CN211922615U - Constructional engineering pile device - Google Patents

Constructional engineering pile device Download PDF

Info

Publication number
CN211922615U
CN211922615U CN202020336088.5U CN202020336088U CN211922615U CN 211922615 U CN211922615 U CN 211922615U CN 202020336088 U CN202020336088 U CN 202020336088U CN 211922615 U CN211922615 U CN 211922615U
Authority
CN
China
Prior art keywords
groups
fixedly connected
front side
rear side
gear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020336088.5U
Other languages
Chinese (zh)
Inventor
高鸿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020336088.5U priority Critical patent/CN211922615U/en
Application granted granted Critical
Publication of CN211922615U publication Critical patent/CN211922615U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model relates to a pile device technical field just discloses a building engineering pile device, the on-line screen storage device comprises a base, the four corners of base lower surface is rotated with the top of four group's gyro wheel framves respectively and is connected, gyro wheel frame's bottom and gyro wheel rotate to be connected, the middle part of base upper surface and the bottom fixed connection who controls the room, control the left side of room and the right side fixed connection of two sets of support frames, the bottom of support frame respectively with the left front and back both sides fixed connection of base upper surface. This building engineering pile device through the setting of pneumatic cylinder, makes the mount reach the effect of lift, sets up through the cooperation of driving motor and gear, makes pouring weight, ram and connecting block reach the effect that the circulation goes up and down, through the setting of spring, makes the pouring weight reach the effect that resets, through the setting of pouring weight, makes this building engineering pile device's pile dynamics greatly increased, through the setting of ram, makes this building engineering pile device reach the effect that is difficult for beating partially.

Description

Constructional engineering pile device
Technical Field
The utility model relates to a pile device technical field specifically is a building engineering pile device.
Background
The building engineering refers to an engineering entity formed by the construction of various building constructions and their auxiliary facilities and the installation of lines, pipes and equipment matched with the building constructions, and if the ground construction needs to be built on the ground, the ground needs to bear a large pressure, and the ground needs to have enough strength against the pressure, which is difficult to achieve, so the ground bearing the buildings needs to be reinforced or the bearing mode of the ground needs to be improved, so that it is thought that piling is performed on the foundation, most of the weight of the buildings is transmitted to a deep position below the ground through piles, and further the foundation of the buildings is firm, but the piling precision of most of the existing piling devices is low, and the piling efficiency of most of the piling devices is low.
Chinese patent publication No. CN208266867U discloses a construction pile driving device, which improves overall stability and has a shock-absorbing effect under the action of a supporting mechanism, and on the other hand, improves the ground gripping force between a supporting seat and the ground, and avoids the situation of offset in the pile driving process, but this mode has a great defect: the pile driving device for the building engineering has limited supporting height, is only suitable for driving shorter piles, and has narrow application range.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a building engineering pile device has solved the lower problem of the lower and lower pile efficiency of the pile of the precision of most pile devices pile.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: a piling device for building engineering comprises a base, four corners of the lower surface of the base are respectively and rotatably connected with the tops of four groups of roller carriers, the bottoms of the roller carriers are rotatably connected with rollers, the middle part of the upper surface of the base is fixedly connected with the bottom of an operation room, the left side of the operation room is fixedly connected with the right sides of two groups of supporting frames, the bottoms of the two groups of supporting frames are respectively and fixedly connected with the left front side and the left rear side of the upper surface of the base, the tops of the two groups of supporting frames are respectively and fixedly connected with the front side and the rear side of the upper surface of a connecting plate, the front side and the rear side of the lower surface of the connecting plate are respectively and fixedly connected with the tops of two groups of hydraulic cylinders, the bottoms of the two groups of hydraulic cylinders are respectively and fixedly connected with the front side and the rear side of the, the two groups of first sliding grooves are respectively arranged on the left sides of the two groups of supporting frames, the inner wall of the top of the fixing frame is fixedly connected with the tops of the multiple groups of springs, the bottoms of the springs are fixedly connected with the upper surface of the heavy block, the lower surface of the heavy block is fixedly connected with the top of the rammer, the front side and the rear side of the heavy block are respectively fixedly connected with the two groups of connecting blocks, the front side of the connecting block positioned on the front side of the heavy block is fixedly connected with the rear side of the rack, the rack is slidably connected in the second sliding groove, the second sliding groove is arranged on the front side of the fixing frame, the front side of the rack is meshed with the gear, the right side of the gear is fixedly connected with the output end of the driving motor, the rear side of the driving motor is fixedly connected with the front side of the fixing frame, the left side of the gear is fixedly connected with the right end of the connecting shaft, the front side of the fixed block and the rear side of the fixed block are in a symmetrical relation.
Preferably, two sets of switches are arranged inside the control chamber, and output ends of the two sets of switches are respectively electrically connected with input ends of the hydraulic cylinder and input ends of the driving motors.
Preferably, the springs are provided with eight groups, the front side and the rear side of the eight groups of springs are in a symmetrical relation, and the intervals between the two groups of springs are equal.
Preferably, the upper side of the rammer is in the shape of a circular truncated cone with an upper end surface larger than a lower end surface, and the lower side of the rammer is in the shape of a circular cover.
Preferably, the teeth of the gear are matched with the teeth of the rack, and the gear is a half gear with half teeth and half toothless half.
Preferably, the left end of the connecting shaft is fixedly connected with the middle of the bearing, and the left side of the bearing is fixedly connected with the right side of the fixing block.
(III) advantageous effects
The utility model provides a building engineering pile device possesses following beneficial effect:
1. this building engineering pile device through the setting of pneumatic cylinder, makes the mount reach the effect of lift, sets up through the cooperation of driving motor and gear, makes pouring weight, ram and connecting block reach the effect that the circulation goes up and down, through the setting of spring, makes the pouring weight reach the effect that resets, through the setting of pouring weight, makes this building engineering pile device's pile dynamics greatly increased, through the setting of ram, makes this building engineering pile device reach the effect that is difficult for beating partially.
2. This building engineering pile device sets up through the cooperation of first spout and slide bar, makes the mount reach the effect of spacing lift, through the setting of second spout, makes the rack reach the effect of spacing lift, through the setting of base, makes control room and support frame reach fixed effect, through the setting of gyro wheel, makes this building engineering pile device still have the effect of being convenient for remove the removal.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic structural view of the support frame, the connecting plate and the hydraulic cylinder of the present invention;
fig. 3 is a schematic structural view of the inside of the fixing frame of the present invention.
In the figure: 1. a base; 2. a roller frame; 3. a roller; 4. a control room; 5. a support frame; 6. a connecting plate; 7. a hydraulic cylinder; 8. a fixed mount; 9. a slide bar; 10. a first chute; 11. a spring; 12. a weight block; 13. a rammer; 14. connecting blocks; 15. a rack; 16. a second chute; 17. a gear; 18. a drive motor; 19. a connecting shaft; 20. and (5) fixing blocks.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: a pile driver for building engineering is composed of a base 1, a control chamber 4 and supporting frames 5 fixed by said base 1, four corner of lower surface of base 1 connected to top of four roller frames 2, bottom of roller frame 2 connected to roller 3, rollers 3, and two supporting frames 5 fixed to front and back of upper surface of base 1, connecting plates 6, hydraulic cylinders 7, the fixing frame 8 is enabled to achieve the effect of lifting, the bottoms of the two groups of hydraulic cylinders 7 are respectively fixedly connected with the front side and the rear side of the upper surface of the fixing frame 8, the front side and the rear side of the right side of the fixing frame 8 are respectively fixedly connected with the left ends of the two groups of sliding rods 9, the right ends of the two groups of sliding rods 9 are respectively connected in the two groups of first sliding grooves 10 in a sliding manner, the fixing frame 8 is enabled to achieve the effect of limiting lifting through the matching arrangement of the first sliding grooves 10 and the sliding rods 9, the two groups of first sliding grooves 10 are respectively arranged on the left sides of the two groups of supporting frames 5, the inner wall of the top of the fixing frame 8 is fixedly connected with the tops of the multiple groups of springs 11, the heavy block 12 is enabled to achieve the effect of resetting through the arrangement of the springs 11, the bottom of the springs 11 is fixedly connected with the upper, the pile driving device for the building engineering achieves the effect of uneasy deflection through the arrangement of the rammer 13, the front side and the back side of the heavy block 12 are respectively and fixedly connected with two groups of connecting blocks 14, the front side of the connecting block 14 positioned at the front side of the heavy block 12 is fixedly connected with the back side of the rack 15, the rack 15 is connected in the second sliding groove 16 in a sliding way, the rack 15 achieves the effect of limiting and lifting through the arrangement of the second sliding groove 16, the second sliding groove 16 is arranged at the front side of the fixing frame 8, the front side of the rack 15 is meshed and connected with the gear 17, the right side of the gear 17 is fixedly connected with the output end of the driving motor 18, the heavy block 12, the rammer 13 and the connecting blocks 14 achieve the effect of circular lifting through the matching arrangement of the driving motor 18 and the gear 17, the back side of the driving motor 18 is fixedly connected with the front side of the fixing frame 8, the left side of the gear 17 is fixedly connected with, the rear side of the fixed block 20 is fixedly connected with the front side of the fixed frame 8, and the front side of the fixed block 20 is symmetrical to the rear side of the fixed block 20.
The utility model discloses in, for making the user be convenient for control pneumatic cylinder 7 and driving motor 18 more, control the inside two sets of switches that are provided with of room 4, the output of two sets of switches is connected with the input of pneumatic cylinder 7 and driving motor 18's input electricity respectively.
The utility model discloses in, in order to make the stationarity of pouring weight 12 higher, spring 11 is provided with eight groups altogether, and the position of both sides is the symmetric relation around eight groups of spring 11, and the interval between two sets of springs 11 is the equal.
The utility model discloses in, can concentrate more for the dynamics that makes rammer 13, the upside shape of rammer 13 is the round platform that the up end is bigger than the lower terminal surface, takes place the slippage when in order to prevent rammer 13 pile, and the downside shape of rammer 13 is circular lid form.
The utility model discloses in, inseparabler for making gear 17 and rack 15 can laminate, the tooth of gear 17 and the tooth looks adaptation of rack 15, in order to make rammer 13 can reach the effect of relapseing the lift, gear 17 is half the half-gear that has half toothless of tooth.
The utility model discloses in, in order to make connecting axle 19 pivoted more nimble, the left end of connecting axle 19 and the middle part fixed connection of bearing, the left side of bearing and the right side fixed connection of fixed block 20.
When in use, the roller 3 of a user moves the piling device for the building engineering, so that the rammer 13 is positioned right above the pile, the user adjusts the hydraulic cylinder 7 through the control chamber 4 according to the actual moving condition to lift the fixed frame 8, meanwhile, the slide rod 9 synchronously lifts in the first sliding chute 10, so that the fixed frame 8 achieves the effect of limiting lifting, and the bottom of the rammer 13 is contacted with the top of the pile, the user starts the driving motor 18 through the control chamber 4 according to the actual contacting condition, the driving motor 18 rotates through the gear 17, when the teeth of the gear 17 are contacted with the rack 15, the connecting block 14 and the heavy block 12 are driven to move downwards, so as to drive the rammer 13 to move downwards, when the teeth of the gear 17 are not contacted with the rack 15, the spring 11 is elastically deformed, so that the heavy block 12 achieves the effect of resetting, and simultaneously, the hydraulic cylinder 7 drives the fixed frame 8 to move downwards, the ram 13 drives the pile downwards repeatedly and the user switches off the drive motor 18 and the hydraulic cylinder 7 via the cab 4 depending on the actual driving situation.
In summary, the piling device for the building engineering enables the fixing frame 8 to achieve the lifting effect through the arrangement of the hydraulic cylinder 7, through the matching arrangement of the driving motor 18 and the gear 17, the weight 12, the rammer 13 and the connecting block 14 achieve the effect of cyclic lifting, the weight 12 achieves the reset effect through the arrangement of the spring 11, the piling strength of the piling device for the construction engineering is greatly increased through the arrangement of the weight 12, the pile driving device for the building engineering achieves the effect of uneasy deflection through the arrangement of the rammer 13, the fixed mount 8 achieves the effect of limiting lifting through the matching arrangement of the first chute 10 and the slide bar 9, the rack 15 achieves the effect of limiting and lifting through the arrangement of the second chute 16, the control chamber 4 and the support frame 5 achieve the effect of fixing through the arrangement of the base 1, through the setting of gyro wheel 3, make this building engineering pile driver equipment still have the effect of being convenient for remove the removal.
The electrical components presented in the document are all electrically connected with an external master controller and 220V mains, and the master controller can be a conventional known device controlled by a computer or the like.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a building engineering pile driver equipment, includes base (1), its characterized in that: the four corners of the lower surface of the base (1) are respectively rotatably connected with the tops of four groups of roller carriers (2), the bottoms of the roller carriers (2) are rotatably connected with the rollers (3), the middle part of the upper surface of the base (1) is fixedly connected with the bottoms of the control chambers (4), the left side of each control chamber (4) is fixedly connected with the right sides of two groups of support frames (5), the bottoms of the two groups of support frames (5) are respectively fixedly connected with the left front side and the rear side of the upper surface of the base (1), the tops of the two groups of support frames (5) are respectively fixedly connected with the front side and the rear side of the upper surface of the connecting plate (6), the front side and the rear side of the lower surface of the connecting plate (6) are respectively fixedly connected with the tops of two groups of hydraulic cylinders (7), the bottoms of the two groups of hydraulic cylinders (7) are respectively fixedly connected with the front side and the rear side of the upper surface of the fixing, the right ends of the two groups of sliding rods (9) are respectively connected in two groups of first sliding grooves (10) in a sliding manner, the two groups of first sliding grooves (10) are respectively arranged on the left sides of the two groups of supporting frames (5), the inner wall of the top of the fixing frame (8) is fixedly connected with the tops of the multiple groups of springs (11), the bottoms of the springs (11) are fixedly connected with the upper surface of the heavy block (12), the lower surface of the heavy block (12) is fixedly connected with the top of the rammer (13), the front side and the rear side of the heavy block (12) are respectively fixedly connected with the two groups of connecting blocks (14), the front side of the connecting block (14) on the front side of the heavy block (12) is fixedly connected with the rear side of the rack (15), the rack (15) is connected in a second sliding groove (16) in a sliding manner, the second sliding groove (16) is arranged on the front side of the fixing frame (8), and the front side, the right side of gear (17) and the output fixed connection of driving motor (18), the rear side of driving motor (18) and the front side fixed connection of mount (8), the left side of gear (17) and the right-hand member fixed connection of connecting axle (19), the left end of connecting axle (19) is rotated with the middle part of fixed block (20) and is connected, the rear side of fixed block (20) and the front side fixed connection of mount (8), the front side of fixed block (20) is the symmetric relation with the rear side of fixed block (20).
2. A construction piling device according to claim 1, wherein: two groups of switches are arranged in the control chamber (4), and output ends of the two groups of switches are respectively and electrically connected with an input end of the hydraulic cylinder (7) and an input end of the driving motor (18).
3. A construction piling device according to claim 1, wherein: eight groups of springs (11) are arranged, the front side and the rear side of the eight groups of springs (11) are in a symmetrical relation, and the intervals between the two groups of springs (11) are equal.
4. A construction piling device according to claim 1, wherein: the shape of the upper side of the rammer (13) is a circular table with the upper end surface larger than the lower end surface, and the shape of the lower side of the rammer (13) is a circular cover shape.
5. A construction piling device according to claim 1, wherein: the teeth of the gear (17) are matched with the teeth of the rack (15), and the gear (17) is a half gear with half teeth and half toothless half teeth.
6. A construction piling device according to claim 1, wherein: the left end of the connecting shaft (19) is fixedly connected with the middle of the bearing, and the left side of the bearing is fixedly connected with the right side of the fixing block (20).
CN202020336088.5U 2020-03-17 2020-03-17 Constructional engineering pile device Expired - Fee Related CN211922615U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020336088.5U CN211922615U (en) 2020-03-17 2020-03-17 Constructional engineering pile device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020336088.5U CN211922615U (en) 2020-03-17 2020-03-17 Constructional engineering pile device

Publications (1)

Publication Number Publication Date
CN211922615U true CN211922615U (en) 2020-11-13

Family

ID=73354214

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020336088.5U Expired - Fee Related CN211922615U (en) 2020-03-17 2020-03-17 Constructional engineering pile device

Country Status (1)

Country Link
CN (1) CN211922615U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112627178A (en) * 2020-12-15 2021-04-09 蚌埠美域装饰工程有限公司 Piling device for building engineering foundation construction
CN114150667A (en) * 2021-12-14 2022-03-08 叶大清 Building engineering ground pile device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112627178A (en) * 2020-12-15 2021-04-09 蚌埠美域装饰工程有限公司 Piling device for building engineering foundation construction
CN114150667A (en) * 2021-12-14 2022-03-08 叶大清 Building engineering ground pile device

Similar Documents

Publication Publication Date Title
CN211922615U (en) Constructional engineering pile device
CN116675140B (en) Concrete prefabricated component lifts and aligns installation device
CN111746997B (en) A place frame for water pump
CN114319879B (en) Cement floor leveling device for house building
CN201347615Y (en) Mini plastering machine
CN216856783U (en) Experiment limit platform with raising and lowering functions
CN213173717U (en) Novel automatic device for pressure of pile hammer head
CN107434168B (en) Z-shaped steel stacking machine
CN212425188U (en) Energy-concerving and environment-protective type construction gallows
CN213380044U (en) Multifunctional supporting structure for steel structure welding machine tool
CN213259988U (en) Cold press convenient to go up unloading
CN210419105U (en) Vertical lifting device
CN211709242U (en) Adjustable platform for plastic equipment
CN114263159A (en) Knocking type foundation tamping device for building engineering
CN213508451U (en) Stable pile driver for traffic engineering construction
CN216076149U (en) Improved automatic wall plastering machine
CN221537761U (en) Bender frame
CN220723354U (en) Lifting device
CN218259941U (en) Plate storage rack
CN218205586U (en) Lifting equipment for maintaining stereo garage
CN221519110U (en) Digital printing machine convenient to remove
CN219217427U (en) Wharf container lifting device
CN215105302U (en) Constructional engineering pile device
CN221124257U (en) Universal testing machine for 3D printing of bonding strength between concrete layers
CN220618173U (en) Hoisting device for maintenance of electromechanical equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201113