CN211922485U - Port road junction bank wall construction reinforcing apparatus - Google Patents

Port road junction bank wall construction reinforcing apparatus Download PDF

Info

Publication number
CN211922485U
CN211922485U CN201921759995.4U CN201921759995U CN211922485U CN 211922485 U CN211922485 U CN 211922485U CN 201921759995 U CN201921759995 U CN 201921759995U CN 211922485 U CN211922485 U CN 211922485U
Authority
CN
China
Prior art keywords
cement
revetment
port
road junction
shore
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921759995.4U
Other languages
Chinese (zh)
Inventor
任荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanan Yixing Machinery Technology Co Ltd
Original Assignee
Nanan Yixing Machinery Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanan Yixing Machinery Technology Co Ltd filed Critical Nanan Yixing Machinery Technology Co Ltd
Priority to CN201921759995.4U priority Critical patent/CN211922485U/en
Application granted granted Critical
Publication of CN211922485U publication Critical patent/CN211922485U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a port road junction bank wall construction reinforcing apparatus, including port and cement revetment, still include the safe edge of setting in the cement revetment top, and the cement revetment is built by laying bricks or stones respectively in the top of port, the place ahead extends to inside later, current clamping device is provided with the guard plate of a plurality of metals in the place ahead of cement revetment, the outer wall of guard plate is convex arc-shaped's arch wall, when receiving the impact of rivers, utilize its arch-shaped outer wall to disperse the impact force of rivers, in order to improve its whole ability of resisting the water flow impact, and the inside cavity of guard plate sets up, the production material that greatly practices thrift, production cost is reduced, and vertical grafting has many montants in the cement revetment, on horizontal cross-section, constitute the triangle-shaped structure between montant and the cement revetment, utilize triangle-shaped stability principle, make port road junction bank wall's structural stability higher, the reinforcing effect is better, and the water impact resistance of the reinforced concrete structure is improved on the side surface.

Description

Port road junction bank wall construction reinforcing apparatus
Technical Field
The utility model relates to a construction reinforcement field, in particular to harbour road junction bank wall construction reinforcing apparatus.
Background
The reinforcement means that measures such as reinforcement, local replacement or adjustment of internal force are taken for a bearing structure, a member and related parts which are insufficient in reliability or require improvement of reliability by owners, so that the bearing structure, the member and the related parts have the existing design specifications and the safety, the durability and the applicability required by the owners, and a clamping device is required to perform reinforcement work on the bearing structure, the member and the related parts in the process of constructing the shore wall of the port road junction. The existing reinforcing device for the shore wall of the port road junction needs to enhance the impact resistance to water flow in the using process, so that the reinforcing device with strong water flow impact resistance is designed.
SUMMERY OF THE UTILITY MODEL
The utility model discloses a main aim at provides harbour road junction bank wall construction reinforcing apparatus, can effectively solve the problem among the background art.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
port road junction bank wall construction reinforcing apparatus, including port and cement shore protection, still including setting up the revetment of cement shore protection top, and cement shore protection build by laying bricks or stones respectively and extend to inside behind top, the place ahead of port, the place ahead of cement shore protection is provided with the polylith guard plate, just the guard plate is convex arc arched plate, just the revetment is built by laying bricks or stones the border department at cement shore protection top, it has many montants to go back vertical grafting in the cement shore protection, the grafting of the bottom mounting of montant is in the second fixing base of installing the cement shore protection that extends to in the port through bolt fastening, the first fixing base of bolt fastening installation on cement shore protection top is worn out at the top of montant.
Further, the polylith the guard plate is the metal sheet of rigidity material, just the guard plate passes through bolt fastening's installation on the cement protects the bank, the inside of guard plate is hollow structure.
Furthermore, the first fixing seat and the outer portion of the vertical rod extending out of the top of the cement revetment are wrapped with cement piers, and the cement piers are of cylindrical structures.
Furthermore, the top end of the cement pier is fixedly connected to the guard edge through cement, and the cross section of the guard edge is of an L-shaped structure.
Furthermore, a plurality of vertical rods and the cement revetment form a triangular structure on the horizontal section.
Furthermore, cement piers wrapped on the part, extending out of the cement revetment, of the vertical rods are distributed in the same straight line direction below the revetment.
Compared with the prior art, the utility model discloses following beneficial effect has: the utility model discloses a device for fixing tunnel road junction, including cement revetment, the front of cement revetment, the outer wall of protection plate is convex arc's arch wall, when receiving the impact of rivers, utilize its arch outer wall to disperse the impact force of rivers, be used for carrying its whole ability of anti-water flow impact, and the inside cavity setting of protection plate, the manufacturing material who practices thrift greatly, production cost is reduced, and vertical grafting has many montants in the cement revetment, on the horizontally cross-section, constitute triangular structure between montant and the cement revetment, utilize triangle-shaped stability principle, make port road junction bank wall's structural stability higher, it is better to consolidate the effect, its ability of anti-water flow impact has also been improved on the side.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
fig. 2 is a structural sectional view of the present invention in the horizontal direction.
In the figure: 1. a port; 2. cement bank protection; 3. a protection plate; 4. cement pier; 5. protecting the edge; 6. a first fixed seat; 7. a vertical rod; 8. a second fixed seat.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
Referring to fig. 1-2, the reinforcing device for the construction of the bank wall of the port road junction comprises a port 1 and a cement revetment 2, and further comprises a protective edge 5 arranged above the cement revetment 2, the cement revetment 2 is built above the port 1 and extends to the inside of the port 1 before being built, a plurality of protective plates 3 are arranged in front of the cement revetment 2, the protective plates 3 are convex arc arched plates, the protective edge 5 is built at the edge of the top of the cement revetment 2, a plurality of vertical rods 7 are vertically inserted into the cement revetment 2, the bottom ends of the vertical rods 7 are fixedly inserted into second fixing seats 8 fixedly installed on the cement revetment 2 extending into the port 1 through bolts, and the tops of the vertical rods 7 penetrate through first fixing seats 6 fixedly installed at the top end of the cement revetment 2 through bolts.
As shown in fig. 2, the protection plate 3 is a metal plate made of a rigid material, the protection plate 3 is fixedly installed on the cement revetment 2 through bolts, and the protection plate 3 is of a hollow structure.
By adopting the scheme, the hollow structure protection plate 3 is arranged, so that the manufacturing material is saved, the production cost is reduced, and the hollow structure protection plate is economical and practical.
As shown in fig. 1, the first fixing seat 6 and the vertical rod 7 extending out of the top of the cement revetment 2 are wrapped with cement piers 4, and the cement piers 4 are cylindrical structures.
Through adopting above-mentioned scheme, use cement pier 4 to wrap up montant 7 and first fixing base 6, avoid its direct long-time exposure to appear the condition of corrosion in the air, prolong its life-span of using.
As shown in figure 1, the top end of the cement pier 4 is fixedly connected to the guard edge 5 through cement, and the cross section of the guard edge 5 is of an L-shaped structure.
Through adopting above-mentioned scheme, protect along 5 not only increase the whole height of this bank wall, water-proof effects is better, protects simultaneously along 5 crowds rest usefulness that can supply to walk, and the practicality is stronger.
As shown in fig. 2, a plurality of vertical rods 7 and the cement revetment 2 form a triangular structure on a horizontal section.
As shown in fig. 2, a plurality of cement piers 4 wrapped on the part of the vertical rod 7 extending out of the cement revetment 2 are distributed in the same straight direction below the revetment 5.
By adopting the scheme, the cement pier 4 plays a role in supporting the guard edge 5 below the guard edge.
It should be noted that, the utility model relates to a reinforcing apparatus for constructing the bank wall of a port road junction, when being impacted by water flow, the convex arc outer wall of the arch-shaped protection plate 3 fixedly installed at the front side of the cement revetment 2 is utilized to disperse the acting force when being impacted by water flow, thereby greatly improving the capability of resisting water flow impact, moreover, the vertical rod 7 and the cement revetment 2 directly form a triangle structure on the plane, the integrity and the stability of the structure are greatly improved by utilizing the triangle stability principle, the part of the vertical rod 7 extending out of the cement revetment 2 and the outside of the first fixing seat 6 are piled up and wrapped with cement piers 4, which are used for protecting the vertical rod 7 and the first fixing seat 6, thereby avoiding the situation that the vertical rod 7 and the first fixing seat 6 are directly exposed in the air for a long time to cause corrosion, the service life of the device is prolonged, meanwhile, the top end of the cement piers 4 is also fixedly connected on, the guard edge 5 improves the overall height of the bank wall, so that the port has better waterproof and water-blocking capacity, simple structure and stronger practicability.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (6)

1. Port road junction bank wall construction reinforcing apparatus, including port (1) and cement shore protection (2), its characterized in that: still including setting up be in the revetment (5) of cement shore protection (2) top, and cement shore protection (2) build by laying bricks or stones respectively and extend to inside behind top, the place ahead of port (1), the place ahead of cement shore protection (2) is provided with polylith guard plate (3), just guard plate (3) are convex arc arched plate, just revetment (5) are built by laying bricks or stones the border department at cement shore protection (2) top, it has many montants (7) to go back vertical grafting in cement shore protection (2), the grafting of the bottom mounting of montant (7) is in installing second fixing base (8) that extend to cement shore protection (2) in port (1) through bolt fastening, the first fixing base (6) on cement shore protection (2) top through bolt fastening installation is worn out at the top of montant (7).
2. The port road junction shore wall construction reinforcing device of claim 1, wherein: the protection plate (3) is a metal plate made of a rigid material, the protection plate (3) is fixedly installed on the cement revetment (2) through bolts, and the protection plate (3) is of a hollow structure.
3. The port road junction shore wall construction reinforcing device of claim 1, wherein: the cement pier (4) is wrapped and built on the first fixing seat (6) and the outer portion of the vertical rod (7) extending out of the top of the cement revetment (2), and the cement pier (4) is of a cylindrical structure.
4. The port road junction shore wall construction reinforcing device of claim 3, wherein: the top end of the cement pier (4) is fixedly connected to the guard edge (5) through cement, and the cross section of the guard edge (5) is of an L-shaped structure.
5. The port road junction shore wall construction reinforcing device of claim 1, wherein: and a plurality of vertical rods (7) and the cement revetment (2) form a triangular structure on the horizontal section.
6. The port road junction shore wall construction reinforcing device of claim 1, wherein: and a plurality of cement piers (4) wrapped on the part of the vertical rods (7) extending out of the cement revetment (2) are distributed on the same straight line direction below the guard edge (5).
CN201921759995.4U 2019-10-21 2019-10-21 Port road junction bank wall construction reinforcing apparatus Expired - Fee Related CN211922485U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921759995.4U CN211922485U (en) 2019-10-21 2019-10-21 Port road junction bank wall construction reinforcing apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921759995.4U CN211922485U (en) 2019-10-21 2019-10-21 Port road junction bank wall construction reinforcing apparatus

Publications (1)

Publication Number Publication Date
CN211922485U true CN211922485U (en) 2020-11-13

Family

ID=73319565

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921759995.4U Expired - Fee Related CN211922485U (en) 2019-10-21 2019-10-21 Port road junction bank wall construction reinforcing apparatus

Country Status (1)

Country Link
CN (1) CN211922485U (en)

Similar Documents

Publication Publication Date Title
CN101806041B (en) Rolling stone collision protective structure for bridge pier
KR100965467B1 (en) Eco-pillar debris barrier
CN105862662B (en) A kind of curl arched mole
CN109594530B (en) Novel structure of fine sand stratum flood control dykes and dams
CN101289867A (en) Construction process for removing foundation ditch in water
CN211922485U (en) Port road junction bank wall construction reinforcing apparatus
JP3170990U (en) Breakwater for overturning drag
CN200940245Y (en) Road built by assembled casing filled with stone
CN209989781U (en) Novel structure of silty-fine sand stratum flood control dam
CN211080094U (en) Erosion-resistant protection structure of lake beach
CN210262942U (en) Mud-rock flow blocks dam scour protection reinforced structure
CN215105044U (en) Port engineering gravity type retaining wall enhanced type protecting surface
CN101469547A (en) Apparatus for preventing foundation from being tunneled
CN218437123U (en) Landscape surface layer structure for mountain edge engineering enclosure
CN217174353U (en) Mountain area wading section pier reinforced structure
CN218375721U (en) Building retaining wall
RU2317369C1 (en) Method for river bank consolidation
CN220790835U (en) Multifunctional comprehensive enclosure supporting structure
CN214656259U (en) Novel overflow bridge
CN210827311U (en) Retaining wall for hydraulic engineering
CN208167646U (en) A kind of rivers bank protection protective net
CN215210848U (en) Dykes and dams reinforced structure of civil engineering
CN212612271U (en) Slope reinforcement protective structure
CN215715512U (en) Cast-in-place formula bank protection barricade for water conservancy protection
CN213978826U (en) River section ecological purification overflow dam

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201113

CF01 Termination of patent right due to non-payment of annual fee