Antiseep PE blow off pipe that intensity is high
Technical Field
The utility model relates to a municipal administration pipeline technical field specifically is a PE blow off pipe.
Background
When the existing PE blow-off pipe is used for conveying sewage, the pipeline is buried, so that the existing PE blow-off pipe is easy to be excavated by external force unintentionally, the existing PE blow-off pipe is single in structure and low in overall strength, when the existing PE blow-off pipe is excavated by external force, the existing PE blow-off pipe is easy to damage and leak, rapid crack growth and damage can occur, long-distance pipeline damage can be caused, large-scale leakage accidents can occur, and the blow-off work is influenced;
because the problem leads to PE blow off pipe intensity low, consequently, need carry out further research on current PE blow off pipe, provide a new antiseep PE blow off pipe that intensity is high.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the problems that the prior PE blow-off pipe has single structure and low integral strength, and when external force is received for excavation, the blow-off pipe is easy to be damaged and leak, and provides an anti-leakage PE blow-off pipe with high strength, which can prevent the PE pipe from directly contacting with external force through the strength of the reinforced PE pipe of the outer protection pipe, and provides external protection for the PE pipe, so that the PE pipe is not easily influenced by external force, thereby improving the durability of the PE pipe, and the fixed block is welded between the outer protection pipe and the fixed block in the cavity of the PE pipe body, and the PE pipe is changed into the PE pipe to provide protection through the stress shape of the fixed block, the strength of the PE pipe is greatly improved through the structure, so that the PE pipe is not easy to break when the PE pipe body is buried and is influenced by external force, the PE pipe can be prevented from leaking due to external damage, the service life, a large-scale leakage accident occurs.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides an antiseep PE blow off pipe that intensity is high, includes outer protection tube, buffer layer, fixed block, inoxidizing coating and PE pipe body, the one end integration of outer protection tube is provided with the male joint, the other end integration of outer protection tube is provided with the female joint, the inside embedding of outer protection tube is provided with the inoxidizing coating, the inside embedding that the outer protection tube is located the inoxidizing coating is provided with the fixed block, the inboard embedding that the outer protection tube is located the fixed block is provided with PE pipe body, the outside nestification of PE pipe body is provided with the buffer layer.
Preferably, the protective layer is made of stainless steel material and wraps the inner wall of the outer protection tube.
Preferably, a cavity is arranged between the outer protection tube and the PE tube body, and the fixing block is welded in the cavity of the outer protection tube and the PE tube body.
Preferably, the fixed blocks are made of PE materials, and the fixed blocks are provided with a plurality of groups and are uniformly distributed in the middle of the outer protection tube and the PE tube body.
Preferably, the fixed block is cylindrical, and a cavity is integrally formed inside the fixed block.
Preferably, the fixing block is integrally annularly surrounded at the outer end of the PE pipe body, and a certain gap is formed between the outer protection pipe and the fixing block in the cavity of the PE pipe body.
Preferably, the shock-absorbing layer is sponge material, and the shock-absorbing layer parcel is in the outer end of PE pipe body. Compared with the prior art, the beneficial effects of the utility model are as follows:
the anti-leakage PE blow-off pipe with high strength can reinforce the strength of the outer protection pipe by wrapping the inner wall of the outer protection pipe by the stainless steel protective layer, so that the outer protection pipe is not easily influenced by external force to cause damage and fracture, the cavity is arranged between the outer protection pipe and the PE pipe body, so that after the outer protection pipe is damaged, the PE pipe body is not easily eroded inwards to influence the PE pipe body, the PE pipe cannot be directly contacted with the external force, external protection is provided for the PE pipe, the durability of the PE pipe is improved, the fixing block is fixed between the outer protection pipe and the PE pipe body by fusion, when influenced by the external force, after the outer protection pipe is damaged by the external force, the fixing block reaches the fixing block after the force is delayed by the shock absorption layer, the fixing block at the periphery of the PE pipe body can provide protection for the PE pipe body, when the external force acts on the fixing block, because the fixing block is cylindrical, the, thereby offset external force reduction, the whole outer end that surrounds at PE pipe body that is the ring form of fixed block, and certain clearance still has between the fixed block in the cavity of outer protection tube and PE pipe body, clearance between the fixed block in the cavity of outer protection tube and PE pipe body can provide the space for the deformation of fixed block, cushion, the sponge shock-absorbing layer can cushion the power that the fixed block conducted to PE pipe body, make PE pipe body not invaded by external force, the intensity of PE pipe has been promoted greatly to this kind of structure, make when receiving external force influence after PE pipe body buries ground, be difficult for breaking, can avoid PE pipe because the seepage takes place for outside damage, can effectively promote the life of PE pipe.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings that are required to be used in the embodiments will be briefly described below, it should be understood that the following drawings only illustrate some embodiments of the present invention, and therefore should not be considered as limiting the scope, and for those skilled in the art, other related drawings can be obtained according to the drawings without inventive efforts.
Fig. 1 is a schematic view of the overall structure of the present invention.
Fig. 2 is a schematic view of the internal connection structure of the present invention.
In the figure: 1-an outer protective tube; 2-a protective layer; 3, fixing blocks; 4-a shock-absorbing layer; 5-PE pipe body; 101-a male connector; 102-female joint.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are some, but not all, embodiments of the present invention.
As shown in FIGS. 1-2;
this embodiment provides an antiseep PE blow off pipe that intensity is high, including outer protection tube 1, buffer layer 4, fixed block 3, inoxidizing coating 2 and PE pipe body 5, the one end integration of outer protection tube 1 is provided with male joint 101, the other end integration of outer protection tube 1 is provided with female joint 102, the inside embedding of outer protection tube 1 is provided with inoxidizing coating 2, the inside embedding that outer protection tube 1 is located inoxidizing coating 2 is provided with fixed block 3, the inboard embedding that outer protection tube 1 is located fixed block 3 is provided with PE pipe body 5, the outside nestification of PE pipe body 5 is provided with buffer layer 4.
Further, inoxidizing coating 2 is made by stainless steel material, and inoxidizing coating 2 parcel is on the inner wall of outer protection tube 1, and the intensity that outer protection tube 1 can be strengthened to the parcel of stainless steel inoxidizing coating 2 on the inner wall of outer protection tube 1 for it is difficult for receiving external force to influence, leads to its damaged fracture.
Further, the centre department of outer protection tube 1 and PE pipe body 5 is provided with the cavity, and 3 butt fusions of fixed block are in outer protection tube 1 and PE pipe body 5 cavities, department is provided with the cavity through the centre of outer protection tube 1 and PE pipe body 5, make 1 skin of outer protection tube lose the back, difficult inward erosion influences PE pipe body 5 again, make PE pipe can not direct and external force contact, provide outside protection for PE pipe, the durability of PE pipe has been promoted, fixed block 3 is fixed between outer protection tube 1 and PE pipe body 5 through the butt fusion.
Further, fixed block 3 is made for the PE material, and fixed block 3 is provided with the multiunit, and evenly distributed is in the middle of outer protection tube 1 and PE pipe body 5, and when receiving external force to influence, external force is after destroying outer protection tube 1, delays the back with power through buffer layer 4, arrives fixed block 3 department, can provide the protection for PE pipe body 5 at PE pipe body 5 outlying fixed block 3.
Further, the fixed block 3 is cylindrical, and the inside of the fixed block 3 is integrally provided with a cavity, so that when an external force acts on the fixed block 3, the fixed block 3 is cylindrical, and the fixed block 3 can deform after being stressed, thereby offsetting the reduction of the external force.
Further, fixed block 3 wholly is the ring form and surrounds in the outer end of PE pipe body 5, and still has certain clearance between the fixed block 3 in the cavity of outer protection tube 1 and PE pipe body 5, and the clearance between the fixed block 3 in the cavity of outer protection tube 1 and PE pipe body 5 can provide the space for the deformation of fixed block 3, cushions.
Further, buffer layer 4 is sponge material, and buffer layer 4 parcel is in the outer end of PE pipe body 5, and sponge buffer layer 4 can cushion fixed block 3 conduction to the power of PE pipe body 5, makes PE pipe body 5 not receive external force and disturbs, and the intensity of PE pipe has been promoted greatly to this kind of structure, makes when PE pipe body 5 is buried the ground after and receives the external force influence, is difficult for breaking, can avoid PE pipe because the seepage takes place for the outside damage, can effectively promote the life of PE pipe.
The working principle is as follows:
when the high-strength anti-leakage PE blow-off pipe provided by the utility model is used, the stainless steel protective layer 2 is wrapped on the inner wall of the outer protection pipe 1 to reinforce the strength of the outer protection pipe 1, so that the outer protection pipe is not easily influenced by external force to cause damage and fracture, the cavity is arranged between the outer protection pipe 1 and the PE pipe body 5, so that the PE pipe body 5 is not easily influenced by inward erosion after the skin of the outer protection pipe 1 is damaged, the PE pipe cannot be directly contacted with the external force, external protection is provided for the PE pipe, the durability of the PE pipe is improved, the fixed block 3 is fixed between the outer protection pipe 1 and the PE pipe body 5 through fusion welding, after the external force damages the outer protection pipe 1, the fixed block 3 is reached after the force is delayed through the shock absorption layer 4 when being influenced by the external force, the fixed block 3 at the periphery of the PE pipe body 5 can provide protection for the PE pipe body 5, when external force acts on the fixed block 3, the fixed block 3 can deform after being stressed due to the cylindrical shape of the fixed block 3, thereby reducing and offsetting the external force, the whole fixed block 3 is annularly surrounded at the outer end of the PE pipe body 5, and a certain gap is arranged between the outer protection tube 1 and the fixed block 3 in the cavity of the PE tube body 5, the gap between the outer protection tube 1 and the fixed block 3 in the cavity of the PE tube body 5 can provide a space for the deformation of the fixed block 3 to buffer, the sponge shock absorption layer 4 can buffer the force transmitted from the fixed block 3 to the PE tube body 5, the PE pipe body 5 is not disturbed by external force, the structure greatly improves the strength of the PE pipe, make when receiving external force influence after PE manages body 5 buries ground, be difficult for breaking, can avoid PE to manage because the seepage takes place for the outside damage, can effectively promote the life of PE pipe.
The above is only the preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, without departing from the concept of the present invention, several modifications and improvements can be made, which should also be regarded as the protection scope of the present invention, and these will not affect the effect of the implementation of the present invention and the practicability of the patent.