 16 that the central point that uses dust fall shell 3 is the annular distribution as the centre of a circle, bull stick 15 keeps away from even one end of seat 14 and the inside wall phase-match of U template 16, through above setting, staff can rotate bull stick 15, upwards promote bull stick 15, bull stick 15 drives even board 13 through even seat 14 and upwards promotes, make even through-hole 19 on the board 13 coincide with hole for water spraying 17, rivers pass through hole for water spraying 17 and through-hole 19 blowout, promote the back, rotate the one end of bull stick 15 and insert the inside wall of U template 16, fix bull stick 15, thereby fixed even board 13.
In this embodiment, specifically: base 1's top fixedly connected with water pump 7, base 1's top welding has water tank 4, the top water inlet threaded connection of water tank 4 has case lid 5, the lateral wall bottom intercommunication of water tank 4 has drain pipe 6, the end intercommunication that absorbs water of water pump 7 has the pipe 8 that absorbs water, the one end that the water pump 7 was kept away from to the pipe 8 that absorbs water is linked together with water tank 4, the drain end intercommunication of water pump 7 has outlet pipe 9, the one end that water pump 7 was kept away from to outlet pipe 9 is linked together with basin 10, the switch is installed to the lateral wall of water tank 4, the electrical property input of water pump 7 and the electrical property output end electric connection of switch, through above setting, water pump 7 inhales the inside water of water tank 4 through the pipe 8 that absorbs water, discharge.
In this embodiment, specifically: one side fixedly connected with push rod 2 in top of base 1, the bottom welding of base 1 has the universal wheel 11 that quantity is four evenly distributed, and the staff passes through push rod 2 and promotes the device, and the device removal is assisted to universal wheel 11.
In this embodiment, the water pump 7 is a ZX25-3.2-20 water pump.
Working principle or structural principle, when using, the staff promotes the device through the push rod 2, when needing to carry out dust fall treatment to the dust, the staff opens the switch, the water pump 7 sucks the water in the water tank 4 through the suction pipe 8, discharge into the basin 10 through the outlet pipe 9, the staff adjusts the link plate 13 corresponding to the direction according to the direction that the actual demand sprays, the staff can rotate the rotating rod 15, lift the rotating rod 15 upwards, the rotating rod 15 drives the link plate 13 to lift upwards through the link seat 14, make the through hole 19 on the link plate 13 coincide with the hole for water spraying 17, after lifting, rotate one end of the rotating rod 15 and insert the inside wall of the U-shaped plate 16, fix the rotating rod 15, thereby fix the link plate 13, the rivers are sprayed through the hole for water spraying 17 and the through hole 19, carry out dust fall treatment to the dust in the air, after using, rotate the rotating rod 15, make the rotating rod 15 break away from the U-shaped, under the action of the spring 25, the connecting plate 13 moves downwards to block the water spraying hole 17, so that external dust can be prevented from entering the device.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a reduce device of road construction dust, includes base (1), its characterized in that: the dust settling device is characterized in that a dust settling shell (3) is fixedly connected to the top of the base (1), a water tank (10) is arranged at the top of the dust settling shell (3), a water collecting ring (20) is fixedly connected to the top of the dust settling shell (3), a top plate (21) is welded to the top of the water collecting ring (20), a fixing plate (22) is fixedly connected to the top of the top plate (21), eight water spray holes (17) which are annularly distributed by taking the central point of the water collecting ring (20) as the center of a circle are formed in the outer side wall of the water collecting ring (20), eight sliding holes (27) which are annularly distributed by taking the central point of the top plate (21) as the center of a circle are formed in the bottom of the top plate (21), eight first sliding chutes (23) which are annularly distributed by taking the central point of the fixing plate (22) as the center of a circle are formed in the bottom of the fixing plate, the inner sliding connection of the second sliding groove (24) is provided with a connecting plate (13), the inner part of the first sliding groove (23) is provided with a spring (25), the inner part of the spring (25) is connected with a sliding ring (26) in a sliding manner, and the inner side wall of the sliding ring (26) is fixedly connected with the outer side wall of the connecting plate (13).
2. The apparatus for reducing dust in road construction according to claim 1, wherein: the outer side wall of the dust falling shell (3) is provided with eight grooves (12) which are annularly distributed by taking the central point of the dust falling shell (3) as the circle center, and the bottom of the connecting plate (13) is connected to the inside of the grooves (12) in a sliding manner.
3. The apparatus for reducing dust in road construction according to claim 1, wherein: one side of the connecting plate (13) is provided with a through hole (19), and a honeycomb plate (18) is arranged in the water spraying hole (17).
4. The apparatus for reducing dust in road construction according to claim 1, wherein: link outer wall fixedly connected with of board (13) even seat (14), one side of even seat (14) is rotated and is connected with bull stick (15), the outer wall fixedly connected with quantity of dust fall shell (3) is U template (16) that eight central points that use dust fall shell (3) are the annular and distribute as the centre of a circle, the one end of even seat (14) and the inside wall phase-match of U template (16) are kept away from in bull stick (15).
5. The apparatus for reducing dust in road construction according to claim 1, wherein: the utility model discloses a water pump, including base (1), the top fixedly connected with water pump (7) of base (1), the top welding of base (1) has water tank (4), the top water inlet threaded connection of water tank (4) has case lid (5), the lateral wall bottom intercommunication of water tank (4) has drain pipe (6), the end intercommunication that absorbs water of water pump (7) has the pipe (8) that absorbs water, the one end of keeping away from water pump (7) of the pipe (8) that absorbs water is linked together with water tank (4), the drainage end intercommunication of water pump (7) has outlet pipe (9), the one end that keeps away from water pump (7) in outlet pipe (9) is linked together with basin (10), the switch is installed to the lateral wall of water tank (4), the electrical property input of water pump (7) and the electrical.
6. The apparatus for reducing dust in road construction according to claim 1, wherein: the top one side fixedly connected with push rod (2) of base (1), the bottom welding of base (1) has evenly distributed's universal wheel (11) for four.
CN202020602456.6U 2020-04-21 2020-04-21 Device for reducing road construction dust Expired - Fee Related CN211948199U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020602456.6U CN211948199U (en) 2020-04-21 2020-04-21 Device for reducing road construction dust

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020602456.6U CN211948199U (en) 2020-04-21 2020-04-21 Device for reducing road construction dust

Publications (1)

Publication Number Publication Date
CN211948199U true CN211948199U (en) 2020-11-17

Family

ID=73165202

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020602456.6U Expired - Fee Related CN211948199U (en) 2020-04-21 2020-04-21 Device for reducing road construction dust

Country Status (1)

Country Link
CN (1) CN211948199U (en)

Similar Documents

Publication Publication Date Title
CN211948199U (en) Device for reducing road construction dust
CN213853749U (en) Glass dust collection device for glass production
CN109250844A (en) A kind of environment-protecting industrial sewage disposal device
CN212175644U (en) Dust fall equipment for construction
CN203556175U (en) Easy-to-repair open-window type filter screen
CN210729973U (en) Plastic paint spraying water curtain cabinet
CN205893023U (en) Rural centralized sewage treatment system
CN209355539U (en) A kind of cooling device for justifying in well lid production process
CN204448407U (en) Tool filtration cycle utilizes the Novel curtain cabinet of function
CN206844034U (en) A kind of civil engineering depositing dust spray system
CN215916822U (en) Dustproof sprinkler that uses of construction
CN208436576U (en) The purification device of extra gasification paint in toy paint spraying
CN211871432U (en) Novel sewage treatment agent sprays for sewage treatment device
CN215669865U (en) Wisdom is pot-type no negative pressure water supply equipment of overflow warning for water utilities engineering
CN218794765U (en) Dust device for constructional engineering construction
CN217051960U (en) Sewage treatment and recycling device for water conservation in landscaping
CN212492109U (en) Dust fall flow tube for building construction
CN216223520U (en) Raise dust processing apparatus for construction management
CN109607634A (en) Integrated glass fiber reinforced plastic pretreatment system for sewage and its technique
CN220790063U (en) Prefabricated pump station of integration
CN214347416U (en) Water curtain forming structure of water curtain paint spraying chamber
CN219647049U (en) Water-saving dust settling device
CN210303077U (en) Integral type spray column circulating equipment
CN218281100U (en) Building construction dust device
CN210457699U (en) Oil-liquid separation system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201117