CN211937658U - A rubber coating equipment for skis production - Google Patents

A rubber coating equipment for skis production Download PDF

Info

Publication number
CN211937658U
CN211937658U CN202020226499.9U CN202020226499U CN211937658U CN 211937658 U CN211937658 U CN 211937658U CN 202020226499 U CN202020226499 U CN 202020226499U CN 211937658 U CN211937658 U CN 211937658U
Authority
CN
China
Prior art keywords
support
snowboard
gluing
rubber coating
glue
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020226499.9U
Other languages
Chinese (zh)
Inventor
陈文生
陈博军
陈成龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FUJIAN NANAN TONGSHENG SPORTS EQUIPMENT CO LTD
Original Assignee
FUJIAN NANAN TONGSHENG SPORTS EQUIPMENT CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FUJIAN NANAN TONGSHENG SPORTS EQUIPMENT CO LTD filed Critical FUJIAN NANAN TONGSHENG SPORTS EQUIPMENT CO LTD
Priority to CN202020226499.9U priority Critical patent/CN211937658U/en
Application granted granted Critical
Publication of CN211937658U publication Critical patent/CN211937658U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Coating Apparatus (AREA)

Abstract

The utility model discloses a rubber coating equipment for ski production, including the pressure injection device that is used for sending glue, still including the conveyer that is used for carrying, the conveyer top is provided with the support device, install above the support device and scribble equal device. A rubber coating equipment for ski production, through conveyer's setting, guaranteed going on in succession of ski rubber coating operation, saved the time, through scribbling the setting of equal device, the homogeneity that the glue solution was paintd when having increased continuous rubber coating operation, through the setting of pressing steel ball in the injection apparatus, prevented the water clock of glue solution, increased the homogeneity of painting simultaneously.

Description

A rubber coating equipment for skis production
Technical Field
The utility model belongs to ski production field especially relates to a rubber coating equipment for ski production.
Background
Skis are skiing sports equipment and generally comprise mountain boards, cross-country winter and winter two-item boards, jumping stands, free boards, single boards and the like. The composite material is composed of a multilayer structure, and comprises an elastic reverse material, a box-shaped structure which is relatively high in torque, a plate core, a glass fiber composite material, a high polymer material bottom plate, a metal edge and the like. And glue solution is adopted for bonding the layers. However, in the prior art, the snowboard gluing can not be continuously operated, the gluing interval time is increased, the operation speed is reduced, and the gluing is not uniform due to the lack of a gluing device.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a rubber coating equipment for snowboard production to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
a rubber coating equipment for snowboard production, including the pressure injection device that is used for sending gluey, still include the conveyer that is used for carrying, conveyer top is provided with the support device, install on the support device and scribble the even device.
Further: scribble equal device and include first cylinder, install first support below the first cylinder, install first spreader in the first support, first spreader one side is provided with the scraper blade, first support with first cylinder bolted connection, first spreader with first support bearing connects, the scraper blade with first support bolted connection, the scraper blade with first spreader sliding connection.
The first air cylinder pushes the first support to move up and down to drive the first transverse roller to be in contact with or separated from the snowboard, when the first transverse roller is in contact with the snowboard, the first transverse roller uniformly spreads glue solution under the movement of the snowboard, and the glue solution is scraped from the first transverse roller by the scraper.
Further: scribble equal device and include first cylinder, install the second support below the first cylinder, 2 second horizontal rollers are installed to the symmetry in the second support, the second support with first cylinder bolted connection, the second horizontal roller with second support bearing connects.
The first air cylinder pushes the second support to move up and down to drive the second transverse roller to be in contact with or separated from the snowboard, and when the second transverse roller is in contact with the snowboard, glue solution is uniformly spread by the second transverse roller under the movement of the snowboard.
Further: the pressure injection device comprises a glue storage box, a glue injection pump is installed on one side of the glue storage box, a second cylinder is arranged on one side of the glue injection pump, a supporting seat is installed below the second cylinder, a plurality of glue coating heads are evenly installed above the supporting seat, a spring is installed in each glue coating head, a steel ball is arranged below the spring, the glue injection pump is connected with the glue storage box through bolts, the supporting seat is connected with the second cylinder through bolts, the glue coating heads are connected with the supporting seat through threads, and the steel ball is connected with the glue coating heads in a sliding mode.
The second cylinder pushes the supporting seat to move downwards, so that the gluing head presses the steel ball downwards to be in contact with the ski, the steel ball pushes the spring to open the gluing head, and the glue injection pump extracts glue from the glue storage tank and conveys the glue to the gluing head to be smeared on the surface of the ski.
Further: conveyer is including the symmetry transfer roller that is provided with, install the conveyer belt between the transfer roller, the motor is installed at the transfer roller back, conveyer belt surface evenly distributed has the limiting plate, the motor with the flat key of transfer roller is connected, the limiting plate with the conveyer belt riveting is in the same place.
The motor drives the conveying roller to rotate to drive the conveying belt to move, and the limiting plate is used for preventing the snowboard from sliding.
Further: the support device comprises a support frame, a support plate is installed in the middle of the support frame, a through groove is formed in the top of the support frame, and the support plate and the support frame are riveted together.
The support frame is used for supporting and installing other parts, the supporting plate is used for lifting the lower side of the snowboard, and the through groove is used for installing external parts.
Further: the pressure injection device and the coating device are respectively connected with the bracket device through bolts.
Bolted connection is convenient for dismouting the pressure injection device with scribble the equal device and maintain.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the arrangement of the conveying device ensures the continuous operation of the snowboard gluing operation and saves time;
2. by the arrangement of the coating device, the uniformity of coating the glue solution during continuous gluing operation is improved;
3. the arrangement of the steel ball in the pressure injection device prevents the glue solution from leaking, and increases the uniformity of smearing.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings needed to be used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without inventive exercise.
FIG. 1 is a schematic structural view of a gluing device for snowboard production according to the present invention;
FIG. 2 is a front cross-sectional view of the gluing device for snowboard production of the present invention;
FIG. 3 is a right side view of a gluing head of the gluing device for snowboard production according to the present invention;
FIG. 4 is a sectional view of a coating device of embodiment 1 of the gluing device for snowboard production according to the present invention;
figure 5 is the embodiment 2 of the gluing equipment for snowboard production of the utility model and scribbles the equal device cross-sectional view.
In the reference symbols: 1. a bracket device; 101. a support frame; 102. a support plate; 103. a through groove; 2. a conveying device; 201. a conveying roller; 202. an electric motor; 203. a conveyor belt; 204. a limiting plate; 3. a pressure injection device; 301. a glue storage box; 302. a glue injection pump; 303. a second cylinder; 304. a supporting seat; 305. gluing heads; 306. a spring; 307. a steel ball; 4. a coating device; 401. a first cylinder; 402. a first bracket; 403. a first transverse roller; 404. a squeegee; 405. a second bracket; 406. a second transverse roller.
Detailed Description
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", and the like, indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are used merely for convenience of description and for simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention. Furthermore, the terms "first", "second", etc. are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first," "second," etc. may explicitly or implicitly include one or more of that feature. In the description of the present invention, "a plurality" means two or more unless otherwise specified.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood by those of ordinary skill in the art through specific situations.
The present invention will be further explained with reference to the accompanying drawings:
example 1
As shown in fig. 1-4, the gluing device for snowboard production comprises an injection device 3 for feeding glue and a conveying device 2 for conveying, wherein a support device 1 is arranged above the conveying device 2, and a coating device 4 is arranged on the support device 1.
Further: the coating device 4 comprises a first air cylinder 401, a first bracket 402 is arranged below the first air cylinder 401, a first transverse roller 403 is arranged in the first bracket 402, a scraping plate 404 is arranged on one side of the first transverse roller 403, the first bracket 402 is connected with the first air cylinder 401 through a bolt, the first transverse roller 403 is connected with the first bracket 402 through a bearing, the scraping plate 404 is connected with the first bracket 402 through a bolt, and the scraping plate 404 is connected with the first transverse roller 403 in a sliding manner; the pressure injection device 3 comprises a glue storage tank 301, a glue injection pump 302 is installed on one side of the glue storage tank 301, a second cylinder 303 is arranged on one side of the glue injection pump 302, a supporting seat 304 is installed below the second cylinder 303, a plurality of glue coating heads 305 are uniformly installed on the supporting seat 304, a spring 306 is installed in each glue coating head 305, a steel ball 307 is arranged below each spring 306, the glue injection pump 302 is in bolted connection with the glue storage tank 301, the supporting seat 304 is in bolted connection with the second cylinder 303, the glue coating heads 305 are in threaded connection with the supporting seat 304, and the steel balls 307 are in sliding connection with the glue coating heads 305; the conveying device 2 comprises conveying rollers 201 which are symmetrically arranged, conveying belts 203 are arranged between the conveying rollers 201, motors 202 are arranged behind the conveying rollers 201, limiting plates 204 are uniformly distributed on the surfaces of the conveying belts 203, the motors 202 are connected with the conveying rollers 201 through flat keys, and the limiting plates 204 are riveted with the conveying belts 203; the support device 1 comprises a support frame 101, a supporting plate 102 is arranged in the middle of the support frame 101, a through groove 103 is formed in the top of the support frame 101, and the supporting plate 102 and the support frame 101 are riveted together; the pressure injection device 3 and the coating device 4 are respectively connected with the bracket device 1 through bolts.
Example 2
As shown in figures 1 and 5, the gluing equipment for snowboard production comprises an injection device 3 for delivering glue and a conveying device 2 for conveying, wherein a support device 1 is arranged above the conveying device 2, and a coating device 4 is arranged on the support device 1.
Further: the coating device 4 comprises a first air cylinder 401, a second bracket 405 is arranged below the first air cylinder 401, 2 second transverse rollers 406 are symmetrically arranged in the second bracket 405, the second bracket 405 is connected with the first air cylinder 401 through bolts, and the second transverse rollers 406 are connected with the second bracket 405 through bearings; the pressure injection device 3 comprises a glue storage tank 301, a glue injection pump 302 is installed on one side of the glue storage tank 301, a second cylinder 303 is arranged on one side of the glue injection pump 302, a supporting seat 304 is installed below the second cylinder 303, a plurality of glue coating heads 305 are uniformly installed on the supporting seat 304, a spring 306 is installed in each glue coating head 305, a steel ball 307 is arranged below each spring 306, the glue injection pump 302 is in bolted connection with the glue storage tank 301, the supporting seat 304 is in bolted connection with the second cylinder 303, the glue coating heads 305 are in threaded connection with the supporting seat 304, and the steel balls 307 are in sliding connection with the glue coating heads 305; the conveying device 2 comprises conveying rollers 201 which are symmetrically arranged, conveying belts 203 are arranged between the conveying rollers 201, motors 202 are arranged behind the conveying rollers 201, limiting plates 204 are uniformly distributed on the surfaces of the conveying belts 203, the motors 202 are connected with the conveying rollers 201 through flat keys, and the limiting plates 204 are riveted with the conveying belts 203; the support device 1 comprises a support frame 101, a supporting plate 102 is arranged in the middle of the support frame 101, a through groove 103 is formed in the top of the support frame 101, and the supporting plate 102 and the support frame 101 are riveted together; the pressure injection device 3 and the coating device 4 are respectively connected with the bracket device 1 through bolts.
The utility model discloses a theory of operation and use flow: the snowboard is placed on the conveyor belt 203, the limiting plate 204 prevents the snowboard from sliding, the motor 202 drives the conveyor roller 201 to rotate to drive the conveyor belt 203 and the snowboard to move into the support frame 101, the second air cylinder 303 pushes the support base 304 to move downwards, the glue coating head 305 presses the steel ball 307 to be in contact with the snowboard, the steel ball 307 pushes the spring 306 to open the glue coating head 305, the glue injection pump 302 extracts glue from the glue storage tank 301 and conveys the glue coating head 305 to be coated on the surface of the snowboard, the first air cylinder 401 pushes the first support frame 402 to move downwards to drive the first cross roller 403 to be in contact with the snowboard, the first cross roller 403 uniformly coats the glue under the movement of the snowboard, the scraper 404 scrapes the glue from the first cross roller downwards, or the first air cylinder 401 pushes the second support frame 405 to move downwards to drive the second cross roller 406 to be in contact with the snowboard 403, and the second cross roller 406 uniformly.
The foregoing illustrates and describes the principles, general features, and advantages of the present invention. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention.

Claims (7)

1. Gluing equipment for snowboard production, comprising an injection device (3) for feeding glue, characterized in that: the conveying device is characterized by further comprising a conveying device (2) used for conveying, wherein a support device (1) is arranged above the conveying device (2), and an even coating device (4) is installed on the support device (1).
2. Gluing device for snowboard production according to claim 1, characterized in that: the coating device (4) comprises a first air cylinder (401), a first support (402) is installed below the first air cylinder (401), a first transverse roller (403) is installed in the first support (402), a scraper (404) is arranged on one side of the first transverse roller (403), the first support (402) is in bolted connection with the first air cylinder (401), the first transverse roller (403) is in bearing connection with the first support (402), the scraper (404) is in bolted connection with the first support (402), and the scraper (404) is in sliding connection with the first transverse roller (403).
3. Gluing device for snowboard production according to claim 1, characterized in that: the coating device (4) comprises a first air cylinder (401), a second support (405) is installed below the first air cylinder (401), 2 second transverse rollers (406) are symmetrically installed in the second support (405), the second support (405) is connected with the first air cylinder (401) through bolts, and the second transverse rollers (406) are connected with the second support (405) through bearings.
4. Gluing device for snowboard production according to claim 1, characterized in that: pressure annotate device (3) including storing up gluey case (301), store up gluey case (301) one side and install injection pump (302), injection pump (302) one side is provided with second cylinder (303), install supporting seat (304) below second cylinder (303), evenly install a plurality of rubber coating head (305) above supporting seat (304), install spring (306) in rubber coating head (305), be provided with steel ball (307) below spring (306), injection pump (302) with store up gluey case (301) bolted connection, supporting seat (304) with second cylinder (303) bolted connection, rubber coating head (305) with supporting seat (304) threaded connection, steel ball (307) with rubber coating head (305) sliding connection.
5. Gluing device for snowboard production according to claim 1, characterized in that: conveyer (2) are including transmission roller (201) that the symmetry was provided with, install conveyer belt (203) between transmission roller (201), motor (202) are installed at the back in transmission roller (201), conveyer belt (203) surface evenly distributed has limiting plate (204), motor (202) with transmission roller (201) parallel key is connected, limiting plate (204) with conveyer belt (203) riveting is in the same place.
6. Gluing device for snowboard production according to claim 1, characterized in that: the support device (1) comprises a support frame (101), a supporting plate (102) is installed in the middle of the support frame (101), a through groove (103) is formed in the top of the support frame (101), and the supporting plate (102) and the support frame (101) are riveted together.
7. Gluing device for snowboard production according to claim 1, characterized in that: the pressure injection device (3) and the coating device (4) are respectively connected with the bracket device (1) through bolts.
CN202020226499.9U 2020-02-28 2020-02-28 A rubber coating equipment for skis production Expired - Fee Related CN211937658U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020226499.9U CN211937658U (en) 2020-02-28 2020-02-28 A rubber coating equipment for skis production

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020226499.9U CN211937658U (en) 2020-02-28 2020-02-28 A rubber coating equipment for skis production

Publications (1)

Publication Number Publication Date
CN211937658U true CN211937658U (en) 2020-11-17

Family

ID=73195872

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020226499.9U Expired - Fee Related CN211937658U (en) 2020-02-28 2020-02-28 A rubber coating equipment for skis production

Country Status (1)

Country Link
CN (1) CN211937658U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114289254A (en) * 2021-12-26 2022-04-08 邱常辉 Skis maintenance is maintained with cleaning device that oils

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114289254A (en) * 2021-12-26 2022-04-08 邱常辉 Skis maintenance is maintained with cleaning device that oils

Similar Documents

Publication Publication Date Title
CN211937658U (en) A rubber coating equipment for skis production
CN207176108U (en) The clamping and conveying device that a kind of circuit board is vertically electroplated
CN110722651A (en) Anticorrosion and mothproof treatment method for artificial board blank after forming
CN211515010U (en) Base glue gluing equipment for adhesive tape production
CN112588502A (en) Environment-friendly coating machine of production copper foil
CN202702791U (en) Wet method sticking film machine
CN115178421B (en) Photovoltaic board surface printing opacity membrane plating device
CN210906776U (en) Ball skin rubber coating device
CN214981749U (en) Automatic plate gluing machine
CN207507745U (en) A kind of Frictioning device
CN207507726U (en) A kind of uniform gumming mechanism of film
CN218925117U (en) Glue coating device for composite floor
CN206838392U (en) A kind of passivation automatic assembly line of convenient and efficient
CN114749323B (en) Oiling station of no fingerprint steel band processing line
CN214983327U (en) Self-adhesion waterproofing membrane production rubber coating device
CN211386602U (en) Double-sided oiling equipment used before aluminum plate stamping
CN207914027U (en) A kind of regulating mechanism of film glue application device
CN216069023U (en) Environment-friendly color steel sandwich panel
CN207914026U (en) A kind of film glue application device
CN216605811U (en) Roll coating equipment liquid coating mechanism for producing laminated aluminum capacitor chip
CN210501801U (en) Epoxy resin substrate nickel film coating equipment
CN215328424U (en) Continuous copper plating homogenizing device for copper-plated steel belt
CN113843099A (en) Surface glue coating device for production of extruded foam composite board
CN214188830U (en) Drain board laminating equipment
CN220008547U (en) Single-sided adhesive integrated forming device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201117

CF01 Termination of patent right due to non-payment of annual fee