CN211912880U - Waste water treatment device for building engineering - Google Patents

Waste water treatment device for building engineering Download PDF

Info

Publication number
CN211912880U
CN211912880U CN202020089268.8U CN202020089268U CN211912880U CN 211912880 U CN211912880 U CN 211912880U CN 202020089268 U CN202020089268 U CN 202020089268U CN 211912880 U CN211912880 U CN 211912880U
Authority
CN
China
Prior art keywords
plate
curved
blind hole
treatment device
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020089268.8U
Other languages
Chinese (zh)
Inventor
孔令东
孔静
孔跃
徐婷
朱雨果
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suqian Hongfu Construction Labor Service Co.,Ltd.
Original Assignee
Suqian Aoyuan Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suqian Aoyuan Construction Engineering Co ltd filed Critical Suqian Aoyuan Construction Engineering Co ltd
Priority to CN202020089268.8U priority Critical patent/CN211912880U/en
Application granted granted Critical
Publication of CN211912880U publication Critical patent/CN211912880U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Filtration Of Liquid (AREA)

Abstract

The utility model discloses a wastewater treatment device for construction engineering, including square processing box, the upper shed department cooperation of processing box has a top closing cap, is equipped with the inlet tube of arranging along length direction on the top closing cap, and its structural feature is, be equipped with the curved surface straight slat that is located the below of top closing cap in the processing box, be equipped with the division board on the curved surface straight slat and be located the water filtering hole of the both sides of division board, curved surface straight slat and top closing cap between be equipped with the buckle plate that is located the both sides of division board, the buckle plate constitutes the cylinder with the straight slat lock of curved surface after, the processing box on be equipped with the inserted hole that is located on the extension line of curved surface straight slat, and the diameter of inserted hole is the same with the diameter of cylinder; the utility model has the advantages that: can filter out the silt in the sewage through the setting of the straight slat of curved surface, nevertheless can clear away silt through the insertion of central axostylus axostyle, still do not influence the filtration to sewage simultaneously to improve the efficiency to sewage treatment.

Description

Waste water treatment device for building engineering
Technical Field
The utility model belongs to the technical field of building sewage treatment apparatus, concretely relates to be used for carrying out the device handled to waste water for building engineering.
Background
Can produce a large amount of waste water at the building site, and often contain material such as a large amount of rubbles, silt and plastics in the waste water simultaneously, if discharge waste water to sewer, river in will lead to pipeline blocking and river course water to pollute, so the tradition is mostly handled through heavy mode to the waste water that the building site produced, nevertheless when subsiding the processing, not only required settling time is longer to the silt of subsiding is difficult for handling and clears away, thereby influences the waste water treatment cycle.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a can carry out muddy water quickly separating's processing apparatus to waste water for the building engineering.
In order to realize the purpose, the utility model adopts the technical proposal that the wastewater treatment device for the building engineering comprises a square treatment box body, wherein the upper opening part of the treatment box body is matched with a top sealing cover, the top sealing cover is provided with water inlet pipes arranged along the length direction, and the wastewater treatment device is structurally characterized in that a curved straight strip plate positioned below the top sealing cover is arranged in the treatment box body, a partition plate and water filtering holes positioned at both sides of the partition plate are arranged on the curved straight strip plate, a pressing plate positioned at both sides of the partition plate is arranged between the curved straight strip plate and the top sealing cover, the pressing plate and the curved straight strip plate are buckled to form a cylinder body, the treatment box body is provided with an insertion hole positioned on the extension line of the curved straight strip plate, the diameter of the insertion hole is the same as that of the cylinder body, an internal thread is matched in the insertion hole and is screwed with a plugging disc, the lower extreme that the cover was equipped with slide and slide on the jib is connected with the rotation motor that the output shaft level set up, and the output shaft that rotates the motor has the central axis pole, is equipped with around the blade of central axis pole spiral setting on the global of central axis pole.
Furthermore, a central blind hole is formed in the top surface of the pressure plate, an adjusting rod penetrating through the top sealing cover is matched in the central blind hole, and threads close to the opening are formed in the inner wall of the central blind hole.
Furthermore, the top sealing cover is provided with a through hole which is coaxial with the central blind hole on the pinch plate, and an internal thread sleeve is matched in the through hole.
Furthermore, an external thread is arranged on the adjusting rod, the lower end of the adjusting rod is connected with a limiting disc matched in the central blind hole, and a limiting ring which is positioned above the limiting disc and screwed with the central blind hole is sleeved on the adjusting rod.
Furthermore, a lifting rope is arranged on the pressure buckle plate, a first extension spring is connected to the upper end of the lifting rope, and the upper end of the first extension spring is fixed to the lower surface of the top sealing cover.
Furthermore, the pressing buckle plate is provided with an insertion hole positioned below the water inlet pipe, and the lower surface of the pressing buckle plate is hinged with a bottom support part positioned below the insertion hole.
Further, the collet portion includes the cooperation at the curved plate of the internal surface of pinch plate, and the end connection of curved plate has the straight connecting rod that extends along the axis direction of curved plate, and the end of straight connecting rod is articulated with the internal surface of pinch plate.
Furthermore, the inner surface of the pinch plate is provided with a reset blind hole extending to the outer surface, a second extension spring is connected in the reset blind hole, and the lower end of the second extension spring is connected to the straight connecting rod.
The utility model has the advantages that: can filter out the silt in the sewage through the setting of the straight slat of curved surface, nevertheless can clear away silt through the insertion of central axostylus axostyle, still do not influence the filtration to sewage simultaneously to improve the efficiency to sewage treatment.
Drawings
Fig. 1 is a schematic view of a front view cross-sectional structure of the present invention;
FIG. 2 is a schematic view of the connection structure of the buckling plate and the adjusting rod of the present invention;
FIG. 3 is a schematic view of the top cover structure of the present invention;
FIG. 4 is a schematic side view of the treatment chamber of the present invention;
FIG. 5 is a schematic view of the cross-sectional structure of the buckle plate of the present invention;
the device comprises a treatment box body, a top cover, a water inlet pipe, a water outlet pipe, a 5-curved straight strip plate, a 6-separation plate, a 7-water filtering hole, an 8-pressing plate, a 9-inserting hole, a 10-curved plate head, an 11-blocking disc, a 12-hanging rod, a 13-sliding seat, a 14-output shaft, a 15-rotating motor, a 16-central shaft rod, a 17-blade, an 18-central blind hole, a 19-adjusting rod, a 20-through hole, a 21-internal thread sleeve, a 22-limiting disc, a 23-limiting ring, a 24-lifting rope, a 25-first tension spring, a 26-inserting hole, a 27-curved plate, a 28-straight connecting rod, a 29-reset blind hole and a 30-second tension spring, wherein the treatment box body is arranged on the top of the treatment box.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, rather than all embodiments, and all other embodiments obtained by a person of ordinary skill in the art without creative work belong to the protection scope of the present invention based on the embodiments of the present invention.
Referring to fig. 1 to 5, a wastewater treatment device for construction engineering comprises a square treatment tank 1, a top cover 2 is fitted at an upper opening of the treatment tank 1, a water inlet pipe 3 arranged along a length direction is provided on the top cover 2, a drain pipe 4 is provided at the bottom of the treatment tank 1, a curved straight strip plate 5 positioned below the top cover 2 is provided in the treatment tank 1, a partition plate 6 and water filtering holes 7 positioned at both sides of the partition plate 6 are provided on the curved straight strip plate 5, a press plate 8 positioned at both sides of the partition plate 6 is provided between the curved straight strip plate 5 and the top cover 2, the press plate 8 and the curved straight strip plate 5 are fastened to form a cylinder, an insertion opening 9 positioned on an extension line of the curved straight strip plate 5 is provided on the treatment tank 1, the diameter of the insertion opening 9 is the same as the diameter of the cylinder, a curved plate head 10 butted with the insertion opening 9 is provided on the treatment tank 1, the insert opening 9 is internally matched with an internal thread and is screwed with a plugging disc 11, the outer side of the insert opening 9 is provided with a suspender 12 connected with the processing box body 1, the suspender 12 is sleeved with a sliding seat 13, the lower end of the sliding seat 13 is connected with a rotating motor 15 horizontally arranged by an output shaft 14, the output shaft 14 of the rotating motor 15 is connected with a central shaft lever 16, the peripheral surface of the central shaft lever 16 is provided with blades 17 spirally arranged around the central shaft lever 16, when silt is not removed, the end part of the blade 17 on the central shaft lever 16 is lapped on a curved plate head 10, when the waste sewage is processed, a water pipe for discharging the sewage is butted with a water inlet pipe 3, then after the waste sewage is discharged into the processing box body 1, the waste sewage mixed with silt flows through the curved straight plate 5, and the silt is intercepted and accumulated by the curved straight plate 5, thereby separating the silt from the waste sewage, and then the sliding seat 13 is moved, drive the central axis pole 16 and get into to between the straight slat 5 of buckle 8 and curved surface by inserted hole 9, then through the work of rotating motor 15, drive central axis pole 16 through output shaft 14 and rotate, and then will pile up the silt that is on the straight slat 5 of curved surface through the blade 17 around the central axis pole 16 spiral setting and take out, and because be equipped with the buckle 8 that is located the both sides of division board 6 between the straight slat 5 of curved surface and the top closing cap 2, so can through select the buckle 8 lock back of one side, discharge silt, and the buckle 8 of opposite side still is located the top of the straight slat 5 of curved surface, thereby can realize one side row of mud, the opposite side still filters waste water, thereby improve the efficiency to sewage treatment.
The top surface of the pinch plate 8 is provided with a central blind hole 18, the central blind hole 18 is internally matched with an adjusting rod 19 which is penetrated through by the top seal cover 2, the inner wall of the central blind hole 18 is provided with threads which are arranged close to the opening, the top seal cover 2 is provided with a through hole 20 which is coaxially arranged with the central blind hole 18 on the pinch plate 8, the through hole 20 is internally matched with an internal thread sleeve 21, the pinch plate 8 can be driven to move downwards by the rotation of the adjusting rod 19, the adjusting rod 19 is provided with external threads, the lower end of the adjusting rod 19 is connected with a limiting disc 22 which is matched in the central blind hole 18, the adjusting rod 19 is sleeved with a limiting ring 23 which is positioned above the limiting disc 22 and is screwed with the central blind hole 18, after the limiting ring 23 is screwed with the central blind hole 18, the pinch plate 8 can be driven to move upwards when the adjusting rod 19 rotates, thereby realizing the buckling of, be equipped with lifting rope 24 on the buckle 8, lifting rope 24's upper end is connected with first extension spring 25 and the upper end of first extension spring 25 and the lower fixed surface of top closing cap 2 to can be when upwards moving buckle 8, it is more laborsaving, first extension spring 25 and lifting rope 24 are two and use the central axis of central blind hole 18 as the setting of symmetry line in addition, can make when moving buckle 8 downwards, keep steady movement.
The pressing plate 8 is provided with an inserting hole 26 positioned below the water inlet pipe 3, the lower surface of the pressing plate 8 is hinged with a bottom support part positioned below the inserting hole 26, when the pressing plate 8 is not buckled with the curved straight strip plate 5, the lower end of the water inlet pipe 3 is inserted into the inserting hole 26 and pushes the bottom support part open, so that waste sewage can smoothly flow on the curved straight strip plate 5, the bottom support part comprises a curved plate 27 matched with the inner surface of the pressing plate 8, the end part of the curved plate 27 is connected with a straight connecting rod 28 extending along the axial direction of the curved plate 27, the tail end of the straight connecting rod 28 is hinged with the inner surface of the pressing plate 8, meanwhile, the inner surface of the pressing plate 8 is provided with a reset blind hole 29 extending towards the outer surface, the reset blind hole 29 is internally connected with a second stretching spring 30, the lower end of the second stretching spring 30 is connected on the straight connecting rod 28, after the pressing plate 8, after the lower end of the water inlet pipe 3 is drawn out from the insertion hole 26, the outer curved surface of the curved plate 27 is matched with the inner surface of the buckling plate 8 under the action of the restoring force of the second extension spring 30 to form a plug for the insertion hole 26, so that silt can be effectively discharged.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein, and any reference signs in the claims are not intended to be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (8)

1. The utility model provides a effluent treatment plant for building engineering, includes square processing box, and the upper shed department cooperation of processing box has a top closing cap, is equipped with the inlet tube of arranging along length direction on the top closing cap, its characterized in that: the treatment box body is internally provided with a curved straight strip plate positioned below the top sealing cover, the curved straight strip plate is provided with a separation plate and water filtering holes positioned at two sides of the separation plate, a pressing plate positioned at two sides of the separation plate is arranged between the curved straight strip plate and the top sealing cover, the pressing plate and the curved straight strip plate are buckled to form a cylinder body, the treatment box body is provided with an insertion hole positioned on the extension line of the curved straight strip plate, the diameter of the insertion hole is the same as that of the cylinder body, an internal thread is matched in the insertion hole and is screwed with a plugging disc, the outer side of the insertion hole is provided with a hanging rod connected with the treatment box body, the hanging rod is sleeved with a slide seat, the lower end of the slide seat is connected with a rotating motor arranged horizontally by an output shaft, an output shaft of the rotating motor is.
2. The wastewater treatment device for construction engineering according to claim 1, wherein: the top surface of the pinch plate is provided with a central blind hole, an adjusting rod which is penetrated by the top sealing cover is matched in the central blind hole, and the inner wall of the central blind hole is provided with threads which are arranged close to the opening.
3. The wastewater treatment device for construction engineering according to claim 2, characterized in that: the top sealing cover is provided with a through hole which is coaxial with the central blind hole on the pinch plate, and an internal thread sleeve is matched in the through hole.
4. The wastewater treatment device for construction engineering according to claim 2, characterized in that: the adjusting rod is provided with external threads, the lower end of the adjusting rod is connected with a limiting disc matched in the central blind hole, and a limiting ring which is positioned above the limiting disc and screwed with the central blind hole is sleeved on the adjusting rod.
5. The wastewater treatment device for construction engineering according to claim 1, wherein: the pressure buckle plate is provided with a lifting rope, the upper end of the lifting rope is connected with a first extension spring, and the upper end of the first extension spring is fixed with the lower surface of the top sealing cover.
6. The wastewater treatment device for construction engineering according to claim 1, wherein: the pressure pinch plate is provided with an insertion hole below the water inlet pipe, and the lower surface of the pressure pinch plate is hinged with a bottom support part below the insertion hole.
7. The wastewater treatment device for construction engineering according to claim 6, wherein: the collet part include the cooperation at the curved plate of the internal surface of pinch plate, the end connection of curved plate has the straight connecting rod that extends along the axis direction of curved plate, the terminal articulated with the internal surface of pinch plate of straight connecting rod.
8. The wastewater treatment device for construction engineering according to claim 7, wherein: the inner surface of the pressing plate is provided with a reset blind hole extending to the outer surface, a second extension spring is connected in the reset blind hole, and the lower end of the second extension spring is connected to the straight connecting rod.
CN202020089268.8U 2020-01-14 2020-01-14 Waste water treatment device for building engineering Active CN211912880U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020089268.8U CN211912880U (en) 2020-01-14 2020-01-14 Waste water treatment device for building engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020089268.8U CN211912880U (en) 2020-01-14 2020-01-14 Waste water treatment device for building engineering

Publications (1)

Publication Number Publication Date
CN211912880U true CN211912880U (en) 2020-11-13

Family

ID=73330040

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020089268.8U Active CN211912880U (en) 2020-01-14 2020-01-14 Waste water treatment device for building engineering

Country Status (1)

Country Link
CN (1) CN211912880U (en)

Similar Documents

Publication Publication Date Title
CN108046447B (en) Seawater desalination device based on tidal energy
CN212356858U (en) High-efficient separator
CN211057964U (en) High-efficient sewage pipes that hydraulic engineering used
CN211226773U (en) Be used for green waste water treatment device for construction
CN211912880U (en) Waste water treatment device for building engineering
CN201731109U (en) High flow high pressure backwash valve
CN209865401U (en) Domestic sewage treatment tank
CN104056473A (en) Rainwater pipeline rotational flow grit chamber
CN203916177U (en) Storm sewer rotational flow grit chamber
CN204910946U (en) Vortex back flush solid -liquid separation equipment
CN108479157B (en) A kind of coordinated type multi-stage sewage purification device
CN216934832U (en) Flocculent impurity sedimentation tank of sewage
CN205127548U (en) Toper water conservancy whirl degritting self - cleaning well strainer
CN212293276U (en) Sludge dewatering machine
CN212271146U (en) Municipal administration sewer line with silt filtering mechanism
CN209348200U (en) A kind of novel seawater hydrocone type automatic filter
CN208244180U (en) A kind of sedimentation basin dross collection disposal system
CN112028340A (en) High-efficient separator
CN211973669U (en) Water intake device for reservoir
CN215215328U (en) Hydraulic pipeline for hydraulic engineering
CN220926384U (en) Direct filtration device for high-turbidity mine water treatment
CN216366859U (en) Cyclone filter
CN220266609U (en) Water conservancy and hydropower engineering construction drainage device
CN213805747U (en) Down-flow anti-blocking type launching device for municipal building
CN214389092U (en) Automatic back-flushing filter

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240513

Address after: Room 9-30, 2nd Floor Office, Yihe Road, Phase II, Longcheng Yihe, Sucheng District, Suqian City, Jiangsu Province, 223800, from east to west

Patentee after: Suqian Hongfu Construction Labor Service Co.,Ltd.

Country or region after: China

Address before: 223800 No. 408, building A14, hardware, home appliances and Auto Parts City, Sucheng District, Suqian City, Jiangsu Province

Patentee before: SUQIAN AOYUAN CONSTRUCTION ENGINEERING CO.,LTD.

Country or region before: China