CN211923590U - Building engineering datum line pay-off - Google Patents

Building engineering datum line pay-off Download PDF

Info

Publication number
CN211923590U
CN211923590U CN202020410963.XU CN202020410963U CN211923590U CN 211923590 U CN211923590 U CN 211923590U CN 202020410963 U CN202020410963 U CN 202020410963U CN 211923590 U CN211923590 U CN 211923590U
Authority
CN
China
Prior art keywords
laser
steering
pay
wall surface
datum line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020410963.XU
Other languages
Chinese (zh)
Inventor
李延平
李燕宾
李燕春
吴本荣
李加利
赵法树
许庆涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Ruiye Construction Co Ltd
Original Assignee
Shandong Ruiye Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Ruiye Construction Co Ltd filed Critical Shandong Ruiye Construction Co Ltd
Priority to CN202020410963.XU priority Critical patent/CN211923590U/en
Application granted granted Critical
Publication of CN211923590U publication Critical patent/CN211923590U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a construction engineering datum line pay-off device, which comprises a supporting plate, wherein a connecting structure is arranged on the lower wall surface of the supporting plate, four supporting structures are arranged below the connecting structure, a steering structure is arranged on the upper wall surface of the supporting plate, and a laser pay-off structure is arranged on the upper wall surface of the steering structure; the connection structure includes: the connecting device comprises a large connecting plate, two first connecting seats and two second connecting seats; big connecting plate is installed at the lower wall of backup pad, two the lower wall at big connecting plate is installed to first connecting seat and two second connecting seats, the utility model relates to a construction equipment technical field carries out accurate unwrapping wire through laser to there is not the vestige.

Description

Building engineering datum line pay-off
Technical Field
The utility model relates to a architectural equipment technical field specifically is a building engineering datum line pay-off.
Background
The paying-off is convenient for workers to live and can be constructed according to design drawings strictly, generally all building axes can be called as large lines, corresponding small lines are side lines and dimension lines of structural members, the main idea of paying-off is to move the dimensions of the design drawings to the ground according to the sizes shown in the drawings, and the paying-off is seen if the dimension of the whole project is constructed according to the dimensions of the design drawings, so that the importance of paying-off is not clear, but the existing paying-off technology is paying-off through an ink fountain, but marks are left, and possibly drawn lines are inaccurate, so that equipment for paying-off by using a laser technology is needed, angle adjustment can be carried out, vertical and horizontal lines cannot be carried out, and drawing lines at a certain angle can be carried out.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art, the utility model provides a building engineering datum line pay-off has solved current unwrapping wire technique and has had the vestige, can not carry out the problem of accurate angle unwrapping wire.
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: a construction engineering datum line pay-off device comprises a supporting plate, wherein a connecting structure is arranged on the lower wall surface of the supporting plate, four supporting structures are arranged below the connecting structure, a steering structure is arranged on the upper wall surface of the supporting plate, and a laser pay-off structure is arranged on the upper wall surface of the steering structure;
the connection structure includes: the connecting device comprises a large connecting plate, two first connecting seats and two second connecting seats;
the big connecting plate is installed at the lower wall of backup pad, two first connecting seat and two second connecting seats are installed at the lower wall of big connecting plate.
The support structure includes: the support device comprises a first support rod, a connecting screw, a second support rod, a third support rod and a support column;
the first supporting rod is installed below the connecting structure through a connecting screw, the second supporting rod is sleeved inside the first supporting rod, the third supporting rod is sleeved inside the second supporting rod, and the supporting column is installed on the lower wall surface of the third supporting rod.
The steering structure includes: the device comprises a Z steering shaft, a Z steering sleeve seat, a Z shaft locking handle, an X steering sleeve seat, an X shaft locking handle and a laser pay-off machine supporting plate;
the utility model discloses a laser pay-off machine, including Z steering spindle, Z cover seat suit, Z axle locking handle, X steering spindle, Z cover seat, X axle locking handle, Z axle locking handle, X axle locking handle, Z axle locking.
The laser pay-off structure comprises: the laser pay-off machine comprises a laser pay-off machine box, a vertical laser lamp and a horizontal laser lamp;
the laser paying-off machine box is arranged on the upper wall surface of the laser paying-off machine supporting plate, the laser lamp in the vertical direction is arranged on the front wall surface of the laser paying-off machine box, and the laser lamp in the horizontal direction is arranged on the front wall surface of the laser paying-off machine box.
Preferably, a horizontal air bubble is attached to an upper wall surface of the Z-axis.
Preferably, the lower wall surface of the supporting column is provided with an anti-skid claw.
Advantageous effects
The utility model provides a building engineering datum line pay-off. The method has the following beneficial effects: laser technology has sharp characteristic, so utilizes this characteristic of laser to use laser in the aspect of the unwrapping wire, the utility model discloses compare with traditional unwrapping wire technique, the utility model discloses do not have the vestige, pass through simultaneously the utility model provides a turn to the structure, can put more accurate one-tenth certain angle's datum line.
Drawings
Fig. 1 is the utility model relates to a building engineering datum line pay-off's axle survey structure looks schematic diagram three.
Fig. 2 is the utility model relates to a building engineering datum line pay-off overlook structure schematic diagram.
Fig. 3 is the utility model relates to a constructional engineering datum line pay-off's right side looks structural schematic.
In the figure: 1-a support plate; 2-large connecting plate; 3-a first connection seat; 4-two second connecting seats; 5-a first support bar; 6-connecting screws; 7-a second support bar; 8-a third support bar; 9-a support column; a 10-Z steering shaft; 11-Z steering sleeve seats; 12-Z axis locking handle; 13-X steering sleeve seats; 14-X axis locking handle; 15-laser paying out machine supporting plate; 16-laser pay-off cabinet; 17-vertical direction laser light; 18-horizontal direction laser light; 19-horizontal bubble; 20-anti-slip claw.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: a construction engineering datum line pay-off device comprises a supporting plate 1, wherein a connecting structure is arranged on the lower wall surface of the supporting plate 1, four supporting structures are arranged below the connecting structure, a steering structure is arranged on the upper wall surface of the supporting plate 1, and a laser pay-off structure is arranged on the upper wall surface of the steering structure;
the connection structure includes: the connecting structure comprises a large connecting plate 2, two first connecting seats 3 and two second connecting seats 4;
big connecting plate 2 is installed at the lower wall face of backup pad 1, and two first connecting seat 3 and two second connecting seat 4 are installed at the lower wall face of big connecting plate 2.
The support structure includes: the support device comprises a first support rod 5, a connecting screw 6, a second support rod 7, a third support rod 8 and a support column 9;
first bracing piece 5 passes through connecting screw 6 to be installed in connection structure's below, and the suit is in the inside of first bracing piece 5 at second bracing piece 7, and 8 suits of third bracing piece are in the inside of second bracing piece 7, and the lower wall at third bracing piece 8 is installed to support column 9.
The steering structure includes: the device comprises a Z steering shaft 10, a Z steering sleeve seat 11, a Z shaft locking handle 12, an X steering sleeve seat 13, an X shaft locking handle 14 and a laser paying-off machine supporting plate 15;
the Z steering shaft 10 is installed on the upper wall surface of the supporting plate 1, the Z steering sleeve seat 11 is sleeved on the outer side of the Z steering shaft 10, the Z shaft locking handle 12 is installed on one side of the Z steering sleeve seat 11, the X steering sleeve seat 13 is installed on the upper wall surface of the Z steering sleeve seat 11, the X shaft locking handle 14 is installed on the rear wall surface of the X steering sleeve seat 13, and the laser paying-off machine supporting plate 15 is installed on the upper wall surface of the X steering sleeve seat 13.
The laser unwrapping wire structure includes: a laser pay-off cabinet 16, a vertical laser lamp 17 and a horizontal laser lamp 18;
the laser pay-off machine box 16 is installed on the upper wall surface of the laser pay-off machine support plate 15, the vertical laser lamp 17 is installed on the front wall surface of the laser pay-off machine box 16, and the horizontal laser lamp 18 is installed on the front wall surface of the laser pay-off machine box 16.
It should be noted that: install the battery in the inside of laser unwrapping wire machine case 16 at first, then through first bracing piece 5, connecting screw 6, second bracing piece 7, third bracing piece 8 and support column 9 are adjusted, will the utility model discloses horizontal bubble 19 adjusts the position of positive level, then opens the switch, put out vertical direction laser lamp 17 and horizontal direction laser lamp 18, just so accomplished the unwrapping wire of horizontal direction and vertical direction, if say need become the unwrapping wire of the datum line of certain angle, just turn to the saddle 11 through Z steering spindle 10 and Z, carry out the adjustment of Z axle direction, lock through Z axle locking handle 12 again, turn to saddle 13 through X, carry out the adjustment of X axle direction, rethread X axle locking handle 14 locks.
Preferably, a horizontal air bubble 19 is installed on the upper wall surface of the Z-turn shaft 10.
Preferably, the lower wall surface of the supporting column 9 is provided with an anti-slip claw 20.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation. The use of the phrase "comprising one of the elements does not exclude the presence of other like elements in the process, method, article, or apparatus that comprises the element.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The construction engineering datum line pay-off device comprises a supporting plate (1), and is characterized in that a connecting structure is mounted on the lower wall surface of the supporting plate (1), four supporting structures are mounted below the connecting structure, a steering structure is mounted on the upper wall surface of the supporting plate (1), and a laser pay-off structure is mounted on the upper wall surface of the steering structure;
the connection structure includes: the connecting device comprises a large connecting plate (2), two first connecting seats (3) and two second connecting seats (4);
the large connecting plate (2) is arranged on the lower wall face of the supporting plate (1), and the two first connecting seats (3) and the two second connecting seats (4) are arranged on the lower wall face of the large connecting plate (2).
2. A construction engineering datum line pay-off as claimed in claim 1 wherein the support structure includes: a first support rod (5), a connecting screw (6), a second support rod (7), a third support rod (8) and a support column (9);
first bracing piece (5) are installed in connection structure's below through connecting screw (6), second bracing piece (7) suit is in the inside of first bracing piece (5), third bracing piece (8) suit is in the inside of second bracing piece (7), the lower wall at third bracing piece (8) is installed in support column (9).
3. The construction engineering datum line pay-off device as in claim 1, wherein the steering structure comprises: the device comprises a Z steering shaft (10), a Z steering sleeve seat (11), a Z shaft locking handle (12), an X steering sleeve seat (13), an X shaft locking handle (14) and a laser pay-off machine supporting plate (15);
the last wall in backup pad (1) is installed in Z steering spindle (10), Z turns to the outside at Z steering spindle (10) suit in cover seat (11), one side at Z steering cover seat (11) is installed in Z axle locking handle (12), X turns to the last wall at Z steering cover seat (11) in cover seat (13), the back wall at X steering cover seat (13) is installed in X axle locking handle (14), install the last wall at X steering cover seat (13) in laser paying out machine backup pad (15).
4. The construction engineering datum line pay-off device as in claim 1, wherein the laser pay-off structure comprises: the laser paying-off machine comprises a laser paying-off machine box (16), a vertical laser lamp (17) and a horizontal laser lamp (18);
the laser paying-off machine box (16) is arranged on the upper wall face of a supporting plate (15) of the laser paying-off machine, the laser lamp (17) in the vertical direction is arranged on the front wall face of the laser paying-off machine box (16), and the laser lamp (18) in the horizontal direction is arranged on the front wall face of the laser paying-off machine box (16).
5. A construction engineering datum line pay-off device as claimed in claim 3, wherein a horizontal bubble (19) is mounted on the upper wall surface of the Z steering shaft (10).
6. A construction engineering datum line pay-off device as claimed in claim 2, wherein the lower wall surface of the support pillar (9) is provided with anti-slip claws (20).
CN202020410963.XU 2020-03-26 2020-03-26 Building engineering datum line pay-off Expired - Fee Related CN211923590U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020410963.XU CN211923590U (en) 2020-03-26 2020-03-26 Building engineering datum line pay-off

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020410963.XU CN211923590U (en) 2020-03-26 2020-03-26 Building engineering datum line pay-off

Publications (1)

Publication Number Publication Date
CN211923590U true CN211923590U (en) 2020-11-13

Family

ID=73349879

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020410963.XU Expired - Fee Related CN211923590U (en) 2020-03-26 2020-03-26 Building engineering datum line pay-off

Country Status (1)

Country Link
CN (1) CN211923590U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112762905A (en) * 2020-12-28 2021-05-07 杨新倩 Engineering measuring device and using method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112762905A (en) * 2020-12-28 2021-05-07 杨新倩 Engineering measuring device and using method thereof
CN112762905B (en) * 2020-12-28 2022-05-27 杨新倩 Engineering measuring device and using method thereof

Similar Documents

Publication Publication Date Title
CN211923590U (en) Building engineering datum line pay-off
CN204781452U (en) Section bar and possess framework of this section bar
US20190226843A1 (en) Multi-Functional Level Ruler
CN217303963U (en) Portable building quality engineering detector
CN213874267U (en) Shield tunnel engineering measurement and detection device
CN209927108U (en) Efficient laser angle positioning device
Matthes Quicksand
CN208502282U (en) A kind of masonry auxiliary device
CN217097753U (en) A marking device for water and electricity installation engineering
CN220136181U (en) Aluminum plate and decoration section bar roughness control instrument
CN216696826U (en) Guide system rear view prism fixing device
CN218380697U (en) Measuring scale with adjustable angle
CN214476047U (en) Sign base latch device
CN220988027U (en) Mapping geographic information map marking device
CN214893304U (en) Levelling rod fixing support capable of carrying communication equipment
CN214620992U (en) Measure convenient and fast's dipperstick for building engineering
CN217061287U (en) Safety warning device is used in building engineering construction
CN218238592U (en) Architectural decoration wall measuring equipment with locate function
CN218714837U (en) Building wall standing frame for house construction project
CN211234430U (en) Survey and drawing sighting rod support
CN219731938U (en) Hydraulic engineering foundation detection device
CN212773553U (en) Pre-buried positioner of building water and electricity pipeline
CN219807615U (en) Support frame with regulatory function
CN211519112U (en) Animation control support
CN220727707U (en) Building construction level gauge convenient to location

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201113